Reduced Temperature Cesium Removal from AP-101 Using Crystalline Silicotitanate

Abstract

The Tank Side Cesium Removal (TSCR) system, currently operational under Washington River Protection Solutions LLC (WRPS), sends initial low-activity Hanford waste tank supernate feed to the Hanford Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility. In addition to entrained solids removal from the supernate, the primary goal of TSCR is to remove cesium-137 ( 137 Cs) by ion exchange, allowing contact handling of the liquid effluent product at the WTP. Crystalline silicotitanate (CST) ion exchange media, manufactured by Honeywell UOP, LLC (product IONSIV™ R9140-B), was selected as the ion exchange media at TSCR. Laboratory-scale ion exchange processing using TSCR prototypic unit operations continues to contribute toward WRPS establishing accurate process flowsheets for the individual feed campaigns planned for TSCR. This report describes the small-scale ion exchange testing with 14.0 L of diluted and filtered supernate from tank 241-AP-101 (AP-101DF) at 16 °C (62 °F) to demonstrate processing at temperature conditions that are more prototypic of what the TSCR system could experience during colder seasons of the year. Since CST Cs capacity increases with decreasing contact temperature, testing at the lower operating temperature will help to predict the maximum 137 Cs loading onto the CST in the TSCR system. One of the waste acceptance criteria (WAC) for the WTP Low-Activity Waste Facility is that the waste must contain less than 3.18×10 -5 Ci 137 Cs per mole of Na. For the AP-101DF tank waste to meet this criterion, only 0.144% of the influent 137 Cs concentration may be delivered to the WTP; this requires a Cs decontamination factor of 694. Testing with AP-101DF matched TSCR prototypic operations where a lead-lag configuration was used until the lag column reached the WAC limit, then a polish column was brought online for continued processing in a lead-lag-polish column configuration. Feed was processed at 1.9 bed volumes (BVs) per hour; the flowrate, in terms of contact time with the CST bed, matched the expected flowrate at TSCR. The Cs-decontaminated product was retained for vitrification testing (to be reported separately). The lead column reached 62% Cs breakthrough after processing ~1400 BVs of feed; the 50% Cs breakthrough occurred at 1250 BVs. Testing compared to previous AP-107 testing at 16 °C showed ~80 BV increases in volume processed to reach the WAC limit for both lead and lag columns. A similar slope in breakthrough curves for both tests indicates similar kinetic behavior, with variations in feed matrices (Na and Cs concentrations) likely responsible for the deviations in reaching the WAC limit. The Cs effluent from the lag column reached the WAC limit after processing 875 BVs. Anticipating this breakthrough point, the polish column was preemptively installed at 770 BVs. Cs breakthrough from the lag column began at 300 BVs, reaching 5.32×10 0 µCi/mL, or 5.6 % Cs breakthrough, after processing all 1400 BVs of feed. Table S.1 and Figure S.1 summarize the observed column performance and relevant Cs loading characteristics.

Explore related subjects

Keep this discovery

Explore connections, maps & timelines

BibTeXRIS

Westesen, Amy M., Campbell, Emily L., Williams, Ashley N., Carney, Andrew M., Trang-Le, Truc L.T., Peterson, Reid A.. 2022-06-21. Reduced Temperature Cesium Removal from AP-101 Using Crystalline Silicotitanate. https://doi.org/10.2172/1874368

Cite the original work for its findings. Save a collection to share your selection of sources.

KEEP EXPLORING

Related reports

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2025

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2025. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of the DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, the evaluation of data collected in 2025 continued to indicate that WVDP activities posed no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗