Search NASA⌕ Search

SEARCH · Search NASA

Results for “launch separation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 433 records · Page 24

The Ares I-1 Flight Test--Paving the Road for the Ares I Crew Launch Vehicle

In accordance with the U.S. Vision for Space Exploration and the nation's desire to again send humans to explore beyond Earth orbit, NASA has been tasked to send human beings to the moon, Mars, and beyond. It has been 30 years since the United States last designed and built a human-rated launch vehicle. NASA is now building the Ares I crew launch vehicle, which will loft the Orion crew exploration vehicle into orbit, and the Ares V cargo launch vehicle, which will launch the Lunar Surface Access Module and Earth departure stage to rendezvous Orion for missions to the moon. NASA has marshaled unique resources from the government and private sectors to perform the technically and programmatically complex work of delivering astronauts to orbit early next decade, followed by heavy cargo late next decade. Our experiences with Saturn and the Shuttle have taught us the value of adhering to sound systems engineering, such as the "test as you fly" principle, while applying aerospace best practices and lessons learned. If we are to fly humans safely aboard a launch vehicle, we must employ a variety of methodologies to reduce the technical, schedule, and cost risks inherent in the complex business of space transportation. During the Saturn development effort, NASA conducted multiple demonstration and verification flight tests to prove technology in its operating environment before relying upon it for human spaceflight. Less testing on the integrated Shuttle system did not reduce cost or schedule. NASA plans a progressive series of demonstration (ascent), verification (orbital), and mission flight tests to supplement ground research and high-altitude subsystem testing with real-world data, factoring the results of each test into the next one. In this way, sophisticated analytical models and tools, many of which were not available during Saturn and Shuttle, will be calibrated and we will gain confidence in their predictions, as we gain hands-on experience in operating the first of two new launch vehicle systems. The Ares I-1 flight test vehicle (FTV) will incorporate a mix of flight and mockup hardware, reflecting a configuration similar in mass, weight, and shape (outer mold line or OML) to the operational vehicle. It will be powered by a four-segment reusable solid rocket booster (RSRB), which is currently in Shuttle inventory, and will be modified to include a fifth, inert segment that makes it approximately the same size and weight as the five segment RSRB, which will be available for the second flight test in 2012. The Ares I-1 vehicle configuration is shown. Each test flight has specific objectives appropriate to the design analysis cycle in progress. The Ares I-1 demonstration test, slated for April 2009, gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack, understand how to control its roll during flight, and other characterize the severe stage separation environment that the upper stage will experience during future operational flights. NASA also will begin the process of modifying the launch infrastructure and fine-tuning ground and mission operational scenarios, as NASA transitions from the Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

NASA Armstrong's Approach to Store Separation Analysis

Presentation will an overview of NASA Armstrong's store separation capabilities and how they have been applied recently. Objective of the presentation is to brief Generation Orbit and other potential partners on NASA Armstrong's store separation capabilities. It will include discussions on the use of NAVSEP and Cart3D, as well as some Python scripting work to perform the analysis, and a short overview of this methodology applied to the Towed Glider Air Launch System. Collaboration with potential customers in this area could lead to funding for the further development of a store separation capability at NASA Armstrong, which would boost the portfolio of engineering expertise at the center.

launch operations↗

Motivation for Air-Launch: Past, Present, and Future

Air-launch is defined as two or more air-vehicles joined and working together, that eventually separate in flight, and that have a combined performance greater than the sum of the individual parts. The use of the air-launch concept has taken many forms across civil, commercial, and military contexts throughout the history of aviation. Air-launch techniques have been applied for entertainment, movement of materiel and personnel, efficient execution of aeronautical research, increasing aircraft range, and enabling flexible and efficient launch of space vehicles. For each air-launch application identified in the paper, the motivation for that application is discussed.

history↗

Motivation for Air-Launch: Past, Present, and Future

Air-launch is defined as two or more air-vehicles joined and working together, that eventually separate in flight, and that have a combined performance greater than the sum of the individual parts. The use of the air-launch concept has taken many forms across civil, commercial, and military contexts throughout the history of aviation. Air-launch techniques have been applied for entertainment, movement of materiel and personnel, efficient execution of aeronautical research, increasing aircraft range, and enabling flexible and efficient launch of space vehicles. For each air-launch application identified in the paper, the motivation for that application is discussed.

air-launch↗

Software Tool for Tracking & Mapping the NASA Orion AA-2 Test Flight Ejectable Data Recorders in Real Time

On 2 July 2019, the NASA Ascent Abort 2 flight took place off the Florida coast to test the emergency systems to separate the Orion Crew Module (CM) from the future Space Launch System rocket in the event of a malfunction. During this high-altitude test, instrumentation data was recorded on twelve customized buoyant Ejectable Data Recorders (EDRs) and subsequently jettisoned from the CM in mid-air. Upon release, the EDRs activated their GPS-Iridium beacon systems and began transmitting Short Burst Data (SBD) messages via the Iridium satellite network to relay their individual location and system health information. To locate, track and retrieve each EDR from the ocean surface in real-time, multiple open-source programming tools (Python and Linux shells) were developed for parsing the incoming Iridium binary SBD messages. For this, a Linux laptop was used to receive the Iridium-generated emails containing the SBD messages and autonomously execute the parsing tools. The received SBD data contained location, timestamp and health status information that was translated, saved, and subsequently used for simultaneously generating a continuously updated color-coded tabular display summary and unique KML files used with Google Earth to track their locations. Once their locations were known, dedicated recovery vessels retrieved all EDRs from the ocean. An additional tool was also developed in order to generate 5- and 10-minute geolocation predictions for each EDR by deriving the displacement distance, elapsed time, displacement heading and velocity based on the latest known information available. The recovery vessels were also tracked with the use of a separate commercial GPS beacon system. After jettison, 67% of the EDRs transmitted valid data by the time they were retrieved from the ocean. However, the real-time information presented by the plotting tool allowed for the ready depiction of EDR dispersal patterns and reference drift trajectories, which contributed to the recovery of all twelve EDRs and the AA-2 flight data. Lastly, the available data showed that the distance between the software’s reported drift/predicted locations and the recovery locations did not exceed 38 meters, therefore demonstrating the advantages of this software tool for supporting real-time tracking and recovery efforts of beacon devices.

Moxey, Lucas↗

Ares I-X Flight Test - On the Fast Track to the Future

In less than two years, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for an April 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately130,OOO feet and through maximum dynamic pressure ("Max Q") of approximately 800 pounds per square foot. Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by an integrated vehicle CDR in March 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008.

Davis, Stephan R.↗

Ares I-X Flight Test--The Future Begins Here

In less than one year, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will send humans to the Moon and beyond. Personnel from the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for a 2009 launch. Ares I-X will be a suborbital development flight test that will gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future flights; and demonstrate the first stage recovery system. NASA also will modify the launch infrastructure and ground and mission operations. The Ares I-X Flight Test Vehicle (FTV) will incorporate flight and mockup hardware similar in mass and weight to the operational vehicle. It will be powered by a four-segment Solid Rocket Booster (SRB), which is currently in Shuttle inventory, and will include a fifth spacer segment and new forward structures to make the booster approximately the same size and weight as the five-segment SRB. The Ares I-X flight profile will closely approximate the flight conditions that the Ares I will experience through Mach 4.5, up to approximately 130,000 feet (39,600 meters (m)) and through maximum dynamic pressure ('Max Q') of approximately 800 pounds per square foot (38.3 kilopascals (kPa)). Data from the Ares I-X flight will support the Ares I Critical Design Review (CDR), scheduled for 2010. Work continues on Ares I-X design and hardware fabrication. All of the individual elements are undergoing CDRs, followed by a two-part integrated vehicle CDR in March and July 2008. The various hardware elements are on schedule to begin deliveries to Kennedy Space Center (KSC) in early September 2008. Ares I-X is the first step in the long journey to the Moon and farther destinations. This suborbital test will be NASA's first flight of a new human-rated launch vehicle in more than a generation. This promises to be an exciting time for NASA and the nation, as we reach for new goals in space exploration. A visual presentation is included.

Davis, Stephan R.↗

Thermal & Fluids Analysis and the NASA Launch Services Program

This presentation provides the What, Where, Why, and How of the thermal and fluids analysis disciplines within the Launch Services Program (LSP). The LSP manages all commercial launch services to match NASA science mission payloads to the appropriate launch system. The Flight Analysis Division within the LSP provides multi disciplinary analysis support of these flight systems to characterize payload and launch vehicle environments from payload mate to upper stage through on orbit separation. The Thermal Analysis and Fluids Analysis teams are two distinct groups within the Flight Analysis Division of the LSP who cover a wide array of standard and non standard analytical tasks. These teams offer a significant benefit to both the payload design and integration team and the launch vehicle supplier. These benefits, along with the tools and methods are described in this talk to inform engineers and analysts from both sides of the launch system interface how the LSP Thermal and Fluids Analysis teams can benefit the success of their mission.

Fortenberry, Cindy↗

Development of an Inflatable Airlock for a Deep Space Gateway

Inflatable structures technology utilizes high-strength fabric materials and internal pressure to create a stiffened pressure vessel that can replace traditional metallic primary structure in a habitable spacecraft. The flexibility of fabric structures allows them to be compactly stowed for launch and expanded in space, providing significant launch volume savings. The unique construction and design flexibility of these structures can be customized for a variety of uses in space including landing bags, decelerators, long duration in-space and planetary surface habitats, and even airlocks. An airlock is often a required component of a crewed spacecraft to allow for maintenance and human exploration outside of the vehicle. Airlock designs in use today rely on complex hatches and seals connected by metallic walls. Recent developments towards the design of an inflatable airlock structure show feasibility and a significant launch volume savings over a traditional metallic design. This paper will provide a high-level summary of these projects and the current state-of-the-art in inflatable airlock development with additional references and detail about previous and on-going research, providing guidance for the design of a softgoods airlock system. The use of inflatables in space has been in development since the 1960’s for both habitats and airlocks. The first ever EVA was conducted by the USSR in 1965 using an inflatable airlock known as the Volga. This airlock was attached to the Voskhod 2 spacecraft and turned the vehicle into a dual chamber airlock. The airlock was successfully deployed, used and jettisoned after Alexey Leonov’s historic spacewalk. Additional work on human-rated inflatable structures was not continued until the late 1990’s when NASA-JSC led an effort to demonstrate these structures as feasible long-term pressurized elements with the TransHab project. The technology developed and pioneered during this project led to multiple patents and proven feasibility that inflatables could be used for large habitable structures. Following TransHab, Bigelow Aerospace continued the development of inflatable structures with technical support from NASA. This partnership eventually led to the successful flight certification, launch, attachment and deployment of the Bigelow Expandable Activities Module (BEAM) on the ISS in 2016. Inflatable and expandable airlock structures have undergone various detailed feasibility studies and testing for over 15 years, most notably with the Advanced Inflatable Airlock (AIA), Dual-Chamber Hybrid Inflatable Suitlock (DCIS), Minimalistic Advanced Soft Hatch (MASH), and Lightweight External Inflatable Airlock (LEIA). During this time, full-scale articles have been built and pressure-tested, and mock-ups and demonstrators have been constructed and evaluated. During the 2001-2003 timeframe, the AIA concept was matured through requirements development, conceptual design, subscale and full-scale engineering breadboards subjecting various test articles to deployment and pressure testing up to four times operating pressure. These tests proved the feasibility of successful deployment and structural integrity of an inflatable crewlock. Additional testing was performed in the ensuing years, as funding permitted, to further refine additional structural and deployment concepts and to understand the EVA crewmember interfaces, hatches and EVA support equipment interfaces that would be required for a fully functioning airlock. This work resulted in a refinement of the structural requirements and an accounting of the systems needed in an inflatable airlock. In 2014, the MASH project developed an ultra-lightweight airlock concept with a fabric hatch that utilized a unique pressure vessel shape to minimize structural loads around a linear seal. The concept uses an automated zipper-like seal that allows for crew egress/ingress. Most of the development work on the project thus far has focused on the design, analysis and testing of the primary structure and the zipper-like seal system is in the preliminary stages of development with a successful proof-of-concept test. As part of the 2017 LEIA effort, studies were conducted on EVA crewmember interfaces on the inside of an inflatable airlock. These efforts included the design of an internal secondary structure and placement of handholds and foot restraints to enable hatch opening, closing and translation through the airlock. Structural design, analysis and testing was completed on several secondary structure candidates. Crew interface testing was also completed using an inflatable crewlock mockup and the JSC Active Response Gravity Offload System (ARGOS) to simulate the movement of an EVA crewmember through an inflatable crewlock in microgravity. The results of these tests helped demonstrate the feasibility of utilizing an inflatable structure as an airlock and informed the required volume, hatch size, and configuration and location of translation aids for crewmembers in a microgravity crewlock. The ISS Quest airlock uses a dual-chamber design with isolated compartments known as the equipment-lock and the crewlock. The equipment-lock houses the Servicing, Performance and Checkout Equipment (SPCE) items (suit batteries, consumables, etc.) while the crewlock has limited internal hardware and is the nominally depressurized compartment during US EVAs. While inflatable dual chamber airlocks have been studied, the current state of the art emphasizes an inflatable crewlock-type structure attached to a rigid equipment-lock type or habitat structure. Since a large portion of the hardware in the equipment-lock are rigid components and connectors that are installed on the ground - and an inflatable structure does not achieve full structural capabilities until pressurized in space - a depressurized fabric structure cannot provide the capabilities of a full equipment-lock. The use of an inflatable as a crewlock, however, provides all the required capabilities for EVA operations in a small launch package that offers significant volume savings over a metallic crewlock. The functions of a traditional equipment lock, including the SPCE, could be provided by a spacecraft’s habitat module or node and not necessarily in a separate equipment lock. An inflatable crewlock would be attached to the vehicle and launched in a packed and compressed state, saving volume under the launch shroud and mass for the overall airlock element compared to a rigid crewlock. Work is currently underway to continue development of an inflatable airlock with a variety of focus areas including the consideration of crew-induced loads and interfaces, the design and development of an internal sub-structure to provide translation aids and restraints, the thermal considerations of a fabric shell depressurized during an EVA, the micrometeorite environment in deep space, and the packaging and deployment of an inflatable airlock.

Deep Space Exploration↗

Abort separation of the shuttle

A sensitivity analysis of the factors which affect a successful abort maneuver following a space shuttle launching is presented. Wind tunnel tests were conducted using optimum simulation techniques and data acquisition procedures. Static stability, dynamic stability, and local loads were investigated. It is concluded that parallel abort separation of the space shuttle components is possible at both high and low dynamic pressures. Successful separation is dependent upon configuration, Mach number, rocket exhaust impingement and relative position and attitude of the stages.

Decker, J. P.↗

Overview of Experimental Investigations for Ares I Launch Vehicle Development

Another concern for the vehicle during its design trajectory was the separation of the first stage solid rocket booster from the upper stage component after it had depleted its solid fuel propellant. There has been some concern about the interstage of the first stage from clearing the nozzle of the J2-X engine. A detailed separation aerodynamic wind tunnel investigation was conducted in the AEDC VKF Tunnel A to help to investigate the interaction aerodynamic effects5. A comparison of the separation plane details between the Ares I architecture and the Ares I-X demonstration flight architecture is shown in figure 12. The Ares I design requires a more complex separation sequence and requires better control in order to avoid contact with the nozzle of the upper stage engine. The interstage, which houses the J2-X engine for the Ares I vehicle, must be able to separate cleanly to avoid contact of the J2-X engine. There is only about approximately 18 inches of buffer inside the interstage on each size of the nozzle so this is a challenging controlled separation event. This complex experimental investigation required two separate Ares I models (upper stage and first stage with interstage attached) with independent strain gauge balances installed in each model. It also required the Captive Trajectory System (CTS) that was needed to precisely locate the components in space relative to each other to fill out the planned test matrix. The model setup in the AEDC VKF Tunnel A is shown in figure 13. The CTS remotely positioned the first stage at the required x, y, and z positions and was able to provide interactions within 0.2" of the upper stage. A sample of the axial force on the first stage booster is shown in figure 14. These results, as a function of separation distance between the two stages, are compared to pre-test CFD results. Since this is a very challenging, highly unsteady flow field for CFD to correctly model, the experimental results have been utilized by GN&C discipline to more accurately represent the interaction aerodynamics. In addition to the integrated forces and moments obtained from the test, flow visualization data was obtained from this test in the form of Schlieren photographs, as shown in figure 15, which show the shock structure and interaction effects after the two stages separate during flight. This separation test was crucial in the successful flight test of the Ares I-X vehicle and provided the GN&C discipline with the unpowered proximity aerodynamic effect for a separation of the Ares I vehicle.

Tomek, William G.↗

Wallops Low Elevation Link Analysis for the Constellation Launch/Ascent Links

To execute the President's Vision for Space Exploration, the Constellation Program (CxP) was formed to build the next generation spacecraft Orion and launch vehicles Ares, to transport human and cargo to International Space Station (ISS), moon, and Mars. This paper focuses on the detailed link analysis for Orion/Ares s launch and ascent links with Wallops 11.3m antenna (1) Orion's Dissimilar Voice link: 10.24 Kbps, 2-way (2) Ares Developmental Flight Instrument link, 20 Mbps, downlink. Three launch trajectories are considered: TD7-E, F (Feb), and G (Aug). In certain launch scenarios, the critical events of main engine cutoff (MECO) and Separation occur during the low elevation regime of WFF s downrange -- less than 5 degree elevation angle. The goal of the study is to access if there is enough link margins for WFF to track the DV and DFI links.

Constellation↗

Ares I-X Flight Test - The Future Begins Here

In less than two years, the National Aeronautics and Space Administration (NASA) will launch the Ares I-X mission. This will be the first flight of the Ares I crew launch vehicle, which, together with the Ares V cargo launch vehicle, will eventually send humans to the Moon, Mars, and beyond. As the countdown to this first Ares mission continues, personnel from across the Ares I-X Mission Management Office (MMO) are finalizing designs and fabricating vehicle hardware for an April 2009 launch. This paper will discuss the hardware and programmatic progress of the Ares I-X mission. Like the Apollo program, the Ares launch vehicles will rely upon extensive ground, flight, and orbital testing before sending the Orion crew exploration vehicle into space with humans on board. The first flight of Ares I, designated Ares I-X, will be a suborbital development flight test. Ares I-X gives NASA its first opportunity to gather critical data about the flight dynamics of the integrated launch vehicle stack; understand how to control its roll during flight; better characterize the severe stage separation environments that the upper stage engine will experience during future operational flights; and demonstrate the first stage recovery system. NASA also will begin modifying the launch infrastructure and fine-tuning ground and mission operations, as the agency makes the transition from the Space Shuttle to the Ares/Orion system.

Davis, Stephan R.↗

Analyzing Error in Balloon-Based Wind Measurements Due to Spatial Separation Using the North American Regional Reanalysis

Weather balloons have been a longstanding asset to NASA and Aerospace meteorology. Balloons are used from launch vehicle design to day-of-launch operations. One of the most valuable assets from these balloons is wind data from the surface up to 30 kilometers. Due to aloft winds, the balloons may drift downrange of the launch site and vehicle flight path. A 2017 study found balloons at Kennedy Space Center (KSC) can drift as far as 200 kilometers from the launch site (Decker 2017). To obtain robust launch vehicle wind assessments, it is highly desirable to characterize the wind environment along the flight path. This study looks into the errors associated with spatial separation of wind measurements using the North American Regional Reanalysis (NARR).

Curtis, Nathan↗

Radioisotope Thermoelectric Generator Accident Pre-Assessed Scenario

This scenario was drafted for inclusion in a revision of Federal Radiological Monitoring and Assessment Center (FRMAC) Assessment Manual, Volume 2 - Pre-Assessed Default Scenarios. The contents of this scenario were reviewed and approved by the FRMAC Assessment Working Group in March 2020. The scenario is being issued separately from the full volume ahead of the Mars 2020 launch. The full volume will be published in the future once all scenarios are complete.

61 RADIATION PROTECTION AND DOSIMETRY↗

Development of a large scale Chimera grid system for the Space Shuttle Launch Vehicle

The application of CFD techniques to large problems has dictated the need for large team efforts. This paper offers an opportunity to examine the motivations, goals, needs, problems, as well as the methods, tools, and constraints that defined NASA's development of a 111 grid/16 million point grid system model for the Space Shuttle Launch Vehicle. The Chimera approach used for domain decomposition encouraged separation of the complex geometry into several major components each of which was modeled by an autonomous team. ICEM-CFD, a CAD based grid generation package, simplified the geometry and grid topology definition by provoding mature CAD tools and patch independent meshing. The resulting grid system has, on average, a four inch resolution along the surface.

Pearce, Daniel G.↗

Low Earth orbit communications satellite

A current thrust in satellite communication systems considers a low-Earth orbiting constellations of satellites for continuous global coverage. Conceptual design studies have been done at the time of this design project by LORAL Aerospace Corporation under the program name GLOBALSTAR and by Motorola under their IRIDIUM program. This design project concentrates on the spacecraft design of the GLOBALSTAR low-Earth orbiting communication system. Overview information on the program was gained through the Federal Communications Commission licensing request. The GLOBALSTAR system consists of 48 operational satellites positioned in a Walker Delta pattern providing global coverage and redundancy. The operational orbit is 1389 km (750 nmi) altitude with eight planes of six satellites each. The orbital planes are spaced 45 deg., and the spacecraft are separated by 60 deg. within the plane. A Delta 2 launch vehicle is used to carry six spacecraft for orbit establishment. Once in orbit, the spacecraft will utilize code-division multiple access (spread spectrum modulation) for digital relay, voice, and radio determination satellite services (RDSS) yielding position determination with accuracy up to 200 meters.

Moroney, D.↗