The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Guide for Determining Energy Savings from Changes in Operations, Behavior, and Maintenance Procedures

This Guide is intended to provide energy savings estimation methodologies for energy performance improvement actions resulting from changes in operations, behavior and maintenance procedures. These improvements are often referred to as “non-capital measures” because such improvements are typically achievable with little or no capital expenditures. This Guide is designed to assist industrial facilities in quantifying and documenting the energy savings resulting from these types of improvements, including the collection of essential data.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

Remediation↗

SSR APPLIED – Automated Power Plants: Intelligent, Efficient and Digitised (V.2)

This report describes work undertaken during the SSR APPLIED project. The focus of the project has been on the development of digital twins to de-risk licensing of improved operating and maintenance practices. The operation of a bespoke flowing separate effects molten salt loop at ANL, with realistic temperature gradients, will provide invaluable data for computer codes validation. Three digital twins of aspects of the SSR-W have been successfully developed using ANL expertise and software. These digital twins have demonstrated optimization of the fuel cycle, the ability to model transients using an integrated coupled neutronic – thermal-hydraulic model with a model of the fuel expansion feedback so important to the inherent safety of the SSR-W. Advanced machine learning techniques have been developed and demonstrated for optimization of heat exchanger operation and maintenance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A simulation program for the analysis of on-orbit Space Station maintenance and logistics operations

This paper describes the analysis approach adopted by NASA's Space Station Maintenance Planning and Analysis (MPA) Study and focuses on the development and use of a simulation program called Simulation of Manned Space System Logistics Support (SIMSYLS) for modeling the Space Station operations environment. The basic assumptions and groundrules used in the development of SIMSYLS are presented, including its capabilities, limitations and samples of analyses performed. Finally, a proposed simulation outgrowth entitled Space Applications System Simulation (SASS) is described. SIMSYLS will constitute the foundation for SASS which will provide a full system operational RAM analysis tool for Space Station and its logistics support environment.

Furlong, Kelly L.↗

High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm Maintenance

During the performance period of this grant HRDI (High Resolution Doppler Imager) operations remained nominal. The instrument has suffered no loss of scientific capability and operates whenever sufficient power is available. Generally, there are approximately 5-7 days per month when the power level is too low to permit observations. The daily latitude coverage for HRDI measurements in the mesosphere, lower thermosphere (MLT) region are shown.It shows that during the time of this grant, HRDI operations collected data at a rate comparable to that achieved during the UARS (Upper Atmosphere Research Satellite) prime mission (1991 -1995). Data collection emphasized MLT wind to support the validation efforts of the TIDI instrument on TIMED, therefore fulfilling one of the primary objectives of this phase of the UARS mission. Skinner et al., (2003) present a summary of the instrument performance during this period.

Skinner, Wilbert↗

Preliminary maintenance experience for DSS 13 unattended operations demonstration

The maintenance data base collected for 15 weeks of recent unattended and automated operation of DSS 13 is summarized. During this period, DSS 13 was receiving spacecraft telemetry while being controlled remotely from JPL in Pasadena. Corrective and preventive maintenance manhours are reported by subsystem for DSS 13 including the equipment added for the automation demonstration. The corrective and preventive maintenance weekly manhours at DSS 13 averaged 22 and 40, respectively. The antenna hydraulic and electronic systems accounted for about half of the preventive and corrective maintenance manhours for a comparable attended DSN station, DSS 11.

Remer, D. S.↗

AOI 3 Life Modelling of Critical Steam Cycle Components in Coal-Fueled Power Plants

Microstructural damage accumulation models have been used to produce calibrated life estimation models for a DR22/P22 steel wye-block welds, and a Jethete stainless steel turbine blade (bucket). The calibrated life estimation models will aid the power plant operator in determining optimal maintenance and operation schedules based upon historical operational data as well as current, or future operation schemes. The impact of this project will enable existing coal-fueled power plants to operate safely for longer periods of time and at higher efficiencies, thereby reducing the economic and environmental impact of the existing coal power plant fleet. Testing, characterization, and modelling indicates that the operating life of P22 pipelines and their welds are dominated by fatigue damage mechanisms. Specifically, fatigue is of no concern in these materials when operating under realistic conditions manifesting in the main steam piping of coal-fueled power plants. However, if a low-temperature overload ever occurs during operation, fatigue will manifest as a damage mechanism of interest. Primary impact provided by the completion of this work is in the manifestation of a detailed ABAQUS solid model providing accurate boundary conditions to enable the prediction of operational stresses and strains. The completed plant solid model, in conjunction with the calibrated fatigue and creep life models provide definitive confirmation that creep is the dominant damage mechanism during operational conditions. Jethete life modelling has been completed by the manifestation of a material-specific, and temperature-specific, Kitagowa diagram. The Kitagowa diagram provides maintenance and operation decision making with scientifically-based go/no-go support based upon the crack-like features that have been identified by use of inspection.

01 COAL, LIGNITE, AND PEAT↗

ANSTO Synroc's Inactive Engineering Demonstrator - 19342

As part of the strategy for delivering the SyMo facility, a first of a kind project demonstrating the use of ANSTO Synroc technology for the treatment of intermediate liquid waste derived from Molybdenum-99 production, an inactive engineering demonstrator has been constructed by ANSTO Synroc. The role of this facility is to mitigate a number of the technology risks associated with a first of a kind project by addressing process integration, process operation, process recovery, maintenance, and operator training. Further, the plant is being used to develop the quality assurance framework to ensure that the waste package produced meets the waste acceptance criteria for final disposition. The inactive engineering demonstrator is a highly automated test-platform where the process design for the SyMo facility has been validated. A risk-based approach has been used to develop a comprehensive testing program aimed at mitigating the risks associated with a first of a kind plant and increasing the technology readiness level of the design. The ultimate result of this work is to ensure that the SyMo facility is highly reliable, operable, and maintainable. This paper will deliver a brief overview of the SyMo Facility, the project delivery methodology, and the role the inactive engineering demonstrator plays in project realisation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NIMBUS-7 ERB DELMAT operators guide and maintenance manual

Described in detail are the ERB DELMAT algorithms used to correct the wide field-of-view channels (11, 12, 13 and 14) radiometer data. The computer software and the required operational environment are also delineated. The information and procedures required to maintain the DELMAT program are also described.

Penn, L. M.↗

Hazard and Operability Analysis for Operating, Refueling, and Maintenance of Fuel Cell Electric Buses

​​Since hydrogen vehicles can be implemented in heavy-duty transportation applications such as buses, it is important to understand safety hazards and risks of hydrogen fuel cell electric bus (FCEB) and refueling technology. We conducted a hazard and operability analysis for FCEB operation/driving, refueling, and maintenance/inspection. We identified failure modes and consequences and defined a qualitative risk metric as the product of the likelihood of a failure and the severity of the worst-ca

08 HYDROGEN↗

Predictive-Maintenance Practices: For Operational Safety of Battery Energy Storage Systems

Changes in the Demand Profile and a growing role for renewable and distributed generation are leading to rapid evolution in the electric grid. These changes are beginning to considerably strain the transmission and distribution infrastructure. Utilities are increasingly recognizing that the integration of energy storage in the grid infrastructure will help manage intermittency and improve grid reliability. This recognition, coupled with the proliferation of state-level renewable portfolio standards and rapidly declining lithium-ion (Li-ion) battery costs, has led to a surge in the deployment of battery energy storage systems (BESSs). Additionally, although BESSs represented less than 1% of grid-scale energy storage in the United States in 2019, they are the preferred technology to meet growing demand because they are modular, scalable, and easy to deploy across diverse use cases and geographic locations.

25 ENERGY STORAGE↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Component Reliability in Photovoltaic Systems using Field Failure Statistics

Ongoing operations and maintenance (O&M) are needed to ensure photovoltaic (PV) systems continue to operate and meet production targets over the lifecycle of the system. Although average costs to operate and maintain PV systems have been decreasing over time, reported costs can vary significantly at the plant level. Estimating O&M costs accurately is important for informing financial planning and tracking activities, and subsequently lowering the levelized cost of electricity (LCOE) of PV systems. This report describes a methodology for improving O&M planning estimates by using empirically-derived failure statistics to capture component reliability in the field. The report also summarizes failure patterns observed for specific PV components and local environmental conditions observed in Sandia's PV Reliability, Operations & Maintenance (PVROM) database, a collection of field records across 800+ systems in the U.S. Where system-specific or fleet-specific data are lacking, PVROM-derived failure distribution values can be used to inform cost modeling and other reliability analyses to evaluate opportunities for performance improvements.

14 SOLAR ENERGY↗

Dark Matter Reconstruction in LBAI Experiments with Imperfect Data

Long-baseline atom interferometer (LBAI) experiments offer unprecedented sensitivity to ultralight scalar dark matter (DM) [1], however reconstruction of a putative DM signal with traditional frequency-domain analysis requires ``perfect data (i.e., regularly-sampled with no missing samples). In a real LBAI experiment, there will undoubtedly be imperfections in the data leading to downtime. This downtime can arise from operational considerations (e.g., maintenance), the operational environment (motion of people and animals [2] or elevators), and robustness of the experimental apparatus (e.g., bad atom launches). In this work, we investigate the impact of various downtime models on the overall DM sensitivity of such an experiment. We compare the sensitivity for each downtime model as determined by a ``compound FFT analysis to a baseline no-downtime case. We also show how much sensitivity can be regained by moving to a Lomb-Scargle frequency analysis, as in [2]. Furthermore, we demonstrate reconstruction of the DM wave s phase as well as its frequency. [1] D. Antypas, et al, ``New Horizons: Scalar and Vector Ultralight Dark Matter (2022). arXiv:2203.14915 [2] J. Carlton and C. McCabe, ``From RATs to riches: mitigating anthropogenic and synanthropic noise in atom interferometer searches for ultra-light dark matter (2023). arXiv:2308.101731

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Methanator Fueled Engines for Pollution Control

A methanator fueled Otto-cycle engine is compared with other methods proposed to control pollution due to automobile exhaust emissions. The comparison is made with respect to state of development, emission factors, capital cost, operational and maintenance costs, performance, operational limitations, and impact on the automotive industries. The methanator fueled Otto-cycle engine is projected to meet 1975 emission standards and operate at a lower relative total cost compared to the catalytic muffler system and to have low impact. Additional study is required for system development.

Cagliostro, D. E.↗

Effect of Aging and Demand for Reliability Analysis of Degrading Components

According to the U.S Energy Information Administration (EIA), the U.S fossil fuel share of energy consumption in 2015 was 67%. Furthermore, the Ecotricity UK report based on the CIA World Factbook states that with the current rate of consumption of fossil fuels, petroleum would run out by 2052, natural gas by 2060, and coal by 2088. No fossil fuel will remain by the next century. Besides the limited reserves of fossil fuel, massive consumption of fossil fuel also raises concerns about global warming and pollution. Therefore, there has been a growing interest in reducing fossil fuel consumption in the energy structure and in increasing the proportion of clean energy. Renewable energy (e.g. wind, solar) has the potential for distributed generation. However, the availability for renewable energy fluctuates and is uncontrollable. Therefore, additional energy sources need to be coupled with renewable energy to produce a stable electricity generation profile. Nuclear energy can serve this purpose as it is a clean energy source, has low greenhouse gas emission and possesses high power density and baseload power supply with low fuel cost. It is desirable to develop a hybrid energy system that combines both renewable energy and nuclear energy to meet low carbon emission goals and to utilize renewable energy. Such a nuclear hybrid energy system, consisting of different energy subsystems such as nuclear, solar, and wind, involves frequent switching between different energy subsystems. Since the primary loop in a nuclear power plant generates constant heat, the turbine bypass line in the secondary loop is required to switch frequently to meet the gap in the energy demand and that generated by the renewables. The increased usage of the turbine bypass system is considered to be the major difference between a nuclear hybrid energy system and a traditional nuclear power plant. Reliability analysis for designing such a complex system involves both high level fault propagation analysis at the conceptual design stage and low level failure prediction for specific components. The main focus of this summary to derive a degradation model of hardware components which can later help in the high level fault propagation analysis. The degradation model is a low level failure mode model that combines the effects of natural aging and frequent switching. The model can be used for predicting components' failure due to specific failure modes. The results can serve as indicators for conducting repair actions and maintenance to minimize Operation and Maintenance (O and M) costs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗