Search NASA⌕ Search

SEARCH · Search NASA

Results for “electric grid dynamics”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

TRANSENSOR: Transformer Real-time Assessment INtelligent System with Embedded Network of Sensors and Optical Readout. Final Report

Utilities across the world are wrestling with evolving market dynamics, population growth and climate change. Distributed Energy Resources (DERs) such as solar photovoltaics, distributed generators and energy storage systems are becoming important parts of the U.S. energy mix. These factors are driving an increasing need for low-cost grid asset monitoring. Aside from being costly, traditional utility monitoring systems are not sufficiently robust and do not provide real-time visibility into the condition of grid assets such as transformers. Lack of accurate real-time measurements on performance has resulted in the use of lagging indicators, such as oil sample analysis. To address this need, an innovative embedded optical sensing technology, Transformer Real-time Assessment Intelligent System (TRANSENSOR) was developed, validated and demonstrated in this project. To date, TRANSENSOR has focused on transformers but is extendable to other grid assets. In addition to the technology being embedded into new transformers during manufacturing, a retrofit configuration that can be installed on existing transformers in the field was also developed. It is anticipated that the ability to retrofit existing transformers will help accelerate adoption of the underlying TRANSENSOR technology. Phase 1 of the project focused on laboratory development and qualification of the technology. Following iterations and exploration of relevant optical sensing modalities and multiplexed configurations of interest for the transformer environment, an effective candidate configuration was agreed upon, down-selected and custom-designed for embedding into General Electric (GE) network transformers. Two new GE 500 kilovolt ampere (kVA), 27 kilovolt (kV) distribution network transformers were built with embedded fiber-optic (FO) sensors and successfully qualified per industry standards at GE’s Shreveport, Louisiana facility during Phase 1 of the project. Following the successful completion of Phase 1, the team proceeded to Phase 2, which focused on a field demonstration of the technology. Over Phase 2, the first new GE transformer built with embedded fiber-optic sensors was installed in an above-ground cage and connected to the grid at Con Edison’s Astoria facility. A second transformer equipped with TRANSENSOR was installed in an underground vault. Additionally, an older (1982 year model) GE transformer in an above-ground cage was retrofitted with fiber- optic sensors and reconnected to the grid at ConEd’s facility. Analysis of data acquired from the sensors showed interesting correlations with transformer loading. Additionally, key events such as transformer low-voltage network connection, primary-side energizing, and a pressure loss event from an oil sampling were detected by the TRANSENSOR system. Online data processing/feature extraction algorithms for the second transformer in the underground vault detected key features and event alerts that were transmitted through a wireless 4G connection. The remote deployment concept showed promising results with data collection running for a total of 8 months across the three (3) GE transformers instrumented for the Phase 2 field demonstration. This sets the stage well for further development and commercialization.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Rubik’s Cube Topology Based Particle Swarm Algorithm for Bilevel Building Energy Transaction

Following the rapid growth of distributed energy resources (e.g. renewables, battery), localized peer-to-peer energy transactions are receiving more attention for multiple benefits, such as, reducing power loss, stabilizing the main power grid, etc. To promote distributed renewables locally, the local trading price is usually set to be within the external energy purchasing and selling price range. Consequently, building prosumers are motivated to trade energy through a local transaction center. This local energy transaction is modeled in bilevel optimization game. A selfish upper level agent is assumed with the privilege to set the internal energy transaction price with an objective of maximizing its arbitrage profit. Meanwhile, the building prosumers at the lower level will response to this transaction price and make decisions on electricity transaction amount. Therefore, this non-cooperative leader-follower trading game is seeking for equilibrium solutions on the energy transaction amount and prices. In addition, a uniform local transaction price structure (purchase price equals selling price) is considered here. Aiming at reducing the computational burden from classical Karush-Kuhn-Tucker (KKT) transformation and protecting the private information of each stakeholder (e.g., building), swarm intelligence based solution approach is employed for upper level agent to generate trading price and coordinate the transactive operations. On one hand, to decrease the chance of premature convergence in global-best topology, Rubiks Cube topology is proposed in this study based on further improvement of a two-dimensional square lattice model (i.e., one local-best topology-Von Neumann topology). Rotating operation of the cube is introduced to dynamically changing the neighborhood and enhancing information flow at the later searching state. Several groups of experiments are designed to evaluate the performance of proposed Rubiks Cube topology based particle swarm algorithm. The results have validated the effectiveness of proposed topology and operators comparing with global-best version PSO and Von Neumann topology based PSO and its scalability on larger scale applications.

Feng, Xiaochun↗

Insights into Methodologies and Stochastic Optimization of Thermal Energy Storage-Coupled Advanced Reactor Systems: A Comparison of Methods for Accessing Long-Term Sub-System Sizing Adequacy

This paper investigates the potential of coupling Thermal Energy Storage (TES) with Advanced Reactors (ARs) to address uncertainties posed by climate change in deep decarbonized power systems. The TES Use-case Team at Idaho National Laboratory (INL) has examined the potential of storing thermal energy from ARs during low demand periods and optimizing discharge during peak-priced hours, in both steady-state and transient conditions. Building on this groundwork, this study bridges the gaps in optimal sizing of the sub-system of TES-coupled AR systems using Risk Analysis Virtual Environment (RAVEN) and Holistic Energy Resource Optimization Network (HERON), INL?s framework for grid optimization. By applying this framework, we present statistically-robust optimal charge, discharge including balance of plant (BOP), and storage sizing for the High-Temperature Gas-Cooled Reactor (HTGR) with 203 MWth output. To this end, we generated synthetic price samples for 30 years using 2018 ? 2021 real-time market data from ERCOT, PJM and MISO. Our results reveals that the TES-coupled HTGR system is highly effective in maximizing revenue from electricity sales. We observed a substantial increase of 40 % in ERCOT and a noteworthy 15 % increase in PJM and MISO when compared to the conventional BOP without TES. This improvement is achieved through regionally-tailored sub-system sizing, which ranges from 398 to 416 MWth for the discharge system and 610 to 1029 MWth for the TES. We find that the average electricity price directly impacts the overall economics, while price volatility influences storage size. Additional sensitivity analyses were performed to access the impact of key assumptions on system economics and sizing, differentiating the optimization window (i.e., 24 ? 219 hours of chronological observations) and by imposing storage continuity condition in tracking TES cycles. We observed that at the 120-hour of the optimization window, a reasonable balance between computation time and accuracy was achieved. Our analysis also highlights the significance of conducting multi-day cycle analysis (> 120-hour) for TES to capture interaction between electricity prices and storage dynamics, providing a comprehensive understanding of TES behavior that AR developers should integrate into their plant designs.

25 ENERGY STORAGE↗

Locating the Source of Forced Oscillations in Transmission Power Grids

A forced oscillation event in power grids refers to a state where malfunctioning or abnormally operating equipment causes persisting periodic disturbances in the system. While power grids are designed to damp most perturbations during standard operations, some of them can excite normal modes of the system and cause significant energy transfers across the system, creating large oscillations thousands of miles away from the source. Localization of the source of such disturbances remains an outstanding challenge due to a limited knowledge of the system parameters outside of the zone of responsibility of system operators. Here, we propose a new method for locating the source of forced oscillations that addresses this challenge by performing a simultaneous dynamic model identification using a principled maximum likelihood approach. We illustrate the validity of the algorithm on a variety of examples where forcing leads to resonance conditions in the system dynamics. Our results establish that an accurate knowledge of system parameters is not required for a successful inference of the source and frequency of a forced oscillation. We anticipate that our method will find a broader application in general dynamical systems that can be well described by their linearized dynamics over short periods of time.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Increasing the Number of Installed Residential Heat Pump Water Heaters in the USA Through Improved Technology and Utility Programs

Heat pump water heaters (HPWHs) offer an efficient alternative to electric resistance water heaters, but they suffer from limited market penetration. This paper reviews the current state of HPWHs in the USA, focusing on technology developments and programs to increase adoption. What technological improvements are needed to make HPWHs a good fit in more homes? Additionally, what are the best ways of promoting HPWHs to consumers? Improved communication and controls will allow HPWHs to provide demand response and follow dynamic utility rates. To enable fuel-switching, HPWHs are being developed that only need a standard 120V outlet. Split HPWHs can alleviate the cooling and noise that limit the use of HPWHs in small homes, multifamily buildings, and cold climates. Additionally, new utility programs aim to train installers and provide incentives to distributors to increase the number of HPWHs installed. Some utilities offer novel incentive programs that have led to increased customer uptake. Those advances, coupled with improved controls for load shifting and new products such as split HPWHs and HPWHs that can run on 120V power, may finally move the market forward.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory Protected Areas Database of the United States (PAD-US) areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

IM3 Projected US Data Center Locations

IM3 Projected US Data Center Locations This dataset contains model projections of new data center facilities in the contiguous United States (CONUS) through 2035 using the CERF – Data Centers model. Data center locations are modeled across four data center electricity demand growth scenarios (low, moderate, high, higher) and five market gravity scenarios (0%, 25%, 50%, 75%, 100%). Projected locations are intended to be regional representations of feasible siting locations in the future to assess potential grid and water stress impacts. The data center load growth scenarios correspond with the rates outlined in EPRI (2024) and include 3.71%, 5%, 10%, and 15% annual growth of electricity demand for data centers from 2023 values in 37 states across the CONUS. Market gravity scenarios correspond to the relative importance of proximity to data center markets or high population areas compared to locational cost in the siting algorithm. 0% market gravity means that siting decisions were entirely determined by the locational cost in each feasible location. 100% market gravity means that only market proximity was considered when siting. Other scenarios have weight placed on both components where total weight always equals 100%. Locational cost is dependent on facility cooling type and corresponding electricity cost, taxes, and other factors. Facility cooling type is spatially determined where high water stress and/or areas with high summer wet bulb temperatures are assumed to operate with mechanical cooling for a higher fraction of the year rather than evaporative cooling. Feasible data center siting areas are based on geospatial suitability raster data developed with open-source information. The following areas are excluded from siting: Areas within 300 m of a federal airport runway or within an airport area boundary Waterbodies Areas with slope >16% Areas susceptible to sinkholes High coastal or inland flood risk areas Local, state, and federal parks, leisure areas, and cemeteries Areas >2 km away from electric substations Areas >5 km away from a municipal water supplier service area Areas >2 km away from high-speed fiber provider service territory USGS Protected Areas Database of the United States (PAD-US) GAP status 1, 2, or 3 areas US National Parks Wetlands USFWS critical habitats BIA land areas Railroads, major roadways, and minor roadways Military areas and training grounds NLCD developed lands Areas >0.8 km (0.5 miles) from NLCD developed lands Because we use open-source information, proprietary information that can influence siting decisions such as individual tax agreements with cities, detailed fiber line connectivity, electric grid power capacity agreements, and others, are not currently accounted for in the modeling process. Using specific building locations and footprints in the dataset for local planning purposes is not advised. Technical Information Geospatial data is provided in geojson format using the Albers Equal Area Conic (ESRI:102003) coordinate reference system. The datasets contain the following parameters: id - unique identification number within given scenario file growth_scenario – data center demand growth scenario market_gravity_weight – market gravity weight scenario (%) region – name of region (i.e., US State) total_cost_million_usd – locational siting cost ($million) campus_size_square_ft – total land acquired for data center facility (square ft) data_center_it_power_mw – IT power of data center facility (MW) mechanical_cooling_frac – fraction of year when data center uses mechanical cooling system water_cooling_frac– fraction of year when data center uses evaporative cooling system cooling_energy_demand_mwh – total annual facility energy demand for cooling (MWh) cooling_water_demand_mgy – total annual facility water demand for cooling (MG) cooling_water_consumption_mgy – total annual facility water consumed (MG) normalized_locational_cost – normalized total locational cost score for location normalized_gravity_score – normalized market gravity score for location weighted_siting_score – total weighted siting score of locational cost and gravity score geometry – polygon geometry of facility Acknowledgment IM3 is a multi-institutional effort led by Pacific Northwest National Laboratory and supported by the U.S. Department of Energy's Office of Science as part of research in MultiSector Dynamics, Earth and Environmental Systems Modeling Program. License This data is made available under a CCBY4.0 License Disclaimer This material was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor the United States Department of Energy, nor the Contractor, nor any or their employees, nor any jurisdiction or organization that has cooperated in the development of these materials, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness or any information, apparatus, product, software, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof, or Battelle Memorial Institute. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof. PACIFIC NORTHWEST NATIONAL LABORATORYoperated byBATTELLEfor theUNITED STATES DEPARTMENT OF ENERGYunder Contract DE-AC05-76RL01830

Mongird, Kendall (ORCID:0000000328077088)↗

Modeling Framework for Bulk Electric Grid Impacts from HEMP E1 and E3 Effects (Tasks 3.1 Final Report)

This report presents a framework to evaluate the impact of a high-altitude electromagnetic pulse (HEMP) event on a bulk electric power grid. This report limits itself to modeling the impact of EMP E1 and E3 components. The co-simulation of E1 and E3 is presented in detail, and the focus of the paper is on the framework rather than actual results. This approach is highly conservative as E1 and E3 are not maximized with the same event characteristics and may only slightly overlap. The actual results shown in this report are based on a synthetic grid with synthetic data and a limited exemplary EMP model. The framework presented can be leveraged and used to analyze the impact of other threat scenarios, both manmade and natural disasters. This report d escribes a Monte-Carlo based methodology to probabilistically quantify the transient response of the power grid to a HEMP event. The approach uses multiple fundamental steps to characterize the system response to HEMP events, focused on the E1 and E3 components of the event. 1) Obtain component failure data related to HEMP events testing of components and creating component failure models. Use the component failure model to create component failure conditional probability density function (PDF) that is a function of the HEMP induced terminal voltage. 2) Model HEMP scenarios and calculate the E1 coupled voltage profiles seen by all system components. Model the same HEMP scenarios and calculate the transformer reactive power consumption profiles due to E3. 3) Sample each component failure PDF to determine which grid components will fail, due to the E1 voltage spike, for each scenario. 4) Perform dynamic simulations that incorporate the predicted component failures from E1 and reactive power consumption at each transformer affected by E3. These simulations allow for secondary transients to affect the relays/protection remaining in service which can lead to cascading outages. 5) Identify the locations and amount of load lost for each scenario through grid dynamic simulation. This can be an indication of the immediate grid impacts from a HEMP event. In addition, perform more detailed analysis to determine critical nodes and system trends. 6) To help realize the longer-term impacts, a security constrained alternating current optimal power flow (ACOPF) is run to maximize critical load served. This report describes a modeling framework to assess the systemic grid impacts due to a HEMP event. This stochastic simulation framework generates a large amount of data for each Monte Carlo replication, including HEMP location and characteristics, relay and component failures, E3 GIC profiles, cascading dynamics including voltage and frequency over time, and final system state. This data can then be analyzed to identify trends, e.g., unique system behavior modes or critical components whose failure is more likely to cause serious systemic effects. The proposed analysis process is demonstrated on a representative system. In order to draw realistic conclusions of the impact of a HEMP event on the grid, a significant amount of work remains with respect to modeling the impact on various grid components.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Modular Power Electronics Approach for High Power Dynamic Wireless Charging System

Dynamic wireless power transfer (DWPT) can provide energy to EVs in motion and extend the drive range. Upscaling the charging power to 200 kW (High Power DWPT) reduces the percentage of electrified roadway required, and the solution becomes cost-effective. To smooth the power at the battery and grid, a secondary regulation stage must be added. The DWPT system therefore relies on power electronics to interface with the coils and regulate the power flow. Designing this high power system using wide bandgap devices makes ensuring high efficiency, small size, and reliable operation very challenging, and significant engineering effort is required to build such complicated systems for large-scale installation and deployment. Here, this paper describes a modular design approach for the power electronics to achieve the 200 kW wireless power transfer. As described, the SiC power electronics building block is designed, simulated, and characterized. The approach is validated in the DWPT system to build the inverter, the rectifier, and the DC/DC converter, which demonstrated high performance and reliable operation with 188 kW power.

42 ENGINEERING↗

Oscillation Risks of Grid-Following and Grid-Forming Inverter-Based Resources in Series-Compensated Networks

Here, this paper investigates the dynamic behavior of a grid-connected inverter-based resource (IBR) when connected radially to a series compensated line. Potential interactions between the series compensation and the IBR have been identified for both types: grid-following (GFL) or grid-forming (GFM). The study begins with electromagnetic transient (EMT) simulations to demonstrate stability issues. Subsequently, nonlinear analytical models are formulated in the dq frame, validated against the EMT simulation, and leveraged to assess eigenvalues and participation factors. Influencing factors of the dominant oscillation modes have been identified. The analysis results show that series compensation may make a mode associated with the synchronization unit unstable. Furthermore, customized feedback systems are built for the synchronizing loop. Series compensation can increase the sensitivity of the voltage phase angle towards the synchronizing angle, and introduce phase lag in the real power response towards the synchronizing angle. These factors may cause interactions with the phase-locked loop in GFL-IBR systems and with power-based synchronization in GFM-IBR systems, potentially leading to instability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CyDER: A Cyber Physical Co-simulation Platform for Distributed Energy Resources in Smartgrids

The CyDER project aimed at developing an open-source, modular and scalable co-simulation platform for power grids with large shares of Distributed Energy Resources (DERs). The project partners are the Lawrence Berkeley National Lab (LBNL), Lawrence Livermore National Lab (LLNL), PG&E, SolarCity, and ChargePoint. The prime recipient is LBNL; SolarCity and ChargePoint were partners for the project’s first two years. Increased DER integration introduces a number of challenges in power grid operation including a more dynamic interaction between the transmission grid and distribution grids, and increased modeling complexity. Although specialized software exists to precisely model different components of the power system, it is far from trivial to integrate all various models and perform a holistic simulation. Instead of replicating all models in a common simulation program, a commonly accepted approach to tackle this model diversity is to couple third-party simulators and models through a co-simulation platform that coordinates information exchange among the various components. Following this line of research, this project’s objective was to develop a co-simulation platform based on a widely accepted industrial standard called Functional Mockup Interface (FMI). Within this process, the project developed models compliant with the FMI standard, called Functional Mockup Units (FMUs), and used them to perform various operational and planning power system analyses. Relying and building upon an industrial standard is the main differentiation of this project compared with previous or parallel efforts in the co-simulation area. Particular emphasis was put on delivering software utilities to facilitate setting up and running co-simulations by end-users. Furthermore, a strong aspect of this project is demonstrating that co-simulation techniques can be used to perform Hardware-in-the-Loop (HIL) simulations that couple software components (e.g., simulated models) with hardware components (e.g., real devices such PV systems and batteries). The long-term goal of CyDER project is to help establish FMI as a powerful standard for co-simulation and promote adoption by electric utilities and other interested stakeholders. The main accomplishments of the project include the development of several FMUs including distribution and transmission grid models, PV inverters with Volt/Var/Watt controllers, batteries, and predictive optimal controllers. Additionally, a unique software package was developed, called SimulatorToFMU, which is capable of exporting any Python-driven simulator or Python script as an FMU. This is an important contribution towards establishing FMI as one of the main co-simulation standards, because more and more third-party programs for sub-system modeling and simulation are delivered with Python APIs. The CyDER platform was used to perform PV hosting capacity analyses in real utility feeders with and without smart inverter controls, battery storage, and EV charging. Smart inverter controls include conventional Volt/Var/Watt controls for reactive power support and active power curtailment, but also predictive controls that optimize the charging and discharging profile of the battery connected on the DC side in order to minimize the customer’s economic benefit. Finally, an important result of this project is delivering an experimental setup that consists of residential-scale PV inverters with battery storage, a real-time grid simulator with an ideal voltage source as grid emulator, and micro Phasor Measurement Units (PMUs). All these components and additional software modules are coupled to one another using the FMI standard and can be co-simulated with the CyDER platform.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗

NASA Tech Briefs, July 2011

Topics covered include: 1) Collaborative Clustering for Sensor Networks; 2) Teleoperated Marsupial Mobile Sensor Platform Pair for Telepresence Insertion Into Challenging Structures; 3) Automated Verification of Spatial Resolution in Remotely Sensed Imagery; 4) Electrical Connector Mechanical Seating Sensor; 5) In Situ Aerosol Detector; 6) Multi-Parameter Aerosol Scattering Sensor; 7) MOSFET Switching Circuit Protects Shape Memory Alloy Actuators; 8) Optimized FPGA Implementation of Multi-Rate FIR Filters Through Thread Decomposition; 9) Circuit for Communication Over Power Lines; 10) High-Efficiency Ka-Band Waveguide Two-Way Asymmetric Power Combiner; 11) 10-100 Gbps Offload NIC for WAN, NLR, and Grid Computing; 12) Pulsed Laser System to Simulate Effects of Cosmic Rays in Semiconductor Devices; 13) Flight Planning in the Cloud; 14) MPS Editor; 15) Object-Oriented Multi Disciplinary Design, Analysis, and Optimization Tool; 16) Cryogenic-Compatible Winchester Connector Mount and Retaining System for Composite Tubes; 17) Development of Position-Sensitive Magnetic Calorimeters for X-Ray Astronomy; 18) Planar Rotary Piezoelectric Motor Using Ultrasonic Horns; 19) Self-Rupturing Hermetic Valve; 20) Explosive Bolt Dual-Initiated from One Side; 21) Dampers for Stationary Labyrinth Seals; 22) Two-Arm Flexible Thermal Strap; 23) Carbon Dioxide Removal via Passive Thermal Approaches; 24) Polymer Electrolyte-Based Ambient Temperature Oxygen Microsensors for Environmental Monitoring; 25) Pressure Shell Approach to Integrated Environmental Protection; 26) Image Quality Indicator for Infrared Inspections; 27) Micro-Slit Collimators for X-Ray/Gamma-Ray Imaging; 28) Scatterometer-Calibrated Stability Verification Method; 29) Test Port for Fiber-Optic-Coupled Laser Altimeter; 30) Phase Retrieval System for Assessing Diamond Turning and Optical Surface Defects; 31) Laser Oscillator Incorporating a Wedged Polarization Rotator and a Porro Prism as Cavity Mirror; 32) Generic, Extensible, Configurable Push-Pull Framework for Large-Scale Science Missions; 33) Dynamic Loads Generation for Multi-Point Vibration Excitation Problems; 34) Optimal Control via Self-Generated Stochasticity; 35) Space-Time Localization of Plasma Turbulence Using Multiple Spacecraft Radio Links; 36) Surface Contact Model for Comets and Asteroids; 37) Dust Mitigation Vehicle; 38) Optical Coating Performance for Heat Reflectors of the JWST-ISIM Electronic Component; 39) SpaceCube Demonstration Platform; 40) Aperture Mask for Unambiguous Parity Determination in Long Wavelength Imagers; 41) Spaceflight Ka-Band High-Rate Radiation-Hard Modulator; 42) Enabling Disabled Persons to Gain Access to Digital Media; 43) Cytometer on a Chip; 44) Principles, Techniques, and Applications of Tissue Microfluidics; and 45) Two-Stage Winch for Kites and Tethered Balloons or Blimps.

Source record↗

Parameterization of generic positive sequence models to represent behavior of inverter based resources in low short circuit scenarios

The connection of large inverter based resources (IBR) in transmission systems is often located geographically and electrically far away from load centers. This, coupled with the displacement of synchronous machine plants, results in a reduction of the network short circuit strength at the point of connection. Under these conditions, state-of-the-art positive sequence simulation platforms and models can have difficulties maintaining numerical stability and/or providing an accurate representation of IBR plant dynamic behavior. As a result, computationally heavy time domain electromagnetic transient (EMT) simulations may be required to evaluate these systems. In this paper, a recently developed improved generic positive sequence model is parameterized to provide a representation of IBR behavior in low short circuit networks. Further, comparisons against generic and detailed EMT models demonstrate the suitability of the improved positive sequence model to study practical stability issues experienced with presently in-service plants. Such a model can provide some of the accuracy of an EMT representation with a much lower computational burden. The performance of the positive sequence model is validated against the behavior shown by both open white box and closed black box EMT domain models from around the world.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design and optimization of flexible decoupled high-temperature gas-cooled reactor plants with thermal energy storage

Advanced nuclear power plants are well-positioned for future zero-carbon grids, however, the need for flexible power generation will be required over the traditional emphasis on baseload generation for meeting historical demands. To achieve such flexibility, this work examines viable configurations for coupling nuclear energy production with thermal energy storage. Previous designs on nuclear-thermal energy storage configurations for advanced reactor designs, which utilized reactor steam as the heat source for charging the thermal energy storage, are restricted by the heat diversion ratio and efficiency losses, thus their impacts can be limited. In this context, this study proposes configurations for fully decoupling the nuclear reactor from the power cycle and positioning the storage as an intermediate loop, thereby achieving an unconstrained heat diversion ratio and improved efficiency. Compared with a standard high-temperature gas-cooled reactor’s power cycle, steady-state thermodynamic modeling and dispatch optimizations quantify the benefits of a steam reheat cycle within the fully decoupled thermal energy system to separate the plant cycle from the high-pressure primary side. These benefits are further detailed, compatible with required high-temperature and high-pressure conditions, through (1) open-source dynamic transient models that examine the impact of off-design operation on the systems, (2) the investigation of components design and costing and finally (3) sizing and dispatch optimization. The fully-decoupled design achieves a cycle efficiency of 43.1%, an enhancement over the vendor’s standard efficiency of 42.2% (Xe-100 design). Here, the proposed design offers strengthened physical barriers from the nuclear island as well as superior operational flexibility and power boosting. Dispatch optimization and market analysis reveal that thermal energy storage size is highly dependent on the peak patterns of electricity prices and the minimum generation level constraint imposed on the balance of plant. Evaluation of off-design operation demonstrates that the full decoupling design with the suggested fail-safe control mechanisms ensures a minimal impact on reactor parameters, even during rapid power ramping.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Coupling Subsurface and Above-Surface Models for Optimizing the Design of Borefields and District Heating and Cooling Systems

Accurate dynamic energy simulation is important for the design and sizing of district heating and cooling systems with geothermal heat exchange for seasonal energy storage. Current modeling approaches in building and district energy simulation tools typically consider heat conduction through the ground between boreholes without flowing groundwater. While detailed simulation tools for subsurface heat and mass transfer exist, these fall short in simulating above-surface energy systems. To support the design and operation of such systems, the study developed a coupled model including a software package for building and district energy simulation, and software for detailed heat and mass transfer in the subsurface. For the first, it uses the open-source Modelica Buildings Library, which includes dynamic simulation models for building and district energy and control systems. For the heat and mass transfer in the soil, it uses the TOUGH simulator. The TOUGH family of codes can model heat and multi-phase, multi-component mass transport for a variety of fluid systems, as well as chemical reactions, in fractured porous media. The study validated the coupled modeling approach by comparing the simulation results with one from the g-function based ground response model. It then looked into effects when the water table and the regional groundwater flow are considered in the ground, from the perspective of heat exchange between borehole and ground, and the electrical consumption of the district heating and cooling systems. To access the simulation models, please find the links in the submission: -- For coupled approach validation: see model Buildings.Fluid.Geothermal.Borefields.Examples.BorefieldsWithTough and Buildings.Examples.DistrictReservoirNetworks.Examples.Reservoir3Variable_TOUGH from the "Modelica Building Library" resource, branch issue1495_tough_interface, commit a2667c0. -- For the study of the effect of water table: see model Buildings.Examples.DistrictReservoirNetworks.Examples.Reservoir3Variable_TOUGH from he "Modelica Building Library" resource, branch issue1495_tough_interface_moreIO, commit 760de49. -- For the study of the effect of regional groundwater flow: see Buildings.Examples.DistrictReservoirNetworks.Examples.Reservoir3Variable_TOUGH from he "Modelica Building Library" resource, branch issue1495_tough_interface_moreIO_3D, commit c2a2d2a. The coupling interface script "GrounResponse.py" can be found from the above links in the folder Buildings/Resources/Python-Sources. Also, the needed files for TOUGH simulation are in the folder Buildings/Resources/Python-Sources/ToughFiles that can be accessed through the above links. A brief description of these files is given below; detailed specifications for the first three files may be found in the TOUGH3 Users Guide (Jung et al., 2018) https://tough.lbl.gov/documentation/tough-manuals/. (1) INCON - initial conditions for each grid block (2) INFILE - main input file with material properties and control parameters (3) MESH - description of the computational grid (4) readsave - Modelica/TOUGH interface program: read the final output of TOUGH simulation after TOUGH time step and prepare for transfer to Modelica for next Modelica time step (5) readsave.inp - input parameters for program readsave (6) writeincon - Modelica/TOUGH interface program: write the output of Modelica after Modelica time step and prepare for transfer to TOUGH as initial conditions for the next TOUGH step (7) writeincon.inp - input parameters for program writeincon

15 GEOTHERMAL ENERGY↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗