Search NASA⌕ Search

SEARCH · Search NASA

Results for “orbital operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Robotic Refueling Mission 3: Cryogenic Demonstration Subsystem Operations

The Robotic Refueling Mission 3 (RRM3) payload was installed on the International Space Station (ISS) in December 2018. Its Cryogenic Demonstation Subsystem (CDS) was loaded with 19 kilograms of liquid methane, for demonstration of on-orbit storage and transfer. We provide a short description of the design and ground testing of the CDS, and then discuss the on-orbit operations through the first half of 2019.

Cryogenic Fluid Storage↗

Modification of an impulse-factoring orbital transfer technique to account for orbit determination and maneuver execution errors

A method has previously been developed to satisfy terminal rendezvous and intermediate timing constraints for planetary missions involving orbital operations. The method uses impulse factoring in which a two-impulse transfer is divided into three or four impulses which add one or two intermediate orbits. The periods of the intermediate orbits and the number of revolutions in each orbit are varied to satisfy timing constraints. Techniques are developed to retarget the orbital transfer in the presence of orbit-determination and maneuver-execution errors. Sample results indicate that the nominal transfer can be retargeted with little change in either the magnitude (Delta V) or location of the individual impulses. Additonally, the total Delta V required for the retargeted transfer is little different from that required for the nominal transfer. A digital computer program developed to implement the techniques is described.

Kibler, J. F.↗

The 25 kW power module evolution study. Part 3: Conceptual designs for power module evolution. Volume 2: Program plans

A plan is presented for the evolutionary development and deployment of the power module system with performance capabilities required to support the 1983 to 1990 user requirements. Aspects summarized include program functional, operational, and hardware elements; program work breakdown and specification items; development plans and schedules for developmental and technology milestones; test concepts and timeliness; and ground and orbit operations concepts.

Source record↗

Satellite services system analysis study. Volume 1: Executive summary

Service requirements are considered. Topics include development of on-orbit operations scenarios, service equipment summary, crew interaction, and satellite features facilitating servicing. Service equipment concepts are considered. Topics include payload deployment, close proximity retrieval, on-orbit servicing, backup/contingency, delivery/retrieval of high energy payloads, Earth return, optional service, and advanced capabilities. Program requirements are assessed.

Source record↗

GD SDR Automatic Gain Control Characterization Testing

The General Dynamics (GD) S-Band software defined radio (SDR) in the Space Communications and Navigation (SCAN) Testbed on the International Space Station (ISS) will provide experimenters an opportunity to develop and demonstrate experimental waveforms in space. The GD SDR platform and initial waveform were characterized on the ground before launch and the data will be compared to the data that will be collected during on-orbit operations. A desired function of the SDR is to estimate the received signal to noise ratio (SNR), which would enable experimenters to better determine on-orbit link conditions. The GD SDR does not have an SNR estimator, but it does have an analog and a digital automatic gain control (AGC). The AGCs can be used to estimate the SDR input power which can be converted into a SNR. Tests were conducted to characterize the AGC response to changes in SDR input power and temperature. This purpose of this paper is to describe the tests that were conducted, discuss the results showi ng how the AGCs relate to the SDR input power, and provide recommendations for AGC testing and characterization.

Nappier, Jennifer M.↗

GD SDR Automatic Gain Control Characterization Testing

The General Dynamics (GD) S-Band software defined radio (SDR) in the Space Communications and Navigation (SCAN) Testbed on the International Space Station (ISS) will provide experimenters an opportunity to develop and demonstrate experimental waveforms in space. The GD SDR platform and initial waveform were characterized on the ground before launch and the data will be compared to the data that will be collected during on-orbit operations. A desired function of the SDR is to estimate the received signal to noise ratio (SNR), which would enable experimenters to better determine on-orbit link conditions. The GD SDR does not have an SNR estimator, but it does have an analog and a digital automatic gain control (AGC). The AGCs can be used to estimate the SDR input power which can be converted into a SNR. Tests were conducted to characterize the AGC response to changes in SDR input power and temperature. This purpose of this paper is to describe the tests that were conducted, discuss the results showing how the AGCs relate to the SDR input power, and provide recommendations for AGC testing and characterization.

Nappier, Jennifer M.↗

Applying real-time operations to integrate and evaluate Space Station Freedom design

During its 30 year lifetime, Space Station Freedom will provide unique opportunities for a variety of research, commercial and space exploration activities. The diversity of Freedom's on-orbit operations and the partitioning of the spacecraft's flight elements and systems requires consideration of operations early in the design development. This paper presents a method for defining a structured relationship between Space Station Freedom real-time operations and system functionality, and discusses how this relationship can be used when evaluating the spacecraft design.

Schmidt, George↗

Uncertainty Modeling for Structural Control Analysis and Synthesis

The development of an accurate model of uncertainties for the control of structures that undergo a change in operational environment, based solely on modeling and experimentation in the original environment is studied. The application used throughout this work is the development of an on-orbit uncertainty model based on ground modeling and experimentation. A ground based uncertainty model consisting of mean errors and bounds on critical structural parameters is developed. The uncertainty model is created using multiple data sets to observe all relevant uncertainties in the system. The Discrete Extended Kalman Filter is used as an identification/parameter estimation method for each data set, in addition to providing a covariance matrix which aids in the development of the uncertainty model. Once ground based modal uncertainties have been developed, they are localized to specific degrees of freedom in the form of mass and stiffness uncertainties. Two techniques are presented: a matrix method which develops the mass and stiffness uncertainties in a mathematical manner; and a sensitivity method which assumes a form for the mass and stiffness uncertainties in macroelements and scaling factors. This form allows the derivation of mass and stiffness uncertainties in a more physical manner. The mass and stiffness uncertainties of the ground based system are then mapped onto the on-orbit system, and projected to create an analogous on-orbit uncertainty model in the form of mean errors and bounds on critical parameters. The Middeck Active Control Experiment is introduced as experimental verification for the localization and projection methods developed. In addition, closed loop results from on-orbit operations of the experiment verify the use of the uncertainty model for control analysis and synthesis in space.

Campbell, Mark E.↗

An evaluation of interactive displays for trajectory planning and proximity operations

Rendezvous, docking, and other Space Station proximity operations will be routine in nature in years to come. However, the specific parameters describing each maneuver, such as initial range and position, will vary from mission to mission so a means for depicting and interacting with graphic representations of proposed mission plans is necessary. Orbital operations are inherently non-intuitive due to non-linearities in the equations of motion of orbiting vehicles. Consequently, relative motion between two spacecraft cannot always be easily visualized. For these reasons, real time interactive visual aids and planning tools will be helpful, if not necessary, for future missions both in pre-flight training and on-orbit. Two such displays, Navie and eivaN, are currently available for examination and human factors testing. Since the docking tasks were fundamentally different with each device and because Navie imposed more constraints on the users than eivaN did, the orbital mechanics effects had a more pronounced effect on the Navie results.

Brody, Adam R.↗

PI Microgravity Services Role for International Space Station Operations

During the ISS era, the NASA Lewis Research Center's Principal Investigator Microgravity Services (PIMS) project will provide to principal investigators (PIs) microgravity environment information and characterization of the accelerations to which their experiments were exposed during on orbit operations. PIMS supports PIs by providing them with microgravity environment information for experiment vehicles, carriers, and locations within the vehicle. This is done to assist the PI with their effort to evaluate the effect of acceleration on their experiments. Furthermore, PIMS responsibilities are to support the investigators in the area of acceleration data analysis and interpretation, and provide the Microgravity science community with a microgravity environment characterization of selected experiment carriers and vehicles. Also, PIMS provides expertise in the areas of microgravity experiment requirements, vibration isolation, and the implementation of requirements for different spacecraft to the microgravity community and other NASA programs.

DeLombard, Richard↗

Assessing Terra Disposal Orbit Candidates from an Orbital Debris Perspective

The NASA Terra satellite is reaching the end of its mission life. Because the satellite resides in the 705 km Earth Science Constellation, disposal strategies need to be considered to remove it from this densely populated operational orbit. Of critical importance was the need to examine the future potential risk to other satellite residents of the 705 km constellation due to an unexpected breakup event of the Terra satellite post-disposal. This study quantifies the comparative risk of debris impacts associated with the two leading candidate disposal orbits (701 km vs. 686 km) and characterizes the suitability of each orbit for the purpose of long-term spacecraft disposal. The increase in collision risk to any member of the 705 km Earth Science Constellation is very modest. The long-term, average, total risk (including the ambient background risk) due to a Terra breakup at a disposal of -19 km (i.e., 686 km) relative to the 705 km constellation is 9.7 × 10(exp -6) impacts/day versus 1.0 × 10(exp -5) impacts/day for a disposal of only -4 km (i.e., 701 km). For perspective, note that the nominal space background risk to the 705 km constellation is 9.2 × 10(exp -6) impacts/day which implies a very modest increase in risk (approximately 3% difference between the two cases) due to a Terra breakup in either disposal orbit.

Abraham, Andrew J.↗

800 Hours of Operational Experience from a 2 kW(sub e) Solar Dynamic System

From December 1994 to September 1998, testing with a 2 kW(sub e) Solar Dynamic power system resulted in 33 individual tests, 886 hours of solar heating, and 783 hours of power generation. Power generation ranged from 400 watts to over 2 kW(sub e), and SD system efficiencies have been measured up to 17 per cent, during simulated low-Earth orbit operation. Further, the turbo-alternator-compressors successfully completed 100 start/stops on foil bearings. Operation was conducted in a large thermal/vacuum facility with a simulated Sun at the NASA Lewis Research Center. The Solar Dynamic system featured a closed Brayton conversion unit integrated with a solar heat receiver, which included thermal energy storage for continuous power output through a typical low-Earth orbit. Two power conversion units and three alternator configurations were used during testing. This paper will review the test program, provide operational and performance data, and review a number of technology issues.

Shaltens, Richard K.↗

Orbital Express Mission Operations Planning and Resource Management using ASPEN

The Orbital Express satellite servicing demonstrator program is a DARPA program aimed at developing "a safe and cost-effective approach to autonomously service satellites in orbit". The system consists of: a) the Autonomous Space Transport Robotic Operations (ASTRO) vehicle, under development by Boeing Integrated Defense Systems, and b) a prototype modular next-generation serviceable satellite, NEXTSat, being developed by Ball Aerospace. Flexibility of ASPEN: a) Accommodate changes to procedures; b) Accommodate changes to daily losses and gains; c) Responsive re-planning; and d) Critical to success of mission planning Auto-Generation of activity models: a) Created plans quickly; b) Repetition/Re-use of models each day; and c) Guarantees the AML syntax. One SRP per day vs. Tactical team

automated planning scheduling↗

Deep reconditioning of batteries during DSCS 3 flight operations

Deep reconditioning of batteries is defined as discharge below the 1.0 volt/cell level to a value of about 1.0 volt/battery. This type of reconditioning was investigated for use on the Defense Satellite Communications System (DSCS) spacecraft, and has been used during the first year of orbital operation. Prior to launch of the spacecraft, the deep reconditioning was used during the battery life test, which has now complete fourteen eclipse periods. Reconditioning was performed prior to each eclipse period of the life test, and is scheduled to be used prior to each eclipse period in orbit. The battery data for discharge and recharge is presented for one of the life test reconditioning cycles, and for each of the three batteries during the reconditioning cycles between eclipse period no.1 and eclipse period no.2 in Earth orbit.

Thierfelder, H. E.↗

OAST Space Theme Workshop. Volume 2: Theme summary. 5: Global service (no. 11). A. Statement. B. 26 April 1976 presentation. C. Summary

The benefits to be obtained from cost-effective global observation of the earth, its environment, and its natural and man-made features are examined using typical spacecraft and missions which could enhance the benefits of space operations. The technology needs and areas of interest include: (1) a ten-fold increase in the dimensions of deployable and erectable structures to provide booms, antennas, and platforms for global sensor systems; (2) control and stabilization systems capable of pointing accuracies of 1 arc second or less to locate targets of interest and maintain platform or sensor orientation during operations; (3) a factor of five improvements in spacecraft power capacity to support payloads and supporting electronics; (4) auxiliary propulsion systems capable of 5 to 10 years on orbit operation; (5) multipurpose sensors; and (6) end-to-end data management and an information system configured to accept new components or concepts as they develop.

Source record↗

Orbital Propagation of Momentum Exchange Tether Systems

An advanced concept in in-space transportation currently being studied is the Momentum-Exchange/Electrodynamic Reboost Tether System (MXER). The system acts as a large momentum wheel, imparting a Av to a payload in low earth orbit (LEO) at the expense of its own orbital energy. After throwing a payload, the system reboosts itself using an electrodynamic tether to push against Earth's magnetic field and brings itself back up to an operational orbit to prepare for the next payload. The ability to reboost itself allows for continued reuse of the system without the expenditure of propellants. Considering the cost of lifting propellant from the ,ground to LEO to do the same Av boost at $10000 per pound, the system cuts the launch cost of the payload dramatically, and subsequently, the MXER system pays for itself after a small number of missions.1 One of the technical hurdles to be overcome with the MXER concept is the rendezvous maneuver. The rendezvous window for the capture of the payload is on the order of a few seconds, as opposed to traditional docking maneuvers, which can take as long ets necessary to complete a precise docking. The payload, therefore, must be able to match its orbit to meet up with the capture device on the end of the tether at a specific time and location in the future. In order to be able to determine that location, the MXER system must be numerically propagated forward in time to predict where the capture device will be at that instant. It should be kept in mind that the propagation computation must be done faster than real-time. This study focuses on the efforts to find and/or build the tools necessary to numerically propagate the motion of the MXER system as accurately as possible.

John Westerhoff↗

Graduate Student Researchers Program (GSRP)

An advanced concept in in-space transportation currently being studied is the Momentum-Exchange/Electrodynamic Reboost Tether System (MXER). The MXER system is a permanently orbiting platform designed to boost payloads from low earth orbit (LEO). Unlike conventional rockets that use propellants, MXER acts as a large momentum wheel, imparting a Av to a payload at the expense of its own orbital energy. After throwing a payload, the system reboosts itself using an electrodynamic tether to push against Earth s magnetic field and brings itself back up to an operational orbit to prepare for the next payload. The ability to reboost itself allows for continued reuse of the system without the expenditure of propellants. Considering the cost of lifting propellant from the ground to LEO to do the same Av boost at $10000 per pound, the system cuts the launch cost of the payload dramatically, and subsequently, the MXER system pays for itself after a small number of missions. As such, this technology is a valuable addition to NASA s mission for in-space transportation.

Westerhoff, John↗

Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange

The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.

systems engineering↗