Bounding the Failure Probability Range of Polynomial Systems Subject to P-box Uncertainties

This paper proposes a reliability analysis framework for systems subject to multiple design requirements that depend polynomially on the uncertainty. Uncertainty is prescribed by probability boxes, also known as p-boxes, whose distribution functions have free or fixed functional forms. An approach based on the Bernstein expansion of polynomials and optimization is proposed. In particular, we search for the elements of a multi-dimensional p-box that minimize (i.e., the best-case) and maximize (i.e., the worst-case) the probability of inner and outer bounding sets of the failure domain. This technique yields intervals that bound the range of failure probabilities. The offset between this bounding interval and the actual failure probability range can be made arbitrarily tight with additional computational effort.

Crespo, Luis G.↗

Neural Networks Based Approach to Enhance Space Hardware Reliability

This paper demonstrates the use of Neural Networks as a device modeling tool to increase the reliability analysis accuracy of circuits targeted for space applications. The paper tackles a number of case studies of relevance to the design of Flight hardware. The results show that the proposed technique generates more accurate models than the ones regularly used to model circuits.

Neural Networks↗

And the Humans Save the Day or Maybe They Ruin It: The Importance of Humans in the Loop

Flying a mission in space requires a massive commitment of resources, and without the talent and commitment of the people involved in this effort we would never leave the atmosphere of Earth. When we use the phrase "humans in the loop", it could apply to almost any endeavor since everything starts with humans developing a concept, completing the design process, building or implementing a product and using the product to achieve a goal or purpose. Narrowing the focus to spaceflights, there are a variety of individuals involved throughout the preparations for flight and the flight itself. All of the humans involved add value and support for program success. The purpose of this paper focuses on how a Probabilistic Risk Assessment (PRA) accounts for the human in the loop for potential missions using a technique called Human Reliability Analysis (HRA). Human actions can increase or decrease the overall risk via initiating events or mitigating them, thus removing the human from the loop doesn't always lower the risk.

DeMott, Diana↗

Solar Versus Fission Surface Power for Mars

A multi-discipline team of experts from the National Aeronautics and Space Administration (NASA) developed Mars surface power system point design solutions for two conceptual missions to Mars using In-situ resource utilization (ISRU). The primary goal of this study was to compare the relative merits of solar- versus fission-powered versions of each surface mission. First, the team compared three different solar-power options against a fission power system concept for a sub-scale, uncrewed demonstration mission. This “pathfinder” design utilized a 4.5 meter diameter lander. Its primary mission would be to demonstrate Mars entry, descent, and landing techniques. Once on the Martian surface, the lander’s ISRU payload would demonstrate liquid oxygen propellant production from atmospheric resources. For the purpose of this exercise, location was assumed to be at the Martian equator. The three solar concepts considered included a system that only operated during daylight hours (at roughly half the daily propellant production rate of a round-the-clock fission design), a battery-augmented system that operated through the night (matching the fission concept’s propellant production rate), and a system that operated only during daylight, but at a higher rate (again, matching the fission concept’s propellant production rate). Including 30% mass growth allowance, total payload masses for the three solar concepts ranged from 1,128 to 2,425 kg, versus the 2,751 kg fission power scheme. However, solar power masses increase as landing sites are selected further from the equator, making landing site selection a key driver in the final power system decision. The team also noted that detailed reliability analysis should be performed on daytime-only solar power schemes to assess potential issues with frequent ISRU system on/off cycling.

Rucker, Michelle A.↗

And the Human Saves the Day or Maybe They Ruin It, The Importance of Humans in the Loop

Flying a mission in space requires a massive commitment of resources, and without the talent and commitment of the people involved in this effort we would never leave the atmosphere of Earth as safely as we have. When we use the phrase "humans in the loop", it could apply to almost any endeavor since everything starts with humans developing a concept, completing the design process, building or implementing a product and using the product to achieve a goal or purpose. Narrowing the focus to spaceflight, there are a variety of individuals involved throughout the preparations for flight and the flight itself. All of the humans involved add value and support for program success. The paper discusses the concepts of human involvement in technological programs, how a Probabilistic Risk Assessment (PRA) accounts for the human in the loop for potential missions using a technique called Human Reliability Analysis (HRA) and the tradeoffs between having a human in the loop or not. Human actions can increase or decrease the overall risk via initiating events or mitigating them, thus removing the human from the loop doesn't always lowers the risk.

DeMott, Diana L.↗

MIL-HDBK-338: Environmental Conversion Table Correction

In reliability analysis, especially for launch vehicles, limited data is frequently a problem. Component data from other environments must be used. MIL-HBK-338 has a matrix showing the conversation between environments. Due to round off the conversions are not commutative, converting from A to B will not equal converting from B to A. Agenda: Introduction to environment conversions; Original table; Original table with edits; How big is the problem?; First attempt at correction; Proposed solution.

Hark, Frank↗

MIL-HDBK-338-Environmental Conversion Table Correction

In reliability analysis for space launch vehicles, limited data is frequently a challenge due to the pure number of launches. A common solution is to use surrogate historical data of similar components from other industries (military data). The operating environment of the common data may be different from that of the necessary target analysis. The military electronic design handbook (MIL-HDBK-338) has a table for converting Mean Time Between Failure (MTBF) data from one environment to another. However, the table has some discrepancies and rounding of complementary conversions; namely going from environment A to B does not given the same result as going from B to A. This presentation will show the discrepancies in the original conversation table, the greater than expected magnitude, the problem with the updated published table and a suggested corrected table to reference when doing MTBF data environment conversion.

Hark, Frank↗

Lost in Translation: the Case for Integrated Testing

The building of a spacecraft is complex and often involves multiple suppliers and companies that have their own designs and processes. Standards have been developed across the industries to reduce the chances for critical flight errors at the system level, but the spacecraft is still vulnerable to the introduction of critical errors during integration of these systems. Critical errors can occur at any time during the process and in many cases, human reliability analysis (HRA) identifies human error as a risk driver. Most programs have a test plan in place that is intended to catch these errors, but it is not uncommon for schedule and cost stress to result in less testing than initially planned. Therefore, integrated testing, or "testing as you fly," is essential as a final check on the design and assembly to catch any errors prior to the mission. This presentation will outline the unique benefits of integrated testing by catching critical flight errors that can otherwise go undetected, discuss HRA methods that are used to identify opportunities for human error, lessons learned and challenges over ownership of testing will be discussed.

Young, Aaron↗

Application of a Rapid Design Tool to a 3D Woven Structural Joint

The optimization of composite structural joints is an iterative process and a multiscale problem. High fidelity finite element modeling of joints with 3D woven and laminated materials can become computationally expensive. The aim of this paper is to establish a reliable analysis process for the optimization of a composite Y-joint (curved Pi-joint), to be used in an aircraft fuselage, using commercial rapid joint design, analysis, and optimization software. The rapid joint design tool was investigated as a substitute and/or complement to a finite element analysis software. A composite Pi-joint and a composite Y-joint were evaluated using the rapid joint design tool to determine the applicability and limits of the software. Furthermore, three main preliminary parametric studies were performed to better understand the capability of the tool in predicting the stress distributions and trends in the Y-joint. The parameters investigated were the joint curvature, the laminated skin thickness, the adhesive systems, and the ply composition. Lastly, trends in predicted failure load were produced as a function of skin thickness (16ply, 24ply and 32ply). Failure loads were found with varying joint curvature and skin thickness using stress-based adherend failure criterion. The rapid joint design tool was also validated against existing experimental results.

Bonded Joints↗

Gateway Program Safety and Mission Assurance Integration - the Future of Safe Deep Space Human Exploration

As a foundational element of the National Aeronautics and Space Administration (NASA) Artemis Campaign, the Gateway is an incrementally built cislunar spacecraft that will serve as a platform for deep space human exploration, science, and technology demonstration. The Gateway will be a unifying catalyst for international partners around the world to establish sustained deep space scientific investigations, lunar surface access, and missions to Mars. As human exploration moves farther away from Earth, spacecraft designs must prioritize and optimize mass and volume allocations, while minimizing human and spacecraft risk. To accomplish this objective, the Gateway Program Safety and Mission Assurance functions develop, implement, and ensure compliance with requirements, in concert with the accurate characterization and transparent communication of residual hazard risks, for integrated safety, reliability and maintainability and quality assurance. Safety and Mission Assurance was a key contributor during Gateway program pre-formulation and formulation activities where safety and reliability analysis was embedded in the Gateway Systems Engineering and Integration team. During these early program stages, a preliminary Gateway Integrated Hazard Analysis and Preliminary Gateway Probabilistic Risk Assessment assisted in Gateway architectural and operational definition as part of a risk-informed design process. As the deep space architecture has matured, the integrated Safety and Mission Assurance analyses have matured, new safety review processes have been developed, and requirements have been refined to ensure compliance with integrated safety and mission assurance objectives. The Gateway Program is currently concluding the preliminary design review informed milestone, where the primary objectives included: - Ensured completeness and consistency of the preliminary design, including the meeting of all requirements within appropriate margins and acceptable risk posture. - Identification of any major issues moving forward to the Critical Design phase. At this milestone, Safety and Mission Assurance provided numerous products, including Gateway Top Risks and Risk Mitigation Plans, updated integrated hazard analyses, updated probabilistic risk assessment, Crew Survival Analysis Report, and updated Safety and Mission Assurance Requirements and Plans. These products provide a many-faceted perspective on the inherent risk and available mitigations involved in flying the current proposed vehicle design and anticipated stack configurations. In addition, Safety and Mission Assurance identified top technical, process and workforce concerns to be addressed as the program progresses toward the critical design phase. This paper will detail the evolution of the Gateway Program Safety and Mission Assurance integration functions, provide its current status and lessons learned for future human spaceflight programs. Throughout this paper the key tenets of the Gateway Program Safety and Mission Assurance will be discussed: - Application of a risk-informed approach to identify and mitigate areas of highest risk. - Leverage of valuable processes and lessons learned from earlier spaceflight programs. - Development of Safety and Mission Assurance products to inform design risk trades. - Utilization of common Safety and Mission Assurance practices to identify safety risks for multiple perspectives: top-down, bottom-up, and across lines of integration. - Approval of safety hazards at the appropriate level of authority, keeping most deliberation closest to design expertise and elevating risks of greatest concern for program-level consideration. - Championing of Safety and Mission Assurance processes and forums to foster a pervasive safety culture that is transparent, inclusive, and collaborative between all partners. These tenets have allowed the Gateway Safety and Mission Assurance function to play a key role in optimized vehicle design evolution, and early identification and mitigation of Gateway program and Artemis mission risk.

Helen Vaccaro↗

Method of Testing and Predicting Failures of Electronic Mechanical Systems

A method employing a knowledge base of human expertise comprising a reliability model analysis implemented for diagnostic routines is disclosed. The reliability analysis comprises digraph models that determine target events created by hardware failures human actions, and other factors affecting the system operation. The reliability analysis contains a wealth of human expertise information that is used to build automatic diagnostic routines and which provides a knowledge base that can be used to solve other artificial intelligence problems.

Iverson, David L.↗

The application of emulation techniques in the analysis of highly reliable, guidance and control computer systems

Emulation techniques can be a solution to a difficulty that arises in the analysis of the reliability of guidance and control computer systems for future commercial aircraft. Described here is the difficulty, the lack of credibility of reliability estimates obtained by analytical modeling techniques. The difficulty is an unavoidable consequence of the following: (1) a reliability requirement so demanding as to make system evaluation by use testing infeasible; (2) a complex system design technique, fault tolerance; (3) system reliability dominated by errors due to flaws in the system definition; and (4) elaborate analytical modeling techniques whose precision outputs are quite sensitive to errors of approximation in their input data. Use of emulation techniques for pseudo-testing systems to evaluate bounds on the parameter values needed for the analytical techniques is then discussed. Finally several examples of the application of emulation techniques are described.

Migneault, Gerard E.↗

Reliability and Maintainability Analysis of a High Air Pressure Compressor Facility

This paper discusses a Reliability, Availability, and Maintainability (RAM) independent assessment conducted to support the refurbishment of the Compressor Station at the NASA Langley Research Center (LaRC). The paper discusses the methodologies used by the assessment team to derive the repair by replacement (RR) strategies to improve the reliability and availability of the Compressor Station (Ref.1). This includes a RAPTOR simulation model that was used to generate the statistical data analysis needed to derive a 15-year investment plan to support the refurbishment of the facility. To summarize, study results clearly indicate that the air compressors are well past their design life. The major failures of Compressors indicate that significant latent failure causes are present. Given the occurrence of these high-cost failures following compressor overhauls, future major failures should be anticipated if compressors are not replaced. Given the results from the RR analysis, the study team recommended a compressor replacement strategy. Based on the data analysis, the RR strategy will lead to sustainable operations through significant improvements in reliability, availability, and the probability of meeting the air demand with acceptable investment cost that should translate, in the long run, into major cost savings. For example, the probability of meeting air demand improved from 79.7 percent for the Base Case to 97.3 percent. Expressed in terms of a reduction in the probability of failing to meet demand (1 in 5 days to 1 in 37 days), the improvement is about 700 percent. Similarly, compressor replacement improved the operational availability of the facility from 97.5 percent to 99.8 percent. Expressed in terms of a reduction in system unavailability (1 in 40 to 1 in 500), the improvement is better than 1000 percent (an order of magnitude improvement). It is worthy to note that the methodologies, tools, and techniques used in the LaRC study can be used to evaluate similar high value equipment components and facilities. Also, lessons learned in data collection and maintenance practices derived from the observations, findings, and recommendations of the study are extremely important in the evaluation and sustainment of new compressor facilities.

Safie, Fayssal M.↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, within a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability, and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation, testing results, and other information. Where appropriate, actual performance history was used to calculate failure rates for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to assess compliance with requirements and to highlight design or performance shortcomings for further decision making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability, and maintainability analysis, and present findings and observation based on analysis leading to the Ground Operations Project Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Constellation Ground Systems Launch Availability Analysis: Enhancing Highly Reliable Launch Systems Design

Success of the Constellation Program's lunar architecture requires successfully launching two vehicles, Ares I/Orion and Ares V/Altair, in a very limited time period. The reliability and maintainability of flight vehicles and ground systems must deliver a high probability of successfully launching the second vehicle in order to avoid wasting the on-orbit asset launched by the first vehicle. The Ground Operations Project determined which ground subsystems had the potential to affect the probability of the second launch and allocated quantitative availability requirements to these subsystems. The Ground Operations Project also developed a methodology to estimate subsystem reliability, availability and maintainability to ensure that ground subsystems complied with allocated launch availability and maintainability requirements. The verification analysis developed quantitative estimates of subsystem availability based on design documentation; testing results, and other information. Where appropriate, actual performance history was used for legacy subsystems or comparative components that will support Constellation. The results of the verification analysis will be used to verify compliance with requirements and to highlight design or performance shortcomings for further decision-making. This case study will discuss the subsystem requirements allocation process, describe the ground systems methodology for completing quantitative reliability, availability and maintainability analysis, and present findings and observation based on analysis leading to the Ground Systems Preliminary Design Review milestone.

Gernand, Jeffrey L.↗

Estimation and enhancement of real-time software reliability through mutation analysis

A simulation-based technique for obtaining numerical estimates of the reliability of N-version, real-time software is presented. An extended stochastic Petri net is employed to represent the synchronization structure of N versions of the software, where dependencies among versions are modeled through correlated sampling of module execution times. Test results utilizing specifications for NASA's planetary lander control software indicate that mutation-based testing could hold greater potential for enhancing reliability than the desirable but perhaps unachievable goal of independence among N versions.

Geist, Robert↗