FRIB Beam Power Ramp-up: Status and Plans

After project completion on scope, on cost, and ahead of schedule, the Facility for Rare Isotope Beams began operations for scientific users in May of 2022. The ramp-up to a beam power of 400 kW is planned over a six-year period; 1 kW was delivered for initial user runs from in 2022, and 5 kW was delivered as of February 2023. Test runs with 10 kW 36Ar and 48Ca beams were conducted in July 2023. Upgrade plans include doubling the primary-beam energy to 400 MeV/nucleon for enhanced discovery potential (¿FRIB 400¿). This talk reports on the strategic plans towards high power operations emphasizing challenges and resolutions in beam-interception devices and targetry systems, radiation protection and controls, and legacy system renovation and integration.

43 PARTICLE ACCELERATORS↗

Scalable Truck Charging Demand Simulation for Cost-Optimized Infrastructure Planning

This project developed a scalable, high-resolution model to simulate medium- and heavy-duty (MHD) electric truck charging demand and assess its impact on grid infrastructure. Using generative modeling, simulation, and cost optimization, the project delivered an end-to-end software pipeline and a library of 96 real-world scenarios for the Dallas–Houston megaregion. We demonstrated a modular architecture for transportation and grid modeling, implemented cost-optimized infrastructure planning methods, and quantified grid capital, operational, and environmental costs across a wide range of truck electrification scenarios. The results have been adopted by major utility stakeholders and contributed to regional planning efforts.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Liquid rocket booster study. Volume 2, book 3, appendices 2-5: PPIP, transition plan, AMOS plan, and environmental analysis

This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.

Source record↗

Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

Mckay, Charles↗

Solar Terrestrial programs: A five year plan

Major projects to be initiated in the 1980-1985 period, designed to study the Sun, the heliosphere, Earth's magnetosphere, and the upper atmosphere involve the use of spacelab as well as free flying spacecraft. Current and recent investigations in these areas are reviewed and the guiding principles followed in planning future missions are examined. The implementation strategy, the planning process, and supporting research and technology are discussed.

Stern, D. P.↗

DE-FE0023919 Phase 5 Scientific/Technical Report

Phase 5 of the Deepwater Methane Hydrate Characterization and Scientific Assessment research project (DOE Award No. DE-FE0023919) occurred from Oct. 1, 2020 to Nov. 15, 2023. Throughout Phase 5, UT performed all aspects of project management and planning according to the award, project management plan, and statement of project objectives (Task 1). UT maintained and augmented the capability to transport, store, manipulate and analyze pressure cores (Task 13). UT’s hydrate core effective stress chamber can now run tests at effective stresses up to 20 MPa. A benchmark study was conducted and confirmed that the K0 permeameter accurately estimates geomechanical and petrophysical properties of geomaterials under uniaxial strain conditions. UT continued to analyze remaining UT-GOM2-1 pressure cores from GC955 (Task 10).

03 NATURAL GAS↗

Status and Plans for the WCRP/GEWEX Global Precipitation Climatology Project (GPCP)

Status and plans for GPCP are presented along with scientific findings from the current data set. Global and large regional rainfall variations and possible long-term changes are examined using the 26-year (1979-2004) monthly dataset from the Global Precipitation Climatology Project (GPCP). One emphasis is to discriminate among the variations due to ENSO, volcanic events and possible long-term changes. Although the global change of precipitation in the data set is near zero, the data set does indicate an upward trend (0.13 mm/day/25yr) and a downward trend (-0.06 mm/day/25yr) over tropical oceans and lands (25S-25N), respectively. This corresponds to a 4% increase (ocean) and 2% decrease (land) during this time period. Simple techniques are derived to attempt to eliminate variations due to ENSO and major volcanic eruptions in the Tropics. Using only annual values two "volcano years" are determined by examining ocean-land coupled variations in precipitation related to ENSO and other phenomena. The outlier years coincide with Pinatubo and El Chicon eruptions. The ENSO signal is reduced by deriving mean ocean and land values for El Nino, La Nina and neutral conditions based on Nino 3.4 SST and normalizing the annual ocean and land precipitation to the neutral set of cases. The impact of the two major volcanic eruptions over the past 25 years is estimated to be about a 5% reduction in tropical rainfall. The modified data set (with ENSO and volcano effect at least partially removed) retains the same approximate linear change slopes over the data set period, but with reduced variance leading to significance tests with results in the 90-95% range. Intercomparisons between the GPCP, SSM/I (1988-2004), and TRMM (1998-2004) satellite rainfall products and alternate gauge analyses over land are made to attempt to increase or decrease confidence in the changes seen in the GPCP analysis.

Adkerm Robert F.↗

A procedure for merging land cover/use data from LANDSAT, aerial photography, and map sources: Compatibility, accuracy, and cost. Remote Sensing Project

Regional planning agencies are currently expressing a need for detailed land cover/use information to effectively meet the requirements of various federal programs. Individual data sources have advantages and limitations in fulfilling this need, both in terms of time/cost and technological capability. A methodology has been developed to merge land cover/use data from LANDSAT, aerial photography and map sources to maximize the effective use of a variety of data sources in the provision of an integrated information system for regional analysis. A test of the proposed inventory method is currently under way in four central Michigan townships. This test will evaluate the compatibility, accuracy and cost of the integrated method with reference to inventories developed from a single data source, and determine both the technological feasibility and analytical potential of such a system.

Enslin, W. R.↗

Real-time fuzzy inference based robot path planning

This project addresses the problem of adaptive trajectory generation for a robot arm. Conventional trajectory generation involves computing a path in real time to minimize a performance measure such as expended energy. This method can be computationally intensive, and it may yield poor results if the trajectory is weakly constrained. Typically some implicit constraints are known, but cannot be encoded analytically. The alternative approach used here is to formulate domain-specific knowledge, including implicit and ill-defined constraints, in terms of fuzzy rules. These rules utilize linguistic terms to relate input variables to output variables. Since the fuzzy rulebase is determined off-line, only high-level, computationally light processing is required in real time. Potential applications for adaptive trajectory generation include missile guidance and various sophisticated robot control tasks, such as automotive assembly, high speed electrical parts insertion, stepper alignment, and motion control for high speed parcel transfer systems.

Pacini, Peter J.↗

Method for Producing Launch/Landing Pads and Structures Project

Current plans for deep space exploration include building landing-launch pads capable of withstanding the rocket blast of much larger spacecraft that that of the Apollo days. The proposed concept will develop lightweight launch and landing pad materials from in-situ materials, utilizing regolith to produce controllable porous cast metallic foam brickstiles shapes. These shapes can be utilized to lay a landing launch platform, as a construction material or as more complex parts of mechanical assemblies.

Technology Portfolio System↗

Calibration Plan

PhD project update presentation to be given to Texas Tech University advisor.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

Dickinson, William B.↗

A Planning Revolution

Explore the source record for details and available documents.

project planning RecDel System↗

Crustal dynamics project observations: 1982 results and plans for 1983

The 1982 Crustal Dynamics Project observations by fixed and mobile SLR and VLBI systems are reviewed. Plate motion measurements between North America and Europe were conducted by both techniques and SLR measurements were also made between North America, the Pacific, Australia and South American plates. Regional deformation measurements by VLBI and SLR systems were restricted to the western United States in 1982, including a number of important intercomparison baseline measured by both techniques. In 1983 the observing program grows significantly, with new SLR systems in Mexico, Easter Island, the Pacific and Italy. New VLBI systems will include a dedicated VLBI site at Weltzell, in Germany. Two highly mobile SLR and two highly mobile VLBI systems will greatly increase the regional deformation measurements in California and through the Basin and Range, where more than 25 sites will be occupied in 1983.

Frey, H.↗