Search NASA⌕ Search

SEARCH · Search NASA

Results for “ESA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Mars Sample Return Science Planning Group Phase 2 (MSPG2): Overview & Interim Report

Mars Sample Return (MSR) has been a high priority of the international planetary science community for decades. In recent years, significant programmatic advances have brought MSR closer to becoming a reality. In 2018, NASA and the European Space Agency (ESA) signed a joint Statement of Intent to continue defining respective roles and responsibilities in the flight missions required to realize MSR. In October 2020, NASA and ESA formalized this partnership with the signature of a Memorandum of Understanding for the MSR flight elements. The MSR campaign consists of M2020, two MSR flight elements and the ground-based infrastructure to receive, handle and curate the samples from Mars. In an engineering sense, MSR consists of a linked set of missions, and a concluding set of ground-based activities, that we refer to as the MSR Campaign.

G. Kminek↗

Assessment of Potential Mars Relay Network Enhancements

In anticipation of increased demands on Mars relay services, including planned arrivals of NASA’s InSight Lander in November 2018, and of NASA’s Mars 2020 rover and ESA’s ExoMars Rover & Surface Platform mission in Feb-Mar.2021, we have assessed a number of potential modifications and upgrades to Mars relay orbiters and quantified their impacts in terms of key relay support metrics, to support NASA and ESA programmatic decisions. Specific areas of investigation include: 1) implementation of “split-pass” relay capability for support to collocated landers, 2) modifications of the extended mission orbit for the Mars Atmosphere and Volatile EvolutioN Mission (MAVEN), and 3) introduction of Low-Density Parity Check (LDPC) coding. We report here on each of these potential upgrades, quantify the performance implications each would have on future Mars relay services in the context of future mission support scenarios, and provide a status on implementation.

Wenkert, Daniel↗

Spacecraft Line-Of-Sight Jitter Mitigation and Management Lessons Learned and Engineering Best Practices

Predicting, managing, controlling, and testing spacecraft line-of-sight (LoS) jitter caused by micro-vibrations due to onboard internal disturbance sources is a formidable multidisciplinary engineering task. It is especially challenging for those missions hosting high-performance, vibration-sensitive optical sensor payloads with stringent pointing stability requirements. Both NASA and ESA are planning technically aggressive spaceflight missions that include ultra-high-performance optical payloads with delicate, highly vibration-sensitive scientific and observational instruments. The GN&C community of practice will need to leverage and build upon their collective experiences and lessons learned to better address future micro-vibration challenges. To identify lessons learned and best engineering practices the NASA Engineering & Safety Center (NESC) sponsored a two-day Spacecraft LoS Jitter Workshop in late 2019. The workshop’s goal was to provide a multidisciplinary forum to elicit deeper understanding of the issues related to solving the spacecraft LoS jitter/micro-vibration problem. A primary objective was to identify and share best practices, rules of thumb, and options for jitter-related activities. Representatives from NASA, JPL, ESA, along with NASA’s industrial partners, independent consultant subject matter experts, and members of academia participated in the workshop. This paper will describe the motivation for the NASA Spacecraft LoS Jitter Workshop and summarize the identified findings, observations, and recommendations.

Lessons Learned;↗

The NASA AfriSAR Campaign: Airborne SAR and Lidar Measurements of Tropical Forest Structure and Biomass in Support of Current and Future Space Missions

In 2015 and 2016, the AfriSAR campaign was carried out as a collaborative effort among international space and National Park agencies (ESA, NASA, ONERA, DLR, ANPN and AGEOS) in support of the upcoming ESA BIOMASS, NASA-ISRO Synthetic Aperture Radar (NISAR) and NASA Global Ecosystem Dynamics Initiative (GEDI) missions. The NASA contribution to the campaign was conducted in 2016 with the NASA LVIS (Land Vegetation and Ice Sensor) Lidar, the NASA L-band UAVSAR (Uninhabited Aerial Vehicle Synthetic Aperture Radar). A central motivation for the AfriSAR deployment was the common AGBD estimation requirement for the three future spaceborne missions, the lack of sufficient airborne and ground calibration data covering the full range of ABGD in tropical forest systems, and the intercomparison and fusion of the technologies. During the campaign, over 7000 km2 of waveform Lidar data from LVIS and 30000 km2 of UAVSAR data were collected over 10 key sites and transects. In addition, field measurements of forest structure and biomass were collected in sixteen 1 hectare sized plots. The campaign produced gridded Lidar canopy structure products, gridded aboveground biomass and associated uncertainties, Lidar based vegetation canopy cover profile products, Polarimetric Interferometric SAR and Tomographic SAR products and field measurements. Our results showcase the types of data products and scientific results expected from the spaceborne Lidar and SAR missions; we also expect that the AfriSAR campaign data will facilitate further analysis and use of waveform Lidar and multiple baseline polarimetric SAR datasets for carbon cycle, biodiversity, water resources and more applications by the greater scientific community.

AfriSAR↗

Spacecraft Line-of-Sight Jitter Management and Mitigation Lessons Learned and Engineering Best Practices

Predicting, managing, controlling, and testing spacecraft line-of-sight (LoS) jitter caused by micro-vibrations due to on-board internal disturbance sources is a formidable multidisciplinary engineering task. It is especially challenging for those missions hosting high-performance (e.g., nano-radian/milli-arcsecond class), vibration-sensitive optical sensor payloads with stringent pointing stability requirements. The Nation Aeronautics and Space Administration (NASA) and the European Space Agency (ESA) are planning technically aggressive spaceflight missions that include ultra-high-performance optical payloads with delicate, highly vibration-sensitive scientific and observational instruments. The guidance, navigation, and control community of practice will need to leverage collective experiences and document their best practices and lessons learned to address future micro-vibration challenges. To identify lessons learned and best practices the NASA Engineering & Safety Center sponsored a 2-day Spacecraft LoS Jitter Workshop in late 2019. The workshop’s goal was to provide a multidisciplinary forum to elicit deeper understanding of the issues related to addressing the spacecraft LoS jitter/micro-vibration problem. The primary objective was to identify, document, and share lessons learned, best practices, and preferred options for jitter-related analysis and test activities. Representatives from NASA, ESA, along with NASA’s industrial partners, independent consultant subject matter experts, and members of academia participated in the workshop. This paper describes the motivation for the workshop and summarize the identified findings and recommendations.

Lessons Learned↗

Study of a Strong L-Band RFI Source

CN006 is the name given by the European Space Agency (ESA) in their reports on radio frequency interference (RFI) to an instance of RFI in the L-band spectral window at 1.413 GHz protected for passive use only. The source of the interference is located east of the Chinese city of Hangzhou in an area with radar installations. Its effect was initially indistinguishable from that of many such RFI sources observed by the ESA's SMOS and NASA's Soil Moisture Active Passive (SMAP) radiometers over China. However, in July 2020, the level of radiation increased dramatically reaching levels exceeding 1700000 K as reported by Soil Moisture and Ocean Salinity (SMOS) becoming the strongest source observed by SMOS. This article describes an analysis of this very strong source (a radar). It provides information to provide insight into an example of a well-defined source of RFI and illustrates the powerful capability of the SMAP radiometer receiver and RFI processing incorporated in it for identifying and understanding interference.

Radio Frequency Interface↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Mars Sample Return Mission Concept Status

This paper will provide an overview of current concepts and options for the architecture and design of a Mars Sample Return Mission, including the Sample Retrieval Lander (SRL) (developed by NASA) and the Earth Return Orbiter (ERO) (developed by ESA) . Key mission objectives and the overall campaign will be described, including the mission’s concept of operations and a notional timeline from launch to entry, through surface operations, to delivery of the samples to Mars orbit and return to Earth. The overall SRL lander vehicle concept will be described, including current options being evaluated. Key lander element options that have been studied will be discussed, including the Mars Ascent Vehicle (MAV), Sample Fetch Rover (provided by ESA), Orbiting Sample container (OS), and sample tube transfer robotics systems. For the ERO the vehicle concept will be described including key interfaces with the Capture/Containment and Return System (CCRS). Specific challenges and approaches for addressing those challenges will be discussed, including key technical margins and backward planetary protection. The information provided about possible Mars sample return architectures is for planning and discussion purposes only. NASA has made no official decision to implement Mars sample return.

Muirhead, Brian K↗

Progress on LISA Colloid Microthruster Technology Development

Colloid microthrusters have been operated successfully in flight, providing drag-free and precision control for spacecraft that can be used for future applications such as gravity wave and exoplanet observatories. The Space Technology 7 Disturbance Reduction System (ST7- DRS) technology demonstration payload included eight Busek Colloid Micro-Newton Thrusters (CMNTs) as part of the Laser Interferometer Space Antenna (LISA) Pathfinder mission that launched in December of 2015. The CMNTs provided full attitude and precision drag-free control of the spacecraft with <10 nm/√Hz stability along the most sensitive axis during commissioning, nominal, and extended mission phases through April of 2017. Performance requirements (≤0.1 μN/√Hz) were met and models were validated based on on- orbit measurements of test mass motion and actuation during the 60-day nominal and 30-day extended missions. In 2018, the European Space Agency (ESA) selected LISA to be the agency’s next “large-class” mission, currently in Phase A, with a launch scheduled for 2034 and a 12.5-year duration, including the transfer (1.5 years), commissioning (1 year), nominal (4 or 6 years), and extended (6 or 4 years) phases of the mission, which sets the lifetime and consumables requirement. NASA is considering a significant contribution of hardware to the ESA-led mission, potentially including colloid microthrusters. In preparation, NASA is developing five technologies to TRL 5 and 6, including the colloid microthrusters, to be ready for infusion into LISA by the mission adoption review (MAR), currently scheduled for 2024. While ST7-DRS effectively brought the CMNTs to TRL 7, additional lower-TRL flow control components must be developed for full redundancy, reducing the system-level TRL back to 4. Key to the future of the colloid microthruster technology will be to use lessons learned and keep as much of the heritage from the ST7 design as possible while updating the system to support redundancy and lifetime requirements of a flagship-class mission. This paper describes the technology plan and progress to reach TRL 6 by the MAR, focusing on near- term plans to reach TRL 5 by the end of March 2022 for the LISA Colloid Microthrusters (CMTs). Work includes requirements development and sizing studies, breadboard and brassboard hardware developments at Busek, including relevant lifetime and environment testing, and lifetime modeling, verification and validation efforts at JPL, UCLA, and UCI.

Gamero-Castaño, Manuel↗

The Salinity Pilot-Mission Exploitation Platform (Pi-MEP): A Hub for Validation and Exploitation of Satellite Sea Surface Salinity Data

The Pilot-Mission Exploitation Platform (Pi-MEP) for salinity is an ESA initiative originally meant to support and widen the uptake of Soil Moisture and Ocean Salinity (SMOS) mission data over the ocean. Starting in 2017, the project aims at setting up a computational web-based platform focusing on satellite sea surface salinity data, supporting studies on enhanced validation and scientific process over the ocean. It has been designed in close collaboration with a dedicated science advisory group in order to achieve three main objectives: gathering all the data required to exploit satellite sea surface salinity data, systematically producing a wide range of metrics for comparing and monitoring sea surface salinity products’ quality, and providing user-friendly tools to explore, visualize and exploit both the collected products and the results of the automated analyses. The Salinity Pi-MEP is becoming a reference hub for the validation of satellite sea surface salinity missions by providing valuable information on satellite products (SMOS, Aquarius, SMAP), an extensive in situ database (e.g., Argo, thermosalinographs, moorings, drifters) and additional thematic datasets (precipitation, evaporation, currents, sea level anomalies, sea surface temperature, etc.). Co-localized databases between satellite products and in situ datasets are systematically generated together with validation analysis reports for 30 predefined regions. The data and reports are made fully accessible through the web interface of the platform. The datasets, validation metrics and tools (automatic, user-driven) of the platform are described in detail in this paper. Several dedicated scientific case studies involving satellite SSS data are also systematically monitored by the platform, including major river plumes, mesoscale signatures in boundary currents, high latitudes, semi-enclosed seas, and the high-precipitation region of the eastern tropical Pacific. Since 2019, a partnership in the Salinity Pi-MEP project has been agreed between ESA and NASA to enlarge focus to encompass the entire set of satellite salinity sensors. The two agencies are now working together to widen the platform features on several technical aspects, such as triple-collocation software implementation, additional match-up collocation criteria and sustained exploitation of data from the SPURS campaigns

ocean↗

Mars Sample Receiving Facility Research and Development to Enable Preservation, Safe Containment, and Scientific Research of Martian Samples on Earth

NASA and ESA are working together to plan a joint campaign to potentially bring back the first Martian samples to Earth in the early 2030s. On the surface of Mars, the Mars 2020Perseverance Rover is selecting and packaging samples that could be returned to Earth for careful examination by an international team of scientists. In preparation for this historic sample return, advance planning is underway to design and build a Mars Sample Receiving Facility (SRF) in the mid-2020s. In 2022, a Mars Sample Receiving Facility Assessment Study(MSAS) will be conducted to further define construction modality and capability options for a facility in the conterminous United States. Since Mars Sample Return (MSR) is currently categorized as a planetary protection restricted Earth return, this new facility would feature biosafety level 4 (BSL-4)-like high containment to protect Earth’s biosphere from any potential hazard. In addition, the facility also requires integration of cleanroom technologies to mitigate against terrestrial contamination and preserve sample integrity for science investigations. The integration of both clean handling and high containment requires significant technology research and development (R&D) by the mid-2020s to support the definition and planning of a SRF before commencing the site specific design phase. The SRF project will need to solidify the inorganic, organic, and biological contamination control (CC) requirements for the facility. This could entail a translation of Mars 2020 mission CC requirements for geologic material to engineering requirements for surfaces and airborne molecular contamination inside isolators and cleanrooms. In tandem, the project will need to determine precision cleaning and sterilization approaches for cleanrooms, isolators, equipment, and tools. Initial material selections for the facility construction materials, cleanrooms, isolators, and BSL-4 suits/garments are an important activity. The recent construction of the OSIRIS-REx and Hayabusa2 curation cleanroom laboratories greatly benefited from early materials testing, before the design phase, to reduced organic outgassing and particulate shedding inside the laboratory. While the early biohazard investigations in the SRF may deem the samples safe to release to laboratories throughout the world, sterilization methods need to be defined to safely release Martian samples. One key aspect of enabling simultaneous sample containment and cleanliness is the concept of a Double-Walled Isolator (DWI) that ESA has been pursuing. Further R&D is needed about DWIs, sample handling, and instrumentation interfaces before beginning the SRF site specific design phase. A working isolator/DWI engineering model should be developed and fabricated. Isolator sizes, connections, pass-through antechambers, and configurations and basic interfaces with instruments and tools as well as the use of robotic, mechanical, and/or human manipulation need to be considered. Inert high purity gas supply (one-pass or recirculation) and other isolator utilities must be determined. Special accommodations for large instruments (e.g., XCT,SEM, etc.) need to be developed. Techniques for opening the sample tubes packaged by M2020and extracting the headspace gas while keeping samples pristine will be challenging, requiring additional R&D, and engagement of the M2020 project. In addition, careful micromanipulation for subdivision and packaging of samples will also need to be included. These combined R&D activities are important before commencing the SRF design phase to ensure safe biohazard containment, sample preservation, and science integrity for the samples that would be studied in the SRF and in laboratories around the world.

mars sample return↗

Mars Sample Return (MSR) Sample Receiving Facility (SRF) Assessment Study (MSAS)

NASA, in partnership with the European Space Agency (ESA), is seeking to return Martian geological and atmospheric samples to Earth for scientific study in the early 2030s. Due to the possibility that the samples could contain extraterrestrial life, Mars Sample Return (MSR) is classified as a Category V: Restricted Earth Return mission by the NASA Planetary Protection Office. As a result of this classification, a MSR Sample Receiving Facility (SRF) must not only provide a pristine environment to ensure samples are protected from terrestrial contamination for scientific investigations, it must also provide high-containment (biosafety level 4 [BSL-4]-equivalence) to isolate the samples from Earth’s biosphere until the samples are deemed safe for release and/or sterilized. The nominal utilization period for a SRF is anticipated to be 2-5 years and is intended to enable curation activities, biohazard assessment, select early science activities, and the rapid release of samples to the scientific community. However, to account for possible delays in schedule or the identification of extant life, this anticipated period of time must be flexible to accommodate schedule extensions and contingency plans. Due to requirements for high-level biological containment and cleanliness, a traditional receiving/curation facility cannot be utilized for MSR. Therefore, beginning in 2022, NASA Johnson Space Center is performing a MSR SRF Assessment Study (MSAS) to investigate the most optimal facility modality for a MSR SRF, as well as start to define programmatic early estimate of costs and schedules before the initial design phase begins. NASA is partnering with industry contractors (architectural and engineering firms with BSL-4 and cleanroom technology experience, as well as other contracted infrastructure and construction specialists) along with selected experts from NASA, ESA, existing U.S. BSL-4 facilities, and other U.S. government agencies, to carry out the assessment study. The MSAS should also aid in the future refinement of the science requirements (e.g., contamination control, equipment accommodations) before site-specific design would commence. As part of the MSAS, NASA is planning to assess an array of possibilities for a MSR SRF. One of the main considerations is the facility modality and whether an existing BSL-4 facility can be utilized (for some or all functions); or, if new constructure would be required, would a traditional fixed facility or a modular facility the best choice. MSAS will also investigate the ability of the modalities to accommodate two different facility capability endmembers: 1) a minimal facility focusing on biohazard assessment and curation tasks with a small footprint, and 2) an enhanced facility with additional capabilities to enable expedited processing and the completion of time-sensitive and (some) sterilization-sensitive science. The assessment is intended to generate information that will inform the selection of facility modalities for high-level conceptual design development. While the assessment study will focus on SRF requirements for accommodating curation, science, and sample safety assessment infrastructure, it will also consider an array of other factors, such as ease of access for international users, decommissioning, repurposing, future sale or lease following MSR’s use of the facility, and uncontained preparatory laboratory spaces. Upon completion of the study, the preferred modality and refined requirements would be utilized for site-specific design but will not be finalized until NASA’s completion of the National Environmental Policy Act (NEPA) process.

A.D. Harrington↗

Maximizing Earth Science Observations with Data Harmonization: Harmonized Landsat/Sentinel-2

In August 2021, NASA released science quality harmonized Landsat/Sentinel-2 products for both cloud-based access and direct download from the Land Processes Distributed Active Archive Center (LP DAAC). These 30-meter products, HLSS30 (Sentinel-2 component) and HLSL30 (Landsat component) are placed on the same grid and are generated and distributed fully in the cloud. Similarly, ESA is prototyping harmonized Landsat Sentinel-2 products at 10-meter resolution. The data production and science teams from NASA and ESA will present technical details on the data production system, data product status and availability, and the benefit of harmonizing instruments with similar sensing characteristics between the agencies.

Earth Science↗

Mars Sample Return – An Overview of the Capture, Containment and Return System

The Mars Sample Return campaign aims at bringing back soil, rock and atmospheric samples from Mars to Earth to answer key questions about Mars’ biological evolution by means of four missions. The first one, Mars 2020, landed on the red planet on February 18, 2021 and has to date collected a number of samples through the Perseverance rover. The three subsequent missions will recover the sample tubes, launch them into Mars orbit and transport them back to Earth. These missions are currently in the planning and design stages of development and represent an international effort comprising NASA, ESA and many industry partners. The work presented here provides an overview of the current design and concept of operations of the NASA-provided Capture, Containment, and Return System (CCRS), which is the payload of the ESA-provided Earth Return Orbiter (ERO). ERO will rendezvous with the orbiting samples and CCRS will capture them, contain them and robotically insert them into a capsule that will return the samples to Earth, the Earth Entry System (EES). Three days before arrival on Earth, CCRS will release the EES, which will fly through space, enter Earth’s atmosphere, descend on a well-defined trajectory and safely land at the Utah Test and Training Range. The decision to implement Mars Sample Return will not be finalized until NASA’s completion of the National Environmental Policy Act process. This document is being made available for information purposes only.

Mars Sample Return↗

Cloud Mask Intercomparison eXercise (CMIX): An evaluation of cloud masking algorithms for Landsat 8 and Sentinel-2

Cloud cover is a major limiting factor in exploiting time-series data acquired by optical spaceborne remote sensing sensors. Multiple methods have been developed to address the problem of cloud detection in satellite imagery and a number of cloud masking algorithms have been developed for optical sensors but very few studies have carried out quantitative intercomparison of state-of-the-art methods in this domain. This paper summarizes results of the first Cloud Masking Intercomparison eXercise (CMIX) conducted within the Committee Earth Observation Satellites (CEOS) Working Group on Calibration & Validation (WGCV). CEOS is the forum for space agency coordination and cooperation on Earth observations, with activities organized under working groups. CMIX, as one such activity, is an international collaborative effort aimed at intercomparing cloud detection algorithms for moderate-spatial resolution (10–30 m) spaceborne optical sensors. The focus of CMIX is on open and free imagery acquired by the Landsat 8 (NASA/USGS) and Sentinel-2 (ESA) missions. Ten algorithms developed by nine teams from fourteen different organizations representing universities, research centers and industry, as well as space agencies (CNES, ESA, DLR, and NASA), are evaluated within the CMIX. Those algorithms vary in their approach and concepts utilized which were based on various spectral properties, spatial and temporal features, as well as machine learning methods. Algorithm outputs are evaluated against existing reference cloud mask datasets. Those datasets vary in sampling methods, geographical distribution, sample unit (points, polygons, full image labels), and generation approaches (experts, machine learning, sky images). Overall, the performance of algorithms varied depending on the reference dataset, which can be attributed to differences in how the reference datasets were produced. The algorithms were in good agreement for thick cloud detection, which were opaque and had lower uncertainties in their identification, in contrast to thin/semi-transparent clouds detection. Not only did CMIX allow identification of strengths and weaknesses of existing algorithms and potential areas of improvements, but also the problems associated with the existing reference datasets. The paper concludes with recommendations on generating new reference datasets, metrics, and an analysis framework to be further exploited and additional input datasets to be considered by future CMIX activities.

Sergii Skakun↗

Future Orbiting and In-Situ Exploration of Venus: Mount Etna as Terrestrial Analog

The exploration of Venus will soon experience a new golden era thanks to the recently selected NASA Deep Atmosphere of Venus Investigation of Noble gases, Chemistry and Imaging (DAVINCI) mission, NASA Venus Emissivity, Radio Science, InSAR, Topography & Spectroscopy (VERITAS) mission, and ESA EnVision mission. The DAVINCI mission will focus on the analysis of the the atmospheric vertical structure and composition of Earth’s twin planet and on the geologic structure of a tesserae terrain. The VERITAS mission will investigate the geologic features of its surface as well as geodynamic characteristics of the subsurface, providing high-resolution emissivity data, a global radar map at an approximate resolution of 30 meters/pixel, and estimation of the gravity anomaly of the shallow crust of the planet. The ESA EnVision mission will be complementary to the two NASA missions, providing high resolution 0.8-2.5 micron emissivity data, Synthetic Aperture Radar (SAR) data, and Subsurface Radar Sounder (SRS) data. Beyond those, the proposed Roscosmos-NASA Venera-D mission will also be equipped with an orbiter that will investigate the atmospheric composition and circulation, as well as a lander that will analize the in-situ chemical composition and the surface-atmosphere interactions.

P. D’Incecco↗

The Next Generation Space Telescope: Visiting a Time When Galaxies Were Young

In the spring and summer of 1996, three independent teams studied the feasibility of a large aperture space telescope to follow the Hubble Space Telescope. The scientific goals for the new telescope had been laid out in a report by the HST & Beyond Committee, a group appointed by the Association of Universities for Research in Astronomy to consider the needs of the astronomical community after the nominal end of the HST mission in 2005. The technical capabilities and constraints on the new observatory were daunting: the telescope optics should be at least 4 meters in diameter and passively cooled to achieve optimum sensitivity in the near-infrared portion of the spectrum. Moreover, the costs should be kept within a fraction of those for the HST: approximately $500M for construction and $900M for lifetime costs, not including support for scientific data analysis. In their presentations to NASA on 19-21 August, 1996, the teams led by Lockheed Martin, TRW, and the Goddard Space Flight Center concluded that a Next Generation Space Telescope (NGST) was not only feasible and affordable, but that it could be made more powerful using recent breakthroughs in space technologies. Coming on the heels of breathtaking HST observations of distant galaxies in the process of formation, such an NGST could bridge the gap in our understanding of the earliest origins of stars, galaxies, and the elements that are the foundations of Life. This report presents the findings of the three teams and the technological roadmap which will guide us to the successful development of the NGST over the next decade. We have made liberal use of the written material, tables, and diagrams prepared by the three study teams. We have also taken advantage of the knowledge and ideas of our colleagues in government, industry and academia. In Appendix A, we list the members of the three study groups, the NGST Science Working Group and the NGST Scientific Oversight Committee. We deeply appreciate their assistance, advice, and enthusiasm. The scientific and technological goals of NGST are part of the Origins initiative in the Office of Space Science, NASA Headquarters. We are pleased to acknowledge the support and leadership of Edward Weiler, a steadfast friend of HST, Harley Thronson, a proponent of all things infrared, and Mike Kaplan, a tireless advocate of new technology. John Campbell, Project Manager for HST, initiated the NGST study at GSFC and we deeply appreciate his formative efforts and continued support. We are also grateful for the foresight of Riccardo Giacconi, Director General of the European Southern Observatory (ESO), and the efforts of his staff. We note that European Space Agency (ESA) staff at the Space Telescope Science Institute and ESO played important roles in the NGST scientific and technical studies. We look forward to future collaboration with ESA, ESO, and other international partners.

H.S. Stockman↗

Spacecraft Line-Of-Sight Jitter Management and Mitigation Lessons Learned And Engineering Best Practices

Predicting, managing, controlling, and testing spacecraft line-of-sight (LoS) jitter caused by micro-vibrations due to on-board internal disturbance sources is a formidable multidisciplinary engineering task. It is especially challenging for those missions hosting high-performance (e.g., nano-radian/milli-arcsecond class), vibration-sensitive optical sensor payloads with stringent pointing stability requirements. The Nation Aeronautics and Space Administration (NASA) and the European Space Agency (ESA) are planning technically aggressive spaceflight missions that include ultra-high-performance optical payloads with delicate, highly vibration-sensitive scientific and observational instruments. The guidance, navigation, and control community of practice will need to leverage collective experiences and document their best practices and lessons learned to address future micro-vibration challenges. To identify lessons learned and best practices the NASA Engineering & Safety Center sponsored a 2-day Spacecraft LoS Jitter Workshop in late 2019. The workshop’s goal was to provide a multidisciplinary forum to elicit deeper understanding of the issues related to addressing the spacecraft LoS jitter/micro-vibration problem. The primary objective was to identify, document, and share lessons learned, best practices, and preferred options for jitter-related analysis and test activities. Representatives from NASA, ESA, along with NASA’s industrial partners, independent consultant subject matter experts, and members of academia participated in the workshop. This paper will describe the motivation for the workshop and summarize the identified findings and recommendations.

Swanson, Davin K.↗