Search NASA⌕ Search

SEARCH · Search NASA

Results for “scheduler development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 451 records · Page 25

DRAS: Deep Reinforcement Learning for Cluster Scheduling in High Performance Computing

Cluster schedulers are crucial in high-performance computing (HPC). They determine when and which user jobs should be allocated to available system resources. Existing cluster scheduling heuristics are developed by human experts based on their experience with specific HPC systems and workloads. However, the increasing complexity of computing systems and the highly dynamic nature of application workloads have placed tremendous burden on manually designed and tuned scheduling heuristics. More aggressive optimization and automation are needed for cluster scheduling in HPC. In this work, we present an automated HPC scheduling agent named DRAS (Deep Reinforcement Agent for Scheduling) by leveraging deep reinforcement learning. DRAS is built on a hierarchical neural network incorporating special HPC scheduling features such as resource reservation and backfilling. An efficient training strategy is presented to enable DRAS to rapidly learn the target environment. Once being provided a specific scheduling objective given by the system manager, DRAS automatically learns to improve its policy through interaction with the scheduling environment and dynamically adjusts its policy as workload changes. We implement DRAS into a HPC scheduling platform called CQGym. CQGym provides a common platform allowing users to flexibly evaluate DRAS and other scheduling methods such as heuristic and optimization methods. Furthermore, the experiments using CQGym with different production workloads demonstrate that DRAS outperforms the existing heuristic and optimization approaches by up to 50%.

97 MATHEMATICS AND COMPUTING↗

Air Traffic Management Technology Demonstration (ATD-1) - Concept to Operations

In order to enable arrival management concepts and solutions in a NextGen environment, ground-based sequencing and scheduling functions have been developed to support metering operations in the National Airspace System. These sequencing and scheduling algorithms as well as tools are designed to aid air traffic controllers in developing an overall arrival strategy. The research presented provides an outline of the challenge of bringing time based scheduling to the terminal environment and the steps that were taken to bring the technology from concept to testing in an operational environment, and finally acquisition by the FAA. ATM Technology Demonstration-1 (ATD-1), is a set of technologies that provides an efficient solution for managing arrival aircraft beginning from just prior to top-of-descent and continuing down to the runway. The ATD-1 suite of technologies has been tested separately, and each has demonstrated benefits in throughput, delay, and fuel-efficiency. Together, the integration of terminal arrival tools allow arrival aircraft to safely fly closer together on more fuel-efficient routes to increase capacity, and reduce delay, fuel burn, noise, and greenhouse gas emissions.

DEMO↗

Welding interconnects to 50-micron silicon solar cells

A program was conducted to develop technologies for welding interconnects to 50-micron thick, 2 by 2 cm solar cells obtained from three suppliers. The cells were characterized with respect to electrical performance, cell thickness, silver contact thickness, contact waviness, bowing, and fracture strength. Weld schedules were independently developed for each of the three cell types and were coincidentally identical. Thermal shock tests (100 cycles from 100 deg to -180 deg C) were performed on 16-cell coupons for each cell type without any weld joint failures or electrical degradation. Three 48-cell modules (one for each cell type) were assembled with 50-micron thick cells, frosted fused silica covers, silver clad Invar interconnectors, and Kapton substrates.

Patterson, R. E.↗

Managing Capital Investments and Resources for Large, Complex Satellite Development Efforts

Once the schedule was baselined and the primary, secondary, and tertiary critical paths (at least) were established: Identified what entity control which portion of the schedule reserve Dollarized the time associated with the schedule reserve and segregated it off from other budget reserves authorization to spend only came when authorization to utilize the time was given Created a process to manage the control of these resources This process was above and beyond the typical schedule controls used to monitor and maintain the day-to-day schedules Webb telescope will be the premier space observatory for astronomers worldwide,extending the tantalizing discoveries of the Hubble Space telescope• An international collaboration among NASA, the European Space Agency, and theCanadian Space Agency• The largest telescope ever placed in space, Webb will be ~100 times more powerful thanHubble• It is so big it has to fold origami-style to fit in the rocket and will unfold like a transformeronce in space• The 5-layer sunshield protects the telescope from the Sun, Earth, and Moon’s infraredradiation. It’s like having sun protection of SPF 1 million• Unprecedented infrared sensitivity will peer back in time over 13.5 billion years to see thefirst galaxies born after the Big Bang• Hubble orbits ~350 miles above the Earth; Webb will orbit the sun ~1 million miles fromEarth• Launch from French Guiana in 2018

Ryan, Richard M.↗

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Payload crew activity planning integration. Task 2: Inflight operations and training for payloads

The primary objectives of the Payload Crew Activity Planning Integration task were to: (1) Determine feasible, cost-effective payload crew activity planning integration methods. (2) Develop an implementation plan and guidelines for payload crew activity plan (CAP) integration between the JSC Orbiter planners and the Payload Centers. Subtask objectives and study activities were defined as: (1) Determine Crew Activity Planning Interfaces. (2) Determine Crew Activity Plan Type and Content. (3) Evaluate Automated Scheduling Tools. (4) Develop a draft Implementation Plan for Crew Activity Planning Integration. The basic guidelines were to develop a plan applicable to the Shuttle operations timeframe, utilize existing center resources and expertise as much as possible, and minimize unnecessary data exchange not directly productive in the development of the end-product timelines.

Hitz, F. R.↗

Metallography of Battery Resistance Spot Welds

Li-ion cells provide an energy dense solution for systems that require rechargeable electrical power. However, these cells can undergo thermal runaway, the point at which the cell becomes thermally unstable and results in hot gas, flame, electrolyte leakage, and in some cases explosion. The heat and fire associated with this type of event is generally violent and can subsequently cause damage to the surrounding system or present a dangerous risk to the personnel nearby. The space flight environment is especially sensitive to risks particularly when it involves potential for fire within the habitable volume of the International Space Station (ISS). In larger battery packs such as Robonaut 2 (R2), numerous Li-ion cells are placed in parallel-series configurations to obtain the required stack voltage and desired run-time or to meet specific power requirements. This raises a second and less obvious concern for batteries that undergo certification for space flight use: the joining quality at the resistance spot weld of battery cells to component wires/leads and battery tabs, bus bars or other electronic components and assemblies. Resistance spot welds undergo materials evaluation, visual inspection, conductivity (resistivity) testing, destructive peel testing, and metallurgical examination in accordance with applicable NASA Process Specifications. Welded components are cross-sectioned to ensure they are free of cracks or voids open to any exterior surface. Pore and voids contained within the weld zone but not open to an exterior surface, and are not determined to have sharp notch like characteristics, shall be acceptable. Depending on requirements, some battery cells are constructed of aluminum canisters while others are constructed of steel. Process specific weld schedules must be developed and certified for each possible joining combination. The aluminum canisters' positive terminals were particularly difficult to weld due to a bi-metal strip that comes ultrasonically pre-welded by the manufacturer. This was further complicated as the maximum electrode force was limited to low-electrode force to prevent deflection of the aluminum can during welding. Other Li-ion cells are comprised of smaller diameter cylindrical steel canisters which are inherently capable of handling greater force from the electrodes. Allowing higher-electrode forces aids greatly in insuring a consistent resistance network for the weld. Overall lessons learned: developing good jigs is critical to insure the parts and electrodes are planer to one another and the location of the weld sites remains accurate and repeatable; maintaining strict control over materials is critical--materials must be of a specific hardness and chemical composition to insure that a weld schedule is repeatable; accuracy of the die used to stamp the projections is critical and worth the investment; and proper seasoning of the electrodes is critical to producing consistent welds--once the electrodes have been properly seasoned, cleaning/dressing should be avoided until it is absolutely necessary.

Martinez, J. E.↗

A New Spin

The trouble was that the shuttle was still under development when that schedule was set. As time went on, the Shuttle had problems with its high pressure turbines, thermal protection tiles, engines, and more. The early launch dates had to be scrapped. NASA Headquarters told us, "We re going to delay your launch two years to allow more time for the Shuttle development to take place. You can slow your development accordingly." Right off the bat, we looked into the celestial mechanics and how they would affect us. The difficulty in launching a spacecraft to Jupiter changes on a year-to- year basis, in a cyclical pattern that repeats about every ten or twelve years. In order to achieve the velocity needed to get from low earth orbit to Jupiter, an upper stage is required in the Shuttle. For the 1982 launch the upper stage was adequate, but it could not provide the velocity we would need in 1984. This meant we would have to separate the Galileo probe from the Galileo orbiter before launch and put each of them on separate Shuttles with separate upper stages. When we told the folks at Headquarters this, they told us, "Okay we'll give you two Shuttle launches."

Casani, John↗

NASA Work Breakdown Structure (WBS) Handbook

The purpose of this document is to provide program/project teams necessary instruction and guidance in the best practices for Work Breakdown Structure (WBS) and WBS dictionary development and use for project implementation and management control. This handbook can be used for all types of NASA projects and work activities including research, development, construction, test and evaluation, and operations. The products of these work efforts may be hardware, software, data, or service elements (alone or in combination). The aim of this document is to assist project teams in the development of effective work breakdown structures that provide a framework of common reference for all project elements. The WBS and WBS dictionary are effective management processes for planning, organizing, and administering NASA programs and projects. The guidance contained in this document is applicable to both in-house, NASA-led effort and contracted effort. It assists management teams from both entities in fulfilling necessary responsibilities for successful accomplishment of project cost, schedule, and technical goals. Benefits resulting from the use of an effective WBS include, but are not limited to: providing a basis for assigned project responsibilities, providing a basis for project schedule and budget development, simplifying a project by dividing the total work scope into manageable units, and providing a common reference for all project communication.

Planning↗

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John↗

Simulation of time-control procedures for the advanced air traffic control system

The problem of mixing four-dimensional (4D) equipped aircraft - aircraft equipped with on-board guidance systems that can predict and control the touchdown time of an aircraft to an accuracy of a few seconds throughout the descent - with unequipped aircraft in the terminal area has been investigated via a real-time air traffic control simulation study. The objective of this study was to examine the effect of time errors (at 120 n. mi. from touchdown) on touchdown time scheduling, and to develop efficient algorithms and procedures to null the initial time errors prior to reaching the final control sector (30 n. mi. from touchdown). Results indicate that initial random errors of up to + or - 2 min can be handled via a single speed advisory issued in the arrival control sector, and thus the time schedule is not disrupted.

Tobias, L.↗

Characterization of International Space Station Crew Members' Workload Contributing to Fatigue, Sleep Disruption and Circadian De-synchronization

The focus of this paper is to characterize how the International Space Station (ISS) crewmembers’ workload may be contributing to sleep loss, circadian misalignment and fatigue. Both sleep quantity and subjective sleep quality are reduced in ISS crewmembers (Barger, Flynn-Evans, Kubey, Walsh, Ronda, Wang, Wright, & Czeisler, 2014). Evidence indicates that the use of hypnotic drugs does not appear to promote extended sleep duration. Because sleep is often driven by psychosocial as well as somatic attributes, traditional therapies may only partially moderate the problem for some individuals. Accordingly, searching for additional abatement tactics is a sensible plan. Scientific studies have shown that sleep can be disrupted from work-related stressors. On the ISS, to optimize their time, the crewmembers follow prescribed, ambitious and rigorous schedules with shared deadlines. Here it will be argued that these human capital leveraging techniques may be undermining the astronaut’s sleep, which could negatively impact performance. Along with half of the Earth-bound working population (Paoli & Merllié, 2001), ISS crewmembers may not be adequately recovering from their workload. This paper begins with a characterization of the working conditions of ISS crewmembers, describes the development of rigorous schedules and portrays a typical workday. Terrestrially-based research is compiled to describe how full and partial sleep deprivation affect physical and cognitive performance and how ISS work characteristics may disrupt sleep and subsequent performance. The literature points toward potential solutions to astronaut fatigue that is related to their workload. Finally, throughout the text, evidence is provided from semi-structured interviews, biographies and textual databases to support the argument that astronaut workload is contributing to their sleep loss and fatigue and that research, development and mitigation strategies should focus on enhancing the restorative process.

fatigue↗

Risk of Performance Decrements and Adverse Health Outcomes Resulting from Sleep Loss, Circadian Desynchronization, and Work Overload

Sleep loss, circadian desynchronization, and work overload occur to some extent for ground and flight crews, prior to and during spaceflight missions. Ground evidence indicates that such risk factors may lead to performance decrements and adverse health outcomes, which could potentially compromise mission objectives. Efforts are needed to identify the environmental and mission conditions that interfere with sleep and circadian alignment, as well as individual differences in vulnerability and resiliency to sleep loss and circadian desynchronization. Specifically, this report highlights a collection of new evidence to better characterize the risk and reveals new gaps in this risk as follows: Sleep loss is apparent during spaceflight. Astronauts consistently average less sleep during spaceflight relative to on the ground. The causes of this sleep loss remain unknown, however ground-based evidence suggests that the sleep duration of astronauts is likely to lead to performance impairment and short and long-term health consequences. Further research is needed in this area in order to develop screening tools to assess individual astronaut sleep need in order to quantify the magnitude of sleep loss during spaceflight; current and planned efforts in BHP's research portfolio address this need. In addition, it is still unclear whether the conditions of spaceflight environment lead to sleep loss or whether other factors, such as work overload lead to the reduced sleep duration. Future data mining efforts and continued data collection on the ISS will help to further characterize factors contributing to sleep loss. Sleep inertia has not been evaluated during spaceflight. Ground-based studies confirm that it takes two to four hours to achieve optimal performance after waking from a sleep episode. Sleep inertia has been associated with increased accidents and reduced performance in operational environments. Sleep inertia poses considerable risk during spaceflight when emergency situations necessitate that crewmembers wake from sleep and make quick decisions. A recently completed BHP investigation assesses the effects of sleep inertia upon abrupt awakening, with and without hypnotics currently used in spaceflight; results from this investigation will help to inform strategies relative to sleep inertia effects on performance. Circadian desynchrony has been observed during spaceflight. Circadian desynchrony during spaceflight develops due to schedule constraints requiring non-24 operations or 'slam-shifts' and due to insufficient or mis-timed light exposure. In addition, circadian misalignment has been associated with reduced sleep duration and increased medication use. In ground-based studies, circadian desynchrony has been associated with significant performance impairment and increased risk of accidents when operations coincide with the circadian nadir. There is a great deal of information available on how to manage circadian misalignment, however, there are currently no easily collected biomarkers that can be used during spaceflight to determine circadian phase. Current research efforts are addressing this gap. Work overload has been documented during current spaceflight operations. NASA has established work hour guidelines that limit shift duration, however, schedule creep, where duty requirements necessitate working beyond scheduled work hours, has been reported. This observation warrants the documentation of actual work hours in order to improve planning and in order to ensure that astronauts receive adequate down time. In addition to concerns about work overload, ground based evidence suggests that work underload may be a concern during deep space missions, where torpor may develop and physically demanding workload will be exchanged for monitoring of autonomous systems. Given that increased automation is anticipated for exploration vehicles, fatigue effects in the context of such systems needs to be further understood. Performance metrics are needed to evaluate fitness-for-duty during spaceflight. Although ground-based evidence supports the notion that sleep loss, circadian desynchronization and work overload lead to performance impairment, inconsistency in the measures used to evaluate performance during spaceflight make it difficult to evaluate the magnitude of performance impairment during spaceflight. Work is underway to standardize measures of performance evaluation during spaceflight. Once established, such performance indicators need to be correlated with operational performance. Individual differences in sleep need and circadian preference, phase shifting ability and period have been documented in ground-based studies. Individual differences in response to sleep loss and circadian misalignment have also been documented and are presumed to be associated with genetic polymorphisms. No studies have systematically reported individual differences in sleep or circadian-related outcomes during spaceflight. More work is needed in this area in order to identify genetic or phenotypic biomarkers that predict resilience or vulnerability to sleep loss in order to personalize countermeasure strategies and mitigate performance impairment during spaceflight. Two laboratory and field investigations specific to this topic are currently ongoing; additional efforts, including an effort to mine existing biological data from spaceflight relative to sleep and circadian outcomes, are planned. Sex differences in sleep need and circadian period and phase have been reported in ground-based studies. The impact of these sex differences on performance is unclear. Sex differences in sleep need and circadian rhythms have not been systematically studied during spaceflight, presumably due to the small number of women that have flown in space. More research is needed in this area to evaluate whether any of the observed sex differences in physiology lead to altered performance in spaceflight and on the ground.

Flynn-Evans, Erin↗

MRO High Resolution Imaging Science Experiment (HiRISE): Instrument Development

The primary functional requirement of the HiRISE imager is to allow identification of both predicted and unknown features on the surface of Mars to a much finer resolution and contrast than previously possible. This results in a camera with a very wide swath width, 6km at 300km altitude, and a high signal to noise ratio, >100:1. Generation of terrain maps, 30 cm vertical resolution, from stereo images requires very accurate geometric calibration. The project limitations of mass, cost and schedule make the development challenging. In addition, the spacecraft stability must not be a major limitation to image quality. The nominal orbit for the science phase of the mission is a 3pm orbit of 255 by 320 km with periapsis locked to the south pole. The track velocity is approximately 3,400 m/s.

Alan Delamere↗

Improving I/O-aware Workflow Scheduling via Data Flow Characterization and trade-off Analysis

The scientific computing paradigm has transitioned from compute-intensive to I/O-intensive and memory-intensive in the past decade, especially when data-driven science has become common practice. Numerous empirical I/O-aware scheduling optimizations have been developed by incorporating I/O capacity and bandwidth as constraints into scheduling. Unfortunately, there is a lack of data flow (I/O) characterization tool and an understanding of trade-offs between concurrency, locality, and I/O bandwidth. To bridge the gap, this work 1) presents a set of descriptors to characterize, organize, and visualize I/O profiles, including flow size, I/O bandwidth, and operation count, which group data flows by I/O types, tasks, and files; 2) proposes an I/O Roofline model-based trade-off analysis to find the optimal trade-off between flow operational intensity, concurrency, and flow performance. The I/O descriptors generate useful insights into complicated I/O behaviors, suggesting distinct concurrency, storage, and scheduling to be used by types, tasks, and files. The proposed trade-off analysis guides scheduling decisions that generate resource assignment with the best flow parallelism. We evaluate our I/O-aware scheduling methodology on a highly I/O-intensive workflow–1000 Genomes. The experimental results demonstrate speedups of up to 2.4× compared to the state-of-the- art methods.

Guo, Luanzheng [BATTELLE (PACIFIC NW LAB)]↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Coordination between Federated Scheduling and Conflict Resolution in UAM Operations

This work proposes a federated scheduling algorithm and explores two mechanisms for coordinating federated scheduling and conflict resolution functions - two core traffic management functions in urban air mobility operations. A federated scheduling algorithm is first developed, together with data that needs to be shared among schedulers. Two mechanisms for coordinating scheduling and conflict resolution functions are then introduced and studied as conflicts in high-density operations may not be completely resolved by conflict resolution function alone. The first coordination mechanism is constructed based on the arrival scheduler at the destination and another one utilizes the departure scheduler at the origin. Experiments and trade space studies are conducted to compare these two mechanisms using fast-time traffic simulations. Results show that both mechanisms perform well in coordinating scheduling and conflict resolution functions and helping resolve all potential conflicts. Experiments also show that with proper parameter selection, both mechanisms can achieve better efficiency (less delay) while maintaining zero losses of separation.

Federated scheduling↗

Self-Directed Cooperative Planetary Rovers

The project is concerned with the development of decision-theoretic techniques to optimize the scientific return of planetary rovers. Planetary rovers are small unmanned vehicles equipped with cameras and a variety of sensors used for scientific experiments. They must operate under tight constraints over such resources as operation time, power, storage capacity, and communication bandwidth. Moreover, the limited computational resources of the rover limit the complexity of on-line planning and scheduling. We have developed a comprehensive solution to this problem that involves high-level tools to describe a mission; a compiler that maps a mission description and additional probabilistic models of the components of the rover into a Markov decision problem; and algorithms for solving the rover control problem that are sensitive to the limited computational resources and high-level of uncertainty in this domain.

Zilberstein, Shlomo↗