Search NASA⌕ Search

SEARCH · Search NASA

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Command module/service module reaction control subsystem assessment

Detailed review of component failure histories, qualification adequacy, manufacturing flow, checkout requirements and flow, ground support equipment interfaces, subsystem interface verification, protective devices, and component design did not reveal major weaknesses in the command service module (CSM) reaction control system (RCS). No changes to the CSM RCS were recommended. The assessment reaffirmed the adequacy of the CSM RCS for future Apollo missions.

Weary, D. P.↗

Modularized instrument system for turbojet engine test facilities

A modular instrument system is being developed to handle the many data channels encountered in turbojet engine testing. Each module contains a group of transducers and all the signal conditioning multiplexing, and digitizing electronics necessary for direct interface with a digital computer. The digital interface within each module is the same for all modules; in addition, each module provides a controlled environment for its contents. A minicomputer in the control room gathers the data, performs on-line calculation and display, and interfaces with a shared recording and computing system. The advantages of this system are: (1) reduced manpower for system installation, setup, and checkout; (2) standardized equipment interfaces; (3) increased reliability through automatic system testing and minimization of manual adjustments; and (4) reduced cost through minimization of wiring and simplification of control room display.

Nieberding, W. C.↗

Solar electric propulsion breadboard thrust subsystem test results.

Work providing a firm basis for building an engineering model thrust subsystem (TSS) is described. A 1500-hr functional demonstration test revealed the impact of each element on TSS integration, operation, and future development. The primary conclusions are: accurate and specific definition of interfaces is essential to a timely system integration program. In addition to normal operating requirements, this definition must include requirements for preflight checkout, self-protection of all interfaces, capability expansion, failure modes, maximum input power, interelement power losses, noise and transient sensitivity and production, packaging for vacuum, thermal control, electrical grounding, cabling, mounting, and handling. In any future design, each phase of the TSS operation (startup, throttling, switching, etc.) should be considered in detail to anticipate and account for possible in-flight variations in element characteristics and performance.

Masek, T. D.↗

Umbilical connect systems.

Umbilical connect systems were studied for the purpose of developing techniques, specifications, and hardware design concepts for prototype systems to be used in the space shuttle program. New techniques are described which permit rapid and reliable mating, connection, and checkout of umbilical carrier assemblies and couplings for vehicle services (cryogenic, electrical, pneumatic, and hydraulic systems).

Valkema, D.↗

A computer method for schedule processing and quick-time updating.

A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.

Mccoy, W. H.↗

Space station prototype environmental/thermal control and life system - A current overview.

The Environmental Thermal Control and Life Support System (ETC/LSS) for a space station has progressed through the design phase into the fabrication of hardware. An overview of the current status of this program is presented with emphasis on the impact and implementation of commonality and maintainability concepts as well as the interface with an on-board checkout system. The programmatic techniques and procedural modifications employed and anticipated are treated.

Willis, N. C., Jr.↗

Atlas/Centaur-29 Intelsat IV (F5) flash flight report

ATLAS/CENTAUR-29 was launched from ETR Complex 36B, June 13, 1972, at a flight azimuth of 101 degrees. The ETR test number was 1240. The launch vehicle consisted of an ATLAS SLV-3C first stage and a CENTAUR second stage. The spacecraft was INTELSAT 4 (F-5). The launch occurred at the opening of the window. Indications are that the spacecraft was injected into the required transfer orbit and has achieved it's final orbit. All orbital parameters were extremely close to nominal. A nominal apogee motor burn took place at 2101 EDT on June 14, 1972 at 124 degrees East longitude and the final duty station of the spacecraft will be at 62 degrees East longitude. A two week communications checkout was started on or about June 15, 1972.

Source record↗

Analysis of space tug operating techniques supplemental report (study 2.4)

An analysis of space tug operating techniques is presented. The subjects discussed are: (1) sustaining engineering requirements, (2) off-site facility requirements, (3) evaluation of tug checkout alternatives, and (4) spares provisioning. Tables of data are included to clarify the written presentation.

Source record↗

Parametric analysis of RF communications and tracking systems for manned space stations

System performance, system interface compatibility, and system management and operations are analyzed for external and internal communications provided by the modular space station. Mathematical models are utilized to evaluate performances of the various communication links between the MSS and the tracking and data relay satellites, the shuttle, and the ground stations. Communication control design requirements are determined from overall MSS control design and checkout requirements are developed in a related systems study. Parallel design efforts consider equipment configurations for the external communication assembly baseband and the internal communication assembly to accommodate signal transfer and control. The recommended baseline design considers also interfaces between equipment groups and the critical functional and signal characteristics of these interfaces. The data processing assembly has direct communication circuits to the external communication assembly and the control interface is provided via a digital data bus and a remote acquisition and control unit.

Source record↗

A program of high resolution X-ray astronomy using sounding rockets

Two Aerobee 170 sounding rocket payloads were flown at the White Sands Missile Range: (1) a focusing X-ray collector on 31 March 1972; and (2) a high resolution telescope on 4 August 1972. Data has been reduced from each of these flights. In the first flight both the rocket and the experiment instrumentation performed adequately, and it is clear that at least the minimum scientific objectives were attained. In the second flight the attitude control system failed to point the telescope at the target for a sufficient length of time. However examination of final preflight checkout data and some flight data indicate that the instrumentation for this rocket payload was functioning according to expectations.

Source record↗

Space shuttle program. Expendable second stage reusable space shuttle booster. Volume 2: Technical summary. Book 2: Expendable second stage vehicle definition

A definition of the expendable second stage for use with the reusable space shuttle booster is presented. The subjects discussed are: (1) expendable second stage design, (2) structural subsystem, (3) propulsion subsystem, (4) avionics subsystems, (5) recovery and deorbit subsystem, and (6) expendable second stage vehicle installation, assembly, and checkout.

Source record↗

Safety assessment for EPS electron-proton spectrometer

A safety analysis was conducted to identify the efforts required to assure relatively hazard free operation of the EPS and to meet the safety requirements of the program. Safety engineering criteria, principles, and techniques in applicable disciplines are stressed in the performance of the system and subsystem studies; in test planning; in the design, development, test, evaluation, and checkout of the equipment; and the operating procedures for the EPS program.

Gleeson, P.↗

Apollo experience report: Flight instrumentation calibration

Three types of instrumentation-calibration data were used in the Apollo Program to provide the correct engineering data for tests and mission support. The command and service module instrumentation-component procurement specifications required individual-component calibration, and calibration data for these individual components (conventional-calibration data) were always used for mission data support. A mean standard type of calibration data derived from a statistical sampling of conventional-calibration data was used for test and checkout during the latter part of the Apollo Program. The lunar module instrumentation procurement specification permitted the use of standard-calibration data. These data were applicable to similarly instrumented measurements. The definition, merit, and application of each type of data are discussed.

Demoss, J. F.↗

SUMC-DV hardware manual

The assembly, the physical and electrical characteristics, and the basic electrical tests of the Space Ultrareliable Modular Computer Demonstration Vehicle (SUMC-DV), are described. The descriptions include: (1) the packaging concepts, physical assembly, design and fabrication using design automation techniques of 10 different types of custom CMOS LSI arrays; (2) the fabrication and testing of the various components including the LSI arrays; (3) the hierarchy of the memory complement and the clock generation and distribution system; (4) system testing techniques; and (5) the procedure employed in the electrical checkout of the system.

Feller, A.↗

Implementing instructions for KSC systems and safety training

The requirements for the safety training program are reported for KSC including transportation, inspection, checkout operations, maintenance of launch vehicles, spacecraft, ground support equipment, and launch teams. The responsibilities and mechanics for implementing the program are outlined.

Source record↗

Study of solid rocket motor for space shuttle booster, volume 2, book 2

A technical analysis of the solid propellant rocket engines for use with the space shuttle is presented. The subjects discussed are: (1) solid rocket motor stage recovery, (2) environmental effects, (3) man rating of the solid propellant rocket engines, (4) system safety analysis, (5) ground support equipment, and (6) transportation, assembly, and checkout.

Source record↗

Ground Operations Aerospace Language (GOAL)

GOAL, is a test engineer oriented language designed to be used to standardize procedure terminology and as the test programming language to be used for ground checkout operations in a space vehicle launch environment. The material presented concerning GOAL includes: (1) a historical review, (2) development objectives and requirements, (3) language scope and format, and (4) language capabilities.

Source record↗