Search NASA⌕ Search

SEARCH · Search NASA

Results for “installed power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 415 records · Page 23

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR)-5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory in support of the development and qualification of tri-structural isotropic low-enriched fuel for use in high-temperature gas-cooled reactors. The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR-5/6/7 experiment were to: • Irradiate reference-design fuel particles to support fuel qualification. • Establish operating margins for the fuel, beyond normal operating conditions. • Provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective was to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR-5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast flux trap of the ATR with a planned duration of 500 effective full-power days. The northeast flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B–168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full-power days. Final burnup values, on a per-compact basis, ranged from 5.66 to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples had failed (the bottom three capsules lost all thermocouples). During the first five cycles (162B – 165A), the fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8–10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to a maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented a fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particles failed in Capsule 3, which was considered possible because the experiment was designed to operate beyond the high-temperature gas-cooled reactor normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to the lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, Cycle 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on the absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cybersecurity Guide for Distributed Wind

Distributed wind sits at the intersection of grid-connected, off-grid and behind-the-meter cyber-physical electrical energy systems. The unique physical properties and communications requirements for distributed wind systems mean that there are unique cybersecurity considerations, but there is little to no existing guidance on best practices for cybersecurity. This document is intended to be a starting point for distributed wind stakeholders including manufacturers, installers and integrators, and operators (facility, aggregator, or utility). We discuss common distributed wind architectures and describe their role in the larger power system, pointing out some of the key connections to be aware of. Cybersecurity cannot exist in a vacuum, but rather must consider all the system and all its connections holistically. The role of distributed wind and the functions it can serve are described to gain understanding of the full range of capabilities. The purpose and application of relevant standards that may apply to certain distributed wind systems is presented. These standards may not apply to all installations, but even for systems that are not required to meet these standards they can be a good reference for best practices. A holistic threat perspective is used to describe the adversaries, threats, and potential impacts of cyberattacks, with special emphasis on what sets distributed wind systems apart from other distributed energy resources (DER). Finally, we present the recommendations for cybersecurity, both in terms of needs of the system and roles that specific stakeholders should fulfill. Distributed wind systems can come in a variety of architectures and applications, so there is no one-size-fits-all approach to cybersecurity. However, this document contains the relevant information for stakeholders to identify the cybersecurity needs of their system, refer to relevant standards, and apply best practices in a manner most consistent with their security and operational goals.

17 WIND ENERGY↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Front End Engineering Design of Linde-BASF Advanced Post-Combustion CO 2 Capture Technology at a Southern Company Natural Gas-Fired Power Plant (Final Scientific/Technical Report)

This document details the execution of Cooperative Agreement DE-FE0031847, “Front End Engineering Design of Linde-BASF Advanced Post-Combustion Carbon Dioxide (CO 2 ) Capture Technology at a Southern Company Natural Gas-Fired Power Plant” during the period of 10/1/2019 to 6/30/2022. The project was funded by the U.S. Department of Energy’s Office of Fossil Energy and Carbon Management (FECM) and managed by the National Energy Technology Laboratory (NETL). Southern Company Services, Inc. (SCS) was the prime recipient and led the project team. Other members of the project team included Linde, Inc. (Linde), Linde Engineering – Dresden (LED), and BASF. The overall goal of the project was to complete a front-end engineering design (FEED) study for installing the Linde-BASF post-combustion capture (PCC) technology at an existing domestic natural gas-fired combined cycle (NGCC) power plant within Southern Company’s portfolio of assets. The CO 2 capture plant was to be of commercial scale (at least 375 MWe) and include process units for pre-conditioning of the flue gas system, the CO 2 capture plant island, storage vessels, the CO 2 compression train, and any necessary components for integration into the NGCC plant. Mississippi Power’s Plant Daniel Unit #4 was chosen as the host site for the FEED with the target of capturing 90% of CO 2 emissions from the existing combustion turbines. The information produced by the FEED was used to develop a cost estimate of +/- 15% accuracy. Capital costs, excluding financing, are estimated at approximately $\$752$ million dollars (2021). The execution of a project based on this FEED study has an estimated duration of almost five years.

03 NATURAL GAS↗

Energy Improvements of Fire Station 71

Since 2018, the City of Shawnee, Kansas has completed two phases of the State of Kansas Facility Conservation Improvement Program (FCIP), an initiative that guarantees operational cost and energy savings through targeted construction improvements on City facilities and infrastructure. The City is currently in the third phase of this FCIP, where one of the projects included an investment in energy improvements for Fire Station 71 (FS 71). The City partnered with Navitas, an Energy Service Company (ESCO), to implement a Photovoltaic Solar Array on FS71. The purpose of this project was to invest in sustainable building improvements with Energy Conservation Measures (ECM) to bring cost savings to the City and to provide sustainable benefits to the residents of Shawnee. In the first task of the project, Navitas collaborated with the City of Shawnee and the Community Development Department to determine the optimal layout and schedule for the installation of the solar array on FS 71. In the second task of the project, Navitas installed the 99.8 kW DC Photovoltaic solar array system. This system installation comprised of racking, inverters, optimizers, load center, and disconnect, which were all installed at a total ECM price of $\$$247,948. The third task focused on start-up and commissioning of the array. Navitas installed a real-time data analytics information management system integrated with utility meters, which evaluates the operations of the utility system and verifies operation of equipment and ensures optimum operation for energy efficiency. In the final task of this project, this analytics system was used for monitoring and verification, which will continue to be used to evaluate the success of the project for the coming years. The primary goal of the project was to install the 99.8 kW DC PV solar array at FS 71 to demonstrate the viability of solar energy systems in essential municipal facilities. Fire stations are energy demanding structures, as they require a constant intake of power and have a high baseline energy usage. The success of solar arrays on a fire station exemplifies their energy efficiency and effectiveness and displays their potential for application on other city facilities. By installing a solar array at such a facility, the City sought not only to offset electricity usage but also to serve as a model for ECMs in other municipal facilities and infrastructure projects. From an economic standpoint, this project demonstrates the feasibility of renewable energy at the municipal level. The total project cost of $\$$247,948 was split evenly between city funds and award funding, minimizing financial risk while ensuring guaranteed long-term savings. Any excess savings that are beyond the guaranteed minimums remain with the city, which enables future investment in sustainable energy initiatives. This project provides many benefits to the public. In addition to reducing the environmental footprint of city operations, it lowers taxpayer-funded utility spending and improves the energy security of a critical facility. The knowledge gained from this implementation motivates the City to focus on similar efforts across other public facilities in future FCIP phases and other City projects.

14 SOLAR ENERGY↗

Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel

This report provides evaluations of the NPP site infrastructure and near-site transportation infrastructure for removing SNF from 19 NPP sites and the Morris Independent Spent Fuel Storage Installation (ISFSI). The material to be removed from the NPP sites includes both the SNF and the greater-than-Class C low-level radioactive waste (GTCC waste)3 that is stored, or will be stored, at the sites. This report is an update of the report Nuclear Power Plant Infrastructure Evaluations for Removal of Spent Nuclear Fuel (Maheras et al. 2021) and includes expansion of the site evaluations to include operating nuclear power plant (NPP) sites and to incorporate updated site inventory data. Figures that include the number of spent nuclear fuel (SNF) assemblies and metric tons heavy metal (MTHM) in a single figure have also been added to the report.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Front-End Engineering Design for Piperazine with the Advanced Stripper

This Department of Energy (DOE) funded project was executed with the goal of preparing a Front-End Engineering Design (FEED) for the capture and compression of 90% of the CO2 that would normally be emitted from an existing natural gas combined cycle (NGCC) plant. The FEED focused on the application of the piperazine advanced stripper (PZAS) process at Mustang Station of the Golden Spread Electric Cooperative (GSEC), which consists of two gas turbines with common heat recovery steam generator (HRSG). The University of Texas at Austin (UT) served as the prime contractor, and subcontracted AECOM Technical Services and Trimeric Corporation to support FEED development. This project team has worked together to advance PZAS for more than a decade. ExxonMobil, Chevron, and Total provided project co-funding. The objectives of this work included: 1. To advance engineering design such that a comprehensive estimate for the total installed cost of a full-scale PZAS CO2 Capture Plant with CO2 compression can be developed on an existing NGCC power plant. a. These detailed costs can also be used to qualify PZAS and other related second generation (2G) amine scrubbing processes for use on cogeneration facilities in refineries and chemical plants that use gas turbines with HRSGs to produce steam. b. These detailed costs will help qualify 2G amine scrubbing for use on NGCC power plants and establish a more accurate baseline cost to be used as a target by other capture technologies. 2. To provide cost details to be used in the economic optimization of the process features of PZAS and other 2G amine scrubbing processes. 3. To provide DOE with a more detailed understanding of carbon capture costs in a commercial application, enabling DOE to better design its R&D program to improve the economics for carbon capture. 4. To provide the host site and cost share partners with the information necessary to determine whether a commercial project to capture and use CO2 for enhanced oil recovery (EOR) or for sequestration can be justified (when accounting for the 45Q tax credit). A key component of the FEED is the estimated total installed cost, which provides a basis for the likely capital investment necessary to implement the PZAS carbon capture process at this location and scale. In combination with the included economic analysis, which accounts for potential revenue from the produced CO2, potential avenues to profitability are explored. The major findings of the FEED are as follows: The Mustang Station PZAS CO2 Capture Plant estimated total project cost of $698 MM of which $384 MM was direct costs. The annual operating costs were $32.6 MM. The total investment for a PZAS facility at Mustang Station is $725 MM. This estimate includes owner’s cost of $25 million and a contingency of $110 MM. • The study estimated the CO2 capture plant at Mustang Station would generate CO2 at $110/tonne for EOR, assuming a 12% IRR (internal rate of return) and an 85% capacity factor. For CO2 storage, the same case would achieve a 12% IRR at about $114/tonne. At a capacity factor of 52%, the storage and EOR cases would break even when carbon is priced ~$150/tonne. The economic analysis determined that the capacity factor and utility pricing, among other variable factors, had a significant effect on the economics and will need additional studied. • The energy penalty of the PZAS plant would be about 46 MW in connected power and 35 MW in operating load. The natural gas requirement (for the Gas Boiler package) would be about 354 MMBTU/hr. • The FEED revealed no major risks in process maturity. However, some areas were outlined for further engineering during detailed design, which included the Gas Boiler system, general arrangement and site layout, air coolers, schedule development, and optimization of the process for higher CO2 removal. • If PZAS were to be implemented at another host site, additional opportunities for cost reduction for would include cost reduction through use of cooling water and steam extraction.

03 NATURAL GAS↗

Deployment and performance of a Low-Energy-Threshold Skipper-CCD inside a nuclear reactor

Charge Coupled Devices (CCD) are being used for reactor neutrino experiments and have already demonstrated their potential in constraining new physics models. The prospect of a Skipper-CCD experiment looking for standard and beyond standard model (BSM) physics in a nuclear reactor has been evaluated for different benchmark scenarios. Here, we report the first installation of a 2-g Skipper-CCD inside the containment building of a 2 GW th nuclear power plant and analyze its performance throughout its first 18 months of operation. The sensor was successfully deployed at Atucha II, in Argentina, 12 meters away from the center of the reactor core. We discuss the challenges involved in the commissioning of the detector and present data acquired during reactor ON and reactor OFF periods, with the sensor functioning with a sub-electron readout noise of 0.17 e - . Based on an exposure of 56.8 g day reactor ON and two reactor OFF data sets with a total exposure of 118.1 g day we characterize the system and evaluate the sensitivity to CEvNS. We achieved a background rate of 33 kdru and a low threshold of 45 eV ee . The ongoing efforts to improve sensitivities to CEvNS and BSM interaction are also discussed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Flexible organic integrated electronics for self-powered multiplexed ocular monitoring

Smart contact lens has drawn extensive research interests due to the noninvasive real-time detection of the human body to provide biomedical information for health management. However, it has been difficult to accurately measure the physiological signals in tears, and the use of external power source has also hindered the future applications. Here, we demonstrated an organic electrochemical transistor based multiplexed sensors self-powered by the organic solar cells (OSCs). The integrated device was fabricated via simple process including solution blade-coating and thermal evaporation. OSCs were optimized to provide optimal operation voltage for the sensors that exhibit semilog-linear response to the glucose and calcium ions in tear fluids without any peripheral circuits. The sensing signals can be transmitted to the laptop wirelessly through a near filed communication unit. This integrated self-powered multiplexed sensing device will provide real-time monitoring of the biomarkers in tears, prospected to be installed on the smart contact lens for the early detection and diagnosis of diabetes.

36 MATERIALS SCIENCE↗

Degradation of Monocrystalline Silicon Photovoltaic Modules From a 10-Year-Old Rooftop System in Florida

A system of 180 monocrystalline aluminum back-surface field modules were installed in Cocoa, Florida, for 10 years. In total, 156 modules are characterized and compared to 3 controls. Power degradation rates vary between – 0.14% to – 3.22% per year, with median and average rates of –0.92% and –1.05% per year, respectively. The losses are primarily resistive with minor optical and recombination loss contributions. Electroluminescence imaging shows a characteristic pattern, which is shown to be resistive in nature when compared to photoluminescence. Resistive losses are due to corrosion of the rear contact Ag/solder interface and, to a much lesser degree, gridline Ag oxidation. Moisture ingress through the backsheet is likely responsible for mediating corrosion. Optical losses are due mostly to a combination of antireflection coating degradation, minor encapsulant browning, and delamination. Minor front contact corrosion may contribute to recombination. Furthermore, this study expands upon previous work on this vintage of the module by examining a large sample set, comprehensive characterization including techniques not previously used on these modules, and a comparison between two other systems of different climates.

14 SOLAR ENERGY↗

Modeling State Transition and Head-Dependent Efficiency Curve for Pumped Storage Hydro in Look-Ahead Dispatch

As one of the most widely installed utility-scale storage facilities, pumped storage hydro (PSH) plays an essential role in providing flexibility for power systems worldwide. Thus, to accurately quantify the flexibility of PSH units in operational optimization problems is important. The conventional PSH models in the literature rarely consider detailed state transitions due to their hourly-based settings. However, it becomes imperative for operational optimization on short-term intervals, especially with increasing shares of renewable energy in power systems. To this end, this paper presents a novel deterministic PSH model that considers the transition time and trajectory between three states of PSH units in look-ahead dispatch. Moreover, to better characterize the varying efficiency of PSH units with water head and flow rate, this paper proposes to model detailed headdependent efficiency curves (hereafter called input-output curves) in look-ahead dispatch, which encounters heavy computational burdens when short time intervals are applied. In this work, a zig-zag piece-wise linear approximation method is used for input-output curve modeling. This can enable an accurate quantification for variable efficiency and head dependence in a computationally effective manner. Here, numerical results are presented to show performances of the proposed PSH model in both flexibility quantification and computation time.

13 HYDRO ENERGY↗

Casing Annulus Monitoring of CO 2 Injection Using Wireless Autonomous Distributed Sensor Networks

Effective and secure carbon subsurface storage, involving the deep underground injection of CO 2 into geological formations where it is permanently trapped, is paramount to mitigating CO 2 emissions (Figure I). Ensuring the integrity of these storage sites and detecting potential leakage through the casing annulus necessitates robust monitoring. This work provides the first integrated demonstration of a wireless casing-annulus monitoring architecture that can operate in highly attenuating cement-brine environments relevant to CO 2 storage. This project focused on developing and validating a novel sensor system for integration with autonomous monitoring near the cement reservoir interface. The goal was a fully integrated Technology Readiness Level (TRL) 4/5 field validation of a distributed wireless intelligent sensor system providing real-time, direct subsurface formation measurements to enhance fluid movement monitoring in the cemented casing annulus. Achieving this objective required the development and integration of 1) wireless autonomous microsensor technology by California Institute of Technology (Caltech); 2) sensor packaging and emplacement technology by Research Triangle Institute (RTI); and 3) smart well completions using wireless active casing collars and NOV pipe by the Sandia National Lab (SNL). The collaboration with the Caltech team in this project aimed to develop millimeter-scale radio frequency identification (RFID) sensors capable of detecting CO 2 , pH, and/or methane levels. These sensors are engineered to be impervious to fluids, allowing them to be mixed with cement and installed within the casing annulus. They operate using RFID protocols at frequencies of 902–928 MHz for both power and communication. A Sandia National Laboratories’ team engaged their expertise in the development of a Smart Collar system designed for the wireless data collection from these RFID sensors embedded in the cement annulus and transmission of this information to the ground surface via IntelliPipe/IntelliServ NOV drill pipe. This is accomplished through inductive coupling at the collar, which facilitates data transfer through each segment of the pipe. Because the system cannot transmit a direct current signal to power the Smart Collar, both power and communication were implemented using alternating current and electromagnetic signals at varying frequencies. Furthermore, the developed microsensor technology had to be demonstrated and validated in comparison with reference transducer measurements in a field test site at The University of Texas at Austin (UT-Austin). Although the full sensor suite did not reach field-deployment readiness, the system-level integration achieved in this project establishes a validated pathway for future incorporation of advanced microsensors.

47 OTHER INSTRUMENTATION↗

Markets and Economic Requirements for Fission Batteries and Other Nuclear Systems

Fission Batteries (FBs) are nuclear reactors defined by five characteristics which enable large-scale deployment: cost competitive, standardized sizes for economic mass production, easy installation and removal, secure and safe unattended operation with high reliability. FBs are not defined by technology or power level. Technical and market considerations suggest that most FBs will produce 20 to 30 MWt. This proceedings reports on the outcomes of two workshops that were held in January 2021 to better define markets and economic challenges for FBs. Three major markets were identified. The largest market is the industrial and commercial heat market. There are about 4000 industrial users (excluding utilities) that require more than one megawatt of heat. The number of customers versus size of heat demand was determined. In a low-carbon world there is the potential for many additional customers—including expanded biofuels production and district heat. The second market is for non-grid electricity. This includes co-generation plants that produce heat and electricity for a single customer. The third market is the maritime market with ~100,000 ships worldwide. In the United States, natural gas is the low-cost energy option today and will remain so unless constraints or taxes impact its use. If restrictions on greenhouse gas emissions, the FB competition includes natural gas with carbon capture, biofuels, hydrogen and grid electricity. Natural gas with carbon capture is not economically viable on a small scale. Biofuels may be expensive but may be the economically preferred option for locations with small energy demands of a few megawatts. Hydrogen is a potential competitor with many of the characteristics of natural gas. Grid electricity is not a competitive source of heat. For FBs to be economically competitive, the price of delivered heat must be $20-50/MWh ($6-15/million BTU). The economically competitive range for non-grid electricity is estimated at $70-100/MWh. These electricity prices are competitive with the retail prices of electricity in many parts of the United States for the customer. FBs are not expected to be competitive selling wholesale electricity to the grid. To achieve the aforementioned cost targets for heat and electricity markets, FB designers must (1) maximize the power output within the constraints of a FB (e.g., truck transportability, passive decay heat removal), (2) drastically reduce the size of onsite staff, (3) adopt core designs with low fuel costs (enrichment and fabrication), and (4) develop a system design that is efficiently manufactured in factories. The business case depends upon more than being just a replacement for natural gas. The largest incentives for adoption of FBs is where they create new markets and new sources of revenue. An example is the paper and pulp industry that burns biomass wastes to provide heat and electricity to make paper. An external heat source could meet the demand for heat and electricity by the paper process and enable converting waste biomass into liquid biofuels rather than burning to provide heat. Other markets, such as data centers, are driven by special energy requirements such as extreme reliability. Most customers are not in the energy business but need heat and electricity to produce a product—a manufactured good, education, retail sales (shopping malls), marine transport or some other product. As a consequence, there will be large incentives to lease rather than own FBs. Leasing avoids the regulatory challenges that remain with the owner of the FB. Leasing creates large incentives for FP standardization of sizes and transportability to maintain the value of the FB at the end of the lease—similar to the leasing of jet engines and aircraft. The economic constraints combined with technical constraints suggest competitive FBs will likely have outputs exceeding 10 MWt. There appear to be little incentives for very long-lived reactor cores because such machines require much larger inventories of fuel. Maintenance requirements and the options to provide technology updates may favor shorter lifetimes (~5 years). The assessment is that there is the potential for FBs to be economically viable and play a major role in global decarbonization in three markets: heat, non-grid electricity and maritime applications.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Transformational Solid Oxide Fuel Cell (SOFC) Technology

This project was conducted under the Co-operative Agreement No. DE-FE0027584 with the US Department Energy to developed advanced Solid Oxide Fuel Cell (SOFC) Technologies. The overall objective of this project was to advance SOFC technology at the cell and stack level to enhance cell robustness and durability, increase performance, and reduce balance-of-plant (BOP) requirements. By reducing system complexity combined with the increases in power density and efficiency, the ultimate goal of the project was to increased reliability and to reduce capital and operating costs of installed systems. The project was focused on pathways that will reduce the cost of the SOFC cell and stack, including the following areas: Robust, redox tolerant cell technology Lower cost cell manufacturing through advances in cell design, which will reduce the amount of material, energy and time used in the fabrication of SOFCs High performance, low temperature electrolyte based on improvement of established materials Innovative SOFC stack architecture which truly integrates Balance of Plant functionality into the stack level design Thermal management of the fuel cell stack for increased durability and expanded window of operation Novel stack design amenable for use in sub-MW to multi-MW-scale power plants and having low replacement cost The incorporation of balance-of-plant (BOP) equipment into the stack platform increased the economic viability of smaller scale systems. The project objectives were met by a multi-prong approach, including new cell design complemented with modifications to existing cell technology, as well as a new stack design incorporating components typically included in the BOP, such as heat exchangers, oxidizer, fuel reformers, and recycle systems. The project culminated with demonstration of a stack test validating the viability of the cell and stack improvements. A cost model was also developed to estimate costs for the advanced stack technology at high volume manufacturing levels. The net outcome of the project is SOFC cell and stack technology with costs significantly below current DOE targets without compromising and, in some cases, improving on the performance and degradation rate demonstrated with the current state-of-the-art stack design. The results of this project advanced the reliability, robustness, and endurance of low-cost SOFC technology that ultimately are ready to be deployed in coal power systems with greater than 60 percent efficiency (based on higher heating value of fuel) and the capability for ≥97% CO 2 capture at a cost-of-electricity that is approximately 40 percent below presently available Integrated Gasification Combined Cycle systems.

03 NATURAL GAS↗

HEMP Testing of Substation Yard Circuit Breaker Control and Protective Relay Circuits

There are concerns about the effects of High-Altitude Electromagnetic Pulses (HEMP) on the electric power grid. Activities to date tested and analyzed vulnerability of digital protective relays (DPRs) used in power substations, but the effect of HEMP on the greater substation environment is not well known. This work establishes a method of testing the vulnerability of circuit breaker control and protective relay circuits to the radiated E1 pulse associated with HEMP based on coupling to the cables in a substation yard. Two DPRs from Schweitzer Engineering Laboratories, Inc. were independently tested. The test setup also included a typical cable in a substation yard with return plane to emulate the ground grid and other ground conductors near the yard cable, cabinetry housing the installed DPRs, station battery and battery charger, terminal block elements, and a breaker simulator to emulate a substation yard configuration. The DPRs were powered from the station battery and the transformer inputs energized with a three-phase source to maintain typical operating conditions during the tests. Vulnerability testing consisted of a conducted E1 pulse injected into the center of the yard cable of the DPR circuits. Current measurements on the yard cable and DPR inputs indicated significant attenuation of the conducted pulse arriving at the control house equipment from the emulated substation yard. This reduction was quantified with respect to the equivalent open-circuit voltage on the yard cable. No equipment damage or undesired operation occurred on the tested circuits for values below 180 kV, which is significantly higher than the anticipated coupling to a substation yard cable.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Strengthening U.S. National Security Through Advanced Energy Innovation

NREL's work in strategic energy security is focused on keeping the United States secure and its citizens safe by applying expertise in advanced energy systems and technologies to prevent energy system disruptions from any source, natural or human. NREL pursues national security objectives by providing partners an accurate understanding of national and international security implications of global energy trends; novel installation, facility, and operational energy solutions; access to NREL R&D capabilities to incorporate advanced energy technologies and biomaterials into mission requirements; and the ability to test future technologies using large-scale grid modeling.

24 POWER TRANSMISSION AND DISTRIBUTION↗