Search NASA⌕ Search

SEARCH · Search NASA

Results for “data requests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Utility-Scale Solar, 2024 Edition: Empirical Trends in Deployment, Technology, Cost, Performance, PPA Pricing, and Value in the United States [Slides]

Berkeley Lab’s “Utility-Scale Solar, 2024 Edition” presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC (PV plants of 5 MWAC or less, including residential rooftop systems, are covered separately in Berkeley Lab’s companion annual report, Tracking the Sun). Key findings from this year’s report include: -18.5 GWAC of new utility-scale PV capacity came online in 2023, bringing cumulative installed capacity to more than 80.2 GWAC across 47 states. Installed costs continued to fall in 2023. Relative to 2022, capacity-weighted averages decreased by 8% to -$\$1.43$/WAC (or $\$1.08$/WDC). Costs, based on a 7.1 GWAC sample of 76 plants completed in 2023, have fallen by 75% (averaging 10% annually) since 2010. Plant-level capacity factors vary widely, from 6% to 36% (on an AC basis), with a sample median of 24%. -Levelized cost of energy (LCOE) of new 2023 projects increased slightly to $\$46$/MWh prior to the application of tax credits but continued to fall to $\$31$/MWh when accounting for federal incentives. PPA prices have largely followed the decline in solar’s LCOE over time, but newly signed longer-term PPA prices have increased since 2021, to an average of $\$35$/MWh (levelized, in 2023 dollars). -Solar’s average energy and capacity value (i.e., ability to offset costs of other power generation sources) across the U.S. was $\$45$/MWh in 2023. Solar’s average market value was lowest in CAISO ($\$27$/MWh), the market with the greatest solar generation share, and highest in ERCOT ($\$67$/MWh). -Newer solar projects had greater market value in 2023 than their generation costs, yielding $\$1.1$ billion in benefits. Projects built in 2022 delivered on average $\$15$/MWh more market value than their costs in 2023. -Solar’s combined value from wholesale electricity markets, public health and climate damage reduction were greater than generation costs and incentives, yielding $\$13.7$ billion in net benefits in 2023. We estimate U.S. health benefits of $\$24$/MWh and reduced global climate damages of $\$101$/MWh. -Adding battery storage is one way to increase the value of solar. Deployment of 52 new PV+battery hybrid plants set a record with 5.3 GW installed in 2023. Our public data file tracks metadata and PPA prices from more than 100 PV+battery hybrid projects that are already online or that have secured offtake arrangements. -Looking ahead, a massive pipeline of at least 1,085 GW of solar capacity dominates the nation’s interconnection queues at the end of 2023. Nearly 571 GW, or 53%, of that total was paired with a battery – in CAISO it was a staggering 98%. Historically only 10% of the requested solar capacity is built. -For more information, and to explore related interactive data visualizations, go to utilityscalesolar.lbl.gov.

14 SOLAR ENERGY↗

Problem Reporting Taxonomy and Data Preparation Tool Evaluation

A member of the NASA Engineering and Safety Center (NESC) Systems Engineering Office (SEO) Technical Discipline Team (TDT) requested a SEO-managed activity to perform a gap analysis on the proposed NASA Standard 0006, "Common NASA Taxonomy for Problem Reporting, Analysis, and Resolution", and to create an input filter and set of instructions for using the data-mining/data-cleansing tool TechOasis1 with Space Shuttle Program (SSP) problem reporting data. The work that achieved these objectives and deployment of TechOasis are discussed in this report.

Beil, Robert J.↗

A hybrid technique for spacecraft attitude interpolation with arbitrary attitude data gaps

An algorithm for obtaining sufficiently accurate estimates of a system parameter Y, given a data record of the parameter in which at arbitrary times no direct observations of Y exist, and describing the variance of these estimates, is proposed. The method provides estimates at all requested times, and the variance of the estimates is maintained as close to the variance of directly measured data as the quality of input information will allow. Three classes of information are used: (1) the measured data record of Y and the statistical extension of this record into time intervals of no direct measurement, obtained by a modification of standard autocorrelation techniques; (2) an a priori indicator of the behavior of Y; and (3) one or more indirect indicators of Y based on observation of other system parameters. The application of the algorithm to the SEASAT-A attitude determination under conditions of sensor field-of-view limitations and sun occultations is presented.

Treder, A. J.↗

X-Ray Micro-Computed Tomography of Apollo Samples as a Curation Technique Enabling Better Research

X-ray micro-computed tomography (micro-CT) is a technique that has been used to research meteorites for some time and many others], and recently it is becoming a more common tool for the curation of meteorites and Apollo samples. Micro-CT is ideally suited to the characterization of astromaterials in the curation process as it can provide textural and compositional information at a small spatial resolution rapidly, nondestructively, and without compromising the cleanliness of the samples (e.g., samples can be scanned sealed in Teflon bags). This data can then inform scientists and curators when making and processing future sample requests for meteorites and Apollo samples. Here we present some preliminary results on micro-CT scans of four Apollo regolith breccias. Methods: Portions of four Apollo samples were used in this study: 14321, 15205, 15405, and 60639. All samples were 8-10 cm in their longest dimension and approximately equant. These samples were micro-CT scanned on the Nikon HMXST 225 System at the Natural History Museum in London. Scans were made at 205-220 kV, 135-160 microamps beam current, with an effective voxel size of 21-44 microns. Results: Initial examination of the data identify a variety of mineral clasts (including sub-voxel FeNi metal grains) and lithic clasts within the regolith breccias. Textural information within some of the lithic clasts was also discernable. Of particular interest was a large basalt clast (approx.1.3 cc) found within sample 60639, which appears to have a sub-ophitic texture. Additionally, internal void space, e.g., fractures and voids, is readily identifiable. Discussion: It is clear from the preliminary data that micro-CT analyses are able to identify important "new" clasts within the Apollo breccias, and better characterize previously described clasts or igneous samples. For example, the 60639 basalt clast was previously believed to be quite small based on its approx.0.5 sq cm exposure on the surface of the main mass. These scans show the clast to be approx.4.5 g, however (assuming a density of approx.3.5 g/cc). This is large enough for detailed studies including multiple geo-chronometers. This basalt clast is of particular interest as it is the largest Apollo 16 basalt, and it is the only mid-TiO2 basalt in the Apollo sample suite. By identifying the location of interesting clasts or grains within a sample, we will be able to make more informed decisions about where to cut a sample in order to best expose clasts of interest for future study. Moreover, knowing the location of internal defects (e.g., fractures) will allow more precise chipping and extraction of clasts or grains. By combining micro-CT scans with compositional techniques like micro x-ray fluorescence (particularly on sawn slabs), we will be able to provide even more comprehensive information to scientists trying to best select samples that fit their scientific needs.

Ziegler, R. A.↗

Software for Generating Troposphere Corrections for InSAR Using GPS and Weather Model Data

Atmospheric errors due to the troposphere are a limiting error source for spaceborne interferometric synthetic aperture radar (InSAR) imaging. This software generates tropospheric delay maps that can be used to correct atmospheric artifacts in InSAR data. The software automatically acquires all needed GPS (Global Positioning System), weather, and Digital Elevation Map data, and generates a tropospheric correction map using a novel algorithm for combining GPS and weather information while accounting for terrain. Existing JPL software was prototypical in nature, required a MATLAB license, required additional steps to acquire and ingest needed GPS and weather data, and did not account for topography in interpolation. Previous software did not achieve a level of automation suitable for integration in a Web portal. This software overcomes these issues. GPS estimates of tropospheric delay are a source of corrections that can be used to form correction maps to be applied to InSAR data, but the spacing of GPS stations is insufficient to remove short-wavelength tropospheric artifacts. This software combines interpolated GPS delay with weather model precipitable water vapor (PWV) and a digital elevation model to account for terrain, increasing the spatial resolution of the tropospheric correction maps and thus removing short wavelength tropospheric artifacts to a greater extent. It will be integrated into a Web portal request system, allowing use in a future L-band SAR Earth radar mission data system. This will be a significant contribution to its technology readiness, building on existing investments in in situ space geodetic networks, and improving timeliness, quality, and science value of the collected data

Moore, Angelyn W.↗

TEAMER: Triton Systems Oscillating Water Column Modeling Data and Report

This dataset provides the output of six Wave Energy Converter Simulator (WEC-Sim) simulations and accompanying documentation for the modeling of Triton Systems' oscillating water column (OWC) system at tank scale (validated using available data for tuning the model, Tests 1-2) and deployment scale (for which no validation data is available, Tests 4-6). Included are the output data in a MATLAB file structure, a comprehensive report on the modeling and design of the Triton OWC system, and a link to the WEC-Sim GitHub page. This work was supported by funding from TEAMER RFTS 5 (Request for Technical Support).

16 TIDAL AND WAVE POWER↗

The Natural Thermoluminescence Survey of Antarctic Meteorites: Ordinary Chondrites at the Grosvenor Mountains, MacAlpine Hills, Pecora Escarpment and Queen Alexandra Range, and New Data New Data for the Elephant Moraine, Ice Fields

The natural TL survey of Antarctic meteorites was started in 1987 at the request of the Antarctic Meteorite Working Group in order to provide an initial description of radiation and thermal histories. It was intended to be a complement to the mineralogical and petrographic surveys performed at the Johnson Space Center and the Smithsonian Institution. All ANSMET samples recovered since then, besides those that were heated throughout by atmospheric passage, have been measured. To date this amounts to about 1200 samples. As the data for each ice field reaches a significant level, we have been conducting a thorough examination of the data for that field with a view to (1) identifying pairing, (2) providing an estimate of terrestrial age and residence time on the ice surface, (3) looking for differences in natural TL between ice fields, (4) looking for variations in natural TL level with location on the ice, (5) looking for meteorites with natural TL levels outside the normal range. Pairing is a necessary first step in ensuring the @ost productive use of the collection, while geographical variations could perhaps provide clues to concentration mechanisms. Samples with natural TL values outside the normal range are usually inferred to have had either small perihelia or recent changes in orbital elements. In addition, induced TL data have enabled us to (5) look for evidence for secular variation in the nature of the flux of meteorites to Earth, and (6) look for petrologically unusual meteorites, such as particularly primitive ordinary chondrites, heavily shocked meteorites, or otherwise anomalous meteorites. To date we have published studies of the TL properties of 167 ordinary chondrites from Allan Hills, 107 from Elephant Moraine and 302 from Lewis Cliff and we have discussed the TL properties of fifteen H chondrites collected at the Allan Hills by Euromet after a storm during the 1988 season. We now have additional databases for a reasonable number of ordinary chondrites from Grosvenor Mountains (39 meteorites), MacAlpine Hills (70 meteorites), Pecora Escarpment (60 meteorites), and Queen Alexandra Range (173 meteorites) and we have data for a further 101 samples from Elephant Moraine. The results are summarized in Table 1. We also have fairly minimal databases (10-15 meteorites) for Dominion Range, Graves Nunataks, Reckling Peak and Wisconsin Range that will not be discussed here.

Benoit, Paul H.↗

Automation of Cassini Support Imaging Uplink Command Development

"Support imaging" is imagery requested by other Cassini science teams to aid in the interpretation of their data. The generation of the spacecraft command sequences for these images is performed by the Cassini Instrument Operations Team. The process initially established for doing this was very labor-intensive, tedious and prone to human error. Team management recognized this process as one that could easily benefit from automation. Team members were tasked to document the existing manual process, develop a plan and strategy to automate the process, implement the plan and strategy, test and validate the new automated process, and deliver the new software tools and documentation to Flight Operations for use during the Cassini extended mission. In addition to the goals of higher efficiency and lower risk in the processing of support imaging requests, an effort was made to maximize adaptability of the process to accommodate uplink procedure changes and the potential addition of new capabilities outside the scope of the initial effort.

Ly-Hollins, Lisa↗

Restoration and PDS Archive of Apollo Lunar Rock Sample Data

In 2008, scientists at the Johnson Space Center (JSC) Lunar Sample Laboratory and Image Science & Analysis Laboratory (under the auspices of the Astromaterials Research and Exploration Science Directorate or ARES) began work on a 4-year project to digitize the original film negatives of Apollo Lunar Rock Sample photographs. These rock samples together with lunar regolith and core samples were collected as part of the lander missions for Apollos 11, 12, 14, 15, 16 and 17. The original film negatives are stored at JSC under cryogenic conditions. This effort is data restoration in the truest sense. The images represent the only record available to scientists which allows them to view the rock samples when making a sample request. As the negatives are being scanned, they are also being formatted and documented for permanent archive in the NASA Planetary Data System (PDS) archive. The ARES group is working collaboratively with the Imaging Node of the PDS on the archiving.

Garcia, P. A.↗

Computer acquired performance data from a chemically vapor-deposited-rhenium, niobium planar diode

Performance data from a chemically vapor-deposited-rhenium, niobium thermionic converter are presented. The planar converter has a guard-ringed collector and a nominal fixed spacing of 0.25 mm (10 mils). The data were obtained by using a computerized acquisition system and are available on request to one of the authors on microfiche as individual and composite parametric current, voltage curves. The parameters are the temperatures of the emitter T sub E collector T sub C, and cesium reservoir T sub R. The composite plots have constant T sub E and varying T sub C or T sub R, or both. Current, voltage envelopes having constant T sub E with and without fixed T sub C appear in the present report. The diode was tested at increments between 1600 and 2000 K for the emitter Hohlraum, 800 to 1100 K for the collector, and 540 and 650 K for the reservoir. A total of 312 current, voltage curves were obtained in the present performance evaluation. Current, voltage envelopes from three rhenium emitter converters evaluated in the present program are also given. The data are compared at commom emitter Hohlraum temperatures.

Manista, E. J.↗

A data base processor semantics specification package

A Semantics Specification Package (DBPSSP) for the Intel Data Base Processor (DBP) is defined. DBPSSP serves as a collection of cross assembly tools that allow the analyst to assemble request blocks on the host computer for passage to the DBP. The assembly tools discussed in this report may be effectively used in conjunction with a DBP compatible data communications protocol to form a query processor, precompiler, or file management system for the database processor. The source modules representing the components of DBPSSP are fully commented and included.

Fishwick, P. A.↗

Advanced Rotordynamic Nonlinear Transient Simulation

Advanced rotordynamic nonlinear transient-simulation program, TRANSIM, developed to predict response of high-performance rotating machinery to variety of forcing functions. Works by modal superposition of rotor and casing subsystems. Transient response of system calculated by numerical integration of equations of motion, performed in modal coordinates. Resulting data transformed back into physical coordinates as required to determine user-requested loads and accelerations as function of time. Used to analyze Space Shuttle main engine high-pressure fuel turbopump. TRANSIM written in FORTRAN 77.

Becht, D. G.↗

Creating a Fully-Electronic GFE Work Authorization Document Process for JSC

JSC’s Electronic Document System (EDS) was published in 2013 by SMA to store and process Task Performance Sheets (TPS), Discrepancy Reports (DR), Hardware Movement Documents (EZT), etc. The 2013 transition turned a fully paper process into an electronic routing one with document level electronic approvals but maintained an in-line paper process . - Today, all work and buy-offs continue to be captured on paper, walked between buildings, and is susceptible to approval errors, a rapidly slowing processing time, and led to projects requesting waivers to use alternate WAD systems, damaging JSC’s QMS. - NT Data Systems team collaborated with multiple platform providers, test user groups, and stakeholders, to find a solution for this growing need in a way that exceeds JSC’s current process, is adaptable to future innovation, and within our limited resource constraints

Nicholas Holaday↗

Electronic Departure Approval Requests in ATD-2 Daily Operations

The NASA Air Traffic Management Demonstration 2 project is investigating Integrated Arrival-Departure-Surface (IADS) air traffic management through progressive refinement of a surface air traffic management system fielded at Charlotte-Douglas International Airport. Among the IADS areas under study are departure release-time approval request (APREQ) traffic management initiatives. This paper presents a review of APREQ operations and compliance data from daily electronic APREQ negotiations. It describes APREQ-compliance improvements observed as the ATD-2 electronic negotiation process has matured and discusses contributing factors.

call for release↗

The Johnson Space Center Management Information Systems (JSCMIS): An interface for organizational databases

The Management Information and Decision Support Environment (MIDSE) is a research activity to build and test a prototype of a generic human interface on the Johnson Space Center (JSC) Information Network (CIN). The existing interfaces were developed specifically to support operations rather than the type of data which management could use. The diversity of the many interfaces and their relative difficulty discouraged occasional users from attempting to use them for their purposes. The MIDSE activity approached this problem by designing and building an interface to one JSC data base - the personnel statistics tables of the NASA Personnel and Payroll System (NPPS). The interface was designed against the following requirements: generic (use with any relational NOMAD data base); easy to learn (intuitive operations for new users); easy to use (efficient operations for experienced users); self-documenting (help facility which informs users about the data base structure as well as the operation of the interface); and low maintenance (easy configuration to new applications). A prototype interface entitled the JSC Management Information Systems (JSCMIS) was produced. It resides on CIN/PROFS and is available to JSC management who request it. The interface has passed management review and is ready for early use. Three kinds of data are now available: personnel statistics, personnel register, and plan/actual cost.

Bishop, Peter C.↗

Graphical Visualization of Human Exploration Capabilities

NASA's pioneering space strategy will require advanced capabilities to expand the boundaries of human exploration on the Journey to Mars (J2M). The Evolvable Mars Campaign (EMC) architecture serves as a framework to identify critical capabilities that need to be developed and tested in order to enable a range of human exploration destinations and missions. Agency-wide System Maturation Teams (SMT) are responsible for the maturation of these critical exploration capabilities and help formulate, guide and resolve performance gaps associated with the EMC-identified capabilities. Systems Capability Organization Reporting Engine boards (SCOREboards) were developed to integrate the SMT data sets into cohesive human exploration capability stories that can be used to promote dialog and communicate NASA's exploration investments. Each SCOREboard provides a graphical visualization of SMT capability development needs that enable exploration missions, and presents a comprehensive overview of data that outlines a roadmap of system maturation needs critical for the J2M. SCOREboards are generated by a computer program that extracts data from a main repository, sorts the data based on a tiered data reduction structure, and then plots the data according to specified user inputs. The ability to sort and plot varying data categories provides the flexibility to present specific SCOREboard capability roadmaps based on customer requests. This paper presents the development of the SCOREboard computer program and shows multiple complementary, yet different datasets through a unified format designed to facilitate comparison between datasets. Example SCOREboard capability roadmaps are presented followed by a discussion of how the roadmaps are used to: 1) communicate capability developments and readiness of systems for future missions, and 2) influence the definition of NASA's human exploration investment portfolio through capability-driven processes. The paper concludes with a description of planned future work to modify the computer program to include additional data and of alternate capability roadmap formats currently under consideration.

Rodgers, Erica M.↗

Measurements of Atmospheric Turbulence on Seattle-Alaska Airways

For about the past year, American Airlines has been engaged in obtaining data on various uses of airborne radar under routine operating conditions. This work is under contract to the Navy Department, Bureau of Ships, and includes the investigation of radar as a navigational aid and terrain collision warning device and its use in icing and turbulence detection. In view of the work of the National Advisory Committee for Aeronautics on atmospheric turbulence, the NACA was requested to participate in the tests to the extent of obtaining and evaluating the turbulence data for use in the turbulence-detection phase of the work. Gust measurements and airborne radar observations were consequently obtained in February and March 1947 during routine flights of an American Airlines airplane on the Seattle-Alaska airways. Unfortunately, the weather conditions encountered during the flights gave no well-defined radar echoes and no comparison between radar indications end turbulence could be made. The gust data for the route, however, are of interest from an operational standpoint, and are presented herein for the information of the Navy Department in accordance with previous arrangements.

Funk, Jack↗

Queued Up: 2025 Edition – Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2024 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with interconnection.fyi, Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 49 non-ISO balancing areas), which collectively represent ~97% of currently installed U.S. electric generating capacity. The dataset includes requests submitted to queues through the end of 2024, and only includes requests seeking to connect to the transmission grid (not distribution-connected or behind-the-meter projects). The files below include both a PDF report and an Excel data file. The PDF report analyzes interconnection data and metrics through the end of 2024. The Excel data file includes (a) the full project-level interconnection queue dataset through 2024, (b) a codebook (data dictionary) describing each data field, and (c) 35 additional tabs featuring tables summarizing a range of interconnection metrics. Key highlights from the Queued Up: 2025 Edition (featuring data through 2024) include: • As of the end of 2024, there were ~10,300 projects actively seeking grid interconnection in the U.S., representing 1,400 GW of generation and approximately 890 GW of storage. • Historic withdrawal rates alongside relatively fewer new requests resulted in a 12% decrease in total active queue volume compared to the prior year. • Active natural gas capacity (136 GW, +72% year-over-year) increased in 2024, while solar (956 GW, -12%), storage (890 GW, -13%), and wind (271 GW, -26%) capacity decreased. • 408 GW of capacity already has a draft or executed interconnection agreement (IA) but has not yet reached commercial operations. • The time projects spend in queues before reaching COD is increasing. For the regions with available data, the median duration from IR to COD has doubled from <2 years for projects built in 2000-2007 to over 4 years for those built in 2018-2024. • Ultimately, most of this proposed capacity will not be built. Only 13% of capacity that submitted interconnection requests from 2000-2019 had reached commercial operations by the end of 2024; 77% of that capacity had been withdrawn and 10% was still active. • FERC Order 2023 and various other reforms are being implemented. These are important measures to reduce interconnection bottlenecks and enhance grid system reliability, but it is too early to measure and assess their full impact. • New additions for the 2025 edition include: (a) additional detail on data processing and gaps; (b) updates on interconnection reforms; (c) new analysis on interconnection agreements, and more.

24 POWER TRANSMISSION AND DISTRIBUTION↗