Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability and Maintainability”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

The National Transmission Planning Study: Chapter 2: Long-Term U.S. Transmission Planning Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 3: Transmission Portfolios and Operations for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 5: Stress Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 6: Conclusions

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

The National Transmission Planning Study: Chapter 4: AC Power Flow Analysis for 2035 Scenarios

The National Transmission Planning Study (NTP Study) was led by the U.S. Department of Energy's Grid Deployment Office, in partnership with the National Renewable Energy Laboratory and Pacific Northwest National Laboratory. The study sought to develop new national grid-scale planning tools and methods that can be used by industry, especially when planning for interregional transmission capacity needs; identify potential transmission solutions that will provide broad-scale benefits to electric customers under a wide range of potential futures; inform planning processes for regional and interregional transmission; and identify interregional and national strategies to maintain grid reliability as the grid transitions, including to a reliance on low- and zero-carbon energy resources. The NTP Study is presented as a collection of six chapters.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Controller-Hardware-in-the-Loop Evaluation of a Microgrid Controller for a Microgrid System With Multiple Grid-Forming Inverters

This paper presents the laboratory evaluation of a commercial Microgrid Management System (MGMS) implemented in the real-world Bronzeville Microgrid which features a futuristic scenario with high renewable energy integration and the use of multiple Grid-Forming (GFM) inverters. The primary objective of the performance evaluation for the MGMS is to assess the MGMS's capability to dispatch GFM units, including a GFM PV unit and two GFM battery units, to maintain the system stability and ensure economic operation, thus guaranteeing the microgrid's resilience during prolonged outages and dynamic events. The laboratory controller hardware-in-the-loop provides realistic testing environment through detailed electromagnetic transient modeling of the microgrid system, hardware MGMS, and standard communication protocols (DNP3). This CHIL evaluation shows how the MGMS effectively manages the GFM inverters, highlighting its performance in maintaining stability, reliability, and survivability in a microgrid environment with a high penetration of renewable energy sources.

controller hardware-in-the-loop↗

Automated Inventory Solutions in End-User IT Support

Managing IT equipment by hand is prone to errors and delays, severely impacting operational continuity and productivity. Manual inventory systems often result in time delays, inconsistent record-keeping, equipment shortages, and increased workloads for IT staff. At Savannah River National Laboratory (SRNL), my internship focused on creating an automated inventory management solution using Microsoft Power Automate and SharePoint Lists. This solution seamlessly integrates with the existing Microsoft 365 infrastructure, thus eliminating the need for additional software purchases or dedicated server space. By providing real-time updates and reducing manual data entry, the new system ensures a more reliable and maintainable approach to IT asset management.

Information Technology↗

EDC development and testing for the Space Station program

NASA's development of electrochemical CO2 concentration technology has led to the creation of subsystem hardware and control and monitoring instrumentation that are ideally suited to Space Station program applications; only seven orbital replacement units, for instance, are required for the performance of process functions. This process simplification leads to superior reliability and enhanced maintainability. Hardware and software features that enhance subsystem reliability through fault detection and isolation have been emphasized in the course of development. Further power, weight, and volume savings, together with enhanced maintainability, are also foreseen in prospective developments of these subsystems.

Boyda, R. B.↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Implementation and Demonstration of the Digital Twin Certification System Remote Operations Framework

Microreactors are one promising advanced-reactor concept being pursued by the nuclear industry. They are distinguished by a relatively low power output of 20 MWth or less. These microreactors are intended for deployment in applications where conventional small-capacity power solutions, such as diesel generators, are either economically unfeasible or logistically challenging. Such applications include providing electric power and/or heat for remote communities, mining sites, defense installations, and humanitarian and disaster-relief missions. An important feature for the successful deployment of microreactors is their capability to be operated remotely. This capability can significantly reduce staffing costs by eliminating the need for licensed operators to be physically present at each reactor site. Instead, operators can be centralized in a single remote operations center placed in an economically advantageous location, thereby optimizing resources by consolidating expertise and enhancing operational efficiency. However, the implementation of a remote operation system for nuclear reactors raises new concerns regarding the security, reliability, and resilience of such a system. One way in which remote operations can be supported in a manner that maintains system security, reliability, and resilience is through the use of digital twins in a novel framework designed to verify and validate sensor data and commands communicated between the remote operations center and reactor. This framework, known as the Digital Twin Certification System (DTCS), has previously been proposed as an operations architecture that can bring security and resiliency levels of remote nuclear-reactor operations to a level acceptable for commercial deployment. This paper moves the proposed DTCS architecture from concept to reality by presenting the implementation and testing of the system. The rationale and implementation of the DTCS using tools such as DeepLynx and Apache Airflow, is covered in-depth. This is followed by a demonstration of the DTCS by applying the implemented system architecture to the Single Primary Heat Extraction and Removal Emulator, a small-scale non-nuclear test bed that emulates thermal behavior of a microreactor. The demonstration includes both normal and abnormal operating scenarios to highlight how the DTCS can increase the security, reliability, and resilience of a remote operations system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Towards Behavioral Reflexion Models

Software architecture has become essential in the struggle to manage today s increasingly large and complex systems. Software architecture views are created to capture important system characteristics on an abstract and, thus, comprehensible level. As the system is implemented and later maintained, it often deviates from the original design specification. Such deviations can have implication for the quality of the system, such as reliability, security, and maintainability. Software architecture compliance checking approaches, such as the reflexion model technique, have been proposed to address this issue by comparing the implementation to a model of the systems architecture design. However, architecture compliance checking approaches focus solely on structural characteristics and ignore behavioral conformance. This is especially an issue in Systems-of- Systems. Systems-of-Systems (SoS) are decompositions of large systems, into smaller systems for the sake of flexibility. Deviations of the implementation to its behavioral design often reduce the reliability of the entire SoS. An approach is needed that supports the reasoning about behavioral conformance on architecture level. In order to address this issue, we have developed an approach for comparing the implementation of a SoS to an architecture model of its behavioral design. The approach follows the idea of reflexion models and adopts it to support the compliance checking of behaviors. In this paper, we focus on sequencing properties as they play an important role in many SoS. Sequencing deviations potentially have a severe impact on the SoS correctness and qualities. The desired behavioral specification is defined in UML sequence diagram notation and behaviors are extracted from the SoS implementation. The behaviors are then mapped to the model of the desired behavior and the two are compared. Finally, a reflexion model is constructed that shows the deviations between behavioral design and implementation. This paper discusses the approach and shows how it can be applied to investigate reliability issues in SoS.

Ackermann, Christopher↗

The influence of various test plans on mission reliability

Methods have been developed for the evaluation of cost effective vibroacoustic test plans for Shuttle Spacelab payloads. The shock and vibration environments of components have been statistically represented, and statistical decision theory has been used to evaluate the cost effectiveness of five basic test plans with structural test options for two of the plans. Component, subassembly, and payload testing have been performed for each plan along with calculations of optimum test levels and expected costs. The tests have been ranked according to both minimizing expected project costs and vibroacoustic reliability. It was found that optimum costs may vary up to $6 million with the lowest plan eliminating component testing and maintaining flight vibration reliability via subassembly tests at high acoustic levels.

Stahle, C. V.↗

Lessons from NASA

Particular requirements related to the design and the operation of spacecraft have forced NASA to take a reliability approach that differs somewhat from that used in many other applications. NASA has found that some of the traditional tools of reliability engineering, such as life testing, reliability demonstration testing, maintainability analysis, and direct failure analysis, are impractical for spacecraft. In place of a statistical approach, the space agency uses an engineering approach to mission reliability. Reliability is to be obtained with the aid of three different approaches, including the application of effective design principles, the control and screening of all parts, and the testing of the entire spacecraft or its prototype for predicted capabilities. Attention is given to failure-mode analysis, the enhancement of Voyager reliability by autonomous operation, the redundancy in Shuttle design, the weeding out of bad hardware, and the preference for off-the-shelf devices.

Williams, W. C.↗

Navigating Integration: Key Challenges for Data Centers, Nuclear Stakeholders, and Utility Operators

The rapid expansion of data centers, driven by the exponential growth in data-processing and storage needs, presents significant challenges and opportunities for various stakeholders, including data center developers, nuclear energy providers, and utility companies. Data centers are projected to consume 6.7–12% of United States (U.S.) electricity by 2028, driven by artificial intelligence (AI) and cloud-computing demands. Nuclear energy offers reliability and dispatchable baseload power, but data centers need power now while nuclear still needs time to address siting, fast power ramping, and regulatory hurdles. Utilities must keep pace with the unprecedented acceleration of large load interconnection requests and urgently adapt to high-density loads while maintaining grid stability, reliability, and accelerating interconnection timelines. This report dives into these challenges and proposes key collaboration strategies to streamline data center integration that aligns with recent federal initiatives like America’s AI Action Plan and related executive orders that emphasize the importance of data center growth, nuclear energy expansion, and maintaining a competitive edge in the global AI race.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Availability Estimation for Facilities in Extreme Geographical Locations

A value added analysis for the Reliability. Availability and Maintainability of McMurdo Ground Station was developed, which will be a useful tool for system managers in sparing, maintenance planning and determining vital performance metrics needed for readiness assessment of the upgrades to the McMurdo System. Output of this study can also be used as inputs and recommendations for the application of Reliability Centered Maintenance (RCM) for the system. ReliaSoft's BlockSim. a commercial Reliability Analysis software package, has been used to model the availability of the system upgrade to the National Aeronautics and Space Administration (NASA) Near Earth Network (NEN) Ground Station at McMurdo Station in the Antarctica. The logistics challenges due to the closure of access to McMurdo Station during the Antarctic winter was modeled using a weighted composite of four Weibull distributions. one of the possible choices for statistical distributions throughout the software program and usually used to account for failure rates of components supplied by different manufacturers. The inaccessibility of the antenna site on a hill outside McMurdo Station throughout one year due to severe weather was modeled with a Weibull distribution for the repair crew availability. The Weibull distribution is based on an analysis of the available weather data for the antenna site for 2007 in combination with the rules for travel restrictions due to severe weather imposed by the administrating agency, the National Science Foundation (NSF). The simulations resulted in an upper bound for the system availability and allowed for identification of components that would improve availability based on a higher on-site spare count than initially planned.

Fischer, Gerd M.↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Utilities and grid operators worldwide are under significant pressure to incorporate intermittent renewable sources while strategizing on how to maintain the necessary stability and reliability of the grid. The development of a power plant which will be capable of flexible operation to meet the needs of the grid as more intermittent sources like wind and solar energy are incorporated is key to maintain the reliability of the grid. Through the use of innovative and cutting-edge technologies that improve efficiency and reduce carbon emissions, and being small compared to today's conventional utility-scale power plants, the modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. Specifically, the process offers: 1) a modular plant design that allows for better operational flexibility; 2) the utilization of fuel-staging and pressurized oxy-combustion, resulting in smaller plant size, improved plant efficiency, and reduced costs for pollutant and CO2 removal compared to traditional power plants with post-combustion capture technology; and 3) the use of small modular boilers and pollutant removal units that can be constructed off-site leading to reduced capital costs for the plant. WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustor-boiler system and the direct contact cooler. To demonstrate the boiler convective section and to obtain critical data for commercial-scale pressurized boiler design, a simulated convective heat transfer boiler test section was designed and integrated with the combustor (radiant section). A direct contact cooler (DCC) was integrated with the combustor-boiler to demonstrate the dynamic operation of the integrated system and the performance of the DCC, including the efficiency for simultaneous removal of NOx and SOx. This talk will present an update on the evaluation of the critical components for system integration, including heat transfer data from the simulated boiler, scrubbing efficiency for the DCC under different operating conditions, and CFD modeling and validation for burner and boiler development.

Magalhaes, Duarte↗

Lower Snake River Dams Contribution to Grid Services

Hydroelectric generation and water storage have long been components of the clean energy mix, providing both reliable steady output and operational flexibility. As variable renewable energy sources such as wind and solar increasingly replace traditional generation, the role of all flexible resources—including hydropower—in balancing supply and demand continues to evolve. This study examined the contribution of the Lower Snake River (LSR) Dam plants to Bonneville Power Administration grid services in maintaining power system reliability within the Western Interconnection. By analyzing publicly available data, the study evaluated various reliability services through performance metrics including energy capacity, balancing and ramping, voltage and reactive power support, frequency response, and transmission impact. Results indicated that the LSR plants deliver services as expected based on their size, contributing to the balancing process, ramping capabilities, and operational reserves, particularly during peak load conditions and weather events, while also providing measurable frequency and voltage support to the grid.

13 HYDRO ENERGY↗

Multi-Timescale Optimal Operation Framework for Integrated Economic and Reliability Analysis of Hybrid Power Plants

This paper introduces a hierarchical modeling framework for hybrid power plants (HPP) to facilitate the operation of HPP in power systems similar to conventional generators (Congens) in the integrated multi-timescale optimal operation framework. To consider the uncertainties of HPP renewable power in the day-ahead scheduling, distributionally robust optimization (DRO) is used. To ensure that the state-of-charge (SOC) of energy storage systems in HPPs aligns closely with the planned value for long-term reliability, real-time SOC management is incorporated. In addition, an adjustable real-time control is designed for the robust delivery of HPP real-time services. Case studies performed on a revised IEEE 39-bus system demonstrate the effectiveness of the proposed framework for HPP operation. Simulation results highlight that the proposed framework not only can help operators schedule HPP similar to Congens in varying weather conditions but can also maintain the frequency reliability of the system.

frequency stability↗