Search NASA⌕ Search

SEARCH · Search NASA

Results for “Process Systems Engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

NASA space power system automation

Investigations were conducted with the objective to identify technology issues in automating space power systems, rank critical technology needs, and recommend technology objectives. It was found that automation can offer significant benefits to space power systems. Automation, or even autonomy, may become an absolute requirement for system implementation. Automation of large power systems will be achieved through evolution. It is pointed out that 'systems engineering' or more specifically, 'automation systems engineering' must be strongly emphasized and done early in the development process. System control can be centralized, distributed or a combination of the two. An important requirement for automation implementation is related to the availability of qualified hardware and software components.

Wagnon, F. W.↗

Hybridized Agile Software Development of Flight Control Team Tools for International Space Station's Payload Operations Integration Center

Ground systems operations at the National Aeronautics and Space Administration's (NASA) Payload Operations and Integration Function (POIF) is increasing, via the High Operations Tempo (HOT) initiative, its ability to support more science activities with a fourth crew member on the International Space Station (ISS). The Flight Control Team's need to support this increased crew presence mandated the need for a series of software tools to better handle the increasing pace of payload science operations. The overall need was clear from the outset, but the full scope and user experience for each tool, were not as well understood, so establishing a fixed set of initial requirements was not feasible. An Agile Software Development (ASD) paradigm takes advantage of uncertainty, and plans for it, so it was deemed the most appropriate approach to create room for exploring novel concepts, and to mount a rapid and flexible response to inevitiably changing requirements. It facilitated the need for unprecedented collaboration between the Product Team (i.e. users from the Flight Control Team) and the Development Team (i.e. POIC systems engineers, developers, testers). This is a process shift in the development, test, and release of software from one that is prescriptive to one that is adaptive, which is necessary for these tools to have longevity. The application of ASD to the product development lifecycle permitted the timely incorporation of customer feedback, and, allowed for continuous quality improvements. This resulted in a suite of tools that are efficient, user-friendly, and enable POIF ground systems to support the increasing pace of payload science operations. ASD is not as much a set of prescriptive processes as it is a shift in mindset; one that moves from planning against change, to planning for change, thereby iteratively growing software towards user-defined value.

Albers, Cerese M.↗

Principles to Products: Toward Realizing MOS 2.0

This is a report on the Operations Revitalization Initiative, part of the ongoing NASA-funded Advanced Multi-Mission Operations Systems (AMMOS) program. We are implementing products that significantly improve efficiency and effectiveness of Mission Operations Systems (MOS) for deep-space missions. We take a multi-mission approach, in keeping with our organization's charter to "provide multi-mission tools and services that enable mission customers to operate at a lower total cost to NASA." Focusing first on architectural fundamentals of the MOS, we review the effort's progress. In particular, we note the use of stakeholder interactions and consideration of past lessons learned to motivate a set of Principles that guide the evolution of the AMMOS. Thus guided, we have created essential patterns and connections (detailed in companion papers) that are explicitly modeled and support elaboration at multiple levels of detail (system, sub-system, element...) throughout a MOS. This architecture is realized in design and implementation products that provide lifecycle support to a Mission at the system and subsystem level. The products include adaptable multi-mission engineering documentation that describes essentials such as operational concepts and scenarios, requirements, interfaces and agreements, information models, and mission operations processes. Because we have adopted a model-based system engineering method, these documents and their contents are meaningfully related to one another and to the system model. This means they are both more rigorous and reusable (from mission to mission) than standard system engineering products. The use of models also enables detailed, early (e.g., formulation phase) insight into the impact of changes (e.g., to interfaces or to software) that is rigorous and complete, allowing better decisions on cost or technical trades. Finally, our work provides clear and rigorous specification of operations needs to software developers, further enabling significant gains in productivity.

AMMOS↗

Digital Engineering Design Center (DEDC): Modelling an ISRU System

The DEDC provides immersive project-based learning on digital engineering toolsets and processes supporting NASA’s digital transformation goals: - Digital Engineering uses authoritative sources of systems' data and models as a continuum across disciplines to support integrated digital approach life cycle activities from concept through disposal. - The digital environment provided includes the state-of-the-art digital engineering suite, Siemens Xcelerator. The pilot project is developing an end-to-end integrated model of an In-Situ Resource Utilization (ISRU) system for commodities production: - ISRU uses local resources to provide mission consumables to enable a sustainable Moon or Mars surface presence. - The final digital twin product will include a methanation reactor, condenser, and electrolyzer subsystem.

Digital Engineering Design Center↗

Application of Agile for Systems Engineering, Project Management and Modeling and Lessons Learned

The Systems Engineering team within the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been transforming its development processes to be more efficient, robust,and responsive to change and to its stakeholders. To these ends, the Systems Engineering team trialed the integration of agile development techniques into existing and new processes. Agile development methods are well understood within the software development community. Outside ofsoftware development, however, how non-software project management (PM) and systems engineering (SE) teams implement agile development techniques is less well understood. In its transformation efforts, the ExMC SE team focused on three main areas: Improving the project communications among subsystem teams and stakeholders by adopting a scrum-like process, Changing the status and reporting mechanisms to improve schedule coordination between the subsystem team, SE leadership, and ExMC Element leadership, and Unifying the model-based SE workflow to improve understanding of Concepts of Operations across projects.This presentation highlights several of these transformations and what the SE team learned while undergoing the transformation.

S Lumpkins↗

Shuttle Systems 3-D Applications: Application of 3-D Graphics in Engineering Training for Shuttle Ground Processing

This project illustrates an animation of the orbiter mate to the external tank, an animation of the OMS POD installation to the orbiter, and a simulation of the landing gear mechanism at the Kennedy Space Center. A detailed storyboard was created to reflect each animation or simulation. Solid models were collected and translated into Pro/Engineer's prt and asm formats. These solid models included computer files of the: orbiter, external tank, solid rocket booster, mobile launch platform, transporter, vehicle assembly building, OMS POD fixture, and landing gear. A depository of the above solid models was established. These solid models were translated into several formats. This depository contained the following files: stl for sterolithography, stp for neutral file work, shrinkwrap for compression, tiff for photoshop work, jpeg for Internet use, and prt and asm for Pro/Engineer use. Solid models were created of the material handling sling, bay 3 platforms, and orbiter contact points. Animations were developed using mechanisms to reflect each storyboard. Every effort was made to build all models technically correct for engineering use. The result was an animated routine that could be used by NASA for training material handlers and uncovering engineering safety issues.

Godfrey, Gary S.↗

Report on the subpanel on remapping procedures

Problems associated with remapping procedures are defined and research tasks are proposed. It is noted that the remapping/rectification process could be significantly aided through engineering systems improvements in attitude control, with subsequent improvement in spacecraft ephemeris modeling accuracy. There is a need for state-of-the-art technology assessments prior to initiation of major programs, and the high potential return from well formulated testing of algorithms on selected data sets of actual and synthetic imagery. In addition, there is a need for tasks that incorporate standard photogrammetric methodology and formulas and that more fully utilize platform and calibration data from current and proposed sensors to reproject digital imagery. The impact of improved platform stability and integration of global positioning system measurements on reduced ground segment processing needs to be critically assessed. Also highlighted is the need for a substantial effort in the development of remapping software and systems that are modular and transportable.

Source record↗

The composite load spectra project

Probabilistic methods and generic load models capable of simulating the load spectra that are induced in space propulsion system components are being developed. Four engine component types (the transfer ducts, the turbine blades, the liquid oxygen posts and the turbopump oxidizer discharge duct) were selected as representative hardware examples. The composite load spectra that simulate the probabilistic loads for these components are typically used as the input loads for a probabilistic structural analysis. The knowledge-based system approach used for the composite load spectra project provides an ideal environment for incremental development. The intelligent database paradigm employed in developing the expert system provides a smooth coupling between the numerical processing and the symbolic (information) processing. Large volumes of engine load information and engineering data are stored in database format and managed by a database management system. Numerical procedures for probabilistic load simulation and database management functions are controlled by rule modules. Rules were hard-wired as decision trees into rule modules to perform process control tasks. There are modules to retrieve load information and models. There are modules to select loads and models to carry out quick load calculations or make an input file for full duty-cycle time dependent load simulation. The composite load spectra load expert system implemented today is capable of performing intelligent rocket engine load spectra simulation. Further development of the expert system will provide tutorial capability for users to learn from it.

Newell, J. F.↗

Methods for the development of a bioregenerative life support system

Presented here is a rudimentary approach to designing a life support system based on the utilization of plants and animals. The biggest stumbling block in the initial phases of developing a bioregenerative life support system is encountered in collecting and consolidating the data. If a database existed for the systems engineer so that he or she may have accurate data and a better understanding of biological systems in engineering terms, then the design process would be simplified. Also addressed is a means of evaluating the subsystems chosen. These subsystems are unified into a common metric, kilograms of mass, and normalized in relation to the throughput of a few basic elements. The initial integration of these subsystems is based on input/output masses and eventually balanced to a point of operation within the inherent performance ranges of the organisms chosen. At this point, it becomes necessary to go beyond the simplifying assumptions of simple mass relationships and further define for each organism the processes used to manipulate the throughput matter. Mainly considered here is the fact that these organisms perform input/output functions on differing timescales, thus establishing the need for buffer volumes or appropriate subsystem phasing. At each point in a systematic design it is necessary to disturb the system and discern its sensitivity to the disturbance. This can be done either through the introduction of a catastrophic failure or by applying a small perturbation to the system. One example is increasing the crew size. Here the wide range of performance characteristics once again shows that biological systems have an inherent advantage in responding to systemic perturbations. Since the design of any space-based system depends on mass, power, and volume requirements, each subsystem must be evaluated in these terms.

Goldman, Michelle↗

Principles of Sociology in Systems Engineering

Systems engineering involves both the integration of the system and the integration of the disciplines which develop and operate the system. Integrating the disciplines is a sociological effort to bring together different groups, often with different terminology, to achieve a common goal, the system. The focus for the systems engineer is information flow through the organization, between the disciplines, to ensure the system is developed and operated with all relevant information informing system decisions. Robert K. Merton studied the sociological principles of the sciences and the sociological principles he developed apply to systems engineering. Concepts such as specification of ignorance, common terminology, opportunity structures, role-sets, and the reclama (reconsideration) process are all important sociological approaches that should be employed by the systems engineer. In bringing the disciplines together, the systems engineer must also be wary of social ambivalence, social anomie, social dysfunction, insider-outsider behavior, unintended consequences, and the self-fulfilling prophecy. These sociological principles provide the systems engineer with key approaches to manage the information flow through the organization as the disciplines are integrated and share their information. This also helps identify key sociological barriers to information flow through the organization. This paper will discuss this theoretical basis for the application of sociological principles to systems engineering.

Watson, Michael D.↗

Technology Transfer Challenges: A Case Study of User-Centered Design in NASA's Systems Engineering Culture

The Upper Stage (US) section of the National Aeronautics and Space Administration's (NASA) Ares I rocket will require internal access platforms for maintenance tasks performed by humans inside the vehicle. Tasks will occur during expensive critical path operations at Kennedy Space Center (KSC) including vehicle stacking and launch preparation activities. Platforms must be translated through a small human access hatch, installed in an enclosed worksite environment, support the weight of ground operators and be removed before flight - and their design must minimize additional vehicle mass at attachment points. This paper describes the application of a user-centered conceptual design process and the unique challenges encountered within NASA's systems engineering culture focused on requirements and "heritage hardware". The NASA design team at Marshall Space Flight Center (MSFC) initiated the user-centered design process by studying heritage internal access kits and proposing new design concepts during brainstorming sessions. Simultaneously, they partnered with the Technology Transfer/Innovative Partnerships Program to research inflatable structures and dynamic scaffolding solutions that could enable ground operator access. While this creative, technology-oriented exploration was encouraged by upper management, some design stakeholders consistently opposed ideas utilizing novel, untested equipment. Subsequent collaboration with an engineering consulting firm improved the technical credibility of several options, however, there was continued resistance from team members focused on meeting system requirements with pre-certified hardware. After a six-month idea-generating phase, an intensive six-week effort produced viable design concepts that justified additional vehicle mass while optimizing the human factors of platform installation and use. Although these selected final concepts closely resemble heritage internal access platforms, challenges from the application of the user-centered process provided valuable lessons for improving future collaborative conceptual design efforts.

Quick, Jason↗

Secondary Electron Emission and the Exploration of Space

The emission of secondary electrons from surfaces exposed to the space plasma and radiation environment is a process of great importance to space system engineering design and operations. A spacecraft will collect charge until it reaches an equilibrium potential gov,erned by the balance of incoming electron and ion currents from the space environment with outgoing secondary, backscattered, and photoelectron currents. Laboratory measurements of secondary electron yields are an important parameter for use in spacecraft charging analyses because the magnitude and sign of the equilibrium potential depends on both the energy spectrum of electrons and ions in the space environment and the electrical properties of the surface materials (including the energy dependent secondary electron yields). Typical benign equilibrium potentials range &om a few tens of volts positive in interplanetary space to a few volts negative in low Earth orbit. However, spacecraft are known to charge to negative potentials exceeding one to ten kilovolts in some environments and anomalies or system failures due to electrostatic discharges originating from highly charged surfaces becomes a serious concern. This presentation will provide a review of the spacecraft charging process with special emphasis on the role of secondary electrons in controlling the current balance process. Charging examples will include spacecraft in Earth orbit and interplanetary space as well as dust charging on the lunar surface, a phenomenon of importance to future lunar surface operations.

Minow, Joseph I.↗

Integration Tests of the 4 kW-class High Voltage Hall Accelerator Power Processing Unit with the HiVHAc and the SPT-140 Hall Effect Thrusters

NASAs Science Mission Directorate is sponsoring the development of a 4 kW-class Hall propulsion system for implementation in NASA science and exploration missions. The main components of the system include the High Voltage Hall Accelerator (HiVHAc), an engineering model power processing unit (PPU) developed by Colorado Power Electronics, and a xenon flow control module (XFCM) developed by VACCO Industries. NASA Glenn Research Center is performing integrated tests of the Hall thruster propulsion system. This presentation presents results from integrated tests of the PPU and XFCM with the HiVHAc engineering development thruster and a SPT-140 thruster provided by Space System Loral. The results presented in this paper demonstrate thruster discharge initiation, open-loop and closed-loop control of the discharge current with anode flow for both the HiVHAc and the SPT-140 thrusters. Integrated tests with the SPT-140 thruster indicated that the PPU was able to repeatedly initiate the thrusters discharge, achieve steady state operation, and successfully throttle the thruster between 1.5 and 4.5 kW. The measured SPT-140 performance was identical to levels reported by Space Systems Loral.

Hall Thrusters↗

Integration Tests of the 4 kW-Class High Voltage Hall Accelerator Power Processing Unit with the HiVHAc and the SPT-140 Hall Effect Thrusters

NASA's Science Mission Directorate is sponsoring the development of a 4 kW-class Hall propulsion system for implementation in NASA science and exploration missions. The main components of the system include the High Voltage Hall Accelerator (HiVHAc), an engineering model power processing unit (PPU) developed by Colorado Power Electronics, and a xenon flow control module (XFCM) developed by VACCO Industries. NASA Glenn Research Center is performing integrated tests of the Hall thruster propulsion system. This paper presents results from integrated tests of the PPU and XFCM with the HiVHAc engineering development thruster and a SPT-140 thruster provided by Space System Loral. The results presented in this paper demonstrate thruster discharge initiation along with open-loop and closed-loop control of the discharge current with anode flow for both the HiVHAc and the SPT-140 thrusters. Integrated tests with the SPT-140 thruster indicated that the PPU was able to repeatedly initiate the thruster's discharge, achieve steady state operation, and successfully throttle the thruster between 1.5 and 4.5 kW. The measured SPT-140 performance was identical to levels reported by Space Systems Loral.

Power Processing Unit↗

Flat-plate solar array project: Experimental process system development unit for producing semiconductor-grade silicon using the silane-to-silicon process

The engineering design, fabrication, assembly, operation, economic analysis, and process support research and development for an Experimental Process System Development Unit for producing semiconductor-grade silicon using the slane-to-silicon process are reported. The design activity was completed. About 95% of purchased equipment was received. The draft of the operations manual was about 50% complete and the design of the free-space system continued. The system using silicon power transfer, melting, and shotting on a psuedocontinuous basis was demonstrated.

Source record↗

Flat-plate solar-array project. Experimental process system development unit for producing semiconductor-grade silicon using the silane-to-silicon process

The engineering design, fabrication, assembly, operation, economic analysis, and process support R and D for an Experimental Process System Development Unit (EPSDU) are reported. About 95% of purchased equipment is received and will be reshipped to the West Coast location. The Data Collection System is completed. In the area of melting/consolidation, to the system using silicon powder transfer, melting and shotting on a pseudocontinuous basis is demonstrated. It is proposed to continue the very promising fluid bed work.

Source record↗

Preliminary concept for lunar exploration tracking and data acquisition and data processing systems

The NASA Office of Exploration is evaluating potential scenarios for an ambitious and complex mission to the moon. This paper sumarizes the initial system engineering analyses being performed to identify the communications, data processing, and navigational support required by these case studies. A feasible option for providing tracking and data acquisition using technology available in the 1990s is described.

Hei, Donald, Jr.↗

Integration of Uncertainty Quantification in a Model-Based Systems Analysis and Engineering Framework

This paper presents a technical approach to improve the confidence in the systems analysis process by integrating Uncertainty Quantification (UQ) techniques within a Model-Based Systems Analysis and Engineering (MBSA&E) framework. The MBSA&E architecture uses system models and multidisciplinary analytical solutions as central artifacts for system design and analysis. The integration of UQ enables engineers to assess and mitigate uncertainties associated with a system model, design parameters, and constraint inputs, leading to more complete design studies and further informed decision-making processes. The proposed approach leverages the strengths of MBSA&E and extends it with a UQ methodology to quantify uncertainties in the input parameters and to trace the uncertainties as they propagate throughout the system model. To demonstrate the effectiveness of an integrated MBSA&E-UQ approach, a case study involving a simplified analysis of a Transonic Truss-Braced Wing (TTBW) concept vehicle is performed. This integration enables a more comprehensive evaluation of system performance and behavior under uncertainty and a more robust approach for system design and analysis. Lastly, the paper addresses the challenges and considerations associated with integrating UQ into an MBSA&E framework.

systems analysis↗