Search NASA⌕ Search

SEARCH · Search NASA

Results for “LOCATION CLOSURE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Automated and Adaptive Mission Planning for Orbital Express

The Orbital Express space mission was a Defense Advanced Research Projects Agency (DARPA) lead demonstration of on-orbit satellite servicing scenarios, autonomous rendezvous, fluid transfers of hydrazine propellant, and robotic arm transfers of Orbital Replacement Unit (ORU) components. Boeing's Autonomous Space Transport Robotic Operations (ASTRO) vehicle provided the servicing to the Ball Aerospace's Next Generation Serviceable Satellite (NextSat) client. For communication opportunities, operations used the high-bandwidth ground-based Air Force Satellite Control Network (AFSCN) along with the relatively low-bandwidth GEO-Synchronous space-borne Tracking and Data Relay Satellite System (TDRSS) network. Mission operations were conducted out of the RDT&E Support Complex (RSC) at the Kirtland Air Force Base in New Mexico. All mission objectives were met successfully: The first of several autonomous rendezvous was demonstrated on May 5, 2007; autonomous free-flyer capture was demonstrated on June 22, 2007; the fluid and ORU transfers throughout the mission were successful. Planning operations for the mission were conducted by a team of personnel including Flight Directors, who were responsible for verifying the steps and contacts within the procedures, the Rendezvous Planners who would compute the locations and visibilities of the spacecraft, the Scenario Resource Planners (SRPs), who were concerned with assignment of communications windows, monitoring of resources, and sending commands to the ASTRO spacecraft, and the Mission planners who would interface with the real-time operations environment, process planning products and coordinate activities with the SRP. The SRP position was staffed by JPL personnel who used the Automated Scheduling and Planning ENvironment (ASPEN) to model and enforce mission and satellite constraints. The lifecycle of a plan began three weeks outside its execution on-board. During the planning timeframe, many aspects could change the plan, causing the need for re-planning. These variable factors, ranging from shifting contact times to ground-station closures and required maintenance times, are discussed along with the flexibility of the ASPEN tool to accommodate changes to procedures and the daily or long-range plan, which contributed to the success of the mission. This paper will present an introduction to ASPEN, a more in-depth discussion on its use on the Orbital Express mission, and other relative work. A description of ground operations after the SRP deliveries were made is included, and we briefly discuss lessons learned from the planning perspective and future work.

scheduling↗

Salt Waste Processing Facility project lessons learned: Acquisition through construction - 15518

The Salt Waste Processing Facility (SWPF), located at the Savannah River Site (SRS) in Aiken, South Carolina, is a multi-billion dollar Liquid Radioactive Waste (LRW) processing facility that represents the keystone for the U.S. Department of Energy (DOE)-EM clean-up mission at SRS. The SWPF facilitates DOE-EM clean-up at SRS by decontaminating the salt waste, which is the dominant volumetric component in the LRW tanks, thereby allowing the cleaned salt waste to be removed from the tanks and stabilized into an approved grout-based final waste form. The small volume of removed radionuclides is sent to the Defense Waste Processing Facility (DWPF) for vitrification. Emptied LRW storage tanks are then grouted into an approved configuration for final closure. The SWPF project is currently 100% complete with design, 80% complete with construction, and 10% complete with commissioning. To date there have been numerous lessons learned with regard to project acquisition, design, procurement, construction, and quality assurance (QA) approaches (both good practices and mistakes) that are considered to be of significant value in improving the state of major project execution within the DOE-EM clean-up program as well as to the wider DOE enterprise. An overview of the current SWPF project status is provided and key lessons learned in the aforementioned areas are presented relative to improving future DOE major project execution performance. Specific areas to be addressed include strategies to optimize integration of design and nuclear safety, constructability tools for design and construction synchronization, commercial grade dedication (CGD) approaches to mitigate atrophy in the nuclear supply chain, and QA perspectives to facilitate effective and efficient project execution. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

43-0434 Bridge Inspection Report 2021

The documentation includes the following: 1. 2021 NMDOT Bridge Inspection Report including Element Level Data Collection (in digital formats prepared by NMSU)--conforms to the National Bridge Inspection Standards and AASHTO Manual for Bridge Element Inspection; 2. 2021 Supplemental Report (in digital formats prepared by NMSU)--provides detailed information related to current condition of major bridge components; 3. 2021 Inspection Pictures (in digital format prepared by NMSU); 4. 2021 Delamination Map (in digital format prepared by LANL). During the 2021 inspection, three critical findings were reported to our LANL contact, Mr. Jonathan Stein, by text and/or email on June 26, 2021. 1. The south joint of the bridge had a modular section of the joint that could potentially come loose during the passing of vehicles. This was reported as a critical finding for safety. If the modular section becomes dislodged or deformed it could pose a serious hazard that could result in a punctured tire to vehicles, motorcyclists and/or bicyclist causing drivers/riders to lose control; 2. The bracket plate located at the north end of the bridge on the pedestrian walkway was corroded through and provides little protection to pedestrians and bicyclists. This was reported as a critical finding for safety to prevent injuries to people; 3. The north approach rail has three missing posts. These posts help ensure that traffic is redirected and the energy is absorbed by the rail. This was reported as a critical finding for safety. Additionally, the approach rail is on a curve with a nearby drop off. Immediate repair is recommended. Based on the 2021 inspection, the bridge deck is rated in "fair" condition. The chain drag performed on the deck identified several areas with delamination that are concentrated near the expansion joints, in the closure joint of the deck near the bridge centerline, and at the south end of the northbound lanes. The chain drag performed during the 2021 inspection revealed 215,333 sq. in. (1495 sq. ft) of delaminations and patched areas (not including the sidewalk). This is approximately a 600% increase from 2019. It is recommended that the delaminations and spalls with exposed rebar be repaired. The "delaminated area" map for the 2021 inspection is provided in the supplemental report.

42 ENGINEERING↗

River Corridor Closure at DOE's Hanford Site - 12503

The discussion of Hanford's River Corridor will cover work that has already been completed plus the work remaining to be done. This includes the buildings, waste sites, and groundwater plumes in the 300 Area; large-scale burial ground remediation in the 600 Area; plutonium production reactor dismantling and 'cocooning' along the river; preservation of the world's first full-scale plutonium production reactor; removal of more than 14 million tons of contaminated soil and debris along the Columbia River shoreline and throughout the River Corridor; and the excavation of buried waste sites in the river shore area. It also includes operating an EPA-permitted low-level waste disposal facility in the central portion of the site. At the completions of cleanup in 2015, Hanford's River Corridor will be the largest closure project ever completed by the Department of Energy. Cleanup of the River Corridor has been one of Hanford's top priorities since the early 1990's. This urgency has been due to the proximity of hundreds of waste sites to the Columbia River. In addition, removal of the sludge from K West Basin, near the river, remains a high priority. This 220-square-mile area of the Hanford Site sits on the edge of the last free-flowing stretch of the Columbia River. The River Corridor portion of the Hanford Site includes the 100 and 300 Areas along the south shore of the Columbia River. The 100 Areas contain nine retired plutonium production reactors. These areas are also the location of numerous support facilities and solid and liquid waste disposal sites that have contaminated groundwater and soil. The 300 Area, located just north of the city of Richland, contains fuel fabrication facilities, nuclear research and development facilities, and their associated solid and liquid waste disposal sites that have contaminated groundwater and soil. In order to ensure that cleanup actions address all threats to human health and the environment, the River Corridor includes the adjacent areas that extend from the 100 Area and 300 Area to the Central Plateau. For sites in the River Corridor, remedial actions are expected to restore groundwater to drinking water standards and ensure that aquatic life in the Columbia River is protected by achieving ambient water quality standards. It is intended that these objectives be achieved, unless technically impracticable, within a reasonable timeframe. In those instances where remedial action objectives are not achievable in a reasonable time frame, or are determined to be technically impracticable, programs are being implemented to contain the plume, prevent exposure to contaminated groundwater, and evaluate further risk reduction opportunities as new technologies become available. River Corridor cleanup work also removes potential sources of contamination, which are close to the Columbia River, and places them on the Central Plateau for final disposal. The intent is to shrink the footprint of active cleanup to within the 75-square- mile area of the Central Plateau by removing excess facilities and remediating waste sites. Cleanup actions are supporting anticipated future land uses consistent with the Hanford Reach National Monument, where applicable, and the Hanford Comprehensive Land- Use Plan (DOE 1999). The River Corridor has been divided into six geographic decision areas to achieve source and groundwater remedy decisions. These decisions will provide comprehensive coverage for all areas within the River Corridor and will incorporate ongoing interim action cleanup activities. Cleanup levels will be achieved in order to support anticipated future land uses of conservation and preservation for most of this area and industrial use for the 300 Area. At the conclusion of cleanup actions, the federal government will implement long-term stewardship activities to ensure protection of human health and the environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Neutronics Scoping for Ramp Testing in the Advanced Test Reactor

With the closure of the Halden Boiling Water Reactor in 2018, the global capacity for in-reactor power ramp testing has been lost. As such tests provide valuable data for understanding pellet-cladding interaction (PCI) phenomena, finding new facilities for ramp testing is of interest to the United States Accident-Tolerant Fuel (ATF) Program. Several options at Idaho National Laboratory (INL) are being evaluated for adding ramp test capabilities. In the Transient Reactor Test Facility (TREAT), one option is testing inside a Transient Water Irradiation System in TREAT (TWIST) capsule. In the Advanced Test Reactor (ATR), one option under consideration is testing in an I-Loop toward the outer edge of the core. Another is testing in Loop-2A, located in the Center Flux Trap (CFT) of the ATR. In this paper, we examine the conceptual scoping for the Loop-2A experiment known as ATF-2Ramp.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Near Real-Time Two and Three-Dimensional Electrical Geophysical Monitoring of Natural and Engineered Processes Associated with Subsurface Remediation - 16052

Legacy soil and groundwater contamination associated with nuclear weapons production is projected to be one of the largest cleanup liabilities to the U.S. Department of Energy for the foreseeable future. Remediation of subsurface contaminants is complicated by the combined effects of geochemical heterogeneity, geological heterogeneity, and the difficulty and expense of adequate borehole access. Each of these complications contributes to uncertainty in the distribution of contaminants and the performance of in situ treatments, which increases risk to human health and the environment and cost to closure in general. Electrical resistivity tomography (ERT) is a method of remotely imaging the electrical properties of the subsurface, which are governed by both geochemical and geological structure, thereby providing useful proxies for understanding contaminant distribution and the behavior in situ remediation processes. Recent advancements in both data collection and data processing capabilities are enabling ERT monitoring to be executed and provided to site operators in near real-time. To summarize the process, ERT surveys are rapidly and continuously collected during a time-sensitive operation such as an amendment injection. At the completion of each survey, data are transferred by wireless internet to offsite supercomputing resources for parallel tomographic inversion. Inversion results are then transferred back to onsite operators and/or other locations for visualization. In this paper, we demonstrate the utility of time-lapse ERT for monitoring fluid transport (both gas and liquid phase). We then demonstrate two real-time imaging applications for monitoring both natural and engineered processes at the Hanford Site within the vadose and the saturated zones. We expect this new capability for autonomous real-time imaging to enable ERT to be used as a cost-effective, short-term rapid feedback mechanism for guiding subsurface remediation injections, in addition to longer term monitoring of post-injection performance and environmental impact, all using the same electrode array and instrumentation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization and D and D of PET Cyclotron and Radioisotope Production Facility - 17536

The State University of New York at Buffalo is in the process of the decontamination and decommissioning (D and D) of a cyclotron and radioisotope production facility located in Parker Hall on the South Campus. Many unique characterization activities are needed for compliant waste packaging, transportation, and disposal. In addition to the cyclotron used for successful production of radioisotopes, the facility features hot cells and glove boxes used for the purification and conditioning of the final product. Many challenges exist for the decommissioning of the cyclotron and the radioisotope production facility. These challenges include the proper characterization and management of the cyclotron, its associated equipment, and the remaining facility. Slightly activated concrete constitutes the majority of the remaining radioactive materials to be disposed of during the decommissioning. Challenges for this project include; - Regulatory interface between the New York Department of Health (NYDOH) and the New York Department of Environmental Conservation (DEC) for license closure; - Characterization of the cyclotron, its support equipment and the activated vault areas; - The most cost effective disposal options and the Data Quality Objectives needed for the various disposal options. The paper primarily focuses on challenges for characterization of the cyclotron and the remaining radioisotope production facility at the University at Buffalo. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗

Assessment of defense-related uranium mines in the United States and other US DOE office of legacy management domestic and international uranium initiatives - 15335

US DOE's Office of Legacy Management (LM) has taken several initiatives to improve domestic uranium mining and milling operations in the United States and to contribute to the management of legacy uranium mining and milling sites around the world. Initiatives include completing the 2014 Report to Congress on Defense-Related Uranium Mines, managing the Title X Uranium and Thorium Program with the Office of Environmental Management, and assisting IAEA with uranium issues in member state countries. The 2014 Report to Congress identified abandoned uranium mines (AUMs) in the United States that provided uranium ore to the US Atomic Energy Commission (AEC) between 1947 and 1970. The report identified AUM locations, reclamation/remediation status, radiological risks and other hazards, costs for reclamation and remediation, and potential prioritization schemes for mine cleanup. To develop reclamation and remediation cleanup cost estimates and assess risks, AUMs were grouped into six categories by tons of uranium ore produced, ranging from Small (less than 91 metric tons [100 tons]) to Very Large (greater than 453,900 metric tons [500,000 tons]). Radiological risk was calculated using the RESRAD computer code for five exposure scenarios: offsite resident, onsite resident, occasional visitor, recreational visitor, and mine reclamation worker. Results indicate that 69 percent of the AUMs are in Colorado and Utah and 23 percent are in Arizona, Wyoming, and New Mexico; and that the majority of the AUMs (68 percent) were considered Small or Small/Medium production mines, producing less than 908 metric tons (1,000 tons) of uranium ore. Although New Mexico has fewer AUMs (247) than the other states in the Colorado Plateau region, AUMs in that state (primarily those in the Grants Mineral Belt) produced 45 percent of the 79.5 million tons of AEC-purchased uranium ore. About 50 percent of the AUMs are on public land managed by the US Bureau of Land Management; 435 AUMs are on the Navajo Nation. Risk estimates for the onsite resident scenario (plausible on tribal and non-federal land) could result in an incremental cancer risk greater than 10{sup -4}. Radon inhalation was the dominant contributor to radiological risk for the five exposure scenarios evaluated. Different state and federal agencies are conducting cleanup of some AUMs under various remedial and legal authorities. Activities constituting mine 'reclamation' may reduce radiological risks to humans to acceptable levels for many mines on federal public lands if the occasional visitor and recreational visitor exposure scenarios are assumed. Addressing physical hazards (e.g., open shafts) at mines where conditions could cause serious injuries is typically a priority of public land management agencies. At locations where mine-related groundwater contamination occurs, it is a significant contributor to cleanup costs. However, most Small and Small/Medium AUMs were likely developed above the water table, and some wet mines are located in areas where groundwater has high, naturally occurring levels of the same constituents (including radioactive elements) that are typically associated with uranium mines. LM is also administering, with the US DOE Office of Environmental Management, the Title X program, which was developed by Congress to reimburse private companies (i.e., those that held active operating licenses prior to 1978) for a portion of their reclamation costs for mill sites that processed ore sold to AEC. LM recently updated the program guidance document and established internal protocols for annually auditing companies. LM is assisting IAEA on two different initiatives: assisting developing countries with training on the basic steps to take to perform reclamation of uranium mines, and developing technical guidance and case studies related to safety and environmental assessments and post-closure management of uranium legacy sites as part of the IAEA Regulatory Supervision of Legacy Sites initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The AMPLATZER Vascular Plug 4: Preliminary Experience

The purpose of this communication is to describe our preliminary experience with the AMPLATZER Vascular Plug 4 (AVP 4) in peripheral vascular embolization. The AVP 4 was used for peripheral vascular embolization in five patients with renal pseudoaneurysm (n = 2), postsurgical peritoneal bleeding (n = 1), posttraumatic gluteal hemorrhage (n = 1), and intercostal pseudoaneurysm (n = 1). Occlusion time was recorded. Patients were followed up clinically and by imaging for 1 month after the procedure. All treated vessels or vascular abnormalities were successfully occluded within 3 min for low-flow circulation and over 8 min for high-flow circulation. At 1-month follow-up, all patients were symptom-free. All deployed devices remained in the original locations and desirable configurations. In conclusion, the AVP 4 seems to be safe and effective for occluding peripheral vessels and vascular abnormalities. Because of its compatibility with 0.038-in. catheters, it can be deployed through a diagnostic catheter following angiography without exchanging a sheath or guiding catheter. Compared with the previous generation of vascular plugs, the AVP 4 allows for faster procedure times and decreased exposure to radiation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Corrective Action Decision Document/Corrective Action Plan for Corrective Action Unit 577: Area 5 Chromium Containing Waste Disposal Cells, Nevada National Security Site, Nevada

This Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) is for Corrective Action Unit (CAU) 577, “Area 5 Chromium Containing Waste Disposal Cells,” which is located in Area 5 of the Nevada National Security Site (NNSS). CAU 577 includes five low-level waste cells at the Area 5 Radioactive Waste Management Site (RWMS) where buried waste received from Nuclear Fuel Services, Inc. (NFS), was subsequently determined to contain chromium that exceeded the Toxicity Characteristic Leaching Procedure regulatory limit, which would require the waste to carry hazardous waste code D007. To resolve issues related to this alleged violation of hazardous waste regulations, a Settlement Agreement was executed between the Nevada Division of Environmental Protection (NDEP) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office on April 25, 2019, which identified agreed-upon mitigation measures. The Settlement Agreement required that the chromium-containing waste received from NFS would be addressed following the closure process laid out in the Federal Facility Agreement and Consent Order (FFACO).

54 ENVIRONMENTAL SCIENCES↗

Remediation of Highland Drive Landfill: Technical Challenges of Segregating Co-Mingled LLRW and Municipal Solid Waste in an Urbanized Area - 13319

Highland Drive Landfill is an inactive Municipal Solid Waste (MSW) Landfill which received waste from the 1940's until its closure in 1991. During a portion of its active life, the Landfill received low-level radioactive waste (LLRW) which currently exists both in a defined layer and co-mingled with MSW. Remediation of this site to remove the LLRW to meet established cleanup criteria, forms part of the Port Hope Project being undertaken by Atomic Energy Canada Limited (AECL) and Public Works and Government Services Canada (PWGSC) as part of the Port Hope Area Initiative (PHAI). The total volume of LLRW and co-mingled LLRW/MSW estimated to require removal from the Highland Drive Landfill is approximately 51,900 cubic metres (m{sup 3}). The segregation and removal of LLRW at the Highland Drive Landfill presents a number of unique technical challenges due to the co-mingled waste and location of the Landfill in an urbanized area. Key challenges addressed as part of the design process included: delineation of the extent of LLRW, development of cut lines, and estimation of the quantity of co-mingled LLRW in a heterogeneous matrix; protection of adjacent receptors in a manner which would not impact the use of adjacent facilities which include residences, a recreational facility, and a school; coordination and phasing of the work to allow management of six separate material streams including clean soil, MSW, co-mingled LLRW/MSW, LLRW, un-impacted water, and impacted water/leachate within a confined environment; and development of a multi-tiered and adaptive program of monitoring and control measures for odour, dust, and water including assessment of risk of exceedance of monitoring criteria. In addition to ensuring public safety and protection of the environment during remedy implementation, significant effort in the design process was paid to balancing the advantages of increased certainty, including higher production rates, against the costs of attaining increased certainty. Many of these lessons may be applicable to other projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Low- and high-order accurate boundary conditions: From Stokes to Darcy porous flow modeled with standard and improved Brinkman lattice Boltzmann schemes

The present contribution focuses on the accuracy of reflection-type boundary conditions in the Stokes–Brinkman–Darcy modeling of porous flows solved with the lattice Boltzmann method (LBM), which we operate with the two-relaxation-time (TRT) collision and the Brinkman-force based scheme (BF), called BF-TRT scheme. In parallel, we compare it with the Stokes–Brinkman–Darcy linear finite element method (FEM) where the Dirichlet boundary conditions are enforced on grid vertices. In bulk, both BF-TRT and FEM share the same defect: in their discretization a correction to the modeled Brinkman equation appears, given by the discrete Laplacian of the velocity-proportional resistance force. This correction modifies the effective Brinkman viscosity, playing a crucial role in the triggering of spurious oscillations in the bulk solution. While the exact form of this defect is available in lattice-aligned, straight or diagonal, flows; in arbitrary flow/lattice orientations its approximation is constructed. At boundaries, we verify that such a Brinkman viscosity correction has an even more harmful impact. Already at the first order, it shifts the location of the no-slip wall condition supported by traditional LBM boundary schemes, such as the bounce-back rule. For that reason, this work develops a new class of boundary schemes to prescribe the Dirichlet velocity condition at an arbitrary wall/boundary-node distance and that supports a higher order accuracy in the accommodation of the TRT-Brinkman solutions. For their modeling, we consider the standard BF scheme and its improved version, called IBF; this latter is generalized in this work to suppress or to reduce the viscosity correction in arbitrarily oriented flows. Our framework extends the one- and two-point families of linear and parabolic link-wise boundary schemes, respectively called B-LI and B-MLI, which avoid the interference of the Brinkman viscosity correction in their closure relations. The performance of LBM and FEM is thoroughly evaluated in three benchmark tests, which are run throughout three distinctive permeability regimes. The first configuration is a horizontal porous channel, studied with a symbolic approach, where we construct the exact solutions of FEM and BF/IBF with different boundary schemes. The second problem refers to an inclined porous channel flow, which brings in as new challenge the formation of spurious boundary layers in LBM; that is, numerical artefacts that arise due to a deficient accommodation of the bulk solution by the low-accurate boundary scheme. The third problem considers a porous flow past a periodic square array of solid cylinders, which intensifies the previous two tests with the simulation of a more complex flow pattern. The ensemble of numerical tests provides guidelines on the effect of grid resolution and the TRT free collision parameter over the accuracy and the quality of the velocity field, spanning from Stokes to Darcy permeability regimes. It is shown that, with the use of the high-order accurate boundary schemes, the simple, uniform-mesh-based TRT-LBM formulation can even surpass the accuracy of FEM employing hardworking body-fitted meshes.

75 CONDENSED MATTER PHYSICS, SUPERCONDUCTIVITY AND↗

Airborne Sun photometry and Closure Studies in SAFARI-2000 Dry Season Campaign

From August 13 to September 25, the Southern African Regional Science Initiative's (SAFARI 2000) dry-season airborne campaign studied the complex interactions between the region's ecosystems, air pollution, atmospheric circulation, land-atmosphere interactions, and land use change. The field campaign was timed to coincide with the annual winter fire season in Southern Africa. This challenging campaign. which coordinated ground-based measurement teams, multiple research aircraft, and satellite overpasses across nine African nations, was head quartered at the Petersburg International Airport in South Africa's Northern Province. Among many others, unique coordinated observations were made of the evolution of massive, thick haze layers produced by industrial emissions, biomass burning, marine and biogenic sources. The NASA Ames Airborne Tracking 14-channel Sunphotometer (AATS-14) was operated successfully aboard the University of Washington CV-580 during 24 data flights. The AATS-14 instrument measures the transmission of the direct solar beam at 14 discrete wavelengths (3501558 nm) from which we derive spectral aerosol optical depths (AOD), columnar water vapor (CWV) and columnar ozone. Flying at different altitudes over a fixed location allows derivation of layer AOD and CWV. Data taken during feasible vertical profiles allows derivation of aerosol extinction and water vapor density. In the talk, we show comparisons with ground-based AERONET sun/sky photometer results, with ground based MPL-Net lidar data, and with measurements from a lidar aboard the high flying ER-2 aircraft. We will use measurements from the Ames Solar Spectral Flux Radiometer to derive estimates of solar spectral forcing as a function of aerosol thickness. Validations of TOMS and Terra satellite aerosol and water-vapor retrievals will also be discussed.

Schmid, B.↗

Zero-Valent Iron Permeable Reactive Barrier to Remediate Volatile Organic Compounds in Groundwater - 20209

The US DOE-SRS, the US EPA, and the South Carolina Department of Health and Environmental Control determined it was appropriate to perform a non-time critical removal action at the P-Area Groundwater Operable Unit at the SRS to reduce the mass and downgradient transport of trichloroethylene in the P-Area groundwater plume. Contaminated groundwater discharges to a nearby stream, Steel Creek, within the SRS boundaries, resulting in trichloroethylene concentrations above the maximum contaminant level. Impact to surface water is limited in areal extent and supported by recently collected characterization data. The P-Area Groundwater Operable Unit encompasses the groundwater beneath an industrial area within SRS, P Area, where the P-Reactor once operated. The boundaries of the P-Area Groundwater Operable Unit extend northwest to Steel Creek, northeast toward PAR Pond, and southeast to Meyers Branch. Groundwater in the Upper Three Runs Aquifer of the P-Area Groundwater Operable Unit has been impacted by reactor and facility operations between 1954 and 1991, including tritium and volatile organic compounds. The P-Area surface units contributing to groundwater contamination were remediated as part of the P-Area Operable Unit in 2011. The P-Reactor closure is one of the first of its kind in the DOE Complex and is one of only a few full-sized production reactors in the US to undergo completion of final closure activities. The nature and extent of groundwater contamination was determined using a variety of investigative approaches such as groundwater monitoring wells, direct-push technology, and surface water samples. Groundwater contamination associated with trichloroethylene is primarily exhibited in a narrow plume that extends from the source area at P-Reactor and west to Steel Creek. Maximum contaminant level exceedances in groundwater occur over an area of ∼6.9 hectares for trichloroethylene with concentrations as high as 7.7 milligrams per liter. To the west of the P-Area facility area, the trichloroethylene groundwater plume is controlled by a buried geologic feature, assumed to be an old stream bed, that further narrows the groundwater plume in what has been designated as the 'neck area.' This narrowing of the groundwater plume provides an ideal location for a treatment barrier. The non-time critical removal action alternative chosen is to install a zero-valent iron permeable reactive barrier within the neck area of the trichloroethylene groundwater plume, perpendicular to groundwater flow direction. This technology will provide a treatment barrier that will reduce trichloroethylene groundwater concentrations by 90% and has an anticipated useful life of at least 25 years. A pre-design investigation was performed in the neck area to confirm site lithology, hydrogeology, geochemistry, and extent of trichloroethylene contamination prior to a final design. A treatability study, conducted as part of the pre-design investigation, indicated that the subsurface and groundwater in the PArea Groundwater Operable Unit is compatible with the zero-valent iron and will not lead to excessive buildup from mineralization/precipitation or biofouling. Probabilistic modeling was conducted using field and laboratory data to determine the expected performance of the zero-valent iron permeable reactive barrier. The model simulations indicated that a 3.81-centimeter thick barrier would provide greater than 90% reduction of trichloroethylene groundwater concentration. The final design of the zero-valent iron permeable reactive barrier is a barrier that will extend 80.5 linear meters in a 'zigzag' orientation to best transect the trichloroethylene plume and account for varying groundwater flow. The barrier will be installed from 13.7 meters below ground surface to 41.1 meters below ground surface for 65.8 linear meters and from 13.7 meters below ground surface to 36.6 meters below ground surface for 14.6 linear meters, the base of which is 'keyed' into a low permeability zone. The barrier is designed to a thickness of 10.2 centimeters, which was determined to reduce the trichloroethylene groundwater concentrations by greater than 90% with a safety factor of 2.67. A total of approximately 689 metric tons of zero-valent iron will be injected through 22 injection wells spaced 3.66 meters apart, using guar to suspend the zero-valent iron. Zero-valent iron permeable reactive barrier construction will be monitored through 23 installed resistivity receivers offset 7.32 meters from the zerovalent iron permeable reactive barrier. The zero-valent iron will be energized with a low-voltage 100 Hertz signal during injection and will be monitored using the resistivity receivers to ensure complete coalescence of the zero-valent iron permeable reactive barrier. The zero-valent iron was sized to have a hydraulic conductivity greater than the natural subsurface, thus promoting groundwater flow through the barrier. As contaminated groundwater contacts the zero-valent iron, volatile organic compounds, including trichloroethylene, are immediately degraded to harmless compounds such as ethylene. The performance of the zero-valent iron permeable reactive barrier will be monitored using three upgradient monitoring well clusters, six downgradient monitoring well clusters, and four in-wall monitoring wells. The in-wall monitoring wells will indicate immediate reduction of trichloroethylene mass in the groundwater and allow analyses of the zero-valent iron permeable reactive barrier health. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Measurement and prediction of mean velocity and turbulence structure in the near wake of an airfoil

An experimental investigation of the near wake of a thin airfoil at various incidence angles is reported in this paper. The airfoil (NACA 0012 basic thickness form) was located in a wind tunnel, and the wake structure was measured using hot-wire sensors. The measurements of mean-velocity, turbulence intensity and Reynolds-stress components across the wake at several distances downstream show the complex nature of the near wake and its asymmetrical behavior. The asymmetry in the wake property, which is maintained up to a length of 1.5 chords downstream of the trailing edge of the blade, is dependent on the incidence angle of the inlet flow. The streamwise velocity defect in an asymmetric wake decays more slowly compared to that of a symmetric wake. The streamline curvature due to the blade loading has a substantial effect on the mean velocity profile as well as the turbulence structure. The numerical study of the same wake indicates that the existing turbulence closure models need some modification to account for the asymmetric characteristics of the wake.

Hah, C.↗

Observation of excited states in 20 Mg sheds light on nuclear forces and shell evolution

The exotic Borromean nucleus 20 Mg with N = 8, located at the proton drip line provides a unique testing ground for nuclear forces and the evolution of shell structure in the neutron-deficient region. We report on the first observation of proton unbound resonances together with bound states in 20 Mg from the 20 Mg (d, d ') reaction performed at TRIUMF. Phenomenological shell-model calculations offer a reasonable description. However, our experimental results present a challenge for current first-principles nuclear structure approaches and point to the need for improved chiral forces and ab initio calculations. Furthermore, the differential cross section of the first excited state is compared with distorted-wave Born approximation calculations to deduce a neutron quadrupole deformation parameter of β$_n$ = 0.46 ± 0.21 . Lastly, this provides the first indication of a possible weakening of the N = 8 shell closure at the proton drip line.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirements relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗