A Retrospective Analysis of Distributed Solar Interconnection Timelines and Related State Mandates

Most distributed residential photovoltaic (PV) systems must secure an interconnection agreement prior to operation that ensures the local electrical system will operate safely within the broader electrical grid. PV installers generally submit an interconnection application to the local utility that provides all the necessary details the utility needs to evaluate the proposed system. To encourage timely execution of this process, many states’ utility commissions have established mandates that limit the maximum number of days allowed for utility review and approval of interconnection for certain small, often residential applications. In this paper, we derive the median and range of cycle times for the pre-installation approval phase of the interconnection process (i.e., from application submission to approval by the utility) across 24 U.S. states, using a data set of approximately 170,000 projects. We evaluate the percentage of projects that are approved within respective state-mandated timelines from 2017– 2019. We further evaluate how timelines have evolved since 2012 for a subset of five states: Arizona, California, Colorado, New Jersey, and New York. The analyses are divided into two size ranges: systems that are ≤10 kilowatts (kW), and systems that are 11–50 kW.

14 SOLAR ENERGY↗

Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine (Final Report)

As the nation continues to encourage, through market structures and financial incentives, the proliferation of intermittent renewable electricity, how to optimize the ever-changing electric grid and identify means to retain and improve resilience, while ensuring continued reductions in GHG emissions, will be critical. According to Bloomberg, wind & solar generated 10.5% of US electricity in 2020 and that percentage continues to grow. In support of expanding renewable energy use, and to address its intermittent nature, this project will develop the Hydrogen Storage for Flexible Fossil Fuel Power Generation platform that is dispatchable, reliable, repeatable and have the ability to produce zero or negative carbon power while interfacing with geology capable of CO2 and hydrogen storage. GTI Energy (GTIE) and team members Illinois State Geological Survey (ISGS), Mitsubishi Heavy Industries America (MHIA), Ameren Illinois, Hexagon Purus, and the Low Carbon Resources Initiative (LCRI) completed a Phase I Conceptual Study under contract DE-FE0032012 for Hydrogen Storage for Flexible Fossil Fuel Power Generation: Integration of Underground Hydrogen Storage with Gas Turbine. The Hydrogen Storage for Flexible Fossil Fuel Power Generation platform addresses the intermittent nature of the expanding use of Variable Renewable Energy (VRE) generation. The low cost of the electricity (COE) generated results in greater dispatch and more operation at higher power levels (higher efficiency), fewer short intervals, and fewer start/stop cycles. The reliable, resilient system can produce zero carbon power and store hydrogen. It will demonstrate hydrogen storage in geologic formations like those used in natural gas underground storage thus enabling large scale storage of hydrogen in sedimentary strata across the United States rather than in geographically restricted salt caverns. The Phase I study confirmed the system is feasible and generates power at lower cost than other low carbon approaches. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production. The study advanced the maturity of the H 2 storage-based system with flexible power generation by completing a Pre-FEED study (Phase II). The Pre-FEED focused on the selected Energy Farm on the University of Illinois Urbana-Champaign (UIUC) site that includes above ground and underground hydrogen storage, low-carbon hydrogen production (GTI’s Compact Hydrogen Generator, CHG) with underground CO2 sequestration, and a 40-MW class gas turbine. The Pre-FEED addressed the entire system and its interconnection to the natural gas and electric grid and mitigation of key risks, such as storage behavior, load-following, and system operation. During Phase 1 of the project, the team completed key tasks, which moved the entire demonstration project, specific components and approaches closer to commercialization. These Phase I Accomplishments include: Completing System Requirements Review; Completing System Layout and Modeling - Heat & Mass Balance and Process Flow Diagram; Completing modelling of 9 turbine performance cases; Evaluating rock strata for underground storage of hydrogen and sequestration of carbon dioxide; Completing initial modelling of underground storage of hydrogen and withdrawal with evaluation of loss and water production; Identifying roadable storage for above ground hydrogen storage; Identifying existing electrical infrastructure for receiving/delivering electricity; Identifying existing gas supply infrastructure for receiving natural gas; Document concept design/development plans in required reports. Conclusions: The 12-month Feasibility study in Phase I study was completed and confirmed the system is feasible and generates power at lower cost than other low carbon approaches and even lower cost than the reference NGCC plant without carbon capture when taking advantage of 45Q carbon credits. The study enabled the fidelity of the concept to be improved and allowed identification of the requirements for the system. Defining the individual system and component requirements was performed via the system requirements review with the whole team. These requirements were then incorporated into and iterated with our Heat & Mass Balance process model and process flow diagrams were generated to reflect the overall system. This information was then used to complete the TEA and show economic feasibility. Large scale non-salt geologic storage of hydrogen is an enabling technology for a hydrogen-fired turbine that can be retrofitted into large-scale electric generating units (EGU). Our demonstration will include 428 MWh or ~4 hours full load of hydrogen storage (above and underground). Carbon capture inherent to the CHG process can capture 90% CO 2 (with upgrades to >98%). This system provides a COE of 23% savings relative to an NGCC with a post combustion amine system. Our proposed storage system decouples carbon capture and hydrogen production from power production; therefore, we expect our proposed system’s efficiency and variable COE to be superior resulting in overall higher dispatch and reduced deep cycling. Our demonstration will be full to multi-day hydrogen storage and has the potential for longer (seasonal) duration commercially. The demonstration defines the pathway for broad commercial application and will accelerate the development of larger systems suitable for centralized utility scale electricity production.

03 NATURAL GAS↗

Executive Summary: Concentrating Solar Power Impact on Grid Reliability

This study examines the impact of concentrating solar power (CSP) on grid reliability by investigating the dynamic behavior of the Western Interconnection under conditions of high solar and wind generation. Reliability in this case refers to the somewhat narrow context of stability: transient stability and frequency response; and control stability, especially that associated with weak grids. The objectives of this study were to identify renewable energy penetration levels and mixes, severe disturbances, and load conditions where grid performance and reliability could be enhanced with CSP plants. Instantaneous penetrations of wind and solar - both photovoltaics (PV) and CSP - up to approximately 60% were considered. The focus is on situations in the Western Interconnection bulk power system during which variable renewable generation has displaced other (non-CSP) synchronous thermal generation under highly stressed, weak system conditions. Particular attention was given to impacts of frequency-responsive controls and synchronous generation characteristics.

14 SOLAR ENERGY↗

Concentrating Solar Power Impact on Grid Reliability

This study examines the impact of concentrating solar power (CSP) on grid reliability by investigating the dynamic behavior of the Western Interconnection under conditions of high solar and wind generation. Reliability in this case refers to the somewhat narrow context of stability: transient stability and frequency response; and control stability, especially that associated with weak grids. The objectives of this study were to identify renewable energy penetration levels and mixes, severe disturbances, and load conditions where grid performance and reliability could be enhanced with CSP plants. Instantaneous penetrations of wind and solar - both photovoltaics (PV) and CSP - up to approximately 60% were considered. The focus is on situations in the Western Interconnection bulk power system during which variable renewable generation has displaced other (non-CSP) synchronous thermal generation under highly stressed, weak system conditions. Particular attention was given to impacts of frequency-responsive controls and synchronous generation characteristics.

14 SOLAR ENERGY↗

Time series power flow analysis for distribution connected PV generation

Distributed photovoltaic (PV) projects must go through an interconnection study process before connecting to the distribution grid. These studies are intended to identify the likely impacts and mitigation alternatives. In the majority of the cases, system impacts can be ruled out or mitigation can be identified without an involved study, through a screening process or a simple supplemental review study. For some proposed projects, expensive and time-consuming interconnection studies are required. The challenges to performing the studies are twofold. First, every study scenario is potentially unique, as the studies are often highly specific to the amount of PV generation capacity that varies greatly from feeder to feeder and is often unevenly distributed along the same feeder. This can cause location-specific impacts and mitigations. The second challenge is the inherent variability in PV power output which can interact with feeder operation in complex ways, by affecting the operation of voltage regulation and protection devices. The typical simulation tools and methods in use today for distribution system planning are often not adequate to accurately assess these potential impacts. This report demonstrates how quasi-static time series (QSTS) simulation and high time-resolution data can be used to assess the potential impacts in a more comprehensive manner. The QSTS simulations are applied to a set of sample feeders with high PV deployment to illustrate the usefulness of the approach. The report describes methods that can help determine how PV affects distribution system operations. The simulation results are focused on enhancing the understanding of the underlying technical issues. The examples also highlight the steps needed to perform QSTS simulation and describe the data needed to drive the simulations. The goal of this report is to make the methodology of time series power flow analysis readily accessible to utilities and others responsible for evaluating potential PV impacts.

Broderick, Robert Joseph↗

Power grid frequency prediction using spatiotemporal modeling

Understanding power system dynamics is essential for interarea oscillation analysis and the detection of grid instabilities. The FNET/GridEye is a GPS-synchronized wide-area frequency measurement network that provides an accurate picture of the normal real-time operational condition of the power system-dynamics, giving rise to new and intricate spatiotemporal patterns of power loads. We propose to model FNET/GridEye grid frequency data from the U.S. Eastern Interconnection with a spatiotemporal statistical model. We predict the frequency data at locations without observations, a critical need during disruption events where measurement data are inaccessible. Spatial information is accounted for either as neighboring measurements in the form of covariates or with a spatiotemporal correlation model captured by a latent Gaussian field. Finally, the proposed method is useful in estimating power system dynamic response from limited phasor measurements and holds promise for predicting instability that may lead to undesirable effects such as cascading outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Use of DAGMan in CRAB3 to improve the splitting of CMS user jobs

CRAB3 is a workload management tool used by CMS physicists to analyze data acquired by the Compact Muon Solenoid (CMS) detector at the CERN Large Hadron Collider (LHC). Research in high energy physics often requires the analysis of large collections of files, referred to as datasets. The task is divided into jobs that are distributed among a large collection of worker nodes throughout the Worldwide LHC Computing Grid (WLCG). Splitting a large analysis task into optimally sized jobs is critical to efficient use of distributed computing resources. Jobs that are too big will have excessive runtimes and will not distribute the work across all of the available nodes. However, splitting the project into a large number of very small jobs is also inefficient, as each job creates additional overhead which increases load on infrastructure resources. Currently this splitting is done manually, using parameters provided by the user. However the resources needed for each job are difficult to predict because of frequent variations in the performance of the user code and the content of the input dataset. As a result, dividing a task into jobs by hand is difficult and often suboptimal. In this work we present a new feature called “automatic splitting” which removes the need for users to manually specify job splitting parameters. We discuss how HTCondor DAGMan can be used to build dynamic Directed Acyclic Graphs (DAGs) to optimize the performance of large CMS analysis jobs on the Grid. We use DAGMan to dynamically generate interconnected DAGs that estimate the processing time the user code will require to analyze each event. This is used to calculate an estimate of the total processing time per job, and a set of analysis jobs are run using this estimate as a specified time limit. Some jobs may not finish within the alloted time; they are terminated at the time limit, and the unfinished data is regrouped into smaller jobs and resubmitted.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Assessment of Industrial Load for Demand Response across U.S. Regions of the Western Interconnect

Demand response has the ability to both increase power grid reliability and potentially reduce operating system costs. Understanding the role of demand response in grid modeling has been difficult due to complex nature of the load characteristics compared to the modeled generation and the variation in load types. This is particularly true of industrial loads, where hundreds of different industries exist with varying availability for demand response. We present a framework considering industrial loads for the development of availability profiles for demand response that can provide more regional understanding and can be inserted into analysis software for further study.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Accelerating cost-effective deployment of solar generation on the distribution grid

The Task 1 objective is to “expedite the PV interconnection process by revising the screening process in California”. The goal of this task is to develop a data-driven, validated approach to determining feeder limits that can simplify interconnection processes and lead to greater PV adoption across the California distribution system.

14 SOLAR ENERGY↗

Antigua and Barbuda Distributed Energy Resources Deployment Guidelines

This document is designed to provide comprehensive considerations, best practices and guidance for deployment of Distributed Energy Resources (DERs) in Antigua and Barbuda. The document provides lists of various technology selection guidance including technical specifications, requirements and applicable key standards and code associated with key DERs and balance of plant equipment. The document also presents the key microgrid design considerations to integrate the DERs to achieve the economic, decarbonization and resiliency goals. Taking into account sensitive grid for such islands, for grid readiness and screening the potential DER interconnection, general approach is highlighted along with the potential technical interconnection requirements. Furthermore, this document shows the key stakeholders involved in such DER integration and/or microgrid project and how key responsible project team can be qualified. Finally, this document refers to key information about warranties and consumer rights and maintenance of the systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

Comparative Analysis of Inter-Area Oscillations in the US Eastern and Western Interconnections

This paper presents a comparative analysis of interarea oscillations in the US Eastern and Western Interconnections using frequency disturbance data collected from the advanced wide-area Frequency Monitoring Network (FNET/GridEye), enabling us to investigate and compare the oscillation characteristics of both regions. The study analyzes the statistical data from the two interconnections, including total oscillation events, average dominant frequencies, damping ratios, and maximum amplitudes. We also explore the impact of seasonal and daily variations on oscillation occurrences and the influence of different grid topologies and operational practices. The results provide insights into both interconnections' stability and control characteristics, offering valuable information for power system operators to enhance grid stability and oscillation suppression measures.

Fu, Hao [University of Tennessee, Knoxville (UTK)]↗

Multi-Port Autonomous Reconfigurable Solar Power Plant

As the penetration level of power electronics increases and remote photovoltaic (PV) generation is integrated into the alternating current (ac) grid, the short-circuit ratio (SCR) at the point of interconnection of a hybrid PV–energy storage system (ESS) plant may be low. Additionally, the inertia of the alternating current (ac) grid may be low. The low SCRs and inertias can lead to reliability challenges in the power grid. These operating conditions require additional reinforcements, such as synchronous condensers, static var compensators, static synchronous compensators, and high-voltage direct current (HVdc) links/grids. HVdc links or grids may also provide the additional capability of connecting the plant to asynchronous grids and/or connecting asynchronous grids, among others. This scenario leads to discrete development of solar inverters, energy storage inverters, HVdc converters, and several transformers. Some of the problems associated with this discrete development and inverter-based generation include increased cost, lower reliability, and reduced efficiency associated with duplication of power electronics (PEs); competing controls of several individual discrete inverter-based generators due to the presence of multiple PEs, which leads to derating of the system; and transient stability problems arising from inverter-based generation, such as voltage/frequency events leading inverter shutdowns, voltage instability and control interactions in the formed weak grid, and harmonics caused by resonances of multiple inverters.

14 SOLAR ENERGY↗

Hybrid Systems to Enable High Penetration PV

A model for PV plus energy storage and fuel cells was developed in the System Advisor Model (SAM). This model was used to evaluate the ramp rate and interconnection capacity factor for a hypothetical utility-scale plant for several configuration options. For PV only, the plant experienced 3345 violations of a 10%/minute ramp up limitation and a interconnection capacity factor of 17.6%. Adding a battery reduced the violations to 154 per year and the magnitude of the average violation to 2%. Adding a fuel cell to the PV system increased the capacity factor to 78% without improving ramp violations. Using a combined PV plus storage plus fuel cell arrangement maintained the improved capacity factor while reducing ramp up violations to 23, illustrating the potential to operate a hybrid system both to enable grid integration requirements and increase utilization of the interconnection.

14 SOLAR ENERGY↗

Hybrid Systems to Enable High Penetration PV: Preprint

A model for PV plus energy storage and fuel cells was developed in the System Advisor Model (SAM). This model was used to evaluate the ramp rate and interconnection capacity factor for a hypothetical utility-scale plant for several configuration options. For PV only, the plant experienced 3345 violations of a 10%/minute ramp up limitation and a interconnection capacity factor of 17.6%. Adding a battery reduced the violations to 154 per year and the magnitude of the average violation to 2%. Adding a fuel cell to the PV system increased the capacity factor to 78% without improving ramp violations. Using a combined PV plus storage plus fuel cell arrangement maintained the improved capacity factor while reducing ramp up violations to 23, illustrating the potential to operate a hybrid system both to enable grid integration requirements and increase utilization of the interconnection.

14 SOLAR ENERGY↗

Hardware Design of Medium Voltage SiC-Based Modular Multilevel Converters for Grid-Tied Applications

This paper presents a design of a 10 kV silicon carbide (SiC) MOSFET based modular multilevel converter (MMC). The MMC functions as the interconnection between a 24 kV dc bus and a 13. SkV distribution grid. This paper focuses on the hardware design of the MMC and its submodules. The gate driver, auxiliary power supply and bus bur in submodules are major components that need to meet high dv/dt immunity and high insulation voltage requirements. The gate driver achieves over 200 kV/us common mode transient immunity (CMTI). Its associated auxiliary power supply is based on an on-board transformer with over 30 kV insulation capability and 1.4 pF barrier capacitance. The busbar achieves less than 11 kV/cm electric field in the air to avoid partial discharges. Validation tests of the MMC submodule were performed by double pulse tests at 5 kV and buck converter tests at3 kV, 52A (peak). Reliable operations were achieved in validation tests.

auxiliary power supply↗

Virtual interconnection platform initiative scoping study

Due to security and liability concerns, the research community has limited access to realistic large-scale power grid models to test and validate new operation and control methodologies. It is also difficult for industry to evaluate the relative value of competing new tools without a common platform for comparison. This report proposes to develop a large-scale virtual power grid model that retains basic features and represents future trends of major U.S. electric interconnections. This model will include realistic power flow and dynamics information as well as a relevant geospatial distribution of assets. This model will be made widely available to the research community for various power system stability and control studies and can be used as a common platform for comparing the efficacies of various new technologies.

97 MATHEMATICS AND COMPUTING↗