Search NASA⌕ Search

SEARCH · Search NASA

Results for “Pre-Launch”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Validation of the Radiometric Stability of the Atmospheric Infrared Sounder

It has been widely accepted that an infrared sounder in low polar orbit is capable of producing climate quality data, if the spectral brightness temperatures have instrumental trends of less than 10 mK/yr. Achieving measurement stability at this level is not only very demanding of the design of the instrument, it is also pushes the state of art of measuring on orbit what stability is actually achieved. We discuss this using Atmospheric Infrared Sounder (AIRS) L1B data collected between 2002 and 2011. We compare the L1B brightness temperature observed in cloud filtered night tropical ocean spectra (obs) to the brightness temperature calculated based on the known surface emissivity, temperature and water vapor profiles from the ECMWF ReAnalysis (ERA) and the growth rates of CO2, N2O and Ozone. The trend in (obs-calc) is a powerful tool for the evaluation of the stability of the 2378 AIRS channels. We divided the channels into seven classes: All channels which sound in the stratosphere (at pressure levels below 150 hPa), 14 micron CO2 sounding, 4 micron CO2 P-branch sounding, 4 micron CO2 R-branch sounding, water vapor sounding, shortwave surface sounding and longwave surface sounding. The peak in the weighting function at 1050 hPa separates sounding and surface channels. The boundary between shortwave and longwave is 5 microns. Except for the stratosphere sounding channels, the remaining six groups have (obs-calc) trends of less than 20 mK/yr. The longwave surface channels have trends of 2 mK/yr, significantly less than the 8 mK/yr trend seem in the shortwave window channels. Based on the design of the instrument, trends within a group of channels should be the same. While the longwave and shortwave trends are less than the canonical 10 mK/yr, the larger trend in the shortwave channels could be an artifact of using the pre-launch determined calibration coefficients. This is currently under evaluation. The trend in (obs-calc) for the non-surface sounding channels, in particular for stratosphere sounding and upper tropospheric water channels, is dominated by artifacts created in calc, most likely due to changes in the ERA Ozone and water vapor. Based on this argument the best estimate of the trend for the channels within a channel group is given by the surface sensitive channels within the group. Based on this consideration we estimated the trend of all AIRS longwave channels as 2 mK/yr, while the shortwave channels have a trend of 8 mK/yr.

CO2↗

In-Flight Operation of the Dawn Ion Propulsion System Through the Preparations for Escape From Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, 4 Vesta, and the dwarf planet 1 Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 rocket that placed the 1218-kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta-V of approximately 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, transfer between Ceres science orbits, and orbit maintenance maneuvers for all Vesta and Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta-V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. An additional 231 hours of IPS thrusting was used to enter the first Vesta science orbit, called Survey orbit, on August 3, 2011 at an altitude of about 2,735 km. The IPS was then used over the next year to transfer the spacecraft to the other science orbits: a high altitude mapping orbit (HAMO-1) in September 2011 at an altitude of approximately 673 km, a low altitude mapping orbit (LAMO) at approximately 210 km altitude, and a second high altitude mapping orbit (HAMO-2) at approximately 673 km altitude. To date the IPS has been operated for approximately 24,327 hours, consumed approximately 260 kg of xenon, and provided a delta-V of approximately 7 km/s. IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. Thrusting for escape from Vesta and cruise to Ceres is planned to start in late July 2012 with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through preparations for departure from Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Orbit Capture at Vesta

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta -II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. Onboard the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the ?V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The first 80 days after launch were dedicated to the initial checkout of the spacecraft which was followed by about ten months of full-power thrusting leading to a Mars gravity assist in February 2009 that provided 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. Deterministic thrusting for heliocentric transfer to Vesta resumed in June 2009 and was concluded with orbit capture at Vesta in July 2011. IPS was operated for approximately 23,400 hours, consumed approximately 250 kg of xenon, and provided a delta-V of approximately 6.7 km/s to achieve orbit capture at Vesta. IPS performance characteristics are very close to the expected performance characteristics based on analysis performed pre-launch. The only significant problem to have occurred over the almost four years of IPS operations in flight was the temporary failure of a valve driver board in DCIU-1, resulting in a loss of thrust of approximately 29 hours. Thrusting operations resumed after switching to DCIU-2, and power cycling conducted after orbit capture indicates DCIU-1 is completely operational. After about three weeks of survey operations IPS will be used to maneuver the spacecraft as needed for science operations including orbit transfers. After approximately one year of science operations IPS will then be used for escape from Vesta and begin thrusting for cruise to Ceres with a planned arrival date at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through orbit capture and the start of science operations at Vesta.

Garner, Charles E.↗

Cassini Maneuver Experience: Ending the Equinox Mission

The Cassini-Huygens spacecraft was launched in 1997 on a mission to observe Saturn and its many moons. After a seven-year interplanetary cruise, it entered a Saturnian orbit for a four-year Prime Mission in 2004 and began a two-year Equinox Mission in 2008. It has been approved for another seven-year mission, the Solstice Mission, starting in October 2010. This paper highlights significant maneuver activities performed from July 2009 to June 2010. We present results for the 45 maneuvers during this time. The successful navigation of the Cassini orbiter can be attributed in part to the accurate maneuver performance, which has greatly exceeded pre-launch expectations.

Ballard, Christopher G.↗

Cassini-Huygens Maneuver Experience: First Year of the Equinox Mission

The Cassini-Huygens spacecraft was launched in 1997 on a mission to observe Saturn and its many moons. After a seven-year cruise, it entered a Saturnian orbit for a four-year, prime mission. Due to the success of the prime mission, spacecraft health, and remaining propellant, a two-year extended mission, the Equinox Mission, was approved. Maneuver designs and analyses performed through the first year of the Equinox Mission are presented. Results for the 46 most recent maneuvers are given. A substantial contribution to the navigation success of the Cassini-Huygens spacecraft is the continued accurate performance, which has exceeded the pre-launch expectations and requirements.

Gist, Emily M.↗

Cassini-Huygens Maneuver Experience: Ending the Prime Mission

The Cassini-Huygens spacecraft was launched in 1997 on a mission to observe Saturn and its many moons. After a seven-year cruise, it entered a Saturnian orbit for a four-year, prime mission. This paper highlights significant maneuver activities performed during the last year of the prime mission. Specifically, results of 42 recent maneuvers are presented. Many maneuvers have been skipped, saving fuel and flight team effort. The system has performed more accurately than the pre-launch expectations and requirements. This is in large part why the Cassini-Huygens spacecraft has been navigated with tremendous success during the prime mission.

Saturn↗

AST Launch Vehicle Acoustics

The liftoff phase induces acoustic loading over a broad frequency range for a launch vehicle. These external acoustic environments are then used in the prediction of internal vibration responses of the vehicle and components which result in the qualification levels. Thus, predicting these liftoff acoustic (LOA) environments is critical to the design requirements of any launch vehicle. If there is a significant amount of uncertainty in the predictions or if acoustic mitigation options must be implemented, a subscale acoustic test is a feasible pre-launch test option to verify the LOA environments. The NASA Space Launch System (SLS) program initiated the Scale Model Acoustic Test (SMAT) to verify the predicted SLS LOA environments and to determine the acoustic reduction with an above deck water sound suppression system. The SMAT was conducted at Marshall Space Flight Center and the test article included a 5% scale SLS vehicle model, tower and Mobile Launcher. Acoustic and pressure data were measured by approximately 250 instruments. The SMAT liftoff acoustic results are presented, findings are discussed and a comparison is shown to the Ares I Scale Model Acoustic Test (ASMAT) results.

Houston, Janice↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASA's Space Launch System

The development of the Space Launch System (SLS) launch vehicle requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The characteristics of these systems must be matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large complex systems engineering challenge being addressed in part by focusing on the specific subsystems handling of off-nominal mission and fault tolerance. Using traditional model based system and software engineering design principles from the Unified Modeling Language (UML), the Mission and Fault Management (M&FM) algorithms are crafted and vetted in specialized Integrated Development Teams composed of multiple development disciplines. NASA also has formed an M&FM team for addressing fault management early in the development lifecycle. This team has developed a dedicated Vehicle Management End-to-End Testbed (VMET) that integrates specific M&FM algorithms, specialized nominal and off-nominal test cases, and vendor-supplied physics-based launch vehicle subsystem models. The flexibility of VMET enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the algorithms utilizing actual subsystem models. The intent is to validate the algorithms and substantiate them with performance baselines for each of the vehicle subsystems in an independent platform exterior to flight software test processes. In any software development process there is inherent risk in the interpretation and implementation of concepts into software through requirements and test processes. Risk reduction is addressed by working with other organizations such as S&MA, Structures and Environments, GNC, Orion, the Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission and Loss of Crew probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and detection and responses that can be tested in VMET and confirm that responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - ARINC 653 partitioned OS, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM. The plan for VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by Flight Software. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure the effectiveness of M&FM algorithms performance in the FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

VIIRS On-Orbit Calibration and Performance Update

The S-NPP VIIRS was launched on October 28, 2011 and activated on November 8, and then went through a series of intensive functional tests in order to establish the sensor's baseline characteristics and initial on-orbit performance. With the exception of large optical degradation in the NIR and SWIR spectral regions that is due to pre-launch mirror coating contamination, both the VIIRS instrument and its on-board calibrators continue to operate and function normally. With continuous dedicated effort, it is expected that most of the sensor calibration parameters will continue to meet their design requirements and that high quality data products will be continuously generated and used by the operational as well as research community.

On-Orbit↗

Analysis of JPSS J1 VIIRS Polarization Sensitivity Using the NIST T-SIRCUS

The polarization sensitivity of the Joint Polar Satellite System (JPSS) J1 Visible Infrared Imaging Radiometer Suite (VIIRS) measured pre-launch using a broadband source was observed to be larger than expected for many reflective bands. Ray trace modeling predicted that the observed polarization sensitivity was the result of larger diattenuation at the edges of the focal plane filter spectral bandpass. Additional ground measurements were performed using a monochromatic source (the NIST T-SIRCUS) to input linearly polarized light at a number of wavelengths across the bandpass of two VIIRS spectral bands and two scan angles. This work describes the data processing, analysis, and results derived from the T-SIRCUS measurements, comparing them with broadband measurements. Results have shown that the observed degree of linear polarization, when weighted by the sensor's spectral response function, is generally larger on the edges and smaller in the center of the spectral bandpass, as predicted. However, phase angle changes in the center of the bandpass differ between model and measurement. Integration of the monochromatic polarization sensitivity over wavelength produced results consistent with the broadband source measurements, for all cases considered.

reflective bands↗

The Magnetospheric Multiscale Magnetometers

The success of the Magnetospheric Multiscale mission depends on the accurate measurement of the magnetic field on all four spacecraft. To ensure this success, two independently designed and built fluxgate magnetometers were developed, avoiding single-point failures. The magnetometers were dubbed the digital fluxgate (DFG), which uses an ASIC implementation and was supplied by the Space Research Institute of the Austrian Academy of Sciences and the analogue magnetometer (AFG) with a more traditional circuit board design supplied by the University of California, Los Angeles. A stringent magnetic cleanliness program was executed under the supervision of the Johns Hopkins University,s Applied Physics Laboratory. To achieve mission objectives, the calibration determined on the ground will be refined in space to ensure all eight magnetometers are precisely inter-calibrated. Near real-time data plays a key role in the transmission of high-resolution observations stored onboard so rapid processing of the low-resolution data is required. This article describes these instruments, the magnetic cleanliness program, and the instrument pre-launch calibrations, the planned in-flight calibration program, and the information flow that provides the data on the rapid time scale needed for mission success.

Magnetosphere↗

In-Flight Operation of the Dawn Ion Propulsion System Through Survey Science Orbit at Ceres

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt objects, Vesta and Ceres. The Dawn spacecraft was launched from the Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H- 9.5 (Delta-II Heavy) rocket that placed the 1218-kg spacecraft onto an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide a total delta V of 11 km/s for the heliocentric transfer to Vesta, orbit capture at Vesta, transfer between Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer between Ceres science orbits. Full-power thrusting from December 2007 through October 2008 was used to successfully target a Mars gravity assist flyby in February 2009 that provided an additional delta V of 2.6 km/s. Deterministic thrusting for the heliocentric transfer to Vesta resumed in June 2009 and concluded with orbit capture at Vesta on July 16, 2011. From July 2011 through September 2012 the IPS was used to transfer to all the different science orbits at Vesta and to escape from Vesta orbit. Cruise for a rendezvous with Ceres began in September 2012 and concluded with the start of the approach to Ceres phase on December 26, 2015, leading to orbit capture on March 6, 2015. Deterministic thrusting continued during approach to place the spacecraft in its first science orbit, called RC3, which was achieved on April 23, 2015. Following science operations at RC3 ion thrusting was resumed for twenty-five days leading to arrival to the next science orbit, called survey orbit, on June 3, 2015. The IPS will be used for all subsequent orbit transfers and trajectory correction maneuvers until completion of the primary mission in approximately June 2016. To date the IPS has been operated for over 46,774 hours, consumed approximately 393 kg of xenon, and provided a delta V of over 10.8 km/s to the spacecraft. The IPS performance characteristics are very close to the expected performance based on analysis and testing performed pre-launch. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through arrival at the second science orbit at Ceres.

Garner, Charles E.↗

Analysis of Particulate Contamination During Launch of MMS Mission

NASA's Magnetospheric MultiScale (MMS) is an unmanned constellation of four identical spacecraft designed to investigate magnetic reconnection by obtaining detailed measurements of plasma properties in Earth's magnetopause and magnetotail. Each of the four identical satellites carries a suite of instruments which characterize the ambient ion and electron energy spectrum and composition. Some of these instruments utilize microchannel plates and are sensitive to particulate contamination. In this paper, we analyze the transport of particulates during pre-launch, launch and ascent events, and use the analysis to obtain quantitative predictions of contamination impact on the instruments. Viewfactor calculation is performed by considering the gravitational and aerodynamic forces acting on the particles.

Brieda, Lubos↗

Kepler Instrument Performance: An In-Flight Update

The Kepler Mission is designed to detect the 80 parts per million (ppm) signal from an Earth-Sun equivalent transit. Such precision requires superb instrument stability on time scales up to 2 days and systematic error removal to better than 20 ppm. The sole scientic instrument is the Photometer, a 0.95 m aperture Schmidt telescope that feeds the 94.6 million pixel CCD detector array, which contains both Science and Fine Guidance Sensor (FGS) CCDs. Since Kepler's launch in March 2009, we have been using the commissioning and science operations data to characterize the instrument and monitor its performance. We find that the in-flight detector properties of the focal plane, including bias levels, read noise, gain, linearity, saturation, FGS to Science crosstalk,and video crosstalk between Science CCDs, are essentially unchanged from their pre-launch values. Kepler'sunprecedented sensitivity and stability in space have allowed us to measure both short- and long- term effects from cosmic rays, see interactions of previously known image artifacts with starlight, and uncover several unexpected systematics that affect photometric precision. Based on these results, we expect to attain Kepler's planned photometric precision over 90% of the field of view.

CCD↗

Overview of the TOPEX/Poseidon Platform Harvest Verification Experiment

An overview is given of the in situ measurement system installed on Texaco's Platform Harvest for verification of the sea-level measurement from the TOPEX/POSEIDON satellite. The pre-launch error budget suggested that the total root mean square (RMS) error due to measurements made at this verification site would be less than four centimeters.

satellite↗

TOPEX/Poseidon Electrical Power System - Performance

This paper shows that the power system performance (batteries, solar array, power regulator) on-board the TOPEX/Poseidon satellite has met or exceeded pre-launch predicitons and has successfully managed the performance of NiCd batteries which had shown anomalous performance on other missions such as UARS and GRO.

batteries↗

Ground-based Validation of the EOS Multi-angle Imaging SpectroRadiometer (MISR) Aerosol Retrieval Algorithms and Science Data Products

A plan for the ground-based validation of MISR aerosol retrieval is outlined. Activities occur in two phases: (1) pre-launch, work is focused on technique development and MISR algorithm validation using conventional ground-base methods and a MISR simulator (AirMISR) operating from the ER-2 aircraft to simulate MISR on-orbit observations. (2) Post-launch, the validation program relies on ground campaigns, underflights wit the MISR simulator and the use of local measurements fo aerosol loading and properties and irradiance measurements derived from the AERONET and ISIS networks.

algorithm↗

An Overview of Experiments and Modeling of Polysiloxane-Coated Thermal Protection Systems for Missions to Mars, Titan, and Beyond.

Phenolic Impregnated Carbon Ablator (PICA) gained heritage during the historic Stardust mission, where it successfully returned samples from a comet’s tail and has since been instrumental in delivering payloads to the surface of Mars [1-3]. Most recently, PICA enabled the safe return of samples collected from asteroid Bennu as part of the OSIRIS-REx mission. This rich legacy underscores PICA’s critical role in allowing NASA’s most ambitious exploration missions. However, the friable nature of its phenolic phase presents challenges during handling and pre-launch activities. To mitigate this issue, PICA is coated with a polysiloxane resin system, which serves to suppress particulate dispersion and thereby safeguard spacecraft components. A comprehensive understanding of the polysiloxane resin’s behavior is imperative, as it profoundly shapes the material response of PICA during atmospheric entry by influencing its thermal and oxidative stability. This influence extends to thermocouple plugs embedded within thermal protection systems. These plugs have demonstrated their significance in missions such as Mars Science Laboratory (MSL) and Mars 2020, where the MEDLI and MEDLI2 instrumentation suites delivered in-valuable insights into the performance of thermal protection systems during entry into the Martian atmosphere [4]. Looking ahead, missions such as Dragonfly, set to descend into Titan’s dense atmosphere, aim to leverage advanced sensor technologies to further refine our understanding of thermal protection response [5]. Moreover, thermocouple plugs play an essential role in validating cutting-edge material response models, such as those pioneered under NASA’s Entry Systems Modeling Project (ESM), designed, in-part, to predict the operational integrity of thermal protection systems under the extreme stresses of atmospheric entry. To achieve these modeling goals, ground-based experiments are crucial to provide the foundational data necessary for developing and refining these predictive tools. To this end, an extensive test campaign was conducted at the Hypersonic Materials Environmental Test System (HyMETS) to investigate the high-temperature behavior of the polysiloxane resin in an air environment [6]. These experiments revealed critical phenomena, including the formation of a silicon oxycarbide layer that enhances oxidation resistance, moderates surface temperatures, and alters in-depth thermal response. Building on these findings, subsequent tests were designed to simulate atmospheric entry conditions in reactive gases, such as CO2 and N2, to mimic the environments of Mars and Titan, respectively, as well as non-reactive gases representing the atmospheres of the Ice Giants (Neptune and Uranus). A heating rate dependent decomposition mechanism has been identified for the polysiloxane resin under oxidizing conditions (Fig. 1). In the initial stage, the resin and the underlying thermal protection system undergo pyrolysis, rapidly generating a thin amorphous silicon oxycarbide interwoven with carbonaceous char and residual fibers from PICA. During the second stage, the nascent oxide layer establishes a robust, oxidation-resistant thermal barrier coating, which significantly impedes heat transfer to the underlying carbonaceous char, resulting in a stagnation of the surface temperature. A key factor contributing to this thermal resistance is the low recombination efficiency of atomic oxygen (γ), which further diminishes the heat load on the material’s interior layers [7]. Moreover, as the surface temperature stagnates, the silicon oxycarbide phase separates into distinct regions of silica and free graphite. Ultimately, when the heat flux reaches a critical threshold, a third stage is triggered, leading to the breakdown of the coating through carbothermal reduction, exposing the underlying char layer. This exposure leads to a dramatic surface temperature spike, driven by highly exothermic reactions between atomic oxygen and the char layer, further accelerating material degradation. A detailed mass and heat transfer model of PICA coated with polysiloxane resin was implemented in the Porous material Analysis Toolbox based on OpenFOAM, PATO [8]. The initial stage was considered negligible in this model because the resin decomposition occurs rapidly within a thin surface layer. Instead, the coating was directly considered as an oxygen-resistant thermal barrier coating. For the second stage, the thin amorphous silicon oxycarbide was treated as a pure silica surface to simplify the thermochemical behavior. The model ac-counts for surface equilibrium processes using representative elements of the coating-environment system. For the third stage, specific boundary conditions were developed to estimate the onset and progression of the coating removal. Two-dimensional material response simulations were conducted to compare uncoated and coated PICA using boundary conditions calibrated with HyMETS data. Fig. 2 illustrates that the simulations closely align with experimental data, successfully reproducing measured temperature profiles. This work will include the latest advancements in the coating model, including the calibration of recombination of atomic oxygen at the surface during the second phase. These simulated results will be further validated against additional CO2 data points from HyMETS, reinforcing the models’ predictive capabilities. These mechanisms and their effects on thermal protection systems, including thermochemical behavior and thermocouple probe performance in extreme environments, provide crucial insights for optimizing spacecraft designs that safeguard scientific payload and ensure mission success in future planetary exploration endeavors.

Active Oxidation↗