Search NASA⌕ Search

SEARCH · Search NASA

Results for “Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

Weighted Composition Operators for Learning Nonlinear Dynamics

Operator theoretic methods in dynamical system have been dominated by the use of Koopman operators and their continuous time counterparts, such as Koopman Generators and Liouville Operators. The advantage gained from their use primarily stems from the ability to extract subspaces and eigenfunctions within a space of observables that are invariant with respect to the Koopman operator over that space. When this occurs, a dynamic mode decomposition of the systems state provides a linear model for the dynamical system. Not all Koopman operators have eigenfunctions that may be exploited in this manner. However, the framework can still be leveraged for approximations using other operators. In this setting, we present a different operator for the study of dynamical systems, the weighted composition operator. These operators are compact for a wide range of dynamics and spaces, and through their interactions with occupation kernels and vector valued kernels, they admit an estimation of the underlying dynamics. Here, this manuscript presents a new algorithm for the data driven study of dynamical systems from data, and also provides two numerical experiments where convergence is achieved as a proof of concept.

97 MATHEMATICS AND COMPUTING↗

Ground Segment Operations Concept for the Orion Artemis-2 Optical Communications System

The ACCESS Project (formerly Space Network) will implement an optical communications ground segment to support the Orion Artemis II Optical Communications (O2O) demonstration as part of the next manned human spaceflight mission to the moon, Artemis II. O2O implements laser communication (lasercomm) technology for operational use on the Orion series of spacecraft, as a development test objective (DTO), in order to demonstrate the feasibility and operational utility of lasercomm for human spaceflight missions. O2O consists of three segments: Space Segment, Ground Segment, and Operations Segment. The Space Segment consists of the Space Terminal Element and the Orion spacecraft. The Space Terminal Element effort is managed by the GSFC Laser-Enhanced Mission Communications Navigation and Operational Services (LEMNOS) project in collaboration with MIT Lincoln Laboratory. The Ground Segment consists of an optical ground terminal (GT) at the White Sands Complex (WSC), which is being developed in collaboration with MIT Lincoln Laboratory, the Ground Segment Operations and Analysis (GSOA) element and Ground Data Element (GDE), and a second optical GT in the Optical Communications Telescope Laboratory (OCTL) at the JPL Table Mountain Facility. The Operations Segment consists of the Artemis II Mission Control Center (MCC), the Lasercomm Space Terminal Console (LSTC), and the Lasercomm Link Planning & Analysis Center (LPAC), all located at the Johnson Space Center (JSC). O2O utilizes pulse-position modulation (PPM) direct-to-earth services resulting in an 80 Mbps downlink data rate from lunar orbit. The O2O concept of operations is to provide optical services for a minimum of 1 hour per day for each day of the Artemis II mission. O2O will utilize a 10-20 Mbps uplink data rate and 40-260 Mbps downlink data rate, depending on the Artemis II mission phase. The ACCESS project will also provide a centralized mission data interface for user data distribution and storage to the MCC and perform planning and scheduling of services in coordination with the Operations Segment for the O2O Ground Segment. The O2O Ground Segment will support the following O2O mission phases: Pre-Mission Planning; Daily Operations Planning; Event Execution; and Post-Pass Reporting. O2O will be used to exchange data files between Orion and the MCC and to distribute real-time video through the optical downlink service to the MCC; which would not be possible without the high-bandwidth link that O2O will provide to Orion. In this paper, I will discuss the O2O Ground Segment development approach and how it will support these critical O2O functions: plan and schedule the contact; acquire and track the optical link; flow information bidirectionally; distribute information; and control and accommodate the system.

optical communications↗

Development of Space Mission Integrated Operations Scenarios

Integrated Operations Scenarios (IOS) describe nominal operations planned for a space mission. Operational scenarios are key to an operations concept, as they help identify issues and drivers on the operations system. This paper covers the tools, processes, and inputs that feed into an IOS product, and how IOS iterations during a mission lifecycle can buy down operational risks. A case used for this paper is nominal operations for an initial crewed Artemis mission that includes cross-program sequence of tasks required to accomplish end to end functions from launch through transit, on-orbit operations, to safely return to Earth. An IOS product serves as a reference for discussions during requirements development, task and risk analyses, concept of operations development, and as foundation to prepare space mission flight plans.

integrated operations scenarios↗

Insights Into Seismicity Associated With Flexibly Operating Enhanced Geothermal System From Real‐Time Distributed Acoustic Sensing

Enhanced Geothermal Systems (EGS) have the capacity to broaden the accessible resource pool for geothermal power generation. Traditionally viewed as a “baseload” resource, their flexible operation might also enable dispatchable load‐following generation and long‐term energy storage, aligning them with the evolving landscape of decarbonized electricity systems. However, increasing permeability and extracting energy during EGS operations can induce microseismic events; for many prior EGS efforts, some associated seismicity has been observed. While energetically beneficial, the flexibility of EGS operations prompts our inquiry into whether new types of operations will yield previously unseen seismicity patterns. We demonstrate the use of distributed acoustic sensing (DAS) with real‐time edge computing to monitor seismicity during a pilot test of a cyclically operated EGS facility at the Blue Mountain geothermal field. Our focus lies in uncovering seismicity insights from the real‐time microseismic catalog, particularly during load‐following dispatchability tests simulating flexible EGS operation. Here, we find that variations in pore pressure consistently correlate with seismicity, and that controlling pressure cycles during flexible operations appears to constrain microseismic activity during subsequent cycles. The spatio‐temporal evolution of microseismic clouds recorded during cyclic injection cycles fits diffusive models over our available observation period. Additionally, seismicity elevation lags behind pore pressure increases, likely due to pressure diffusion to the fracture system boundary. Through real‐time monitoring, we offer novel insights into seismicity associated with flexibly operating EGS. Our findings suggest that leveraging DAS and edge computing can inform EGS operations and help mitigate induced seismicity.

Chamarczuk, Michal [Rice Univ., Houston, TX (Unite↗

Tug fleet and ground operations schedules and controls. Volume 2: part 1

This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

Source record↗

Payload integration and operations

Integration and operation of Spacelab payloads presents major challenges to engineering disciplines in areas of ground operations and flight mission operations. The integration of ground operations encompasses activities performed by the instrument developers and principal investigators and by the centralized payload integration site and launch site. The payload will be operated on orbit by a payload crew trained in payload experimentation and by a payload operations control center where investigator science groups and operations personnel are prepared to provide support. The payload mission planning, control center, data processing facility and operations are developed and verified prior to realtime flight operations. The mission management approach to minimize program costs and impacts to payloads and the Space Transportation System/Spacelab accommodations is presented.

Hall, R. R.↗

Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2

The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.

Source record↗

STS flight operations - Concept versus reality

The NASA Lyndon B. Johnson Space Center Mission Operations Directorate (MOD) has the responsibility for planning, training, and implementing of flight operations in support of the National Space Transportation System (STS) Program. In this role, MOD has responsibility for the operational interface with customers and the translation of customer requirements into operating plans to satisfy their objectives. The basic objectives of flight operations are to maximize mission success, to minimize risks to the Orbiter and the crew, to decrease operating costs, and to achieve an effective balance in the application of all operational resources. In the National STS Program, to date, 20 missions have been flown and the process for planning, training, and flight operations has been thoroughly exercised. In this paper, MOD's performance is assessed, and those areas in which our initial operating concepts have been successful as well as those in which significant additional work is required are identified.

Kranz, E. F.↗

Space station operations management

Space Station Freedom operations management concepts must be responsive to the unique challenges presented by the permanently manned international laboratory. Space Station Freedom will be assembled over a three year period where the operational environment will change as significant capability plateaus are reached. First Element Launch, Man-Tended Capability, and Permanent Manned Capability, represent milestones in operational capability that is increasing toward mature operations capability. Operations management concepts are being developed to accomodate the varying operational capabilities during assembly, as well as the mature operational environment. This paper describes operations management concepts designed to accomodate the uniqueness of Space Station Freedoom, utilizing tools and processes that seek to control operations costs.

Cannon, Kathleen V.↗

NSI operations center

The NASA Science Internet (NSI) Network Operations Staff is responsible for providing reliable communication connectivity for the NASA science community. As the NSI user community expands, so does the demand for greater interoperability with users and resources on other networks (e.g., NSFnet, ESnet), both nationally and internationally. Coupled with the science community's demand for greater access to other resources is the demand for more reliable communication connectivity. Recognizing this, the NASA Science Internet Project Office (NSIPO) expands its Operations activities. By January 1990, Network Operations was equipped with a telephone hotline, and its staff was expanded to six Network Operations Analysts. These six analysts provide 24-hour-a-day, 7-day-a-week coverage to assist site managers with problem determination and resolution. The NSI Operations staff monitors network circuits and their associated routers. In most instances, NSI Operations diagnoses and reports problems before users realize a problem exists. Monitoring of the NSI TCP/IP Network is currently being done with Proteon's Overview monitoring system. The Overview monitoring system displays a map of the NSI network utilizing various colors to indicate the conditions of the components being monitored. Each node or site is polled via the Simple Network Monitoring Protocol (SNMP). If a circuit goes down, Overview alerts the Network Operations staff with an audible alarm and changes the color of the component. When an alert is received, Network Operations personnel immediately verify and diagnose the problem, coordinate repair with other networking service groups, track problems, and document problem and resolution into a trouble ticket data base. NSI Operations offers the NSI science community reliable connectivity by exercising prompt assessment and resolution of network problems.

Zanley, Nancy L.↗

Mission description and in-flight operations of ERBE instruments on ERBS, NOAA 9, and NOAA 10 spacecraft

Instruments of the Earth Radiation Budget Experiment (ERBE) are operating on three different Earth-orbiting spacecraft. The Earth Radiation Budget Satellite (ERBS) is operated by NASA, and NOAA 9 and NOAA 10 weather satellites are operated by the National Oceanic and Atmospheric Administration (NOAA). This paper is the second in a series that describes the ERBE mission, and data processing and validation procedures. This paper describes the spacecraft and instrument operations for the second full year of in-orbit operations, which extend from February 1986 through January 1987. Validation and archival of radiation measurements made by ERBE instruments during this second year of operation were completed in July 1991. This period includes the only time, November 1986 through January 1987, during which all ERBE instruments aboard the ERBE, NOAA 9, and NOAA 10 spacecraft were simultaneously operational. This paper covers normal and special operations of the spacecraft and instruments, operational anomalies, and the responses of the instruments to in-orbit and seasonal variations in the solar environment.

Weaver, William L.↗

Test, Control and Monitor System (TCMS) operations plan

The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

Macfarlane, C. K.↗

The use of automation and robotic systems to establish and maintain lunar base operations

Robotic systems provide a means of performing many of the operations required to establish and maintain a lunar base. They form a synergistic system when properly used in concert with human activities. This paper discusses the various areas where robotics and automation may be used to enhance lunar base operations. Robots are particularly well suited for surface operations (exterior to the base habitat modules) because they can be designed to operate in the extreme temperatures and vacuum conditions of the Moon (or Mars). In this environment, the capabilities of semi-autonomous robots would surpass that of humans in all but the most complex tasks. Robotic surface operations include such activities as long range geological and mineralogical surveys with sample return, materials movement in and around the base, construction of radiation barriers around habitats, transfer of materials over large distances, and construction of outposts. Most of the above operations could be performed with minor modifications to a single basic robotic rover. Within the lunar base habitats there are a few areas where robotic operations would be preferable to human operations. Such areas include routine inspections for leakage in the habitat and its systems, underground transfer of materials between habitats, and replacement of consumables. In these and many other activities, robotic systems will greatly enhance lunar base operations. The robotic systems described in this paper are based on what is realistically achievable with relatively near term technology. A lunar base can be built and maintained if we are willing.

Petrosky, Lyman J.↗

Ground operation of robotics on Space Station Freedom

This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.

Wojcik, Z. Alex↗

Representing operations procedures using temporal dependency networks

DSN Link Monitor & Control (LMC) operations consist primarily of executing procedures to configure, calibrate, test, and operate a communications link between an interplanetary spacecraft and its mission control center. Currently the LMC operators are responsible for integrating procedures into an end-to-end series of steps. The research presented in this paper is investigating new ways of specifying operations procedures that incorporate the insight of operations, engineering, and science personnel to improve mission operations. The paper describes the rationale for using Temporal Dependency Networks (TDN's) to represent the procedures, a description of how the data is acquired, and the knowledge engineering effort required to represent operations procedures. Results of operational tests of this concept, as implemented in the LMC Operator Assistant Prototype (LMCOA), are also presented.

Fayyad, Kristina E.↗

A distributed planning concept for Space Station payload operations

The complex and diverse nature of the payload operations to be performed on the Space Station requires a robust and flexible planning approach. The planning approach for Space Station payload operations must support the phased development of the Space Station, as well as the geographically distributed users of the Space Station. To date, the planning approach for manned operations in space has been one of centralized planning to the n-th degree of detail. This approach, while valid for short duration flights, incurs high operations costs and is not conducive to long duration Space Station operations. The Space Station payload operations planning concept must reduce operations costs, accommodate phased station development, support distributed users, and provide flexibility. One way to meet these objectives is to distribute the planning functions across a hierarchy of payload planning organizations based on their particular needs and expertise. This paper presents a planning concept which satisfies all phases of the development of the Space Station (manned Shuttle flights, unmanned Station operations, and permanent manned operations), and the migration from centralized to distributed planning functions. Identified in this paper are the payload planning functions which can be distributed and the process by which these functions are performed.

Hagopian, Jeff↗

EDOS operations concept and development approach

The Earth Observing System (EOS) Data and Operations System (EDOS) is being developed by the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) for the capture, level zero processing, distribution, and backup archiving of high speed telemetry data received from EOS spacecraft. All data received will conform to the Consultative Committee for Space Data Standards (CCSDS) recommendations. The major EDOS goals are to: (1) minimize EOS program costs to implement and operate EDOS; (2) respond effectively to EOS growth requirements; and (3) maintain compatibility with existing and enhanced versions of NASA institutional systems required to support EOS spacecraft. In order to meet these goals, the following objectives have been defined for EDOS: (1) standardize EDOS interfaces to maximize utility for future requirements; (2) emphasize life-cycle cost (LCC) considerations (rather than procurement costs) in making design decisions and meeting reliability, maintainability, availability (RMA) and upgradability requirements; (3) implement data-driven operations to the maximum extent possible to minimize staffing requirements and to maximize system responsiveness; (4) provide a system capable of simultaneously supporting multiple spacecraft, each in different phases of their life-cycles; (5) provide for technology insertion features to accommodate growth and future LCC reductions during the operations phase; and (6) provide a system that is sufficiently robust to accommodate incremental performance upgrades while supporting operations. Operations concept working group meetings were facilitated to help develop the EDOS operations concept. This provided a cohesive concept that met with approval of responsible personnel from the start. This approach not only speeded up the development process by reducing review cycles, it also provided a medium for generating good ideas that were immediately molded into feasible concepts. The operations concept was then used as a basis for the EDOS specification. When it was felt that concept elements did not support detailed requirements, the facilitator process was used to resolve discrepancies or to add new concept elements to support the specification. This method provided an ongoing revisal of the operations concept and prevented large revisions at the end of the requirement analysis phase of system development.

Knoble, G.↗

Feasibility Study of a Rotorcraft Health and Usage Monitoring System (HUMS): Results of Operator's Evaluation

The objective was to evaluate the feasibility of a state-of-the-art health and usage monitoring system (HUMS) to provide monitoring of critical mechanical systems on the helicopter, including motors, drive train, engines, and life-limited components. The implementation of HUMS and cost integration with current maintenance procedures was assessed from the operator's viewpoint in order to achieve expected benefits from these systems, such as enhanced safety, reduced maintenance cost, and increased availability. An operational HUMS that was installed and operated under an independent flight trial program was used as a basis for this study. The HUMS equipment and software were commercially available. Based on the results of the feasibility study, the HUMS used in the flight trial program generally demonstrated a high level of reliability in monitoring the rotor system, engines, drive train, and life-limited components. The system acted as a sentinel to warn of impending failures. A worn tail rotor pitch bearing was detected by HUMS, which had the capability for self testing to diagnose system and sensor faults. Examples of potential payback to the operator with HUMS were identified, including reduced insurance cost through enhanced safety, lower operating costs derived from maintenance credits, increased aircraft availability, and improved operating efficiency. The interfacing of HUMS with current operational procedures was assessed to require only minimal revisions to the operator's maintenance manuals. Finally the success in realizing the potential benefits from HUMS technology was found to depend on the operator, helicopter manufacturer, regulator (FAA), and HUMS supplier working together.

Romero, Raylund↗