Search NASA⌕ Search

SEARCH · Search NASA

Results for “nuclear waste treatment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

Cesium Removal Performance Comparisons of Crystalline Silicotitanate Media Batches with Savannah River Site Waste Simulant

The Tank Closure Cesium Removal (TCCR) system uses ion exchange columns filled with Crystalline Silicotitanate (CST) media to process radioactive waste solutions for the removal of Cs137. TCCR currently focuses on dissolving Savannah River Site (SRS) Tank 10H waste (primarily sodium salt cake solids) within the tank followed by at-tank ion exchange column treatment. Plans are underway to prepare and install a second TCCR unit at SRS. Capacity and particle size differences exist between archived (IE-911) and more recently-prepared CST media batches (9120- B and 9140-B). Side-by-side comparison testing was performed to evaluate the cesium removal performance of each batch to aid in selecting the preferred CST batch and media characteristics to load into the second TCCR unit. Batch contact equilibrium and flow-through column tests have been conducted with three CST batches using an SRS Average Simulant. Simulant batch contact equilibrium cesium loading results for the three CST batches (including two lots of one batch) are provided in Table ES-1. The 35 °C data indicates that the archived IE-911 batch has a higher cesium capacity than recently-prepared CST media and that the minor TCCR CST 9120-B media lot (2099000035) has similar cesium removal performance to the major TCCR lot (2099000034). Tests conducted at 25 ºC for the archived IE-911 CST batch indicated lower cesium removal performance with this simulant batch than was observed recently with a different SRS Average Simulant batch. A dilution factor (DF) is typically utilized when modeling engineered CST media cesium loading performance to account for mass contributions from the binder material. In cases where CST performance is lower than expected, this factor includes corrections for the binder and for low performance. The ZAM (Zheng, Anthony, and Miller) Isotherm Model DF values are provided in Table ES-1 for each simulant batch contact result. DF values near 0.5 were determined for the 9120-B and 9140-B CST batch contact tests while DF values near 0.6 (20% higher) were determined for the tests with IE-911. These dilution factors are lower than recently observed with a different SRS Average Simulant batch (9140-B DF = 0.68; IE-911 DF = 1.0). Based on these results, it appears that some component in the simulant solution used for equilibrium testing may have resulted in reduced cesium loading on the CST media.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Gaps in Hanford High-Level Waste Solids Settling Behavior and Settling Time Evaluation for Direct Feed High-Level Waste (DFHLW) Operations

Settling of high-level waste (HLW) solids in process vessels is a key conceptual process step in providing HLW feed directly to the Hanford Waste Treatment and Immobilization Plant (WTP) HLW Vitrification Facility. Direct Feed High-Level Waste (DFHLW) is a potential approach to initiating HLW vitrification prior to completing of the WTP Pretreatment Facility. Settling would be used with subsequent supernatant decant to concentrate HLW feed. To support planning for DFHLW, Washington River Protection Solutions (WRPS) requested support from the Pacific Northwest National Laboratory to evaluate the current data set available to predict the time needed for HLW solids to settle, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling time. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers including: Gap 1: In-Tank Settling Rates Faster than Settling of Laboratory Samples, Gap 2: Effect of Sludge Leaching/Washing on Predicted Settling Times, Gap 3: Predicting Waste Settling from Waste Chemistry (Waste Type), Gap 4: Predicting Waste Settling from Particle Size and Density Distributions (PSDDs), Gap 5: Insufficient Laboratory and In-Tank Settling Data to Represent Hanford Waste, Gap 6: Methods for Real-Time, In-Tank Tracking of Settling, Gap 7: Prediction of Sediment Erosion Resistance as a Function of Settling Time, and Gap 8: Prediction of Sediment Solids Content as a Function of Settling Time. In addition to the data gaps, an overarching observation of the settling rate and settled layer data is the significant variation in behavior. At similar solids concentrations, settling rates can vary by as much as 3 orders of magnitude depending on the source waste tank, and significantly different settling rates are noted between laboratory and in situ tests for the same waste tank. The range of average solids concentration in existing HLW sediment, which may have been quiescent for decades, can vary from less than 7 wt% to greater than 74 wt% solids. The shear strengths (or yield stresses) measured on laboratory samples range from less than 27 Pa to greater than 6400 Pa. These variations can challenge process planning for the application of a settle/decant process for DFHLW. This report describes the significance of the gaps to the settle/decant process and presents uncertainties by way of examples. Potential technical approaches for resolving these gaps are described and the estimated difficulty in resolving these gaps is evaluated. Based on the significance of the gap and the difficulty of resolution, recommendations are made to address specific gaps. Scoping estimates of the potential settling times for DFHLW solids have been made based on the existing data set with its associated gaps. Depending on the process vessel depth and final sediment concentration, substantial fractions of the scoping estimate results for settling times for characterized HLW exceed the 2-week period that has been previously assumed for process planning. There is also significant disparity, potentially greater than a factor of 5000 difference, in the estimated settling times depending on process vessel depth and final sediment solid concentration. This variation in results underscores the significance of the identified gaps and uncertainties with respect to process planning for utilizing settle/decant operations for DFHLW.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PFAS Removal by Ion Exchange Resins: Background and Knowledge Gaps with Respect to the Hanford Site

Per- and polyfluoroalkyl substances (PFAS) have been a rising concern for the past two decades, with the United States Department of Defense and Environmental Protection Agency investing millions of dollars in research into remediation and clean-up technologies. Due to the environmental persistence, toxicity, biological uptake, and ongoing changes in both federal and state regulatory space, understanding the fate and transport of PFAS compounds has been of growing concern to the US Department of Energy (DOE). The DOE’s Hanford Site is investigating historical use of PFAS and will be doing site characterization for PFAS. Thus, PFAS have not yet been identified as a contaminant concern in regulatory documents. Based on historical records that mention the discharge of aqueous film-forming foam containing PFAS and having on-site fire stations (a risk factor for PFAS contamination), it seems likely that environmental releases of PFAS may have occurred. Pump and treat (P&T) remediation is the selected remedy for multiple groundwater contaminant plumes at Hanford. These P&T systems use ion exchange (IX) as a component of aboveground treatment, with the specific resins depending on the target contaminants. There is potential that these IX resins may be able to remove PFAS from groundwater, but investigation is needed to understand affinity/selectivity and removal capacity given the groundwater composition and the operating conditions. This report provides background on PFAS uses and chemistry, then provides a review of IX resin applications for PFAS, identifying knowledge gaps. Recommendations are provided regarding research needed to address knowledge gaps and acquire information needed to propose IX as a future PFAS remediation technology at the Hanford Site, as well as other U.S. Department of Energy sites. Generally, PFAS compounds are fluorinated substances that contain at least one fully fluorinated methyl or methylene carbon – with a few noted exceptions, any chemical with at least a perfluorinated methyl group (–CF3) or a perfluorinated methylene group (–CF2–) is a PFAS. These chemical compounds are characterized as non-biodegradable, non-reactive, non-photolytic, and hydrolysis resistant. This makes them highly recalcitrant within the environment, however polyfluoroalkyl materials are less recalcitrant as the carbon chains contain C–H bonds which are more easily broken than carbon – fluorine (C–F) bonds. The backbone carbon structures are commonly punctuated with a head group, the most well-known of them are perfluorooctanesulfonic acid and perfluorooctanoic acid, which possess a sulfonate and a carboxylate group, respectively. IX resins are marketed for the removal of PFAS from water systems and industrial water, however, the mechanism of removal is not as well understood as for anion or cation removal. A better understanding of the mechanism of removal would enable the development of IX resins that have improved specificity for PFAS removal. Four knowledge gaps were identified: 1) the effect of dissolved ions on the IX resin PFAS removal effectiveness, 2) the effect of additional primary contaminants of concern (PCOCs) or secondary contaminants of concern (SCOCs) on the effectiveness of PFAS via IX resin, 3) the mechanisms of PFAS removal from water, and 4) practical solutions to IX resin regeneration and waste disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ion Exchange Processing of AW-105 Hanford Tank Waste through Crystalline Silicotitanate in a Staged 2- then 3-Column System

The Hanford Site stores an estimated 56 million gallons of mixed radioactive and chemically hazardous waste in large underground tanks. In support of the Direct Feed Low-Activity Waste (DFLAW) Program for expediting Hanford tank waste supernate treatment, laboratory-scale ion exchange processing using prototypic unit operations was conducted on AW-105 tank waste at the Pacific Northwest National Laboratory Radiochemical Processing Laboratory. This report describes the small-scale ion exchange testing with 9.2 L of diluted and filtered supernate from Tank 241-AW-105 (hereafter referred to as AW-105) at 16 °C (62 °F). One of the waste acceptance criteria (WAC) for the Waste Treatment Plant (WTP) Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AW-105 tank waste to meet this criterion, only 0.225% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 445. Testing with AW-105 matched current Tank Side Cesium Removal (TSCR) facility prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the crystalline silicotitanate (CST) bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 83% Cs breakthrough after processing ~1500 BVs of feed; the 50% Cs breakthrough was interpolated from the breakthrough data and occurred at 1041 BVs. Despite the AW-105 having a significantly higher K concentration (0.55 M compared to 0.10 M), testing compared to previous AP-107 ion exchange column testing at 16 °C showed no difference in BVs processed to reach the WAC on the lead column and only an approximate ~20 BV decrease in volume processed to reach the WAC limit on the lag column. The negligible differences in capacity despite the 5x concentration differences in K was determined to be due to the significantly lower NO3 concentration in the AW-105 supernate compared to the AP-107 tank waste matrix. A comparison in breakthrough curves for the two tests also indicated slightly faster kinetic behavior in the AW-105, with the variations in feed matrices (lower NO3 concentration) likely responsible for the deviation. The Cs effluent from the lag column reached the WAC limit after processing 772 BVs. Anticipating this breakthrough point, the polish column was preemptively installed around 675 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 1.10×10 1 µCi/mL, or 14.13 % Cs breakthrough, after processing all 1500 BVs of feed. The polish column processed nominally 830 BVs and reached 2.10×10 -1 µCi/mL, or 0.27 % Cs breakthrough at the conclusion of the test. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cesium Ion Exchange Testing Using Crystalline Silicotitanate with Hanford Tank Waste 241-AP-107

At the time of this testing, the Low-Activity Waste Pretreatment System (LAWPS) was to provide for the initial production of immobilized low-activity waste by feeding Hanford tank supernate from tank farms to the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility for immobilization. Washington River Protection Solutions requested that Hanford tank waste collected from tank 241-AP-107 (hereafter called AP-107) be processed using conceived pretreatment steps (suspended solids removal by filtration, Cs removal by ion exchange) then vitrified. A small-scale test platform to demonstrate the solids filtration, Cs removal, and LAW vitrification was constructed and installed at Pacific Northwest National Laboratory. Bench-scale ion exchange testing with approximately 9 L of AP-107 supernate was conducted using crystalline silicotitanate (CST) ion exchange media. The IONSIV R9140-B CST was provided by Honeywell UOP, LLC in 2018 (Batch 2081000057). The ion exchange media was first tested with simulant and was previously described. This report describes the Cs ion exchange batch contact and column test results with the AP-107 tank waste. Batch contact testing helps to evaluate CST performance on tank waste supernate prior to processing it in the ion exchange columns. Batch contacts were performed with the waste at four Cs concentrations at a phase ratio of 200 (liquid volume to exchanger mass) with AP-107. The distribution coefficient (K d ) at the equilibrium condition of 8.57 µg Cs/mL (AP-107 feed condition) was determined to be 669 mL AP-107/g CST. With a CST bed density of 1.00 g/mL, this K d corresponded to a predicted 50% Cs breakthrough of 669 bed volumes (BVs). The Cs load capacity at the equilibrium feed condition was determined to be 7.5 mg Cs/g dry CST. The column testing was prototypic to the intended LAWPS operations in a lead-lag column format, although on a small-scale basis with 10-mL CST beds. The feed was processed downflow through the lead column and then through the lag column at ~2.2 BV/h. Loading continued until the lag column reached the WTP waste acceptance criteria (WAC) for receiving supernatant waste for vitrification (a function of the Na and 137 Cs concentrations). For AP-107, the WAC is 0.114% of the influent 137 Cs concentration; this required a Cs decontamination factor of 876. The Cs effluent from the lag column reached the WAC after processing ~410 BVs. To keep the subsequent product effluent below the WAC, a replacement lag column was prepared, the lead column was removed from service (after processing a total of 471 BVs), the lag column was put into the lead column position, and the replacement lag column was installed. Feed processing continued and after another ~290 BVs the Cs effluent from the lag column again exceeded the WAC. In both cases, the lead columns only reached 25% Cs breakthrough before removal. Although 50% Cs breakthrough was not reached, this value was estimated and averaged based on extrapolation of the loading curves (640 BVs) and agreed within 4% of the predicted 50% Cs breakthrough from batch contact test results (669 BVs). Table ES.1 summarizes the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Dissolution of Fluoride Salts in Hanford Tank Waste

The Direct Feed High-Level Waste (DFHLW) strategy seeks to bypass the Hanford Waste Treatment and Immobilization Plant Pretreatment Facility while retaining some processing functions to maximize waste feed loading and minimize high-level waste (HLW) waste volume. The DFHLW flowsheet needs leaching, washing, and solids concentration operations either in new or existing tanks. The effectiveness and efficiency of sludge washing has a substantial impact on DST space, mission duration, and the evaporation and low-activity waste (LAW) treatment operations required by these large wash-water additions. One target species requiring washing is fluoride. The HLW glass composition limits for fluorine drive operations to dissolve fluoride-bearing salts into the LAW fraction and thereby maximize waste loading in HLW glass. The fluoride in many high-level wastes at Hanford is predominantly in the form of fluoride-salt precipitates: villiaumite (NaF), kogarkoite (Na 3 FSO 4 ), and natrophosphate (Na 7 F(PO 4 ) 2 ·19H 2 O). Fluoride produces melter off-gas that creates corrosion risk in the off-gas system piping, while the sulfate and phosphate in the fluoride double salts kogarkoite and natrophosphate can be detrimental to glass waste loading. Fluoride salts are sparingly soluble, with solubilities ranging from approximately 40 to 130 kg per kL of pure water, and the dissolution kinetics of the three fluoride salts are not well known. Unexpected delays in a tank dissolution process could be encountered as a result of the lack of information about dissolution rates. In addition, if the double salts show transient non-stoichiometric dissolution of fluoride versus phosphate or sulfate, unexpectedly high concentrations of one of these other constituents could be produced. Washington River Protection Solutions authorized Pacific Northwest National Laboratory to collect the available data for fluoride salt dissolution rate, provide a scoping estimate of dissolution time if possible, and identify gaps in the understanding and predictive capability for estimating dissolution time. Open literature and Hanford reports were reviewed to document, understand, and (where possible) evaluate limitations on fluoride salt equilibria and dissolution kinetics, including both mass transport and surface reaction rate. Scoping estimates of dissolution time were made for mass-transfer-controlled dissolution of spherical particles of fluoride salts suspended in liquid. This is not the only potential governing mechanism; dissolution could be substantially slower if the surface reaction rate (the rate of release of ions from the surface) is the controlling mechanism. When the minimum amount of water for complete dissolution is used and the slip velocity between the liquid and suspended particles is less than or equal to the terminal settling velocity, the estimated mass-transfer rates allow 0.1 mm particles of fluoride salt to dissolve in minutes at 25 °C in water containing no other dissolved salts. Much larger solids, such as the 6-mm chunks that have been seen in heels, could take a few hours to more than a week to dissolve. The actual dissolution times will depend strongly on the actual slip velocity, the extent of particle suspension, constraint by surface reaction rates, the ratio of solvent to solid, and the presence of common ions that shift the solubility equilibria to restrict dissolution of fluoride salts.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment and Simulation of Particulate Transport for Delivery of Solid Amendments into the Subsurface: FY25 Status Report

For particulate-based amendments to be viable for field-scale remediation at the Hanford Site (e.g., the 200 DV-1 Operable Unit), amendment particles need to be delivered a reasonable distance away from an injection well to provide cost effective in situ treatment. Field-scale particle transport models can estimate spatial deposition of amendment particles in the subsurface, which is critical for developing an overall remediation strategy. However, field-scale particle simulations are currently limited due to insufficient simulation capability and a lack of experimental data to validate and parameterize particle transport models. During this fiscal year, the following progress has been made toward a field-scale particle transport modeling evaluation: (1) in addition to the two particle transport models implemented last FY, four additional particle transport models have been implemented within PFLOTRAN; (2) a Python-based pre-screening tool was finalized, enabling users to quickly estimate the particle radius of influence (ROI) for any given particle-amendment system; and (3) an initial compatibility assessment was completed using both particle transport simulations deployed through the pre-screening tool, in conjunction with general guidelines to (a) identify the most suitable amendment particle sizes for various Hanford sediments and (b) evaluate amendment-delivery fluid compatibility. The preliminary compatibility assessment revealed that for amendment delivery success to the various Hanford target formations, amendment particle sizes will likely need to be smaller than the amendment sizes tested in the DV-1 treatability study. It is recommended that amendment particles be decreased in size, or alternative smaller size amendments be obtained from the manufacture, prior to any further experimental testing. Also, preliminary testing suggests that xanthan gum may be the most broadly compatible delivery fluid. Planned laboratory experiments will be instrumental in validating and refining the PFLOTRAN particulate transport model formulations, ultimately enabling predictive capabilities to facilitate the design of field-scale amendment delivery systems. This work consists of acquiring new theoretical or experimental knowledge. The information associated with this report should not be used as design input or operating parameters without additional qualification.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reduced Temperature Cesium Removal from AP-101 Using Crystalline Silicotitanate

The Tank Side Cesium Removal (TSCR) system, currently operational under Washington River Protection Solutions LLC (WRPS), sends initial low-activity Hanford waste tank supernate feed to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at the WTP. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIV™ R9140-B), was selected as the ion exchange media at TSCR. Laboratory-scale ion exchange processing using TSCR prototypic unit operations continues to contribute toward WRPS establishing accurate process flowsheets for the individual feed campaigns planned for TSCR. This report describes the small-scale ion exchange testing with 14.0 L of diluted and filtered supernate from tank 241-AP-101 (AP-101DF) at 16 °C (62 °F) to demonstrate processing at temperature conditions that are more prototypic of what the TSCR system could experience during colder seasons of the year. Since CST Cs capacity increases with decreasing contact temperature, testing at the lower operating temperature will help to predict the maximum 137 Cs loading onto the CST in the TSCR system. One of the waste acceptance criteria (WAC) for the WTP Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AP-101DF tank waste to meet this criterion, only 0.144% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 694. Testing with AP-101DF matched TSCR prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the CST bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 62% Cs breakthrough after processing ~1400 BVs of feed; the 50% Cs breakthrough occurred at 1250 BVs. Testing compared to previous AP-107 testing at 16 °C showed ~80 BV increases in volume processed to reach the WAC limit for both lead and lag columns. A similar slope in breakthrough curves for both tests indicates similar kinetic behavior, with variations in feed matrices (Na and Cs concentrations) likely responsible for the deviations in reaching the WAC limit. The Cs effluent from the lag column reached the WAC limit after processing 875 BVs. Anticipating this breakthrough point, the polish column was preemptively installed at 770 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 5.32×10 0 µCi/mL, or 5.6 % Cs breakthrough, after processing all 1400 BVs of feed. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Study of an Unrefined Humate Solution as a Possible Attenuation-based Remedy for Uranium Contamination in Acidic Groundwater - 20351

The Savannah River Site (SRS), joined the environmental cleanup program in 1981 after the Cold War, and was designated as a hazardous waste management facility. About 1.8 billion gallons of acid wastes were disposed into the F/H Area Seepage Basin that included many radionuclides and dissolved metals, resulting in highly contaminated groundwater plumes with pH of 3 - 5.5. The acidity of the plumes contributes to the mobility of several constituents of concern (COC) such as H-3, U-238, I-129, and Sr-90 for the F-Area plume and H-3, Sr-90 and mercury for the H-Area plume. An active treatment (pump-and-treat and re-injection) system was constructed and put in place in 1997 to address the removal of metals and radionuclides from the contaminated groundwater. As remediation projects advanced, active treatments were transitioned to more passive or enhanced-passive approaches such as the subsurface barrier with base injection system, which has been controlling the mobility of contaminants. However, new and more efficient attenuation-based remedies are always sought. Several studies have proposed that humic substances can be used to remediate sites contaminated with heavy metals by creating a permeable reactive barrier. Humic substances (HS) are major components of soil organic matter. HS are polyfunctional organic macromolecules formed by the chemo-microbiological decomposition of biomass or dead organic matter. These substances are usually divided into three main fractions: humin (insoluble at all pH values), humic acid (soluble at pH greater than 3.5), and fulvic acid (soluble at all pH values). Humic substances are major components of the soil at SRS and, in addition, are also helpful in the removal process of uranium. This research focuses on uranium (VI), which is a key contaminant of concern in the F-Area groundwater plume. The interaction of uranium with sediment in the presence or absence of humic substances involves complex mechanisms that are not yet well understood. The interaction of U(VI) with humic substances can affect the adsorption of U on sediment, altering its mobility in the subsurface. The objective of this study is to study the mobility of uranium in the presence of humic acid and to determine if sediments amended by humic acid can enhance the sorption of heavy metals onto sediments. In this research, experiments were conducted using background (clean) F-Area aquifer sediments to understand and predict uranium mobility. A blended material, humate, containing both humic and fulvic acids and a chemically modified humate (KW15 modified humic or mod-HA) was studied as a possible amendment for uranium remediation in SRS groundwater. Batch experiments were conducted in triplicates using 20 ml of aqueous suspension in DI water containing SRS sediment and mod-HA and studied the effect of pH, kinetics of humate sorption onto SRS sediment and also studied the sorption of uranium onto mod-HA amended SRS sediment. Results indicate that mod-HA amended sediment increases uranium removal significantly. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Small to Full Height Scale Comparisons of Cesium Ion Exchange Performance with Crystalline Silicotitanate

The U.S. Department of Energy’s (DOE) Hanford Site houses 56 million gallons of high-level radioactive waste generated from plutonium production from 1944 to 1988. The supernatant waste, currently stored in underground tanks, is intended to be vitrified following filtration and 137 Cs removal at the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility. The WTP Pretreatment Facility will not be operational for several years. The Tank Side Cesium Removal (TSCR) system is a technology demonstration that will remove cesium from tank waste supernate to support directly feeding LAW to the vitrification facility. The 137 Cs removal is important to meet the WTP LAW contract specification and ultimately for creating a contact-handled waste form. The waste acceptance criteria (WAC) limit for the WTP LAW Facility is <3.18E-5 Ci 137 Cs per mole Na. The TSCR system is skid mounted and employs two key technologies: dead end filtration for solids removal and ion exchange (IX) for cesium removal. Filtration is necessary to protect the functionality of the IX columns. The IX process utilizes sodium form crystalline silicotitanate (CST) IX media produced by UOP Honeywell, LLC (Des Plaines, IL) under the product name IONSIV R9140-B, 18 x 50 mesh, in a lead-lag-polish column configuration. Each column contains a CST bed height of 92 inches and a volume of approximately 157 gallons of CST IX media. The full-scale TSCR operation will run at a residence time of 1.9 bed volumes (BV)/h, which results in a superficial velocity of 7.3 cm/min and a flowrate of ~5 gal/min. Column testing at small (2.5% of the full bed height), medium (12% of the full bed height), and full-height scales has been previously conducted to evaluate process variables and scale up performance of Cs exchange onto the CST. Cesium load performances from various sieve cuts at the small scale indicated that a 30-mesh sieve cut be tested to determine if it better reflects the 12% and full-height column performances at the small scale. Two process flowrates were tested in the small-column configuration with <30-mesh CST and simulant solutions. These tests were compared to full-height column tests at the same residence times to assess CST particle size effect on column scaling. Table S.1 summarizes the observed column performance determined for the two flowrates juxtaposed to the previous work with 5.6 M Na simulant at higher scales (used as benchmarks). The WAC breakthroughs between the small and full-height tests at 1.3 BV/h differed by ~59 BVs. The WAC breakthroughs for small, medium, and full-height tests at 1.8 BV/h were consistent at 240 BVs. The 50% Cs breakthroughs were nominally equivalent for all column tests. The common transition zones and onsets of Cs breakthrough at the 1.8 BV/h tests indicated that the Cs mass transfers were equivalent and thus the <30-mesh CST Cs load performance at the small scale successfully modeled that of the full-height system. It is recommended that the <30-mesh CST be used in subsequent 10-mL CST bed tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Modified Isotherm Modeling to Predict Cs Exchange with Crystalline Silicotitanate in Tank Waste Simulants

The U.S. Department of Energy is working to expedite processing of Hanford tank waste supernate at the Hanford Waste Treatment and Immobilization Plant. To support this goal, Washington River Protection Solutions is designing a Tank Side Cesium Removal (TSCR) system for suspended solids and cesium (Cs/ 137 Cs) removal from Hanford tank waste supernate. The ion exchange media selected for Cs removal at TSCR is crystalline silicotitanate (CST) that is manufactured in a nearly spherical form by Honeywell UOP LLC (UOP; Des Plaines, IL) as product IONSIV® R9140-B (Na form). The Zheng Anthony Miller (ZAM) isotherm model (Zheng et al. 1997) is a multicomponent ion exchange model used to predict the exchange of Group I metals onto CST. The ZAM isotherm has historically been used to predict Cs distribution values from Hanford and Savannah River Site (SRS) tank waste simulants. Figure S.1 summarizes model predictions from the ZAM isotherm that indicate poor prediction of Cs distribution values for simple and complex simulants with the engineered form of CST, IONSIV® R9140-B, and IONSIV® R9120-B where the solid line indicates a perfect fit by the model. The dotted lines indicate ±20% error. Batch contact testing with Hanford tank waste complex and simple simulants was used in conjunction with SRS simulants to experimentally determine Cs distribution values using a modification to the original isotherm model. The experimentally determined maximum Cs capacity for IONSIV® R9140-B CST in both the simple and complex matrices was found to be 0.53±0.3 mmoles Cs/g of CST. This value is not drastically different from the maximum Cs capacity of 0.58 mmoles Cs/g TAM-5 reported by Zheng et al. (1997). However, it is important to note that TAM-5 (commercially IONSIV® IE-910) is a powder. Hamm et al. (2002) determined that a dilution factor was needed to account for the Zr(OH)2 binder in the engineered form of CST. Hamm et al. determined that a dilution factor of 0.68 was appropriate to account for binder contribution and correct overprediction of Cs exchange on the engineered form of CST in ZAM calculations. This reduced the total capacity from 0.58 mmol/g with TAM-5 to 0.39 mmol/g for the engineered form of CST (Hamm et al. 2002). Despite substituting the experimentally determined maximum Cs capacity of 0.55 mmoles Cs/g for the literature-reported capacity of 0.39 mmoles Cs/g, it was determined that additional modifications to the model’s equilibrium rate constants were necessary in refining the isotherm model. The modified model overpredicted K+ uptake by the CST when compared to digested CST results described by Campbell et al. (2019). The modified model was further revised to omit three of the five K+ exchange equilibrium reactions described by ZAM to reduce the additional K+ loading seen by the model. Figure S.2 summarizes the revised model isotherm predictions plotted against measured Kd values.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mesofluidic Inline Separation for Produced Water Treatment

Mesofluidic inline separation developed by PNNL represents an opportunity to remove a key barrier in the treatment of produced water, namely suspended solids that clog downstream operations. The US alone produces over 800 billion gallons of produced water each year, most of which is reinjected underground (but not into the aquifers) as waste. The impact from treating and reusing even a fraction of this wastewater is immense as aquifers in the Midwest and elsewhere dry. The work described herein is essential to leveraging the opportunity to improve produced water quality (to allow for beneficial use) by combining mesofluidic inline separators with reverse osmosis systems. Providing water for agricultural and industrial uses in the American Southwest and Midwest by allowing the reuse of petroleum produced water may be critical to the long-term economics of the region. This is especially true as drought conditions are rapidly lowering aquifer levels in these regions. The incumbent technology for desalination is reverse osmosis (RO) due to its ability to treat a wide range of feedwaters and technological maturity. However, suspended solids cause RO (and other dissolved solids removal technologies) to become clogged and loose performance. A common strategy is to use prefilters upstream of RO systems, but these membrane-based filters easily clog and require regular maintenance. Unlike membrane filters, mesofluidic inline separators provide removal of suspended solids with much lower pressure drops than conventional systems filtration systems, permitting substantially higher flowrates. Although the amount of produced water from petroleum operations is vast, only a small fraction of it is reused or turned into potable water, for example, because of the lack of technologies to remove both dissolved and suspended solids at a significant throughput. This project shows that mesofluidic inline separators coupled with a commercial dissolved solids removal technology (RO) are positioned to do exactly that. Mesofluidic inline separators fit within commercial piping and are tunable for particle sizes of interest as described below. Indeed, mesofluidic inline separators have remarkably smaller footprints than competing filtration technologies and are easily transportable from jobsite to jobsite. This technology has no moving parts so that solids removal can be accomplished at much lower operating cost.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary IHLW Formulation Algorithm Description

This report documents the initial algorithm that could be used by the Waste Treatment and Immobilization Plant (WTP) in batching high-level waste (HLW) and glass-forming chemicals (GFCs) in the HLW melter feed preparation vessel (MFPV) (HFP-VSL-00001 and -00005). Not all Hanford tank waste can be accommodated by the models developed for this report and significant expansion of the model boundaries could be achievable to reduce the WTP mission life and total canister production count. The immobilized HLW (IHLW) must meet a series of constraints to be acceptable for disposal in the Monitored Geologic Repository, which are contained in the Specification 1 of the Contract (DOE 2000), the Waste Acceptance Product Specifications (WAPS, DOE 1996), and the Waste Acceptance System Requirements Document (WASRD, DOE 2007). The IHLW Waste Form Compliance Plan (WCP, 24590-HLW-PL-RT-07-0001, Rev 3) specifies that the formulation algorithm will be developed and used to comply with the constraints associated with glass composition and properties. This report is not an engineering calculation, does not provide design input, and is not an engineering study. Algorithm inputs include the chemical analyses of the blended HLW in the HLW blend vessel (HBV) (HLP-VSL-00028, the volume and composition of the MFPV heel, the volume and composition of the MFPV after waste addition, the volume and composition of MFPV batch after GFC addition, the compositions of individual GFCs, and the mass of glass in each canister. In addition to these inputs, uncertainties in the HLW composition and processing parameters are included in the algorithm. Using the above inputs, the algorithm calculates the following outputs: 1) the volume of HLW to be transferred from the HBV to the MFPV, 2) the mass of each GFC for addition to the MFPV, 3) the composition of the glass that will be produced along with uncertainties, and 4) the predicted properties, with associated uncertainties, of the resulting IHLW. The algorithm uses the property-composition models to calculate properties with associated uncertainties and compares them with various constraints to ensure that a processable feed is formulated and a compliant IHLW is produced. The GFC additions are determined using an optimization approach to provide high confidence that the HLW glass will meet all product quality requirements and key processing constraints. For most HLW batches there are many possible glass compositions that meet all constraints. In these cases, the glass composition is optimized for a series of target component concentrations and target property values. The algorithm also incorporates process measurement and product quality uncertainties, based on the work of Piepel et al. (2005). Estimates of the various process and measurement uncertainties that affect glass compositions and predicted glass properties have been previously reported (Piepel et al. 2005, 2006) and the impacts of these estimated uncertainties on the IHLW composition envelope that meets product quality and processing-related properties with sufficient confidence were evaluated. The details of work performed to date to develop this initial GFC addition and batching algorithm are summarized in Sections 4 and 5. An example data set is used to illustrate the calculations of the algorithm summarized in Section 6. Finally, in Section 7, there is a statement of the required work to achieve a final operational IHLW formulation control algorithm. This report is not an engineering calculation, does not provide design input, and is not an engineering study.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

System Configuration Evaluation for Process Settling of Hanford Waste Solid Particles

Direct Feed High-Level Waste (DFHLW) is a potential flowsheet operations approach to initiating high-level waste (HLW) vitrification prior to completion of the Hanford Waste Treatment and Immobilization Plant (WTP) Pretreatment Facility. A settle/decant process has been proposed to concentrate solids prior to delivery to the WTP HLW Facility during DFHLW operations, wherein the solids in a settled layer would be remixed with the supernatant liquid remaining after decanting operations to provide the feed at required solids concentrations. Settling would be used in lieu of purpose-built filtration or other solids separation equipment. Pacific Northwest National Laboratory (PNNL) is providing baseline technical support to the Washington River Protection Solutions (WRPS) Flowsheet Integration group. To support planning for DFHLW, WRPS previously requested that PNNL evaluate the current data set available to predict the time needed for HLW solids to settle and the solids concentration and strength of that settled layer, to identify gaps in the understanding and predictive capability of HLW solids waste settling times, and to provide scoping estimates of the potential settling times. Eight technical gaps were identified for predicting settling times and characteristics of the formed sediment layers. In addition to the data gaps, an overarching observation was made that there is significant variation in behavior of settling rate and settled layer data. The settling time required to concentrate solids via a settle/decant process was determined from the limited data to have a difference of potentially more than a factor of 5,000 in the estimated settling times, varying from 0.2 to 1,060 days for example depending on process vessel depth and final sediment solids concentration. In contrast, successful processes of liquid-forward output streams resulting from in-tank settling and decanting forward liquid have been reported for operations conducted at the Hanford Site. The purpose of this current report is to further support DFHLW planning by evaluating double-shell tank (DST) and alternate vessel equipment and operational configurations to enable optimization of the settle/decant process to concentrate solids. Hanford waste processing behavior specific to liquid feed availability following a slurry transfer in a DST is summarized, including process stream characteristics and process equipment configurations. The performance of DST process equipment configurations is evaluated for possible improvements using computational fluid dynamics (CFD) and simple analytical models. Potential new vessel design(s) specific to enabling effective settle/decant processes, and cursory summary of other separate and inline solids separations processes, are also provided. The CFD results indicated that improvement in outflow solids concentration was promoted by a reduction in the slurry flow rate, angling the distributor nozzles downward, and lifting the transfer pump. The solid-liquid analysis evaluating particle trajectory confirmed that the potential for particle ingestion (in the transfer pump) was decreased with increased radial separation between the inlet and outlet (transfer pump inlet), decreased inlet flow, and decreased liquid density and viscosity for a neutrally buoyant inlet flow. An assessment was also made of the potential for inflow configuration changes to result in the discrete mounding or piling of solids within the tank. Based on the characterization of the settled waste to date, HLW sediments will be unlikely to sustain a substantial angle of repose to facilitate significant variations in the elevation of the settled solids.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mercury Speciation During Vitrification of LAW

n this work, laboratory and engineering-scale tests were conducted that mimic the reactive environment of the Hanford Tank Waste Treatment and Immobilization Plant (WTP) low activity waste (LAW) melter and off-gas system in order to assess the speciation of mercury at select points in the processing system. The experimental protocols, test equipment, feed materials used, and rationale for testing are detailed in the Test Plan for this work. Particular attention was paid to the amount and speciation of mercury in submerged bed scrubber (SBS) solutions, which are intended to be recycled back to the melter feed at the WTP. Results are presented from detailed mercury analysis of these solutions using Environmental Protection Agency (EPA) Method 1630 and modifications to this method for dimethyl mercury and methyl mercury as well as EPA Method 1631 and modifications to this method for total, dissolved, elemental, suspended, and ionic mercury. Testing was conducted in two separate sets of experiments: (1) One set of tests (crucible-scale furnace tests) that involved heating small batches of mercury-spiked melter feed in crucibles to determine the amount of mercury retained in the glass and the species of mercury in the exhaust gases; (2) A second set of tests (DM10 melter tests) was planned that involved creating LAW melter plenum gas compositions using the DM10 melter system, injecting mercury into the off-gas stream, and passing that stream though a reactor that simulates various plenum gas conditions. Operational issues led to the need to use one of the VSL DM100 melters in place of the planned DM10 melter for these tests. The speciation of mercury after exposure to those conditions was monitored. In both sets of tests, the exhaust gases were run through a scrubber that was intended to mimic the LAW SBS in order to determine how much of the mercury exiting the melter would be retained in the primary off-gas system fluids and in what form. After passing through the SBS, the exhaust stream was analyzed to determine particulate, ionic, elemental, and total mercury passing downstream of the SBS. In tests employing gases derived from the DM100 melter that were spiked with elemental mercury, the processing system provided gas temperatures and residence times that are representative of the WTP LAW vitrification system in order to assess the effect of those conditions on mercury speciation. The Decontamination Factor (DF) across the system in the tests with mercury-spiked DM100 melter exhaust was determined using the analytical data from EPA Method 30B (Fluegas Adsorption Mercury Speciation (FAMS TM )) exhaust samples and the amount of mercury detected in the SBS solutions. Mercury species used in melter feed crucible scale tests were divalent (chloride and iodide), monovalent (chloride and fluoride), and elemental mercury. Individual tests included only a single form of mercury in the feed. The results for total mercury mass balances in the crucible tests are also presented.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fracture toughness evaluations for spent nuclear fuel dry storage canister welds and spent nuclear fuel clad-pellet structures

Integrity of spent nuclear fuel (SNF) interim storage canisters is very important to the safety of the back-end nuclear fuel cycle. Stress corrosion cracking (SCC) potential of interim storage canister has been considered as a high priority. Because no post-weld heat treatment was required for forming these canisters, the high tensile residual stress existed within these canister welds. This can change the fracture resistance capacity significantly as well as increase SCC potential. Due to relative thin shell thickness of a canister weldment, the spiral notch torsion test (SNTT) method was used to estimate the canister weldment fracture toughness. SNTT was developed to measure the intrinsic fracture toughness of structural materials using small specimens. The SNTT method has been applied to a wide variety of structural materials, such as low-alloy steels, stainless steel, aluminum alloy, ceramics, concrete, and composites. The SNTT system operates by applying pure torsion to cylindrical specimens with a notch line that spirals around the specimen at a 45° pitch. In order to carry out pure torsion load mode, biaxial tension/torsion tester was developed accordingly to perform SNTT protocol. Moreover, applying fracture mechanics approach to SNF system reliability investigation is warranted due to the inherent flaws and hydride structures existed in a SNF system after nuclear reactor operation. However, none of the existing fracture toughness data deal with fuel cladding specific geometry or spent fuel material conditions, such as cladding structure with the pellet-inserts and the associated pellet clad mechanical interactions induced mixed-mode damage mechanisms. Thus, the development of an intrinsic fracture mechanics approach that is suitable for SNF materials is needed. Furthermore, due to thin wall and small dimension of clad tubing structure, the SNTT method was used to estimate the clad tubing structure fracture toughness. Fracture testing were performed on the received stainless steel canister weldment, most SNTT weld samples fracture initiation sites are at heat-affected zone (HAZ) regions. The estimated fracture toughness J Q ’ for the baseline SS304 steel is at 283 kJ/m². The estimated JQ’ for the SS304/308 weld and baseline metals are 148 kJ/m 2 and 459 kJ/m 2 , respectively. Out of cell fracture testing for spent fuel structure were carried out on the surrogate rods made of Zr-4 clad and alumina inserts, the estimated fracture toughness values for baseline Zr-4 cladding with alumina-pellet inserts are: (1) For SNTT samples with a short or medium crack length, between 5.4-mm and 8-mm, the estimate J IQ upon fracture initiation for the baseline Zr-4 cladding is at 50 kJ/m 2 with 2-sigma uncertainty of 3.26 kJ/m 2 , and the associated K IQ is at 67.46 MPa$\sqrt{m}$; and (2) For SNTT samples with a long crack length, around 13-mm, the crack initialization is deviated from that of the Mode-I tensile fracture and appears to be a mixed-mode fracture of Mode I - tensile stress and Mode III - out of plane shear stress; the estimated J MQ is at 18.9 kJ/m 2 , the associated K MQ is at 41.4 MPa$\sqrt{m}$.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗