Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical power systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 397 records · Page 22

Summary Report of HERO WEC Test Article for Waves to Water: Electrical Power Take-Off

The National Renewable Energy Laboratory (NREL) designed and fabricated the hydraulic and electric reverse osmosis (HERO) wave energy converter (WEC), which is a modular system that can utilize either an electrical or hydraulic power take-off (PTO) system to power a desalination device. The method by which this device can convert mechanical work to either hydraulic or electrical energy is by harnessing the energy from waves via a rotary output shaft. This report describes the electrical configuration, where a rotary generator replaces the pump in the hydraulic configuration to power a submersible pump and reverse osmosis unit via an electrical cable, rather than a hydraulic line/hose. This device is of a non-proprietary design where every aspect of the design is made public, including the physical designs, non-proprietary cost data, and electrical drawings developed for the build of this device.

16 TIDAL AND WAVE POWER↗

Security-Constrained Unit Commitment for Electricity Market: Modeling, Solution Methods, and Future Challenges

This paper summarizes the technical activities of the IEEE Task Force on Solving Large Scale Optimization Problems in Electricity Market and Power System Applications. This Task Force was established by the IEEE Technology and Innovation Subcommittee to first review the state-of-the-art of the security-constrained unit commitment (SCUC) business model, its mathematical formulation, and solution techniques in solving electricity market clearing problems. The Task Force then investigated the emerging challenges of future market clearing problems and presented efforts in building benchmark mathematical and business models.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Electric Vehicles into the Grid

Historically, transportation and power systems operated independently, but the rise of electric vehicles is transforming this relationship. In the United States, EV demands are expected to become the largest source of electricity load growth, posing challenges for the grid if not properly managed. This presentation highlights how managed charging strategies and strategic infrastructure deployment can integrate EVs into the power system to enhance grid efficiency and support renewable energy.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI↗

Multi-modular power plant with off-grid power source

A multi-modular power plant may include a plurality of on-site nuclear power modules configured to generate a power plant output, wherein one or more of the nuclear power modules may be designated as service module units which are configured to generate a first portion of the power plant output. A remainder of the nuclear power modules may be configured to generate a second portion of the power plant output. A number of power plant systems may be configured to operate using electricity associated with a house load of the power plant, wherein the first portion of the power plant output is equal to or greater than the house load. Additionally, a switchyard may be configured to electrically connect the power plant to a distributed electrical grid. The distributed electrical grid may be configured to service a plurality of geographically distributed consumers, and the switchyard may be configured to apply the second portion of the power plant output to the distributed electrical grid. The switchyard may further be configured to apply at least part of the first portion of the power plant output to the power plant systems during a loss of power from the distributed electrical grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wound-Field Synchronous Machine-System Integration toward 8X Power Density and Commercialization

In support of VTO's Electric Drive R&D activity, the Electric Drive Technologies (EDT) Consortium, a multi-disciplinary team of national labs and universities, coordinates and conducts a portfolio of research to advance the state-of-the-art in electric drive technologies. The Consortium established the following strategic goal listed below: (EDT Research Consortium Strategic Goal (compared to 2015 baseline)) A 125K electric traction drive system: (1) 8X power density improvement, or 1/10 the volume (33 kW/L), (2) 1/2 the cost ($\$$3.3/kW), (3) 2X useful life (300,000 miles), and (4) 100 kW/L inverter and a <20,000 rpm, 50kW/L electric motor The objective of this project is to design a Wound Field Synchronous Machine with 8X power density improvement and cost below $\$$3.3/kW.

42 ENGINEERING↗

Net Zero Energy Model for Wastewater Treatment Plants

The primary objective of this study is to achieve net-zero energy (NZE) wastewater treatment plants (WWTPs) by utilizing energy efficiency opportunities (EEO), combined heat and power (CHP) systems, and other renewable energy (RE) sources, e.g., solar, water, and wind powers. Herein, this study discusses an innovative energy solution for WWTPs in the United States, and one of the WWTPs with a flow capacity of 1.5 million gallons per day (MGD) was selected as a case study. An optimization tool, Hybrid Optimization of Multiple Energy Resources (HOMER) software, is used in this study to find the best energy system configuration to run the system. An energy audit for one WWTP was conducted in early 2020 and the report is used to do this study. The proposed EEOs were able to reduce WWTP energy consumption by about 11%. The excess anaerobic digester gas was utilized in a CHP system to cover about 42% of the facility’s consumption. Also, 3% of the utility energy consumption can be claimed by microturbines in the aeration tanks. Another two renewable energy systems, solar photovoltaic (PV) with 29% and water turbines with 15%, contribute to covering 100% of the WWTP energy consumption and achieving an NZE WWTP.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

An Integrated Assessment of a G3 GMD Event on Large-Scale Power Grids: From Magnetometer Data to Geomagnetically Induced Current Analysis

Solar activities can cause geomagnetic disturbances (GMDs) that give rise to geomagnetically induced currents (GICs) which may compromise the reliability of the power system. In order to build more reliable models representing GMD interactions with the power grid, the power system’s detailed electrical model must be considered along with fluctuations in the earth’s magnetic and induced surface electric fields. Here, this study investigates the impact of incorporating spatially varying magnetic fields into surface electric field models on GMD risk metrics. A spatially independent magnetic field model and a spatially varying model are compared through simulations. To perform this analysis, the earth’s magnetic field disturbances are transformed into surface electric fields using respective one-dimensional earth conductivity models. Then, the modeling impact of these electric fields is studied using a 2,000-bus grid for Texas and a 25,000-bus grid for the northeast and mid- Atlantic regions of the United States. Simulation results reveal that the inclusion of spatially varying magnetic fields results in considerable differences in GMD risk metrics, highlighting the importance of accounting for spatial variability when assessing GMD risks in the power system.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Hardware Platform for Studying Naval Power Electronic Power Distribution Systems

Abstract – Future intelligent ship system designs will likely include electric propulsion, numerous highpower sensors, and directed energy weapons. Supply and control of these large nonlinear loads will require a networked, multi-converter power electronic power distribution system. This work presents a hardware platform to emulate a microgrid power system with multiple power converters and a power data communication network. The platform is reconfigurable and can include both AC and DC power distribution zones, representative of shipboard power systems. It also allows for the study of both power control actuation and power data communication delays. Since the platform is based on electric power hardware, spatial and temporal uncertainties are inherently embedded in the system. Specifically, this work examines the control actuation of multiple pulsed power loads in a single microgrid. Several pulse load levels and operating scenarios have been implemented and measured. A framework for control parameter quantification is presented, and various metrics are explored to capture pulse signal characteristics. The sensitivity of pulse load metric parameters is analyzed. Dynamic shipboard, mission-specific load profiles coupled with pulse loads can also be emulated in the hardware platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Datasets for Widespread Residential Space Heating Electrification in Texas

In this experiment, we explore long term patterns in electricity demand driven by the dual effects of full electrification of space heating in Texas (by adoption of electric heat pumps), and climate change. We use a predictive model of electricity demand, climate projections, and an open source nodal power system (DC Optimal Power Flow) model of the Electric Reliability Council of Texas (ERCOT) system. Heat pumps are a more energy efficient way of providing space heating and cooling in homes. We attempt to exhaustively investigate the impacts of full residential space heating electrification by adoption of heat pumps for the segment of Texas households that currently rely on fossil fuels (about 40%), while simultaneously incorporating climate change meteorological variables. We explore a range of scenarios of heat pump efficiency and climate uncertainty over a long period of future years (2020-2099). In total, the simulation experiment generates 1,280 simulation years of hourly data. We report and analyze results in form of impacts on residential load, total load, peak load, seasonality of peaking, and reliability measured by occurrence and frequency of loss of load events. While the experiment is for ERCOT, the insights and approach can be applied to other regions. The results from the analysis can inform system planners on a range of potential capacity requirements/ reliability implications and/or risks of full space heating electrification via the adoption of electric heat pumps, given the uncertainty in the scenarios/ climate futures. The dataset includes model output for residential, non residential and total load, and the results from the GO ERCOT model runs for 4 RCP Scenarios (RCP 4.5 Cooler, RCP 4.5 Hotter, RCP 8.5 Cooler, RCP 8.5 Hotter), 4 Heating electrification Scenarios (Base , Standard Efficiency HP, High Efficiency HP, Ultra-High Efficiency HP) over 80 years (2020-2099). The metrological variables at BA scale were weighted weighted using population projections consistent with the SSP3 scenario.

Climate Change↗

Stochastic pre-event preparation for enhancing resilience of distribution systems

Extreme weather events are the common causes for power supply interruptions and power outages in electrical distribution systems. Improving the distribution system and enhancing its resilience is becoming crucial due to the increased frequency of extreme weather events. Preparation and allocation of multiple flexible resources, such as mobile resources, fuel resources, and labor resources before extreme weather events can mitigate the effects of extreme weather events and enhance the resilience of power distribution systems. Here, in this paper, a two-stage stochastic mixed-integer linear programming (SMILP) is proposed to optimize the preparation and resource allocation process for upcoming extreme weather events, which leads to faster and more efficient post-event restoration. The objective of the proposed two-stage SMILP is to maximize the served load and minimize the operating cost of flexible resources. The first stage in the optimization problem selects the amounts and locations of different resources. The second stage considers the operational constraints of the distribution system and repair crew scheduling constraints. The proposed stochastic pre-event preparation model is solved by a scenario decomposition method, Progressive Hedging (PH), to ease the computational complexity introduced by a large number of scenarios. Furthermore, to show the impact of solar photovoltaic (PV) generation on system resilience, three types of PV systems are considered during a power outage and the resilience improvements with different PV penetration levels are compared. Numerical results from simulations on a large-scale (more than 10,000 nodes) distribution feeder have been used to validate the effectiveness and scalability of the proposed method.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Assessment and Commissioning of Electrical Substation Grid Testbed with a Real-Time Simulator and Protective Relays/Power Meters in the Loop

Electrical utility substations are wired with intelligent electronic devices (IEDs), such as protective relays, power meters, and communication switches. Substation engineers commission these IEDs to assess the appropriate measurements for monitoring, control, power system protection, and communication applications. Like real electrical utility substations, complex electrical substation grid testbeds (ESGTs) need to be assessed for measuring current and voltage signals in monitoring, power system protection, control (synchro check), and communication applications that are limited by small measurement percentage errors. In the process of setting an ESGT with real-time simulators and IEDs in the loop, protective relays, power meters, and communication devices must be commissioned before running experiments. In this study, an ESGT with IEDs and distributed ledger technology was developed. The ESGT with a real-time simulator and IEDs in the loop was satisfactorily assessed and commissioned. The commissioning and problem-solving tasks of the testbed are described to define a method with flowcharts to assess possible trouble-shooting in ESGTs. This method was based on comparing the simulations versus IED measurements for the phase current and voltage magnitudes, three-phase phasor diagrams, breaker states, protective relay times with selectivity coordination at electrical faults, communication data points, and time-stamp sources.

Piesciorovsky, Emilio↗

UNIFI Specifications for Grid-Forming Inverter-Based Resources (V. 2)

The UNiversal Interoperability for grid-Forming Inverters (UNIFI) Consortium is addressing fundamental challenges facing the integration of grid-forming (GFM) inverters in electric grids alongside rotating machines and other inverter-based resources (IBRs). This document defines a set of UNIFI Specifications for GFM IBRs that provides requirements from both a power system-level as well as functional requirements at the inverter level that are intended to provide means for vendor-agnostic operation of GFM IBRs at any scale in electric power systems. The specifications are clearly identified and attributed to an IBR plant or an IBR unit throughout the document, where applicable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

UNIFI Specifications for Grid-Forming Inverter-Based Resources: Version 3

The UNiversal Interoperability for grid-Forming Inverters (UNIFI) Consortium addresses fundamental challenges facing the integration of grid-forming (GFM) inverters in electric grids alongside rotating machines and other inverter-based resources (IBRs). This document defines a set of UNIFI specifications for GFM IBRs that provides requirements from both a power system level as well as functional requirements at the inverter level that are intended to provide means for the vendor-agnostic operation of GFM IBRs at any scale in electric power systems.

14 SOLAR ENERGY↗

Recommendations for Distributed Energy Resource Patching

While computer systems, software applications, and operational technology (OT)/Industrial Control System (ICS) devices are regularly updated through automated and manual processes, there are several unique challenges associated with distributed energy resource (DER) patching. Millions of DER devices from dozens of vendors have been deployed in home, corporate, and utility network environments that may or may not be internet-connected. These devices make up a growing portion of the electric power critical infrastructure system and are expected to operate for decades. During that operational period, it is anticipated that critical and noncritical firmware patches will be regularly created to improve DER functional capabilities or repair security deficiencies in the equipment. The SunSpec/Sandia DER Cybersecurity Workgroup created a Patching Subgroup to investigate appropriate recommendations for the DER patching, holding fortnightly meetings for more than nine months. The group focused on DER equipment, but the observations and recommendations contained in this report also apply to DERMS tools and other OT equipment used in the end-to-end DER communication environment. The group found there were many standards and guides that discuss firmware lifecycles, patch and asset management, and code-signing implementations, but did not singularly cover the needs of the DER industry. This report collates best practices from these standards organizations and establishes a set of best practices that may be used as a basis for future national or international patching guides or standards.

97 MATHEMATICS AND COMPUTING↗

Development and Test Progress Towards a Supercritical Carbon Dioxide-Based Gas Turbine Waste Heat Recovery System

Supercritical carbon dioxide systems are the focus of significant recent research efforts and promise compact, high-efficiency architecture for gas turbine waste heat recovery for pipeline gas turbines. The waste heat recovery system improves operating efficiency by converting waste heat to additional electric power, which increases overall system efficiency by 35% at the design point, and also significantly improves part-load performance. This paper describes the system design and component selection for a 5.7 MWe waste heat recovery system based on an integrally-geared compressor-expander architecture, including the thermodynamic cycle development, system architecture and component trade studies, and final selection. Validation test results for critical first-of-a-kind compressor and turbine component technologies are also presented, demonstrating full-pressure performance and progress towards commercialization.

wilkes, Jason↗

Nuclear Energy in Long-Term System Models: A Multi-Model Perspective

Long-term energy system models–including electric sector capacity expansion models–are widely used tools for informing planning, technology assessment, and policy analysis. Recent decarbonization goals and rapid technological change have increased the need to appropriately represent economic characteristics and technical details of energy system resources, including variable renewable energy, energy storage technologies, carbon-capture-equipped capacity, and nuclear energy. Nuclear power represents about 20% of electricity generation and 50% of carbon-free electricity in the United States as of 2021. However, there are many perspectives on the role of existing and new nuclear in the future U.S. energy system, which is reflected in the broad range of potential contributions reported in the literature. This project aims to understand how issues central to nuclear energy are represented in long-term energy models. Building on earlier collaborations that focused on variable renewable energy and energy storage, this project convenes four modeling teams that use national-scale long-term energy system models from the Electric Power Research Institute, the National Renewable Energy Laboratory, the U.S. Energy Information Administration, and the U.S. Environmental Protection Agency to share methods and data, update models, run coordinated scenarios, and identify research needs. Improving tools can provide more insightful analyses and ensure that methods are more transparent.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗