Search NASA⌕ Search

SEARCH · Search NASA

Results for “Mix Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

The new ITER baseline, research plan and open R&D issues

A new baseline (NB) has been proposed by the ITER Project to ensure a robust achievement of the Projects’ goals, in view of past challenges including delays incurred due to the Covid-19 pandemic, technical challenges in completing first-of-a-kind components and in nuclear licensing. The NB includes modifications to the configuration of the ITER device and its ancillaries (e.g. change from beryllium to tungsten as first wall material, modification of the heating and current drive mix, etc.) as well as additional testing of components (e.g. toroidal field coils) or phased installation (start with inertially cooled first wall before later installation of the final actively water-cooled components) to minimise operational risks. In the NB, the ITER research plan (IRP) will be divided into three main phases: (a) start of research operation, with 40 MW of ECH and 10 MW of ICH, which will focus on the demonstration of 15 MA operation in L-mode, commissioning of all required systems, including disruption mitigation, and the demonstration of H-mode plasma operation in deuterium; (b) DT-1, with 60–67 MW of ECH, 33 MW of neutral beam injection (NBI) and 10–20 MW of ICH, which will demonstrate robust operation in high confinement H-mode plasmas in DT up to Q ⩾ 10 and for burn durations of 300–500 s within an accumulated neutron fluence of ∼1% of the ITER machine’s lifetime total, and; (c) DT-2, with up to 67 MW of ECH, up to 49.5 MW of NBI and up to 20 MW of ICH, with the ITER tokamak and ancillaries in their final configuration to demonstrate routine operation in DT plasmas at high Q and the Q ⩾ 5 long-pulse and steady-state scenarios to the final neutron fluence and to perform R&D on nuclear fusion reactor issues. The logic, physics basis, modelling and experimental evaluations carried out to support the NB and the associated IRP are described. These include the impact of the tungsten wall on plasma scenarios and associated risk mitigation measures, as well as the optimisation of the tokamak components and ancillaries to minimise Project risks. Open R&D issues related to these evaluations and mitigation measures are also described together with experimental, modelling and validation activities required to address them.

ITER↗

Population of the giant pairing vibration

Background: We present that the giant pairing vibration (GPV), a correlated two-nucleon mode in the second shell above the Fermi surface, has long been predicted and expected to be strongly populated in two-nucleon transfer cross sections similar to those of the normal pairing vibration. Recent experiments have provided evidence for this mode in 14,15 C but, despite sensitive studies, it has not been definitively identified in either Sn or Pb nuclei where pairing correlations are known to play a crucial role. Purpose: Our aim is to test whether features inherent to the mixing of bound and unbound levels might account for this and to study the effect in a simple and intuitively clear approach. Method: We study the mixing of unbound levels in a set of toy models that capture the essential physics of the GPV, along with a more realistic calculation including distorted-wave Born approximation transfer amplitudes. Results: The calculated (relative) cross section to populate a simulated GPV state is effectively low, compared to the case of bound levels with no widths Conclusions: The mixing turns out to be only a minor contributor to the weak population. Rather, the main reason is the melting of the GPV peak due to the width it acquires from the low orbital angular momentum single-particle states playing a dominant role in two-nucleon transfer amplitudes. Lastly, this effect, in addition to a severe Q-value mismatch, may account for the elusive nature of this mode in (t,p) and (p,t) reactions.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Leptonic unitarity triangles

We present a comprehensive analysis of leptonic unitarity triangles, using both current neutrino oscillation data and projections of next-generation oscillation measurements. Future experiments, sensitive to the degree of CP violation in the lepton sector, will enable the construction of precise triangles. We show how unitarity violation could manifest in the triangles and discuss how they serve as unitarity tests. We also propose the use of Jarlskog factors as a complementary means of probing unitarity. This analysis highlights the importance of testing the unitarity of the leptonic mixing matrix, an understanding of which is crucial for deciphering the nature of the neutrino sector.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evaluation of Pulse Jet Mixer Concentration Profiles to Track Slurry Suspension

A series of tests were conducted to evaluate the mixing performance of pulse jet mixers. A pulse-jet mixing system involves an array of pulse tubes with nozzles directed toward the vessel floor inside the mixing vessel. Fluid is expelled from the pulse tubes during the drive portion of the PJM cycle. Fluid refills into the pulse tubes during the refill portion of the PJM cycle. This cyclical process can be used to mix slurries. Concentration profiles as a function of location and elevation in the tank were taken during the pulse jet mixer cycle at several radial locations within the mixing vessel: at the center, near the wall, and half-way between the center and the wall. The data are being examined to determine how the time during the cycle affects the solids suspension and settling. Examples will be presented for several particle types, concentrations, and pulse-jet operating conditions.

concentration profile↗

Record of Technical Change 1 for Closure Report for Corrective Action Unit 543: Liquid Disposal Units, Nevada Test Site, Nevada, Revision 0

ROTC-1: Downgrade FFACO UR at CAU 543, CAS 06-07-01, Decon Pad to an Administrative UR. CAS 06-07-01, Decon Pad, is located at the Decontamination Facility in Area 6. The CAS consists of the effiuent collection and distribution systems for Buildings 6-605, 6-606, and 6-607, which include two 1,000-gallon (gal) septic tanks, two ground-level sumps and associated piping, the concrete foundation of Building 6-605, floor drains, drain trenches, and cleanouts. The Area 6 Decontamination Facility was built in 1971 and was designed to decontaminate vehicles, equipment, and clothing that had become radiologically contaminated during nuclear testing activities. Additionally, the facility managed mixed and radioactive waste generated from these decontamination processes. The Area 6 Decontamination Facility is located along the southwest edge of Yucca Lake in Area 6 of the NNSS. From 1971through1992, hazardous, radioactive, and sanitary wastes were generated within several buildings and originally discharged via process waste lines, septic systems, and sumps to the Area. 6 Decontamination Pond. The Area 6 Decontamination Facility remained operational until 2001, and is currently inactive and abandoned. Additionally, a portion of the facility yard was used as a contaminated materials storage area where equipment and materials awaited decontamination. As a result, portions of the facility yard are posted as "Contamination Areas" (NNSA/NSO, 2004d). During closure activities, the use-restricted area was fenced and posted, and a UR was implemented for PCBs and radioactivity. As best management practices (BMPs ), two septic tanks, two sumps, and their contents were removed and disposed of as mixed waste; sediment from the Building 6-605 floor drain trenches was removed and disposed of as mixed waste; the floor drain trenches, a diversion box, and seven cleanouts were grouted to grade; and numerous containers and other surface debris were segregated according to waste stream and disposed of appropriately as either low-level waste or sanitary waste (NNSA/NSO, 2008). ·

54 ENVIRONMENTAL SCIENCES↗

Simulant Basis for the Standard High Solids Vessel Design

This document provides the requirements for a test simulant suitable for demonstrating the mixing requirements for the Single High Solids Vessel Design (SHSVD). This simulant has not been evaluated for other purposes such as gas retention and release or erosion. The objective of this work is to provide an underpinning for the simulant properties based on actual waste characterization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Validation Simulations for Multi-Component Mixture Model [Slides]

Set up and ran a large, 3D, 3 component Rayleigh-Taylor Mixing Simulation: Match initial conditions from; Run with multiple mesh sizes to demonstrate convergence to expected mixing layer growth rate. Wrote and tested new FLAG capability to enforce a specified temporal temperature profile.

42 ENGINEERING↗

Bioproduction and Evaluation of Renewable Butyl Acetate as a Desirable Bioblendstock for Diesel Fuel

The objective of this project was to develop an integrated bioprocess for efficient butyl acetate (BA) production through strain development using systematic genome engineering and MicroNiche Engineering™ technology (MNE). BA's potential as a bioblendstock for diesel fuel was evaluated through droplet experiments and Mixing Controlled Compression Ignition (MCCI) engine testing. The project aimed to achieve 30 g/L BA production with a yield of 0.4 g/g and a productivity of 0.6 g/L/h. The suitable composition of the blended fuel (BA/biodiesel) would be determined for MCCI engine application.

99 GENERAL AND MISCELLANEOUS↗

Developing an Innovative Field Expedient Fracture Toughness Testing Protocol for Concrete Materials

The Spiral Notch Torsion Fracture Toughness Test (SNTT) was developed recently to determine the intrinsic fracture toughness (KIC) of structural materials. The SNTT system operates by applying pure torsion to uniform cylindrical specimens with a notch line that spirals around the specimen at a 45 pitch. KIC values are obtained with the aid of a three-dimensional finite-element computer code, TOR3D-KIC. The SNTT method is uniquely suitable for testing a wide variety of materials used extensively in pressure vessel and piping structural components and weldments. Application of the method to metallic, ceramic, and graphite materials has been demonstrated. One important characteristic of SNTT is that neither a fatigue precrack or a deep notch are required for the evaluation of brittle materials, which significantly reduces the sample size requirement. In this paper we report results for a Portland cement-based mortar to demonstrate applicability of the SNTT method to cementitious materials. The estimated KIC of the tested mortar samples with compressive strength of 34.45 MPa was found to be 0.19 MPa m.

36 MATERIALS SCIENCE↗

Oxalate co-precipitation synthesis of calcium zirconate and calcium titanate powders.

Fine powders of calcium zirconate (CaZrO{sub 3}, CZ) and calcium titanate (CaTiO{sub 3}, CT) were synthesized using a nonaqueous oxalate co-precipitation route from Ca(NO{sub 3}){sub 2}{center_dot}4 H{sub 2}O and group(IV) n-butoxides (Ti(OBu{sup n}){sub 4} or Zr(OBu{sup n}){sub 4}). Several reaction conditions and batch sizes (2-35 g) were explored to determine their influence on final particle size, morphology, and phase. Characterization of the as-prepared oxalate precursors, oven dried oxalate precursors (60-90 C), and calcined powders (635-900 C) were analyzed with TGA/DTA, XRD, TEM, and SEM. Densification and sintering studies on pressed CZ pellets at 1375 and 1400 C were also performed. Through the developed oxalate co-precipitation route, densification temperatures for CZ were lowered by 125 C from the 1500 C firing temperature required for conventional mixed oxide powders. Low field electrical tests of the CZ pellets indicated excellent dielectric properties with dielectric constants of {approx}30 and a dissipation factor of 0.0004 were measured at 1 kHz.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Estimating scalar turbulent fluxes with slow-response sensors in the stable atmospheric boundary layer

Conventional and recently developed approaches for estimating turbulent scalar fluxes under stable atmospheric conditions are evaluated, with a focus on gases for which fast sensors are not readily available. First, the relaxed eddy accumulation (REA) classical approach and a recently proposed mixing length parameterization, labeled A22, are tested against eddy-covariance computations. Using high-frequency measurements collected from two contrasting sites (the frozen tundra near Utqiaġvik, Alaska, and a sparsely vegetated grassland in Wendell, Idaho, during winter), it is shown that the REA and A22 models outperform the conventional Monin–Obukhov similarity theory (MOST) utilized widely to infer fluxes from mean gradients. Second, scenarios where slow trace gas sensors are the only viable option in field measurements are investigated using digital filtering applied to fast-response sensors to simulate their slow-response counterparts. With a filtered scalar signal, the observed filtered eddy-covariance fluxes are referred to here as large-eddy-covariance (LEC) fluxes. A virtual eddy accumulation (VEA) approach, akin to the REA model but not requiring a mechanical apparatus to separate the gas flows, is also formulated and tested. A22 outperforms VEA and LEC in predicting the observed unfiltered (total) eddy-covariance (EC) fluxes; however, VEA can still capture the LEC fluxes well. This finding motivates the introduction of a sensor response time correction into the VEA formulation to offset the effect of sensor filtering on the underestimated net averaged fluxes. The only needed parameter for this correction is the mean velocity at the instrument height, a surrogate of the advective timescale. The VEA approach is very suitable and simple to use with gas sensors of intermediate speed (∼ 0.5 to 1 Hz) and with conventional open- or closed-path setups.

58 GEOSCIENCES↗

Development of self-healing films to improve durability of VIPs by in-situ remediation of film defects

The integrity of the VIP barrier film or envelope is a critical for maintaining the ultra-low thermal conductivity of VIPs. Here, the concept of a self-healing barrier film is described and demonstrated. The self-healing concept is based on an addition reaction between two chemicals, without the need for any external stimuli. The chemicals are incorporated as coatings in a multi-layered film and are initially kept separate with a partition layer. In case of damage, the chemicals would mix, react and heal the damage. Tests of small-scale film samples in a custom vacuum pump apparatus by puncturing the samples demonstrated the proof-of-concept. The tests indicated that the chemicals reacted and healed the puncture immediately to maintain the system vacuum. The intact and punctured self-healing films showed near-identical behaviour, while a control sample allowed the pressure to rise to atmospheric levels on puncturing. Development of films with coated chemicals using tape casting and slot die coating methods is also described. These are low-cost and mature technologies, which are commonly used by various industries. The proposed chemicals are low-cost, commercially available materials. Thus, the self-healing technology is expected to be inexpensive and scalable.

Biswas, Kaushik↗

Disjunctive linear separation conditions and mixed-integer formulations for aircraft conflict resolution

In this paper, we address the aircraft conflict resolution problem in air traffic control. We introduce new mixed-integer programming formulations for aircraft conflict resolution with speed, heading and altitude control which are based on disjunctive linear separation conditions. We first examine the two-dimensional aircraft conflict resolution problem with speed and heading control represented as continuous decision variables. We show that the proposed disjunctive linear separation conditions are equivalent to the classical nonlinear conditions for aircraft separation. Further, we characterise conflict-free trajectories based on aircraft velocity bounds and propose a simple pre-processing algorithm to identify aircraft pairs which are either always conflict-free, or which cannot be separated using speed and heading control only. We then incorporate altitude control and propose a lexicographic optimisation formulation that aims to minimise the number of flight level changes before resolving outstanding conflicts via two-dimensional velocity control. The proposed mixed-integer programming formulations are nonconvex, and we propose convex relaxations, decomposition methods and constraint generation algorithms to solve the two-dimensional and lexicographic optimisation formulations to guaranteed optimality. Numerical experiments on four types of conflict resolution benchmarking instances are conducted to test the performance of the proposed mixed-integer formulations. Further, the proposed method is compared against two benchmarks based on state-of-the-art approaches for the aircraft conflict resolution problem. Our numerical results show that the proposed method largely outperforms both benchmarks in terms of runtime and is able to solve significantly more instances to global optimality.

97 MATHEMATICS AND COMPUTING↗

Creep Testing Plastic-Bonded Explosives in Uni-axial Compression

High fidelity measurements of time-dependent strain in the plastic-bonded explosives LX-17-1 and PBX 9502 have been performed under constant, uni-axial, compressive load using a custom designed apparatus. The apparatus uses a combination of extensometers and linear variable differential transformers coupled with a data acquisition system, thermal controls, and gravitational loading. The materials being tested consist of a crystalline explosive material mixed with a polymeric binder. The behavior of each material is related to the type of explosive and to the percentage and type of binder. For any given plastic-bonded explosive, the creep behavior is also dependent on the stress level and test temperature. Experiments were conducted using a 3 x 3 stress-temperature matrix with a temperature range of 24 C to 70 C and with stresses ranging from 250-psi to 780-psi. Analysis of the data has shown that logarithmic curve fits provide an accurate means of quantification and facilitate a long-term predictive capability. This paper will discuss the design of the apparatus, experimental results, and analyses.

36 MATERIALS SCIENCE↗

FY2021 ILAW Glass Ion-Exchange Rate Testing

Approximately 54 to 56 million gallons of radioactive mixed waste is currently stored in underground tanks at The United States Department of Energy’s (DOE’s) Hanford site in the State of Washington. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) will provide DOE’s Office of River Protection (ORP) with a means of treating this waste by vitrification for subsequent disposal. The tank waste will be separated into low- and high-activity waste fractions, which will then be vitrified respectively into Immobilized Low Activity Waste (ILAW) and Immobilized High-Level Waste (IHLW) products. The ILAW product will be disposed of in an engineered facility – the Integrated Disposal Facility (IDF) – on the Hanford site, while the IHLW product will be directed to the national deep geological disposal facility for high-level nuclear waste. The ILAW and IHLW products must meet a variety of requirements with respect to protection of the environment before they can be accepted for disposal. To capitalize on the success of the FY19 and FY20 Atkins/VSL test results on six glasses, Washington River Protection Solutions, LLC (WRPS) has contracted with Atkins/VSL to collect IEX data on four more ILAW glasses using PFT, the results of which are the subject of the present report. The work described herein was performed according to a Test Plan that is responsive to the corresponding WRPS scope of work.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fast parametric relationships for the large-scale reservoir simulation of mixed CH 4 -CO 2 gas hydrate systems

A recent Department of Energy field test on the Alaska North Slope has increased interest in the ability to simulate systems of mixed CO 2 -CH 4 hydrates. However, the physically realistic simulation of mixed-hydrate simulation is not yet a fully solved problem. Limited quantitative laboratory data leads to the use of various ab initio, statistical mechanical, or other mathematic representations of mixed-hydrate phase behavior. Few of these methods are suitable for inclusion in reservoir simulations, particularly for systems with large number of grid elements, 3D systems, or systems with complex geometric configurations. In this paper, we present a set of fast parametric relationships describing the thermodynamic properties and phase behavior of a mixed methane-carbon dioxide hydrate system. We use well-known, off-the-shelf hydrate physical properties packages to generate a sufficiently large dataset, select the most convenient and efficient mathematical forms, and fit the data to those forms to create a physical properties package suitable for inclusion in the TOUGH+ family of codes. Finally, the mapping of the phase and thermodynamic space reveals the complexity of the mixed-hydrate system and allows understanding of the thermodynamics at a level beyond what much of the existing laboratory data and literature currently offer.

58 GEOSCIENCES↗

Letter Report: LAW Simulant Development for Cast Stone Screening Test

More than 56 million gallons of radioactive and hazardous waste are stored in 177 underground storage tanks at the U.S. Department of Energy’s (DOE’s) Hanford Site in southeastern Washington State. The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is being constructed to treat the wastes and immobilize them in a glass waste form. The WTP includes a pretreatment facility to separate the wastes into a small volume of high-level waste (HLW) containing most of the radioactivity and a larger volume of low-activity waste (LAW) containing most of the nonradioactive chemicals. The HLW will be converted to glass in the HLW vitrification facility for ultimate disposal at an offsite federal repository. At least a portion (~35%) of the LAW will be converted to glass in the LAW vitrification facility and will be disposed of onsite at the Integrated Disposal Facility (IDF). The pretreatment and HLW vitrification facilities will have the capacity to treat and immobilize the wastes destined for each facility. However, a second facility will be needed for the expected volume of additional LAW requiring immobilization. A cementitious waste form known as Cast Stone is being considered to provide the required additional LAW immobilization capacity. The Cast Stone waste form must be acceptable for disposal in the IDF. The Cast Stone waste form and immobilization process must be tested to demonstrate that the final Cast Stone waste form can comply with waste acceptance criteria for the IDF disposal facility and that the immobilization processes can be controlled to consistently provide an acceptable waste form product. Further, the waste form must be tested to provide the technical basis for understanding the long term performance of the waste form in the IDF disposal environment. These waste form performance data are needed to support risk assessment and performance assessment (PA) analyses of the long-term environmental impact of the waste disposal in the IDF. A testing program was developed in fiscal year (FY) 2012 describing in some detail the work needed to develop and qualify Cast Stone as a waste form for the solidification of Hanford LAW (Westsik et al. 2012). Included within Westsik et al. (2012) is a section on the near-term needs to address Tri-Party Agreement Milestone M-062-40ZZ. The objectives of the testing program to be conducted in FY 2013 and FY 2014 are to: • Determine an acceptable formulation for the LAW Cast Stone waste form. • Evaluate sources of dry materials for preparing the LAW Cast Stone. • Demonstrate the robustness of the Cast Stone waste form for a range of LAW compositions. • Demonstrate the robustness of the formulation for variability in the Cast Stone process. • Provide Cast Stone contaminant release data for PA and risk assessment evaluations. The first step in determining an acceptable formulation for the LAW Cast Stone waste form is to conduct screening tests to examine expected ranges in pretreated LAW composition, waste stream concentrations, dry-materials sources, and mix ratios of waste feed to dry blend. A statistically designed test matrix will be used to evaluate the effects of these key parameters on the properties of the Cast Stone as it is initially prepared and after curing. The second phase of testing will focus on selection of a baseline Cast Stone formulation for LAW and demonstrating that Cast Stone can meet expected waste form requirements for disposal in the IDF. It is expected that this testing will use the results of the screening tests to define a smaller suite of tests to refine the composition of the baseline Cast Stone formulation (e.g. waste concentration, water to dry mix ratio, waste loading).

Russell, Renee L.↗

ELAWD GROUT HOPPER MOCK-UP TESTING

A 10-inch READCO mixer is used for mixing the premix (45 (wt%) fly ash, 45 wt% slag, and 10 wt% portland cement) with salt solution in the Saltstone Production Facility (SPF). The Saltstone grout free falls into the grout hopper which feeds the suction line leading to the Watson SPX 100 duplex hose pump. The Watson SPX 100 pumps the grout through approximately 1500 feet of piping prior to being discharged into the Saltstone Disposal Facility (SDF) vaults. The existing grout hopper has been identified by the Saltstone Enhanced Low Activity Waste Disposal (ELAWD) project for re-design. The current nominal working volume of this hopper is 12 gallons and does not permit handling an inadvertent addition of excess dry feeds. Saltstone Engineering has proposed a new hopper tank that will have a nominal working volume of 300 gallons and is agitated with a mechanical agitator. The larger volume hopper is designed to handle variability in the output of the READCO mixer and process upsets without entering set back during processing. The objectives of this task involve scaling the proposed hopper design and testing the scaled hopper for the following processing issues: (1) The effect of agitation on radar measurement. Formation of a vortex may affect the ability to accurately measure the tank level. The agitator was run at varying speeds and with varying grout viscosities to determine what parameters cause vortex formation and whether measurement accuracy is affected. (2) A dry feeds over addition. Engineering Calculating X-ESR-Z-00017 1 showed that an additional 300 pounds of dry premix added to a 300 gallon working volume would lower the water to premix ratio (W/P) from the nominal 0.60 to 0.53 based on a Salt Waste Processing Facility (SWPF) salt simulant. A grout with a W/P of 0.53 represents the upper bound of grout rheology that could be processed at the facility. A scaled amount of dry feeds will be added into the hopper to verify that this is a recoverable situation. (3) The necessity of baffles in the hopper. The preference of the facility is not to have baffles in the hopper; however, if the initial testing indicates inadequate agitation or difficulties with the radar measurement, baffles will be tested.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗