Search NASA⌕ Search

SEARCH · Search NASA

Results for “continuous time system estimation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System

This document presents and discusses results from Cooperative Agreement DE-FC26-06NT42778, 'Full-scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System,' which was conducted over the time-period July 24, 2006 through June 30, 2010. The objective of the project was to demonstrate at full scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in pulverized-coal-fired flue gas. Oxidized mercury is removed downstream in wet flue gas desulfurization (FGD) absorbers and collected with the byproducts from the FGD system. The project was co-funded by EPRI, the Lower Colorado River Authority (LCRA), who also provided the host site, Great River Energy, Johnson Matthey, Southern Company, Salt River Project (SRP), the Tennessee Valley Authority (TVA), NRG Energy, Ontario Power and Westar. URS Group was the prime contractor and also provided cofunding. The scope of this project included installing and testing a gold-based catalyst upstream of one full-scale wet FGD absorber module (about 200-MW scale) at LCRA's Fayette Power Project (FPP) Unit 3, which fires Powder River Basin coal. Installation of the catalyst involved modifying the ductwork upstream of one of three wet FGD absorbers on Unit 3, Absorber C. The FGD system uses limestone reagent, operates with forced sulfite oxidation, and normally runs with two FGD modules in service and one spare. The full-scale catalyst test was planned for 24 months to provide catalyst life data. Over the test period, data were collected on catalyst pressure drop, elemental mercury oxidation across the catalyst module, and mercury capture by the downstream wet FGD absorber. The demonstration period began on May 6, 2008 with plans for the catalyst to remain in service until May 5, 2010. However, because of continual increases in pressure drop across the catalyst and concerns that further increases would adversely affect Unit 3 operations, LCRA decided to end the demonstration early, during a planned unit outage. On October 2, 2009, Unit 3 was taken out of service for a fall outage and the catalyst upstream of Absorber C was removed. This ended the demonstration after approximately 17 months of the planned 24 months of operation. This report discusses reasons for the pressure drop increase and potential measures to mitigate such problems in any future application of this technology. Mercury oxidation and capture measurements were made on Unit 3 four times during the 17-month demonstration. Measurements were performed across the catalyst and Absorber C and 'baseline' measurements were performed across Absorber A or B, which did not have a catalyst upstream. Results are presented in the report from all four sets of measurements during the demonstration period. These results include elemental mercury oxidation across the catalyst, mercury capture across Absorber C downstream of the catalyst, baseline mercury capture across Absorber A or B, and mercury re-emissions across both absorbers in service. Also presented in the report are estimates of the average mercury control performance of the oxidation catalyst technology over the 17-month demonstration period and the resulting mercury control costs.

01 COAL, LIGNITE, AND PEAT↗

Multi-Phased, Post-Accident Support of the Fukushima Dai-Ichi Nuclear Power Plant - 12246

In the wake of the March 11 earthquake and tsunami and the subsequent flooding of several of the Fukushima Dai-Ichi reactors, Japan and the Japanese utility TEPCO faced a crisis situation with incredible challenges: substantial amounts of radioactive mixed seawater and freshwater accumulated in the basements of four reactor and other buildings on the site. This water held varying levels of contamination due to the fact that it had been in contact with damaged fuel elements in the cores and with other contaminated components. The overall water inventory was estimated at around 110,000 tons of water with contamination levels up to the order of 1 Ci/l. Time was of the essence to avoid overflow of this accumulated water into the ocean. AREVA proposed, designed and implemented a water treatment solution using a proven chemical coprecipitation process with ppFeNi reagent, which is currently in use for effluent treatment on several nuclear sites including AREVA sites. In addition to the extremely short schedule the other challenge was to adapt the chemical treatment process to the expected composition of the Fukushima water and, in particular, to evaluate the impact of salinity on process performance. It was also necessary to define operating conditions for the VEOLIA equipment that had been selected for implementation of the process in the future facility. The operation phase began on June 17, and by the end of July more than 30,000 tons of highly radioactive saltwater had been decontaminated - the Decontamination Factor (DF) for Cesium was ∼10{sup 4}. It allowed recycling the contaminated water to cool the reactors while protecting workers and the environment. This paper focuses on the Actiflo{sup TM}-Rad water treatment unit project that was part of the TEPCO general water treatment scheme. It presents a detailed look at the principles of the Actiflo{sup TM}-Rad, related on-the-fly R and D, an explanation of system implementation challenges, and a brief summary of operation results to date. AREVA's response to the Fukushima Dai-Ichi crisis was multi-phased: emergency aid and relief supply was sent within days after the accident; AREVA-Veolia engineering teams designed and implemented a water treatment solution in record time, only 3 months; and AREVA continues to support TEPCO and propose solutions for waste management, soil remediation and decontamination of the Fukushima Dai-Ichi site. Despite the huge challenges, the Actiflo{sup TM}-Rad project has been a success: the water treatment unit started on time and performed as expected. The performance is the result of many key elements: AREVA expertise in radioactive effluents decontamination, Veolia know-how in water treatment equipments in crisis environment, and of course AREVA and Veolia teams' creativity. The project success is also due to AREVA and Veolia teams' reactivity and high level of commitment with engineering teams working 24/7 in Japan, France and Germany. AREVA and Veolia deep knowledge of the Japanese industry ensured that the multi-cultural exchanges were not an issue. Finally the excellent overall project management and execution by TEPCO and other Japanese stakeholders was very efficient. The emergency water treatment was a key step of the roadmap towards restoration from the accident at Fukushima Dai-Ichi that TEPCO designed and keeps executing with success. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modeling and Analysis of Coupled Flow Through Packed Beds as a Diagnostic Tool for Packed Bed Reactor Health - 17172

The US Department of Energy, Office of River Protection, is building the Waste Treatment and Immobilization Plant (WTP) in Richland, Washington, to immobilize the hundreds of millions of liters of radioactive waste stored at the Hanford Site in Washington state. The offgas generated during vitrification of these wastes requires treatment to remove and/or destroy chemical and radioactive hazardous components before release to the atmosphere. In particular, volatile and semi-volatile hydrocarbon components are to be catalytically oxidized to carbon dioxide and water, whereas nitrogen oxides (NOx) are to be catalytically reduced to nitrogen and water. These tasks are accomplished in a series of packed bed reactors. Achieving the requisite Destruction/Removal Efficiency (DRE) for each of the tracked components is highly dependent on the flow characteristics of the offgas through the packed beds. The flow kinetics may be monitored and characterized during the initial warm-up of the system. The gases, initially at 76 deg. C (169 deg. F), (a) flow through one side of a countercurrent heat exchanger to recover heat from the exiting gases (which have already passed through the catalytic beds), (b) are then further heated electrically to approximately 400 deg. C (750 deg. F; the preferred operating temperature of the Thermo Catalytic Oxidizer (TCO)), (c) pass through the TCO where the reduced components of the offgas are oxidized over a supported Pt catalyst bed, (d) are partially cooled to approximately 315 deg. C (600 deg. F) by addition of approximately 25% (by weight) diluted ammonia/air mixture, (e) pass through the Selective Catalytic Reducer (SCR) where the NOx components are converted to N{sub 2} and H{sub 2}O over a supported V2O{sub 5}/TiO{sub 2} catalyst bed, and (f) exit through the hot side of the countercurrent heat exchanger. The electrical heater is not powerful enough to raise the temperature of the offgas to the desired 400 deg. C without the contribution of the heat recovered in the heat exchanger. Moreover, the thermal mass of the beds and housings of the TCO and SCR require a significant input of thermal energy to reach the desired operating temperatures; the better part of a day is required to bring the unit from ambient temperatures to operating temperatures. Therefore, the temperature of the stream during the initial warm-up of the system at each point in the system is dependent upon the thermal mass, flow dispersion, and permeability of the components, quantified as characteristic/representative volumes and residence times. By monitoring the temperature of the offgas as it enters and exits each portion of the system during this warm-up period one may model the system as a series of small Continuously Stirred Tank Reactors (CSTR)s (referred to as 'CSTRlets') to explain the flow kinetics through the catalyst beds. These component CSTRlets are adjustable in size and number, that one may model the flow profile of the gases through the catalyst beds. For example, a single large CSTR will present an effluent temperature profile with a simple exponential decay shape. Concatenating more CSTRlets generate more complex sigmoidal responses. Concatenating one CSTRlet significantly larger than the others in the train also alters the shape of the effluent temperature profile, in a fashion not replicable by a train of equal-sized CSTRlets. The ultimate goal is to accurately emulate the entire system as a representative CSTRlet train. Once accomplished, this characterization may be used in subsequent warm-ups (following shutdown for catalyst maintenance, for example) or by an intentional step change in inlet offgas temperature to detect/diagnose anomalies in flow through the beds (e.g., channeling or partial blockage.) This work presents development of this model through analytical, calculational, and empirical means. - The analytic model is accomplished by Laplace transform analysis of each component to recover component process transfer functions. - The calculational portion is performed via brute force finite element calculation. - Fitting empirical data from the warm-up of the TCO skid allows one to select the hypothetical CSTRlet trains which best fit the TCO and SCR beds for the analytical and finite element calculations. The first portion of this paper presents the development of the analytical (Laplace space) model of the coupled system. Estimated values for the initial temperature, mass, specific heat, electrical heat, and relative quantities of the offgas, catalyst beds, stainless steel housings, and ammonia dilution stream are used to generate expected temperature profiles at several selected junctures of the system. The number and size of the component hypothetical CSTRlets are calculated from the analytical model and are used to predict temperature profiles at the exit of the system and at intermediate junctions between system components (where thermocouples are present in the actual unit.) The finite element calculations employ a series of CSTRlet volumes to produce a similar suite of temperature profiles, for comparison with the analytical model results. Finally, empirical data from the Factory Acceptance Test system warm-up are used to select and compare the results from each modeling strategy to select the CSTRlet train(s) which best model the behavior of the actual system. This work presents a novel method of system component characterization, of value to the WTP plant and similar vitrification facilities as well as chemical process industries unrelated to waste management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A computational modeling framework for pre-clinical evaluation of cardiac mapping systems

There are a variety of difficulties in evaluating clinical cardiac mapping systems, most notably the inability to record the transmembrane potential throughout the entire heart during patient procedures which prevents the comparison to a relevant “gold standard”. Cardiac mapping systems are comprised of hardware and software elements including sophisticated mathematical algorithms, both of which continue to undergo rapid innovation. The purpose of this study is to develop a computational modeling framework to evaluate the performance of cardiac mapping systems. The framework enables rigorous evaluation of a mapping system’s ability to localize and characterize (i.e., focal or reentrant) arrhythmogenic sources in the heart. The main component of our tool is a library of computer simulations of various dynamic patterns throughout the entire heart in which the type and location of the arrhythmogenic sources are known. Our framework allows for performance evaluation for various electrode configurations, heart geometries, arrhythmias, and electrogram noise levels and involves blind comparison of mapping systems against a “silver standard” comprised of computer simulations in which the precise transmembrane potential patterns throughout the heart are known. A feasibility study was performed using simulations of patterns in the human left atria and three hypothetical virtual catheter electrode arrays. Activation times (AcT) and patterns (AcP) were computed for three virtual electrode arrays: two basket arrays with good and poor contact and one high-resolution grid with uniform spacing. The average root mean squared difference of AcTs of electrograms and those of the nearest endocardial action potential was less than 1 ms and therefore appears to be a poor performance metric. In an effort to standardize performance evaluation of mapping systems a novel performance metric is introduced based on the number of AcPs identified correctly and those considered spurious as well as misclassifications of arrhythmia type; spatial and temporal localization accuracy of correctly identified patterns was also quantified. This approach provides a rigorous quantitative analysis of cardiac mapping system performance. Proof of concept of this computational evaluation framework suggests that it could help safeguard that mapping systems perform as expected as well as provide estimates of system accuracy.

59 BASIC BIOLOGICAL SCIENCES↗

Modular Undersea Compressed Air Energy Storage (UCAES) System

This project has been devoted to the design, optimization, and cost analysis of a unique power plant with integral energy storage. The proposed facility combines a novel underwater compressed air energy storage (UCAES) system with a customized gas turbine generator, providing exceptional power management and overall efficiency. Unlike conventional CAES, opportunities for underwater storage are plentiful and proximal to the power grid. The UCAES system provides coastal and island communities a practical means for managing the volatility of large-scale wind and solar power resources. The result is higher renewable energy absorption and improved electrical reliability with reduced fossil fuel consumption. The UCAES power plant is composed of three major subsystems: The underwater air containment system (ACS), the air transport pipe (ATP), and the land-based power conversion system (PCS). The underwater ACS is made up of modular concrete shell units, structurally optimized for minimal material usage while employing conventional production methods and equipment. Each shell is designed to receive and control loose fill or gravel, serving as the ballast. The static nature of the final structures make them an asset to marine habitats and includes features intended to permit safe and cost-effective deployment. The ATP Connects the ACS modules to each other and to the on-land power conversion system and utilizes high density polyethylene (HDPE) pipe for low cost and long life. The PCS Houses the turbine-generator ‘expander modules’, with peak capacity of 12.3 MWe each, engineered from existing gas turbine equipment and includes electrically driven commercial 3-stage intercooled centrifugal compressors, each nominally drawing 6.6 MWe when matching the turbine flow requirements. The subsystems listed above are designed with the intent to serve as building-blocks to achieve a peak power output rating in the 40 to 120 MWe range, with 0.25 to 4 hours of energy storage capacity. The modular facility with integral energy storage provides some remarkable transient maneuvers and load-following features unachievable by competing technologies. The system can operate as a dispatchable power plant with a fuel-to-electric efficiency over 41%; substantially better that the average existing Hawaiian peak power generation assets. Optimal efficiency can be maintained while load-following due to modular PCS design and is operable with a range of liquid or gaseous fuels while meeting the most stringent California (CARB) emission standards. The system can operate as a peaking energy plant in discharge mode. Power ramp-up equivalent to 215% of continuous load rating within 1 second accomplished by simply turning off the electric compressor(s). Contrarily, the system can offer energy absorption during periods of grid surplus generation. The electric compressors may be sequenced on to absorb power within seconds. More moderate transitions are easily achieved with standard compressor control functions. The system offers unique features as compared to energy storage systems. ‘Round-trip efficiency’, as calculated by industry standard methods, is in the 90% range. The PCS equipment has a mean-time between overhauls of 80,000 hours, with maintenance costs of less than $0.005/kW-hr of electricity delivered. The underwater ACS structures and piping employ materials and designs specified to achieve a 75 year life. With the underwater containment modules qualified as a marine habitat, there would be no decommissioning costs. In conjunction with the engineering work invested in the design of the UCAES power plant, Brayton Energy has employed a team of manufacturing specialists, marine construction engineers, and power industry experts to create a comprehensive economic model that captures the many site-related variables and configuration options. The cost results and methodology have been validated by suppliers, engineers, and deployment specialists through a detailed case study on Hawaii. While creation of the parametric cost model was based on inputs specific to Hawaii, the proposed construction and deployment steps were chosen to be general enough to allow extrapolation across locations world-wide. Analysis of the proposed system shows it to be a viable option and addresses the principal challenges described by the Department of Energy by offering competitive costs, validated safety and reliability, consideration of the regulatory environment, and utilization of industry accepted practices and equipment. The UCAES system is recommended for immediate consideration in Hawaii. Estimation of time to complete planning, design, and construction of the facility is anticipated to take 3 to 5 years. Other coastal and island communities world-wide should realize similar benefits; as the results presented in this report are considered generally transferable to other locations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Characterization of the Triassic Newark Basin of New York and New Jersey for geologic storage of carbon dioxide

The Newark Basin is a Triassic-aged rift basin underlying densely populated, industrialized sections of New York, New Jersey and Pennsylvania. The Basin is an elongate half-graben encompassing an area of more than 7,510 square-kilometers (2,900 square-miles), and could represent a key storage component for commercial scale management of carbon dioxide emissions via geologic sequestration. The project team first acquired published reports, surface and subsurface maps, and seismic data, which formed the basis for a three-dimensional model framework for the northern end of the Basin incorporating stratigraphic, hydrologic, and water quality data. Field investigations included drilling, coring, and logging of two stratigraphic test borings in Clarkstown, NY (Exit 14 Tandem Lot Well No. 1), drilled to a depth of 2,099 meters (6,885 feet); and Palisades, NY (Lamont-Doherty Earth Observatory Test Well No. 4) drilled to a depth of 549 meters (1,802 feet). Two two-dimensional seismic reflection data lines arrayed perpendicularly were acquired by Schlumberger/WesternGeco to help characterize the structure and stratigraphy and as part of pre-drilling field screening activities for the deep stratigraphic borehole. A total of 47 meters (155 feet) of continuous whole core was recovered from the Tandem Lot boring from depths of 1,393 meters (4,570 feet) to 1,486 meters (4,877 feet). Twenty-five horizontal rotary cores were collected in mudstones and sandstones in the surface casing hole and fifty-two cores were taken in various lithologies in the deep borehole. Rotary core plugs were analyzed by Weatherford Laboratories for routine and advanced testing. Rotary core plug trim end thin sections were evaluated by the New York State Museum for mineralogical analysis and porosity estimation. Using core samples, Lawrence Berkley National Laboratory designed and completed laboratory experiments and numerical modeling analyses to characterize the dissolution and reaction of carbon dioxide with formation brine and minerals, and resulting effects on injection rate, pressure, effective storage volume, and carbon dioxide migration within a prospective sandstone reservoir. $$Three potential porous and permeable sandstone units were identified in the Passaic Formation at the New York State Thruway Exit 14 location. Potential Flow Unit 1, at a depth of 643 meters (2,110 feet) to 751 meters (2,465 feet); Potential Flow Unit 2 at a depth of 853 meters (2,798 feet) to 1,000 meters (3,280 feet); and Potential Flow Unit 3, at a depth of 1,114 meters (3,655 feet) to 1,294 meters (4,250 feet). Reactive transport simulations of interactions between carbon dioxide, brine and formation minerals were carried out to evaluate changes in formation water chemistry, mineral precipitation and dissolution reactions, and any potential resulting effects on formation permeability. The experimental and modeling analyses suggest that mineral precipitation and dissolution reactions (within the target formation) are not expected to lead to significant changes to the underground hydrologic system over time frames (~30 years) typically relevant for carbon dioxide injection operations. Key findings of this basin characterization study include an estimate of carbon dioxide storage capacity in the Newark Basin. Assuming an average porosity of twelve percent and an aquifer volume of 6.1E+12 meters3, calculated ranges of likely storage capacity range from 1.9 – 20.2 gigatonnes under high temperature (low carbon dioxide density) conditions; and 2.9 – 30.2 gigatonnes under low temperature (low carbon dioxide density) conditions. Intra-basin faulting, geometry of the Palisades Sill, and the presence of altered meta-sediments above and below the Sill, increase potential compartmentalization within the basin. A structural/stratigraphic trap type may occur where porous/permeable sediments are cross-cut by the Palisades Sill. Potential injection intervals are present within the Stockton Formation of the Newark Basin. Additional porous/permeable intervals may be present within sandstones of the Passaic Formation, increasing projected storage capacity. Deeper wedges of strata are likely present in the deeper portions of the basin in southern New York and into northern New Jersey. Abundant mudstones are present in the Passaic, Lockatong, and Stockton Formations. These intervals have the requisite petrophysical properties to form effective primary and secondary containment intervals to industrial-scale sequestration of carbon dioxide in the Newark Basin. Hydro-thermally altered meta-sediments in the region immediately surrounding the top and base of the Palisades Sill is devoid of porosity/permeability and forms an additional effective lateral/vertical sealing cap rock.

58 GEOSCIENCES↗

Summary Describing Integration of ERM Methodology into Supervisory Control Framework with Software Package Documentation; Advanced Reactor Technology Milestone: M4AT-16PN2301052

This project involved the development of enhanced risk monitors (ERMs) for active components in Advanced Reactor (AdvRx) designs by integrating real-time information about equipment condition with risk monitors. Health monitoring techniques in combination with predictive estimates of component failure based on condition and risk monitors can serve to indicate the risk posed by continued operation in the presence of detected degradation. This combination of predictive health monitoring based on equipment condition assessment and risk monitors can also enable optimization of maintenance scheduling with respect to the economics of plant operation. This report summarizes PNNL’s multi-year project on the development and evaluation of an ERM concept for active components while highlighting FY2016 accomplishments. Specifically, this report provides a status summary of the integration and demonstration of the prototypic ERM framework with the plant supervisory control algorithms being developed at Oak Ridge National Laboratory (ORNL), and describes additional case studies conducted to assess sensitivity of the technology to different quantities. Supporting documentation on the software package to be provided to ONRL is incorporated in this report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Thinking Inside the Box

In early 2007, SLAC was faced with a shortage of both electrical power and cooling in the main computer building, at the same time that the BaBar collaboration needed a new cluster of 250 batch machines installed. A number of different options were explored for the expansion. Provision of additional electrical power to the building was estimated to take one to two years, and cost several million dollars; additional cooling was even worse. Space in a Silicon Valley co-location facilities was reasonable on a one-year timescale, but broke even in costs by the end of three years, and were more expensive after that. There were also unresolved questions about the affects of additional latency from an offsite compute cluster to the onsite disk servers. The option of converting existing experimental hall space into computer space was estimated at one year, with uncertain availability. An option to aggressively replace several existing clusters with more power-efficient equipment was studied closely, but was disruptive to continued operations, expensive, and didn't provide any additional headroom. Finally, the installation of a Sun Project Blackbox (PBB) unit was selected as providing the capacity on a timescale of six months for a reasonable cost with minimal disruption to service. SLAC obtained and installed a beta unit and have been running it in production since September 2007. The experiences described are with the Early Access version of the PBB. The production version of the box has engineering changes based in part on our experiences.

43 PARTICLE ACCELERATORS↗

Climate-simulated raceway pond culturing: quantifying the maximum achievable annual biomass productivity of Chlorella sorokiniana in the contiguous USA

Chlorella sorokiniana (DOE 1412) emerged as one of the most promising microalgae strains from the NAABB consortium project, with a remarkable doubling time under optimal conditions of 2.57 hr-1. However, its maximum achievable annual biomass productivity in outdoor ponds in the contiguous United States remained unknown. In order to address this knowledge gap, this alga was cultured in indoor LED-lighted and temperature-controlled raceways in nutrient replete freshwater (BG-11) medium at pH 7 under conditions simulating the daily sunlight intensity and water temperature fluctuations during three seasons in Southern Florida, an optimal outdoor pond culture location for this organism identified by biomass growth modeling. Prior strain characterization indicated that the average maximum specific growth rate (µmax) at 36 ºC declined continuously with pH, with µmax corresponding to 5.92, 5.83, 4.89, and 4.21 day-1 at pH 6, 7, 8, and 9, respectively. In addition, the maximum specific growth rate declined nearly linearly with increasing salinity until no growth was observed above 35 g/L NaCl. In the climate-simulated culturing studies, the volumetric ash-free dry weight-based biomass productivities during the linear growth phase were 57, 69, and 97 mg/L-day for 30-year average light and temperature simulations for January (winter), March (spring), and July (summer), respectively, which corresponds to average areal productivities of 11.6, 14.1, and 19.9 g/m2-day at a constant pond depth of 20.5 cm. The photosynthetic efficiencies (PAR) in the three climate-simulated pond culturing experiments ranged from 4.1 to 5.1%. The annual biomass productivity was estimated as ca. 15 g/m2-day, nearly double the U.S. Department of Energy (DOE) 2015 State of Technology annual cultivation productivity of 8.5 g/m2-day, but this is still significantly below the projected 2022 target of ca. 25 g/m2-day (U.S. DOE, 2016) for economic microalgal biofuel production, indicating the need for additional research in strain biology and system engineering.

annual biomass productivity↗

Impact of the MLC on the MRI field distortion of a prototype MRI-linac

Purpose: To cope with intrafraction tumor motion, integrated MRI-linac systems for real-time image guidance are currently under development. The multileaf collimator (MLC) is a key component in every state-of-the-art radiotherapy treatment system, allowing for accurate field shaping and tumor tracking. This work quantifies the magnetic impact of a widely used MLC on the MRI field homogeneity for such a modality.Methods: The finite element method was employed to model a MRI-linac assembly comprised of a 1.0 T split-bore MRI magnet and the key ferromagnetic components of a Varian Millennium 120 MLC, namely, the leaves and motors. Full 3D magnetic field maps of the system were generated. From these field maps, the peak-to-peak distortion within the MRI imaging volume was evaluated over a 30 cm diameter sphere volume (DSV) around the isocenter and compared to a maximum preshim inhomogeneity of 300 μT. Five parametric studies were performed: (1) The source-to-isocenter distance (SID) was varied from 100 to 200 cm, to span the range of a compact system to that with lower magnetic coupling. (2) The MLC model was changed from leaves only to leaves with motors, to determine the contribution to the total distortion caused by MLC leaves and motors separately. (3) The system was configured in the inline or perpendicular orientation, i.e., the linac treatment beam was oriented parallel or perpendicular to the magnetic field direction. (4) The treatment field size was varied from 0 × 0 to 20×20 cm{sup 2}, to span the range of clinical treatment fields. (5) The coil currents were scaled linearly to produce magnetic field strengths B{sub 0} of 0.5, 1.0, and 1.5 T, to estimate how the MLC impact changes with B{sub 0}.Results: (1) The MLC-induced MRI field distortion fell continuously with increasing SID. (2) MLC leaves and motors were found to contribute to the distortion in approximately equal measure. (3) Due to faster falloff of the fringe field, the field distortion was generally smaller in the perpendicular beam orientation. The peak-to-peak DSV distortion was below 300 μT at SID≥130 cm (perpendicular) and SID≥140 cm (inline) for the 1.0 T design. (4) The simulation of different treatment fields was identified to cause dynamic changes in the field distribution. However, the estimated residual distortion was below 1.2 mm geometric distortion at SID≥120 cm (perpendicular) and SID≥130 cm (inline) for a 10 mT/m frequency-encoding gradient. (5) Due to magnetic saturation of the MLC materials, the field distortion remained constant at B{sub 0}>1.0 T.Conclusions: This work shows that the MRI field distortions caused by the MLC cannot be ignored and must be thoroughly investigated for any MRI-linac system. The numeric distortion values obtained for our 1.0 T magnet may vary for other magnet designs with substantially different fringe fields, however the concept of modest increases in the SID to reduce the distortion to a shimmable level is generally applicable.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

EFFECTS OF MOISTURE IN THE 9975 SHIPPING PACKAGE FIBERBOARD ASSEMBLY

The fiberboard assembly used in 9975 shipping packages as an impact-absorption and insulation component has the capacity to absorb moisture, with an accompanying change to its properties. While package fabrication requirements generally maintain the fiberboard moisture content within manufacturing range, there is the potential during use or storage for atypical handling or storage practices which result in the absorption of additional moisture. In addition to performing a transportation function, the 9975 shipping packages are used as a facility storage system for special nuclear materials at the Savannah River Site. A small number of packages after extended storage have been found to contain elevated moisture levels. Typically, this condition is accompanied by an axial compaction of the bottom fiberboard layers, and the growth of mold. In addition to potential atypical practices, fiberboard can exchange moisture with the surrounding air, depending on the ambient humidity. Laboratory data have been generated to correlate the equilibrium moisture content of cane fiberboard with the humidity of the surrounding air. These data are compared to measurements taken within shipping packages. With a reasonable measurement of the fiberboard moisture content, an estimate of the fiberboard properties can be made. Over time, elevated moisture levels will negatively impact performance properties, and promote fiberboard mold growth and resultant degradation.

42 ENGINEERING↗

Evaluation of a performance appraisal framework for radiation therapists in planning and simulation

Constantly evolving technology and techniques within radiation therapy require practitioners to maintain a continuous approach to professional development and training. Systems of performance appraisal and adoption of regular feedback mechanisms are vital to support this development yet frequently lack structure and rely on informal peer support. A Radiation Therapy Performance Appraisal Framework (RT-PAF) for radiation therapists in planning and simulation was developed to define expectations of practice and promote a supportive and objective culture of performance and skills appraisal. Evaluation of the framework was conducted via an anonymous online survey tool. Nine peer reviewers and fourteen recipients provided feedback on its effectiveness and the challenges and limitations of the approach. Findings from the evaluation were positive and suggested that both groups gained benefit from and expressed a strong interest in embedding the approach more routinely. Respondents identified common challenges related to the limited ability to implement suggested development strategies; this was strongly associated with time and rostering issues. This framework successfully defined expectations for practice and provided a fair and objective feedback process that focussed on skills development. It empowered staff to maintain their skills and reach their professional potential. Management support, particularly in regard to provision of protected time was highlighted as critical to the framework's ongoing success. The demonstrated benefits arising in terms of staff satisfaction and development highlight the importance of this commitment to the modern radiation therapy workforce.

07 ISOTOPE AND RADIATION SOURCES↗

Measuring the neutrino-oxygen neutral current quasielastic cross section using the accelerator neutrino neutron interaction experiment

The Accelerator Neutrino Neutron Interaction Experiment (ANNIE) is a 26-ton gadolinium-doped water Cherenkov detector located on-axis to Fermilab’s Booster Neutrino Beam (BNB). ANNIE is uniquely positioned to perform high-statistics measurements of neutrino-nucleus interactions in water, benefiting from a large neutrino flux due to a short (100-meter) baseline. A central focus of ANNIE’s physics program is the measurement of both charged current (CC) and neutral current (NC) cross sections on water, including neutral current quasielastic (NCQE) and CC-inclusive channels. The NCQE measurement is particularly critical for constraining uncertainties in rare-event searches such as the Diffuse Supernova Neutrino Background (DSNB), where atmospheric $\nu$NCQE interactions constitute a significant and poorly constrained background. This dissertation presents a measurement of the flux-averaged neutrino-oxygen neutral current quasielastic ($\nu$NCQE) cross section using $2.573 \times 10^{20}$~POT of BNB exposure from the 2022 and 2023 beam years. The $\nu$NCQE interaction is identified through the primary $\gamma$-rays produced by nuclear de-excitation of the residual $^{15}$N$^*$ or $^{15}$O$^*$ nucleus following nucleon knockout from $^{16}$O. A dedicated Monte Carlo (MC) re-tuning campaign was conducted using an americium-beryllium (AmBe) calibration source, Michel electrons from stopped muons, and throughgoing dirt muons originating upstream of the detector. This multi-sample approach provided a wide-ranging $\mathcal{O}(\text{MeV})$--$\mathcal{O}(\text{GeV})$ dataset for tuning the simulated detector response, which was subsequently validated against AmBe neutron and Michel electron data for use in the $\nu$NCQE analysis. A dedicated laser calibration campaign was carried out to reduce timing uncertainties across the PMT system, enabling reconstruction of the BNB bunch substructure with sufficient resolution to serve as a background rejection tool. By selecting events in-time with individual neutrino bunches, beam-correlated $\nu$NCQE events are separated from diffuse and accelerator-induced backgrounds, notably skyshine neutrons and externally-originating events, that would otherwise dominate traditional charge-based selections within a small-scale, surface-level, short-baseline detector. A data-driven estimation of the skyshine neutron and external background rates was performed and incorporated into the systematic uncertainty budget. The flux-averaged $\nu$NCQE cross section on oxygen is measured to be $1.57 \pm 0.06\,(\text{stat.})$ $^{+0.91}_{-0.67}\,(\text{syst.})$ $\times 10^{-38}\ \text{cm}^{2}$. A full systematic budget is constructed by propagating uncertainties in the secondary hadronic interaction modeling, background cross section normalizations, detector response, neutrino flux, and the primary $\gamma$-ray emission probabilities from oxygen nuclear de-excitation. An idealized de-excitation model, constructed from existing measurements in the literature is developed to benchmark the predictions of the \textsc{GENIE} event generator. A comparison reveals that \textsc{GENIE} systematically overpredicts the primary $\gamma$-ray emission probability from oxygen de-excitation by a factor of $1.49\times$ for $E_\gamma > 6$~MeV and $3.07\times$ in the $3$--$6$~MeV band. This comparison motivates the dominant systematic uncertainty in this analysis, where a conservative uncertainty of $^{+39.9\%}_{-0\%}$ on the primary $\gamma$-ray signal prediction is assigned. The ANNIE result is consistent with and complementary to existing flux-averaged $\nu$NCQE cross section measurements from T2K and Super-Kamiokande, providing an independent measurement with a different detector, neutrino beam, and analysis methodology. Looking ahead, an upgrade to the ANNIE DAQ infrastructure enabling continuous extended readout will allow a complementary $\nu$NCQE neutron multiplicity measurement, directly relevant to constraining the NCQE background in DSNB searches, competitive with the recent T2K measurement at SK-Gd. The planned Super-SANDI upgrade, deploying a large Water-based Liquid Scintillator (WbLS) volume, will further extend ANNIE's reach to hadronic final states and exclusive NC channels, and enable joint measurements with liquid argon detectors sharing the BNB beamline ahead of DUNE and Hyper-Kamiokande.

Doran, Steven [Iowa State U.]↗

Utility-Scale Solar, 2024 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2024 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Key findings from this year’s report include: -18.5 GWAC of new utility-scale PV capacity came online in 2023, bringing cumulative installed capacity to more than 80.2 GWAC across 47 states. Installed costs continued to fall in 2023. Relative to 2022, capacity-weighted averages decreased by 8% to -$\$1.43$/WAC (or $\$1.08$/WDC). Costs, based on a 7.1 GWAC sample of 76 plants completed in 2023, have fallen by 75% (averaging 10% annually) since 2010. Plant-level capacity factors vary widely, from 6% to 36% (on an AC basis), with a sample median of 24%. -Levelized cost of energy (LCOE) of new 2023 projects increased slightly to $\$46$/MWh prior to the application of tax credits but continued to fall to $\$31$/MWh when accounting for federal incentives. PPA prices have largely followed the decline in solar’s LCOE over time, but newly signed longer-term PPA prices have increased since 2021, to an average of $\$35$/MWh (levelized, in 2023 dollars). -Solar’s average energy and capacity value (i.e., ability to offset costs of other power generation sources) across the U.S. was $\$45$/MWh in 2023. Solar’s average market value was lowest in CAISO ($\$27$/MWh), the market with the greatest solar generation share, and highest in ERCOT ($\$67$/MWh). -Newer solar projects had greater market value in 2023 than their generation costs, yielding $\$1.1$ billion in benefits. Projects built in 2022 delivered on average $\$15$/MWh more market value than their costs in 2023. -Solar’s combined value from wholesale electricity markets, public health and climate damage reduction were greater than generation costs and incentives, yielding $\$13.7$ billion in net benefits in 2023. We estimate U.S. health benefits of $\$24$/MWh and reduced global climate damages of $\$101$/MWh. -Adding battery storage is one way to increase the value of solar. Deployment of 52 new PV+battery hybrid plants set a record with 5.3 GW installed in 2023. Our public data file tracks metadata and PPA prices from more than 100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -Looking ahead, a massive pipeline of at least 1,085 GW of solar capacity dominates the nation’s interconnection queues at the end of 2023. Nearly 571 GW, or 53%, of that total was paired with a battery – in CAISO it was a staggering 98%. Historically only 10% of the requested solar capacity is built. -For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Nested Pebble Bed Blanket (NesPeB)

Recent advances in magnetic confinement fusion technology have attracted billions of dollars of investments in startups from venture capitals and corporations, resulting in the development of devices aiming to demonstrate net energy gain in a self-heated burning plasma, such as SPARC (under construction) and others. However, future fusion power plants must operate in regimes that will require technologies far beyond current experience. According to a National Academies of Science, Engineering, and Medicine report, to have nuclear fusion power plants contributing in a timely manner to the planned reduction of atmospheric carbon dioxide, a pilot plant should be built by 2035, and it should demonstrate fusion power production and the performance of the tritium fuel system (requiring a high enough tritium breeding) by 2040. A recognized key technology gap by [26] is the fusion first wall and blanket since no current blanket concept is considered satisfactory or has been built and proven. The first wall and blanket in magnetic fusion reactors form a vital and complex system, as it must satisfy different functions such as power extraction, tritium breeding, plasma containment, radiation shielding, and safety. The list of design requirements is even longer: high enough tritium production for fusion self-sufficiency, low material activation, decay heat and shutdown dose rates, high thermal efficiency, high-capacity factor, high magnets-divertor-vacuum vessel-first wall life, low corrosion, low cost, and intrinsically safe (requiring minimal licensing). Despite fifty-plus years of research, the first wall and blanket concepts proposed suffer from fundamental technical problems and immaturity (TRL=2-3) that jeopardize the timely delivery of a commercial fusion power plant. A fusion first-wall blanket has never been built nor tested, and a "winning", practical functioning design requires enough engineering margins (high enough tritium breeding considering the uncertainty, etc.), manufacturing simplicity, ease of continuous operation, maintenance, and low cost. A new, groundbreaking blanket concept called "Nested Pebble Bed Blanket" (NesPeB) was developed at ORNL under the successful ARPA-E GAMOW FERMI project (patent application allowed by the USPTO). The NesPeB blanket concept addresses current blanket concepts' shortcomings and technical immaturity, paving the way for accelerated delivery of fusion power plants. NesPeB is based on nested pebbles, which are binary-sized lithium-ceramic pebbles enclosed in "Beryllide" perforated and coated spherical shells, which are also binary-sized, stacked on top of each other, forming a "bed" and cooled by Nitrogen gas also "sweeping" the Helium and Tritium generated by the neutron irradiation of Lithium; the vacuum vessel plasma facing material is Molybdenum-96 and -97 with the first wall cooled by Helium while the divertor armor is made of Tungsten. The simulations of the NesPeB blanket using Fusion Reactors Models Integrator (FERMI) are encouraging as they estimate a tritium breeding ratio (TBR) greater than 1.2 using natural Lithium, acceptable pressure drop, and excellent heat transfer properties. Furthermore, the NesPeB blanket is not limited by magneto-hydro-dynamics (MHD) effects, is designed for online refueling, relies on existing tritium extraction technologies, has a simple construction, and limits the corrosion and chemical reactivity problems. NesPeB has the potential to be transformational and disruptive since it can solve all the main, challenging technical problems of fusion device blankets and accelerate a pilot plant delivery for 10 or more years.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Renewable Energy Requirements for Future Building Codes: Options for Compliance

As the model energy codes are improved to reach efficiency levels 50 percent greater than current codes, use of on-site renewable energy generation is likely to become a code requirement. This requirement will be needed because traditional mechanisms for code improvement, including envelope, mechanical and lighting, have been pressed to the end of reasonable limits. Research has been conducted to determine the mechanism for implementing this requirement (Kaufman 2011). Kaufmann et al. determined that the most appropriate way to structure an on-site renewable requirement for commercial buildings is to define the requirement in terms of an installed power density per unit of roof area. This provides a mechanism that is suitable for the installation of photovoltaic (PV) systems on future buildings to offset electricity and reduce the total building energy load. Kaufmann et al. suggested that an appropriate maximum for the requirement in the commercial sector would be 4 W/ft 2 of roof area or 0.5 W/ft 2 of conditioned floor area. As with all code requirements, there must be an alternative compliance path for buildings that may not reasonably meet the renewables requirement. This might include conditions like shading (which makes rooftop PV arrays less effective), unusual architecture, undesirable roof pitch, unsuitable building orientation, or other issues. In the short term, alternative compliance paths including high performance mechanical equipment, dramatic envelope changes, or controls changes may be feasible. These options may be less expensive than many renewable systems, which will require careful balance of energy measures when setting the code requirement levels. As the stringency of the code continues to increase however, efficiency trade-offs will be maximized, requiring alternative compliance options to be focused solely on renewable electricity trade-offs or equivalent programs. One alternate compliance path includes purchase of Renewable Energy Credits (RECs). Each REC represents a specified amount of renewable electricity production and provides an offset of environmental externalities associated with non-renewable electricity production. The purpose of this paper is to explore the possible issues with RECs and comparable alternative compliance options. Existing codes have been examined to determine energy equivalence between the energy generation requirement and the RECs alternative over the life of the building. The price equivalence of the requirement and the alternative are determined to consider the economic drivers for a market decision. This research includes case studies that review how the few existing codes have incorporated RECs and some of the issues inherent with REC markets. Section 1 of the report reviews compliance options including RECs, green energy purchase programs, shared solar agreements and leases, and other options. Section 2 provides detailed case studies on codes that include RECs and community based alternative compliance methods. The methods the existing code requirements structure alternative compliance options like RECs are the focus of the case studies. Section 3 explores the possible structure of the renewable energy generation requirement in the context of energy and price equivalence. The price of RECs have shown high variation by market and over time which makes it critical to for code language to be updated frequently for a renewable energy generation requirement or the requirement will not remain price-equivalent over time. Section 4 of the report provides a maximum case estimate for impact to the PV market and the REC market based on the Kaufmann et al. proposed requirement levels. If all new buildings in the commercial sector complied with the requirement to install rooftop PV arrays, nearly 4,700 MW of solar would be installed in 2012, a major increase from EIA estimates of 640 MW of solar generation capacity installed in 2009. The residential sector could contribute roughly an additional 2,300 MW based on the same code requirement levels of 4 W/ft 2 of roof area. Section 5 of the report provides a basic framework for draft code language recommendations based on the analysis of the alternative compliance levels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Autonomous Inversion of In Situ Deformation Measurement Data for Injection-Induced Stress Change

Geologic carbon storage (GCS) is likely to play a key part of the global effort to dramatically reduce CO2 emissions and perhaps even reduce atmospheric CO2 concentrations through carbon negative operations. A critical part of effort to commercialize and widely deploy this technology is developing the capability to rapidly assimilate real-time monitoring data into a form that will enable site operators to make decisions to manage the safe and efficient operations. Two of the risks associate with GCS are the risk of inducing fractures in the sealing formations that can create leakage pathways and the risk of inducing earthquakes of sufficient magnitude to cause public concern, property damage, or safety risks. To properly manage these risks the site operator needs to know the initial state of stress, the change in stress induced by injection, and the relationship between operational parameters such as injection rate and pressure and the change in stress. Current methods of estimating the change in stress require choosing the type of constitutive model and the model parameters based on core, log, and geophysical data during the characterization phase, with little feedback from operational observations to validate or refine these choices. These characterization methods interrogate the geologic formations using length scales, loading rates or magnitudes that are quite different from those encountered by the actual storage system. It is shown that errors in the assumed constitutive response, even when informed by laboratory tests on core samples, are likely to be common, large, and underestimate the magnitude of stress change caused by injection. Recent advances in borehole-based strain instruments and borehole and surface-based tilt and displacement instruments have now enabled monitoring of the deformation of the storage system throughout its operational lifespan. This data can enable validation and refinement of the knowledge of the geomechanical properties and state of the system, but brings with it a challenge to transform the raw data into actionable knowledge. We demonstrate a method that uses automatic differentiation and a finite-element based geomechanical model perform a gradient-based deterministic inversion of geomechanical monitoring data. This approach allows autonomous integration of the instrument data without the need for time consuming manual interpretation and selection of updated model parameters. Furthermore, only isotropic linear elasticity is considered in this paper, the approach presented is very flexible as to what type of geomechanical constitutive response can be used. The approach is easily adaptable to nonlinear physics-based constitutive models to account for common rock behaviors such as creep and plasticity. The approach also enables training of machine learning-based constitutive models by allowing back propagation of errors through the finite element calculations. This enables strongly enforcing known physics, such as conservation of momentum and continuity, while allowing data-driven models to learn the truly unknown physics such as the constitutive or petrophysical responses.

Burghardt, Jeffrey A.↗

Small Cell Carcinoma of the Head and Neck: University of Miami Experience

Purpose: To describe University of Miami experience in the treatment of small cell carcinoma of the head and neck. Methods and Materials: A total of 12 patients with nonmetastatic small cell carcinoma of the head and neck were treated between April 1987 and September 2007. Radiotherapy was the primary local treatment modality for 8 patients. Results: Of the 12 patients, 8 had died after a median follow-up of 13 months. The 4 patients who were alive were followed for a median of 14 months. The Kaplan-Meier estimate of the proportion of small cell head-and-neck cancer patients surviving to 1 and 2 years was 63% and 26%, respectively. The percentage of patients remaining disease free at 1 and 2 years was 71% and 44%, respectively. The patients with tonsil/parotid gland cancer had significantly greater disease-specific survival compared with the other patients. The median survival time was 30 months in the tonsil/parotid group compared with 15.2 months in the other group (patients with small cell carcinoma of the sinonasal cavity, nasopharynx, and larynx). A total of 4 patients developed recurrence, 3 of whom had a distant failure component. The treatment modality was not associated with a difference in disease-specific survival. The 1-year disease-specific survival rate was 73% in the radiotherapy or radiotherapy/chemotherapy group compared with 67% in the other group. Conclusion: Radiotherapy with or without chemotherapy is a reasonable alternative to surgery for patients with small cell carcinoma of the head and neck. Patients with tonsillar or parotid small cell carcinomas did better than other sites. More aggressive treatment might be warranted for patients with sinonasal carcinoma. The outcome, however, continues to be suboptimal, and more effective therapy is needed because most patients had a component of local and distant failure.

62 RADIOLOGY AND NUCLEAR MEDICINE↗