Search NASA⌕ Search

SEARCH · Search NASA

Results for “Task scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Scripting Module for the Satellite Orbit Analysis Program (SOAP)

This add-on module to the SOAP software can perform changes to simulation objects based on the occurrence of specific conditions. This allows the software to encompass simulation response of scheduled or physical events. Users can manipulate objects in the simulation environment under programmatic control. Inputs to the scripting module are Actions, Conditions, and the Script. Actions are arbitrary modifications to constructs such as Platform Objects (i.e. satellites), Sensor Objects (representing instruments or communication links), or Analysis Objects (user-defined logical or numeric variables). Examples of actions include changes to a satellite orbit ( v), changing a sensor-pointing direction, and the manipulation of a numerical expression. Conditions represent the circumstances under which Actions are performed and can be couched in If-Then-Else logic, like performing v at specific times or adding to the spacecraft power only when it is being illuminated by the Sun. The SOAP script represents the entire set of conditions being considered over a specific time interval. The output of the scripting module is a series of events, which are changes to objects at specific times. As the SOAP simulation clock runs forward, the scheduled events are performed. If the user sets the clock back in time, the events within that interval are automatically undone. This script offers an interface for defining scripts where the user does not have to remember the vocabulary of various keywords. Actions can be captured by employing the same user interface that is used to define the objects themselves. Conditions can be set to invoke Actions by selecting them from pull-down lists. Users define the script by selecting from the pool of defined conditions. Many space systems have to react to arbitrary events that can occur from scheduling or from the environment. For example, an instrument may cease to draw power when the area that it is tasked to observe is not in view. The contingency of the planetary body blocking the line of sight is a condition upon which the power being drawn is set to zero. It remains at zero until the observation objective is again in view. Computing the total power drawn by the instrument over a period of days or weeks can now take such factors into consideration. What makes the architecture especially powerful is that the scripting module can look ahead and behind in simulation time, and this temporal versatility can be leveraged in displays such as x-y plots. For example, a plot of a satellite s altitude as a function of time can take changes to the orbit into account.

Carnright, Robert↗

Space Station Mission Planning Study (MPS) development study. Volume 3: Software development plan

A software development plan is presented for the definition, design, and implementation of the Space Station (SS) Payload Mission Planning System (MPS). This plan is an evolving document and must be updated periodically as the SS design and operations concepts as well as the SS MPS concept evolve. The major segments of this plan are as follows: an overview of the SS MPS and a description of its required capabilities including the computer programs identified as configurable items with an explanation of the place and function of each within the system; an overview of the project plan and a detailed description of each development project activity breaking each into lower level tasks where applicable; identification of the resources required and recommendations for the manner in which they should be utilized including recommended schedules and estimated manpower requirements; and a description of the practices, standards, and techniques recommended for the SS MPS Software (SW) development.

Klus, W. L.↗

Parallel Directionally Split Solver Based on Reformulation of Pipelined Thomas Algorithm

In this research an efficient parallel algorithm for 3-D directionally split problems is developed. The proposed algorithm is based on a reformulated version of the pipelined Thomas algorithm that starts the backward step computations immediately after the completion of the forward step computations for the first portion of lines This algorithm has data available for other computational tasks while processors are idle from the Thomas algorithm. The proposed 3-D directionally split solver is based on the static scheduling of processors where local and non-local, data-dependent and data-independent computations are scheduled while processors are idle. A theoretical model of parallelization efficiency is used to define optimal parameters of the algorithm, to show an asymptotic parallelization penalty and to obtain an optimal cover of a global domain with subdomains. It is shown by computational experiments and by the theoretical model that the proposed algorithm reduces the parallelization penalty about two times over the basic algorithm for the range of the number of processors (subdomains) considered and the number of grid nodes per subdomain.

Povitsky, A.↗

The Proposal for the NASA Sensor Intercalibration and Merger for Biological and Interdisciplinary Oceanic Studies(SIMBIOS) Program, 1995

As a result of the Earth Observing System (EOS) restructuring exercise during the last half of fiscal year 1994, the EOS Color mission, which was scheduled to be a data-buy with a 1998 launch was dropped from the EOS mission manifest primarily because of the number of international ocean color missions scheduled for launch in the 1998 time frame. In lieu of a new mission, NASA Goddard Space Flight Center (GSFC) was tasked by NASA Headquarters to develop an ocean color satellite calibration and validation plan for multiple sensors. The objective of the activity was to develop a methodology and operational capability to combine data products from the various ocean color missions in a manner that ensures the best possible global coverage and data quality. The program was called the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) project coined from the biological term "symbiosis." This document is the original proposal that was developed and submitted in May 1995. SIMBIOS was approved in 1996 and initiated in 1997 with a project office and technical staff at GSFC and a science team to assist in the development of validation data sets, sensor calibration, atmospheric correction, and bio-optical and data merger algorithms. Since its inception, the SIMBIOS program has resulted in a broad-based international collaboration on the calibration and validation of a number of ocean color satellites.

McClain, Charles↗

Case Study: Influences of Uncertainties and Traffic Scenario Difficulties in a Human-in-the-Loop Simulation

This paper presents a case study of how factors such as wind prediction errors and metering delays can influence controller performance and workload in Human-In-The-Loop simulations. Retired air traffic controllers worked two arrival sectors adjacent to the terminal area. The main tasks were to provide safe air traffic operations and deliver the aircraft to the metering fix within +/- 25 seconds of the scheduled arrival time with the help of provided decision support tools. Analyses explore the potential impact of metering delays and system uncertainties on controller workload and performance. The results suggest that trajectory prediction uncertainties impact safety performance, while metering fix accuracy and workload appear subject to the scenario difficulty.

air traffic control↗

Simulation Apps Bring Us Closer to Mars

My work with mathematical modeling and computer simulations began in earnest in 1987 when I signed on with the National Aeronautics and Space Administration, better known as NASA. At the time I was developing computer simulations to support the design of carbon dioxide (CO2) removal systems for the International Space Station (ISS) life support system. CO2 is a human metabolic waste, produced at a rate of a kilogram per day per crewmember. CO2 must be removed from the crew cabin, as it will quickly become detrimental to crew health. The systems used to remove CO2 are typically based on sorption processes, which include complex interactions of heat transfer, mass transfer, and gas flow through porous media. At this time, there were no commercial options for solving a set of coupled mathematical models such as partial differential equations (PDEs); you either force-fit the physics into a thermal analysis package or wrote your own code, complete with discretization, meshing, and solution algorithms. Unfortunately, coding CO2 removal processes from scratch did not allow an appropriate focus on the challenging yet crucial task of understanding and capturing the underlying physics via appropriate mathematical models. Configuration control was often simply ignored due to tight schedules, resulting in a code that would be quicker for a second party to rewrite than modify. In the early 2000s, I decided to move CO2 removal simulations to a platform with built-in meshing, solvers, and postprocessing capabilities, and that could solve user-defined multiphysics PDEs. The program chosen to meet these needs was COMSOL Multiphysics®. Along with freeing the engineer to focus on the underlying physics, a degree of configuration control was automatically achieved via a consistent user interface, thus allowing COMSOL users to share computer models. My team has developed simulations that are already providing a valuable debugging capability for the ISS CO2 removal system, and will provide guidance in upgrades to that system.

Knox, Jim↗

Performance of an Automated System for Control of Traffic in Terminal Airspace

This paper examines the performance of a system that performs automated conflict resolution and arrival scheduling for aircraft in the terminal airspace around major airports. Such a system has the potential to perform separation assurance and arrival sequencing tasks that are currently handled manually by human controllers. The performance of the system is tested against several simulated traffic scenarios that are characterized by the rate at which air traffic is metered into the terminal airspace. For each traffic scenario, the levels of performance that are examined include: number of conflicts predicted to occur, types of resolution maneuver used to resolve predicted conflicts, and the amount of delay for all flights. The simulation results indicate that the percentage of arrivals that required a maneuver that changes the flight's horizontal route ranged between 11% and 15% in all traffic scenarios. That finding has certain implications if this automated system were to be implemented simply as a decision support tool. It is also found that arrival delay due to purely wake vortex separation requirements on final approach constituted only between 29% and 35% of total arrival delay, while the remaining major portion of it is mainly due to delay back propagation effects.

air traffic control↗

Orbit Transfer Vehicle (OTV) advanced expander cycle engine point design study. Task 7: Engine data summary

A performance optimized engine system design for a man-rated advanced LOX/hydrogen expander cycle engine was investigated. The data are presented in tables, figures, and drawings. The following categories of data for the advanced expander cycle engine are presented: engine operating specification and pressure schedule; engine system layout drawing; major component layout drawings, including thrust chamber and nozzle, extendible nozzle actuating mechanism and seal, LOX turbopump, LOX boost pump, hydrogen turbopump, hydrogen boost pump, and propellant control valves; engine performance and service life prediction; engine weight; and engine envelope. The data represent updates based upon current results from the design and analyses tasks performed under contract. Futher iterations in the designs and data can be expected as the advanced expander cycle engine design matures.

Christensen, K. L.↗

Psychological Health Maintenance on Space Station Freedom

The scheduling of crew rotations for up to 180 days on Space Station Freedom presents a special challenge for behavioral scientists who are tasked with providing psychological support for the crews, their families, and mission flight controllers. Preflight psychological support planning may minimize the negative impact of psychological and social issues on mission success, as well as assist NASA management in making real-time mission planning decisions in the event of a significant social event (for example, the death of a family member). During flight, the combined psychological, emotional, and social stressors on the astronauts must be monitored, along with other aspects of their health. The Health Maintenance Facility (HMF) will have the capability of providing preventive, diagnostic, and therapeutic assistance for significant psychiatric and interpersonal problems which may develop. Psychological support will not end with the termination of the mission. Mental health professionals must be part of the team of medical personnel whose job will be to facilitate the transition—physical and mental—from the space environment back to planet Earth. This paper reviews each phase of mission planning for Space Station Freedom and specifies those factors that may be critical for psychological health maintenance on extended-duration space missions.

Patricia A Santy↗

The Effects of Chronic Sleep Restriction on Multiple Object Tracking

The ability to simultaneously track numerous moving objects in the presence of irrelevant stimuli is essential for carrying out a variety of tasks. Sleep loss has been found to impair neurocognitive functioning and, as a result, attentional processing capacity is reduced. A common form of sleep loss is chronic sleep restriction (CSR), in which an inadequate amount of sleep is obtained over consecutive days. The objective of the current study was to determine if performance on the multiple object tracking (MOT) task was adversely impacted by a week of CSR. Twelve healthy participants (6 males, 6 females) kept a fixed sleep-wake schedule, with a constant waketime, at home for four weeks (activity monitors worn on the participant’s nondominant wrist were used to confirm compliance). Weeks one and three were deemed washout weeks, during which participants maintained a 9-hour sleep-wake schedule. Weeks two and four were deemed experimental weeks, during which participants were randomly assigned a 5-hour (CSR) and 9-hour (sleep satiation) sleep-wake schedule. Following night seven of each experimental week, participants completed a 13-hour laboratory visit under dim light (less than 15 lux) where they maintained a constant posture and were provided with hourly isocaloric snacks. MOT was presented at approximately 6 and 8 hours after waking. Participants were required to track four, five, or six moving targets in the presence of identical distractors (always 12 total objects). It was found that participants slept significantly less during the week of CSR compared to the week of sleep satiation. There was no difference in the overall proportion of correct MOT responses following the CSR and sleep satiation weeks. However, an additional analysis examining only the 6 target condition found that the proportion of correct responses was significantly lower following the week of CSR. These findings suggest that CSR has an adverse impact on tracking performance when the cognitive demand was higher. This has implications for individuals, such as air traffic controllers and truck drivers, who must visually track multiple moving objects under high workload situations, often while chronically sleep deprived.

sleep restriction↗

Disposal of hypergolic propellants, phase 6 task 4. Disposal pond products

Waste monomethyl hydrazine scrubber liquor, consisting of aqueous solutions containing small amounts of CH4, Cl2, CH3Cl, CH2Cl2, and CHCl3 as well as large amounts of CH3OH is scheduled to be dumped in stabilization ponds along with nitrate and nitrite salt solutions obtained as waste liquors from the N2O4 scrubbers. The wastes are investigated as to the hazardous materials generated by such combinations of items as described as well as the finite lifetime of such materials in the stabilization ponds. The gas liquid chromatograph was used in the investigation. A series of experiments designed to convert nitrate and nitrite salts to the environmentally innocuous N2O and N2 using solar energy is reported. Results indicate that this solar conversion is feasible.

Cohenour, B. C.↗

Task 4 supporting technology. Densification requirements definition and test objectives. Propellant densification requirements definition

The primary challenge of the X-33 CAN is to build and test a prototype LO2 and LH2 densification ground support equipment (GSE) unit, and perform tank thermodynamic testing within the 15 month phase 1 period. The LO2 and LH2 propellant densification system will be scaled for the IPTD LO2 and LH2 tank configurations. The IPTD tanks were selected for the propellant technology demonstration because of the potential benefits to the phase 1 plan: tanks will be built in time to support thermodynamic testing; minimum cost; minimum schedule risk; future testing at MSFC will build on phase 1 data base; and densification system will be available to support X-33 and RLV engine test at IPTD. The objective of the task 1 effort is to define the preliminary requirements of the propellant densification GSE and tank recirculation system. The key densification system design parameters to be established in Task 1 are: recirculation flow rate; heat exchanger inlet temperature; heat exchanger outlet temperature; maximum heat rejection rate; vent flow rate (GN2 and GH2); densification time; and tank pressure level.

Lak, Tibor↗

Tool-Enabled Changes in Terminal Air Traffic Controller Task and Workload Distribution

A human-in-the-loop simulation was conducted that examined an approach to adjusting airport arrivals in such a way as to enable higher departure throughput while maintaining arrival throughput. This approach, referred to as Departure-Sensitive Arrival Spacing (DSAS), leverages the capabilities of the Terminal Sequencing and Spacing (TSS) system with an additional Decision Support Tool (DST) to assign more precise arrival spacing interval. This presentation will focus on the changes observed in the task distribution and control strategies among three Terminal Radar Approach Control (TRACON) controller participants and the workload associated with those changes across three conditions: Baseline, TSS, and DSAS. Results showed that the application of the DSTs in the TSS condition and those in the DSAS condition enabled a progressive reduction in the number of clearances issued and for the clearances to be issued earlier, further away from the airport. In doing so, there was also a greater use of speed control versus vectoring and altitude for schedule conformance in the TSS and DSAS conditions respectively and relative to Baseline. Workload also shifted in conjunction with the clearance distribution with an overall reduction across conditions. The changes in task and workload distribution enabled a shift from tactical to strategic control, which allowed for a more predictable and efficient delivery of arrivals.

task↗

Application of expert systems in project management decision aiding

The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

Harris, Regina↗

Space station automation of common module power management and distribution

The purpose is to automate a breadboard level Power Management and Distribution (PMAD) system which possesses many functional characteristics of a specified Space Station power system. The automation system was built upon 20 kHz ac source with redundancy of the power buses. There are two power distribution control units which furnish power to six load centers which in turn enable load circuits based upon a system generated schedule. The progress in building this specified autonomous system is described. Automation of Space Station Module PMAD was accomplished by segmenting the complete task in the following four independent tasks: (1) develop a detailed approach for PMAD automation; (2) define the software and hardware elements of automation; (3) develop the automation system for the PMAD breadboard; and (4) select an appropriate host processing environment.

Miller, W.↗

Towards Evolving Electronic Circuits for Autonomous Space Applications

The relatively new field of Evolvable Hardware studies how simulated evolution can reconfigure, adapt, and design hardware structures in an automated manner. Space applications, especially those requiring autonomy, are potential beneficiaries of evolvable hardware. For example, robotic drilling from a mobile platform requires high-bandwidth controller circuits that are difficult to design. In this paper, we present automated design techniques based on evolutionary search that could potentially be used in such applications. First, we present a method of automatically generating analog circuit designs using evolutionary search and a circuit construction language. Our system allows circuit size (number of devices), circuit topology, and device values to be evolved. Using a parallel genetic algorithm, we present experimental results for five design tasks. Second, we investigate the use of coevolution in automated circuit design. We examine fitness evaluation by comparing the effectiveness of four fitness schedules. The results indicate that solution quality is highest with static and co-evolving fitness schedules as compared to the other two dynamic schedules. We discuss these results and offer two possible explanations for the observed behavior: retention of useful information, and alignment of problem difficulty with circuit proficiency.

Lohn, Jason D.↗

Integrated Test and Evaluation Flight Test 3 Flight Test Plan

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

Unmanned↗

UAS Integration in the NAS Project: Integrated Test and Evaluation (IT&E) Flight Test 3

The desire and ability to fly Unmanned Aircraft Systems (UAS) in the National Airspace System (NAS) is of increasing urgency. The application of unmanned aircraft to perform national security, defense, scientific, and emergency management are driving the critical need for less restrictive access by UAS to the NAS. UAS represent a new capability that will provide a variety of services in the government (public) and commercial (civil) aviation sectors. The growth of this potential industry has not yet been realized due to the lack of a common understanding of what is required to safely operate UAS in the NAS. NASA's UAS Integration into the NAS Project is conducting research in the areas of Separation Assurance/Sense and Avoid Interoperability, Human Systems Integration (HSI), and Communication to support reducing the barriers of UAS access to the NAS. This research is broken into two research themes namely, UAS Integration and Test Infrastructure. UAS Integration focuses on airspace integration procedures and performance standards to enable UAS integration in the air transportation system, covering Sense and Avoid (SAA) performance standards, command and control performance standards, and human systems integration. The focus of Test Infrastructure is to enable development and validation of airspace integration procedures and performance standards, including the integrated test and evaluation. In support of the integrated test and evaluation efforts, the Project will develop an adaptable, scalable, and schedulable relevant test environment capable of evaluating concepts and technologies for unmanned aircraft systems to safely operate in the NAS. To accomplish this task, the Project will conduct a series of Human-in-the-Loop and Flight Test activities that integrate key concepts, technologies and/or procedures in a relevant air traffic environment. Each of the integrated events will build on the technical achievements, fidelity and complexity of the previous tests and technical simulations, resulting in research findings that support the development of regulations governing the access of UAS into the NAS.

interoperability↗