Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launches”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Technical Basis Related to the Posture of NASA’s Office of Safety and Mission Assurance for the Launch of Radioactive Material Other than Space Nuclear Systems: Volume 1–Overview of Analysis and Results

NASA has launched and reentered payloads containing radioactive material for over 50 years. The isotopes, their quantity, and their form have varied significantly. The handling of this material prior to its integration into the spacecraft at the launch Center (and after its return to Earth after flight, if applicable) falls under the purview of the Office of the Chief Health and Medical Officer, while after the radioactive material is integrated into the spacecraft at the launch Center, it falls under the purview of the Office of Safety and Mission Assurance’s (OSMA) Nuclear Flight Safety Program. Historically, OSMA concurrence was required for any launch or reentry involving radioactive material. However, OSMA recently revisited this posture due to changes in the Federal policy in this area, and the significant accrued experience. The current report represents the more quantitative study envisioned in the recent change in posture. More specifically, this document addresses the potential risks and other considerations associated with launching small quantities of radioactive material (below the level requiring the Federally-mandated process in National Security Presidential Memorandum- (NSPM-) 20, “Presidential Memorandum on Launch of Spacecraft Containing Space Nuclear Systems” (USG, 2019) to provide the technical basis for when such activities require OSMA concurrence versus notification, as it relates to nuclear flight safety.

Don Helton↗

Surface Hardness Testing of Mobile Launcher 1 (ML-1) Vehicle Support Posts (VSP) Following Artemis I Launch Exposure

Following the successful launch of Artemis I on November 16th, 2022 (Fig 1), a surface hardness assessment was performed on the eight primary VSPs (Figs. 2, 3) located on the Zero Deck of the ML. This assessment was performed as part of an instrument investigation for strain gauges installed on VSP interior surfaces that had a “strange reaction”. This report does not address the VSP strain gauge investigation, but rather VSP structural integrity for future service (Artemis II, III, …). Surface hardness measurements were taken to assess the strength of the ASTM A148 steel castings to confirm thermal exposure from launch had not reannealed the VSPs. However unlikely, it is possible high temperature may have heated and tempered (reannealed) the VSPs, resulting in a change of built-in stresses. This loss in built-in stress may explain the change in off-set measured by the strain gauges. Initial hardness measurements were made at two interior surfaces of VSPs near the strain gauges and the corresponding exterior surfaces (engine hole-facing). Field hardness measurements on the exterior, engine hole surface-facing surfaces for all eight VSPs ranged from 175 to 226 HB/P, well below the minimum hardness of 302 Brinell (HB). Opposing interior surface hardness measurements near strain gauges ranged from 264 to 358 HB/P. In all cases for flight VSPs, a drop in interior-to-exterior hardness ranging from 70 to 132 HB/P was measured. Surface hardness measurements were then made on the two spare VSPs not exposed to launch temperatures for baseline comparison. These two spare VSPs had a drop in Brinell hardness from interior to exterior surfaces ranging from 3 to 17 HB/P. The large interior-to-exterior delta hardness for eight flight VSPs but not for the two spare VSPs suggests launch exposure temperatures softened the exterior surfaces, raising two questions: 1) Are the VSPs compromised for future use, and 2) How deep is the exterior surface softening effect? To address concerns of low surface hardness values at non-critical exterior surfaces, additional field surface hardness measurements were taken at high-stress locations on VSP3: Both door jams, back radius, and internal left and right radius near the base. These values came in well above the required minimum hardness (317 to 365 HB/P). For a more representative pre-launch versus post-launch surface hardness comparison, VSP Acceptance Data Packages (ADPs) were reviewed, and hardness measurements were made at the same eight original locations on VSP3 where hardness measurements were made at the foundry. To determine the degree of softening, 1/8” of material was machined away at three exterior surfaces of engine hole-facing side (Fig. 4). A significant increase in surface hardness was measured ranging from 50 to 86 HB/P. Values at these three locations were still slightly below the required minimum hardness, so an additional 1/8” material was machined away, and hardness values were retaken. At the ¼” depth, hardness values increased to 321 to 324 HB/P. These values fall above the required minimum, concluding surface hardness testing. Rationale for VSP continued use was reached with no restrictions during a Chief Engineering Review based on hardness values exceeding minimum at critical locations and subsurface locations for VSP #3.

Artemis I↗

Variation in Predicted Orbital Lifetime Due to Launch Year

We present trends in predicted orbital lifetimes of CubeSats based not only on orbital parameters, but also launch year and the Area-to-Mass (AtM) ratio of the CubeSat. Determining the orbital lifetime variation of CubeSats in low-Earth orbit (LEO) is an important aspect of mission planning because of two competing factors: (1) the maximum orbital lifetime for orbital debris mitigation requirements, and (2) the minimum orbit duration necessary to accomplish the spacecraft mission requirements. The orbital lifetime is a function of orbital parameters, the AtM ratio of the CubeSat, and date of orbit insertion. Solar flux varies with time, peaking and declining across the 11-year solar cycle and affecting the amount of atmospheric drag on the CubeSat. This results in large variations in orbital lifetime dependent on the mission's launch date. We calculated the variation of orbital lifetime for multiple commonly used 1U to 6U CubeSat mission types across the two upcoming solar cycles. For any given AtM ratio and altitude combination in this analysis, the predicted orbital lifetime varies up to a factor of five due to orbit insertion occurring in a different year. Some examples of orbital lifetime spreads are 5 months to 2 years, and 1.5 to 7.5 years. While orbital lifetimes correlate to the solar cycle, the phasing of the maximum values varies based on a given AtM ratio and altitude combination. Different combinations of these two factors will result in the maximum predicted orbital lifetime occurring at different launch years throughout the solar cycle. Therefore, there is not a specific year within a solar cycle which can be used to calculate the maximum predicted orbital lifetime for all CubeSats. Since CubeSats are typically flown as a rideshare payload on a launch vehicle, mission planners must account for launch date variation in their orbital lifetime predictions. We recommend calculating orbital lifetime for a range of dates to allow for risk planning due to launch date slips, and other mission planning best practices.

CubeSat↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket Lays Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce R. Askins↗

Successful First Flight of NASA’s SLS (Space Launch System) Super Heavy-Lift Rocket: Laying Groundwork for U. S.’s Most Ambitious Missions

In late 2022, NASA’s SLS (Space Launch System) super heavy-lift rocket launched for the first time. Artemis I sent an uncrewed Orion spacecraft on a 25.5-day round-trip mission to lunar orbit. The near-perfect performance laid the groundwork for the next flights and for NASA’s return of humans to the Moon. The SLS team is now preparing for the launch of Artemis II, which will be the first launch of astronauts to cislunar space since Apollo 17 in December 1972. In addition to preparations on the Artemis II launch vehicle, significant progress is being made on the hardware and software for future flights. Artemis II will include a test of a new military-grade GPS system, which will be fully utilized on Artemis III. Progress is also being made on the exploration upper stage (EUS) for the Block 1B SLS variant, which will debut on Artemis IV. New production RS-25 liquid-propellant engines will be used beginning with Artemis V. These new engines, which are in a final qualification test firing program at the time of writing, realize a cost savings of at least 30 percent and reduced production time due to streamlined manufacturing and advances in technology, including additive manufacturing. The evolved solid rocket boosters, which will debut on Artemis IX as part of the Block 2 variant, are in development now. In addition to propulsion updates, each variant of SLS maintains payload configuration flexibility and can fly crew-only, cargo-only, and crew-cargo combinations. This adaptability ensures that SLS, with its significant mass and volume capability – including the ability to launch large co-manifested payloads with Orion directly to trans-lunar injection (TLI) – can support the country’s most ambitious missions. Results from the Artemis I mission, as well as progress to the next flights and SLS variants, will be covered in the paper and presentation.

Bruce Askins↗

NASA’s Space Launch System: Powering Artemis and Enabling Discovery

The debut launch of NASA’s super-heavy lift SLS (Space Launch System) rocket in November 2022 opened a new era of deep space exploration. Called the Artemis I mission, the launch sent an uncrewed Orion spacecraft more than 268,000 miles from Earth into a distant retrograde orbit (DRO) about the Moon, before splashing down in the Pacific Ocean 25 days later. While the mission was critical for multiple reasons to NASA’s Artemis campaign, the data collected during the first launch of SLS was vital to understanding how the launch vehicle performs in the flight environment. The test flight provided real-world data to ground and improve models, on-ground testing, and vehicle performance. Data returned show a nominal launch, with many parameters accurate to pre-flight predictions to within tenths of a percent. Equipped with the data, the SLS team is readying the Artemis II vehicle. Beginning with the fourth flight, SLS variants will have multiple upgrades, which increase the capability of the rocket to enable the nation’s most ambitious missions of returning astronauts to the Moon and lunar vicinity. Current hardware progress, as well as Artemis I flight data, will be provided. Additionally, the test programs that enabled the successful first flight will be discussed.

John Honeycutt↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce R Askins↗

NASA’s SLS (Space Launch System) Rocket Ready for Artemis II Lunar Mission

In early 2026, NASA will launch the Artemis II mission, an approximately 10-day long lunar mission that will fly three NASA astronauts and one CSA (Canadian Space Agency) astronaut on a free-return trajectory around the Moon, following a one-day checkout of their Orion spacecraft in Earth orbit. The mission will be the first to launch astronauts aboard NASA’s Orion spacecraft and on top of the agency’s SLS (Space Launch System) rocket. The mission will also deploy four 12U CubeSats as secondary payloads from the Orion stage adapter, following Orion separation and departure. The payloads, developed by four of NASA’s international partners, will perform a variety of science and technology investigations. The SLS and Orion for the mission are currently stacked in the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida and are undergoing final preparations to rollout to Launch Pad 39B for a tanking test before launch. In addition to preparations for the Artemis II mission, significant progress is being made on the SLS for the Artemis III mission, which is targeted to return astronauts to the lunar surface no later than 2029. Major components of the core stage and solid rocket boosters are already at NASA Kennedy undergoing build-up for the mission. Data from the Artemis II launch and mission, as well as progress to subsequent missions, as available, will be presented.

Bruce Askins↗

Identification of Noise Sources During Rocket Engine Test Firings and a Rocket Launch Using a Microphone Phased-Array

A 70 microphone, 10-foot by 10-foot, microphone phased array was built for use in the harsh environment of rocket launches. The array was setup at NASA Wallops launch pad 0A during a static test firing of Orbital Sciences' Antares engines, and again during the first launch of the Antares vehicle. It was placed 400 feet away from the pad, and was hoisted on a scissor lift 40 feet above ground. The data sets provided unprecedented insight into rocket noise sources. The duct exit was found to be the primary source during the static test firing; the large amount of water injected beneath the nozzle exit and inside the plume duct quenched all other sources. The maps of the noise sources during launch were found to be time-dependent. As the engines came to full power and became louder, the primary source switched from the duct inlet to the duct exit. Further elevation of the vehicle caused spilling of the hot plume, resulting in a distributed noise map covering most of the pad. As the entire plume emerged from the duct, and the ondeck water system came to full power, the plume itself became the loudest noise source. These maps of the noise sources provide vital insight for optimization of sound suppression systems for future Antares launches.

acoustics↗

Conceptual Launch Vehicle and Spacecraft Design for Risk Assessment

One of the most challenging aspects of developing human space launch and exploration systems is minimizing and mitigating the many potential risk factors to ensure the safest possible design while also meeting the required cost, weight, and performance criteria. In order to accomplish this, effective risk analyses and trade studies are needed to identify key risk drivers, dependencies, and sensitivities as the design evolves. The Engineering Risk Assessment (ERA) team at NASA Ames Research Center (ARC) develops advanced risk analysis approaches, models, and tools to provide such meaningful risk and reliability data throughout vehicle development. The goal of the project presented in this memorandum is to design a generic launch 7 vehicle and spacecraft architecture that can be used to develop and demonstrate these new risk analysis techniques without relying on other proprietary or sensitive vehicle designs. To accomplish this, initial spacecraft and launch vehicle (LV) designs were established using historical sizing relationships for a mission delivering four crewmembers and equipment to the International Space Station (ISS). Mass-estimating relationships (MERs) were used to size the crew capsule and launch vehicle, and a combination of optimization techniques and iterative design processes were employed to determine a possible two-stage-to-orbit (TSTO) launch trajectory into a 350-kilometer orbit. Primary subsystems were also designed for the crewed capsule architecture, based on a 24-hour on-orbit mission with a 7-day contingency. Safety analysis was also performed to identify major risks to crew survivability and assess the system's overall reliability. These procedures and analyses validate that the architecture's basic design and performance are reasonable to be used for risk trade studies. While the vehicle designs presented are not intended to represent a viable architecture, they will provide a valuable initial platform for developing and demonstrating innovative risk assessment capabilities.

Launch Vehicle↗

Airborne Simulation of Launch Vehicle Dynamics

In this paper we present a technique for approximating the short-period dynamics of an exploration-class launch vehicle during flight test with a high-performance surrogate aircraft in relatively benign endoatmospheric flight conditions. The surrogate vehicle relies upon a nonlinear dynamic inversion scheme with proportional-integral feedback to drive a subset of the aircraft states into coincidence with the states of a time-varying reference model that simulates the unstable rigid body dynamics, servodynamics, and parasitic elastic and sloshing dynamics of the launch vehicle. The surrogate aircraft flies a constant pitch rate trajectory to approximate the boost phase gravity turn ascent, and the aircraft's closed-loop bandwidth is sufficient to simulate the launch vehicle's fundamental lateral bending and sloshing modes by exciting the rigid body dynamics of the aircraft. A novel control allocation scheme is employed to utilize the aircraft's relatively fast control effectors in inducing various failure modes for the purposes of evaluating control system performance. Sufficient dynamic similarity is achieved such that the control system under evaluation is configured for the full-scale vehicle with no changes to its parameters, and pilot-control system interaction studies can be performed to characterize the effects of guidance takeover during boost. High-fidelity simulation and flight-test results are presented that demonstrate the efficacy of the design in simulating the Space Launch System (SLS) launch vehicle dynamics using the National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center Fullscale Advanced Systems Testbed (FAST), a modified F/A-18 airplane (McDonnell Douglas, now The Boeing Company, Chicago, Illinois), over a range of scenarios designed to stress the SLS's Adaptive Augmenting Control (AAC) algorithm.

airborne simulation↗

Rationales for the Lightning Launch Commit Criteria

Since natural and triggered lightning are demonstrated hazards to launch vehicles, payloads, and spacecraft, NASA and the Department of Defense (DoD) follow the Lightning Launch Commit Criteria (LLCC) for launches from Federal Ranges. The LLCC were developed to prevent future instances of a rocket intercepting natural lightning or triggering a lightning flash during launch from a Federal Range. NASA and DoD utilize the Lightning Advisory Panel (LAP) to establish and develop robust rationale from which the criteria originate. The rationale document also contains appendices that provide additional scientific background, including detailed descriptions of the theory and observations behind the rationales. The LLCC in whole or part are used across the globe due to the rigor of the documented criteria and associated rationale. The Federal Aviation Administration (FAA) adopted the LLCC in 2006 for commercial space transportation and the criteria were codified in the FAA's Code of Federal Regulations (CFR) for Safety of an Expendable Launch Vehicle (Appendix G to 14 CFR Part 417, (G417)) and renamed Lightning Flight Commit Criteria in G417.

Lightning Advisory Panel↗

Motivation for Air-Launch: Past, Present, and Future

Air-launch is defined as two or more air-vehicles joined and working together, that eventually separate in flight, and that have a combined performance greater than the sum of the individual parts. The use of the air-launch concept has taken many forms across civil, commercial, and military contexts throughout the history of aviation. Air-launch techniques have been applied for entertainment, movement of materiel and personnel, efficient execution of aeronautical research, increasing aircraft range, and enabling flexible and efficient launch of space vehicles. For each air-launch application identified in the paper, the motivation for that application is discussed.

history↗

Motivation for Air-Launch: Past, Present, and Future

Air-launch is defined as two or more air-vehicles joined and working together, that eventually separate in flight, and that have a combined performance greater than the sum of the individual parts. The use of the air-launch concept has taken many forms across civil, commercial, and military contexts throughout the history of aviation. Air-launch techniques have been applied for entertainment, movement of materiel and personnel, efficient execution of aeronautical research, increasing aircraft range, and enabling flexible and efficient launch of space vehicles. For each air-launch application identified in the paper, the motivation for that application is discussed.

air-launch↗

Lunar Landing and Launch Pad Construction – Concepts and Criteria

When a lander vehicle launches or lands on the Moon, the rocket engine exhaust plume impinges on the surface and interacts with the regolith to create blast ejecta and associated cratering of the surface. Lunar regolith blast ejecta travels at high velocities (>2,000 m/s) for long distances (kilometers) in a vacuum environment [1] creating hazards for surrounding assets and it can also impact the bottom of the lander vehicle, risking damage to the engines, thermal insulation and sensors. Ballistic particles can possibly enter cislunar space and achieve orbit as debris, if the ejecta is sufficiently energetic. The cratering and regolith erosion can endanger the vehicle itself by affecting the soil stability under the landing gear. Landing on unpredictable terrain with varying topography, natural craters and rock hazards is also hazardous risks tipping a lander at dangerous angles in extreme conditions that may also violate maximum slope angles for subsequent launch operations. During launch (Figure 1), an overpressure pulse created by the ignition of the rocket engines can pose significant ejecta risks to the vehicle. Dust clouds raised during landing limit the efficacy of sensors and reduce visibility for the astronaut pilots, creating significant real-time risk during landing site selection by the pilot or computer navigation system. Future lunar spaceports will require mitigations to these launch and landing risks [2]. There are four main objectives of this effort:1) To establish the state of the art in LLP construction methodologies. 2) To propose criteria for trade studies of LLP concepts. 3) To publicly share the authors’ ideas for potential LLP solutions. 4) To serve as the starting point for future development of LLP technologies. Establishing the state of the art in the area of off-Earth Launch & Landing Pad concepts will base-line the work that has been completed thus far and highlight the wide span between current Technology Readiness Levels (TRLs)and operational readiness. The authors aim to communicate the need for funding in this area in the near term by illustrating that there is much work to be completed before a truly viable option exists. Setting forth criteria for trade studies of LLP concepts is important for several reasons. The first and most straightforward is to establish a framework for performing trade studies on LLP concepts. This will enable NASA to select the most promising concepts for continued development, and it will also help technology developers understand how their concepts compare with others and the priorities of development effort.

landing pad↗

Pedestal Hazard Abatement and Soil Removal Construction Completion Report for Launch Complex 34, Solid Waste Management Unit CC054, Cape Canaveral Space Force Station, Florida

This Construction Completion Report summarizes the activities associated with implementation of an interim measure (IM) for hazard abatement of the Launch Pedestal and soil removal at Launch Complex 34 (LC34), Cape Canaveral Space Force Station, Florida. The purpose of the hazard abatement IM was to mitigate any continuing source of contamination associated with residual paint on the Launch Pedestal that contained polychlorinated biphenyls (PCBs). Sampling determined that residual PCB concerns were limited to the steel elements on the top-side of the Pedestal, which included the torus ring, feed pipe, down pipes, pipe straps and shields, remaining steel cover plates and bolts, and railing support steel. The IM also mitigated the potential spread of contamination to surrounding areas by removing fallen metal fragments from the concrete launch pad, as well as soil from trenches on the launch pad where PCB-containing paint chips may have accumulated prior to or during Pedestal hazard abatement activities.

Complex 34↗

An Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, door porthole accessible via diving board for final closeout of the purge interface. All of these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

Contamination Control↗

Overview of Contamination Control for the James Webb Space Telescope Launch Campaign

The James Webb Space Telescope (JWST) is a large, infrared space telescope operating at Lagrange point 2. JWST is a joint effort between NASA, ESA, and CSA and was launched from the Centre Spatial Guyanais (CSG) on an Ariane 5 rocket in December 2021. The three-month launch campaign utilized enhanced contamination controls to meet JWST’s strict cleanliness requirements. Prior to launch, JWST was permitted to only be exposed to ISO Class 7 cleanrooms, whereas the processing facilities at CSG are ISO Class 8. NASA, ESA, Arianespace, and CNES implemented temporary upgrades to the nominal contamination control operations for the launch campaign unique to JWST, including the use of vetted, portable High Efficiency Particulate Air (HEPA) filter walls, pre-entrance cleanliness acceptance surveys of each facility and the intra-plant transporter, tightened cleanroom protocols, upgraded garmenting and laundering techniques, cleaning of Self-Contained Atmospheric Protection Ensemble (SCAPE) suits, increased maintenance, staffed pre-cleaning stations, adaptation of the house purge network, and a contamination control enclosure atop the Ariane 5 launcher prior to fairing encapsulation. The Ariane 5 fairing interior and Vehicle Equipment Bay membrane also received multiple cleanings, detailed inspections, and verification sampling to achieve necessary cleanliness levels. The fairing itself was specially sealed to protect the inner environment with just a small, doored porthole accessible via diving board for final closeout of the purge interface. All these enhancements together allowed JWST to meet its contamination requirements for launch, ensuring successful post-separation deployments and mission science.

James Webb Space Telescope↗