Search NASA⌕ Search

SEARCH · Search NASA

Results for “proton beam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 469 records · Page 26

Prospects for beyond the Standard Model physics searches at the Deep Underground Neutrino Experiment: DUNE Collaboration

Abstract The Deep Underground Neutrino Experiment (DUNE) will be a powerful tool for a variety of physics topics. The high-intensity proton beams provide a large neutrino flux, sampled by a near detector system consisting of a combination of capable precision detectors, and by the massive far detector system located deep underground. This configuration sets up DUNE as a machine for discovery, as it enables opportunities not only to perform precision neutrino measurements that may uncover deviations from the present three-flavor mixing paradigm, but also to discover new particles and unveil new interactions and symmetries beyond those predicted in the Standard Model (SM). Of the many potential beyond the Standard Model (BSM) topics DUNE will probe, this paper presents a selection of studies quantifying DUNE’s sensitivities to sterile neutrino mixing, heavy neutral leptons, non-standard interactions, CPT symmetry violation, Lorentz invariance violation, neutrino trident production, dark matter from both beam induced and cosmogenic sources, baryon number violation, and other new physics topics that complement those at high-energy colliders and significantly extend the present reach.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Shedding light on X17: community report

The workshop “Shedding light on X17” brings together scientists looking for the existence of a possible new light particle, often referred to as X17. This hypothetical particle can explain the resonant structure observed at ~ 17 MeV in the invariant mass of electron-positron pairs, produced after excitation of nuclei such as 8 Be and 4 He by means of proton beams at the Atomki Laboratory in Debrecen. The purpose of the workshop is to discuss implications of this anomaly, in particular theoretical interpretations as well as present and future experiments aiming at confirming the result and/or at providing experimental evidence for its interpretation.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

IsoDAR@Yemilab: Preliminary design report—volume I (cyclotron driver)

This Preliminary Design Report (PDR) describes the IsoDAR electron-antineutrino source in two volumes which are mostly site-independent and describe the cyclotron driver providing a 10 mA/60 MeV proton beam (this Volume); and the medium energy beam transport line (MEBT) and target (Volume II). The IsoDAR driver and target will produce about 1.15 x 10 23 electron-antineutrinos over 5 years while operating with the anticipated 10 mA/60 MeV beam at an estimated 80% duty factor. Paired with a kton-scale liquid scintillator detector, it will enable a broad particle physics program including searches for new symmetries, new interactions and new particles. Here in Volume I, we describe the driver, which includes the ion source, low energy beam transport, and cyclotron. The latter features Radio-Frequency Quadrupole (RFQ) direct axial injection and represents the first accelerator purpose-built to make use of so-called vortex motion.

Winklehner, Daniel (ORCID:0000000207156310)↗

Decay Dose Shielding Analysis with Hybrid Unstructured Mesh/Constructive Solid Geometry Monte Carlo Calculation and ADVANTG Acceleration

The Oak Ridge National Laboratory (ORNL) Second Target Station (STS) neutron production facility is an accelerator driven pulsed neutron source that is currently being actively developed at ORNL. The neutrons are produced by proton-induced spallation reactions. A proton beam of 700 kW power is delivered to a spallation target in short, less than 1 µs long pulses, with 15 Hz repetition rate. The spallation target of ORNL STS is a rotating water-cooled tungsten target with tantalum cladding housed in a stainless-steel shroud. It is divided into 21 segments. These segments become highly activated due to spallation reactions or nuclei transmutation by the emitted neutrons. The radioactive nuclides continue to decay after ceasing operation. The decay dose rates generated from the target segments once they are removed from their operational location within the core vessel must be accurately quantified to determine the shielding configurations of remote handling tools and transport casks and to aid in planning maintenance events. To determine the shielding configurations needed for an activated target segment after ceasing operation, both the hybrid unstructured mesh (UM)/constructive solid geometry (CSG) approach that was previously utilized for STS analyses [1] and the ADVANTG code [2] were used. Even though the ADVANTG code does not include UM capability, the utilization of its advanced variance reduction technique was crucial to accelerate the extremely difficult final photon transport calculation in this analysis. This paper also describes the procedures taken to mitigate the convergence issues that occur when ADVANTG uses a source definition that does not match the source of the final Monte Carlo (MC) calculation. These convergence issues often occur because of inconsistencies between source and transport biasing parameters.

Ibrahim, Ahmad↗

Expected performance of the FOOT experiment

The main objective of the FOOT (FragmentatiOn of Target) experimentis to measure the double differential cross-sections with respect to the kineticenergy and the angle of emission of fragments produced in nuclear interactions withan accuracy of 5%. Measurements will use the inverse kinematics approach to studythe interaction of heavy ions with proton-rich targets and will be performed in twoenergy regions, one up to 400 MeV/u, to assess the effects of nuclear fragmentationin hadrontherapy treatment with proton beams, and up to 700 MeV/u, to improvethe knowledge of the fragmentation of ions on nuclei to help with the design of spacevehicles shielding.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A data-driven method to constrain the $\bar{p}$ background in Mu2e

The Mu2e experiment will search for the charged lepton flavour violating process of neutrinoless coherent muon to electron conversion in the field of an Al nucleus. The expected signal is a 104.97 MeV/c electron. One of the expected backgrounds is due to ¯ps produced by the proton beam at the Production Target and annihilating in the Stopping Target (ST). The background from ¯p annihilation is not a dominant one, but it has a large uncertainty and it cannot be suppressed by the timing cuts used to reduce the prompt background. However at Mu2e energies, p¯p annihilation is the only source of events with multiple simultaneous tracks coming from the ST. We exploit this unique feature and reconstruct the multi-track events to estimate the ¯p background.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Evaluation of 186 WS 2 target material for production of high specific activity 186 Re via proton irradiation: separation, radiolabeling and recovery/recycling

Enriched tungsten disulfide ( 186 WS 2 ) was evaluated at increasing proton beam currents (20-50 µA) and times (up to 4 h) on a GE PETtrace cyclotron for production of high specific activity (HSA) 186 Re. The HSA 186 Re was separated from the irradiated target as [ 186 Re][ReO 4 ] - by a liquid-liquid extraction method and radiolabeled with a new N 2 S 2 ligand (222-MAMA-N-ethylpropionate). The enriched 186 W was recovered from the extraction process, analyzed for purity and enrichment, and converted back to the disulfide ( 186 WS 2 ). The results demonstrate that the 186 WS 2 is an easily pressed target material that can withstand relatively high currents and can be readily recovered and recycled. The 186 Re produced was isolated in high specific activity and readily formed the radiotracers [ 186 Re][ReO(222-MAMA-N ethylpropionate)] and [ 186 Re][Re(CO) 3 (OH 2 ) 3 ] + .

186Re,N2S2 ligand↗

A high-temperature Rutherford Backscattering Spectrometry apparatus for in situ material characterization

A new methodology for high-temperature Rutherford Backscattering Spectrometry (HT-RBS) has been developed to enable in situ material characterization at elevated temperatures. A 3.5 MeV proton beam penetrates a 10-µm-thick 316L stainless steel foil mounted on a graphite substrate, with backscattered signals detected using an HT-RBS system. Conventional semiconductor detectors, primarily based on silicon, suffer significant performance degradation at temperatures higher than ~ 60 °C due to increased leakage current and noise, leading to signal distortion and failure. Here, to preserve spectral quality, a 5 µm aluminum foil shields the detector from thermal radiation, allowing reliable operation up to 900 °C at the target. A rotatable shutter provides additional thermal isolation during data collection pauses. In situ measurements of areal density changes of 316L stainless steel were conducted to validate the technique, revealing consistency with the known thermal expansion coefficient. The method facilitates seamless switching between irradiation and analysis, enabling continuous studies. This approach supports in situ investigations of diffusion, void swelling, creep, and corrosion, offering a versatile tool for advanced materials research.

36 MATERIALS SCIENCE↗

Evolution of the high-power spallation neutron mercury target at the SNS

The Spallation Neutron Source (SNS) began operation in 2006 and first operated at its full 1.4 MW power in 2013. Targets, which receive the pulsed proton beam, were a limiting factor for reliable full power operation for several years. Reaching reliable target operation at 1.4 MW required not only changes to the target design but also support and coordination across the entire SNS enterprise. The history and some key lessons learned are presented.

Winder, Drew E↗

Proposal for a proton-bunch compression experiment at IOTA in the strong space-charge regime

The longitudinal compression of intense proton bunches with strong space-charge force is an essential component of a proton-based muon source for a muon collider. This paper discusses a proton-bunch compression experiment at the Integrable Optics Test Accelerator (IOTA) storage ring at Fermilab to explore optimal radio frequency (RF) cavity and lattice configurations. IOTA is a compact fixed-energy storage ring that can circulate a 2.5-MeV proton beam with varying beam parameters and lattice configurations. The study will aim to demonstrate a bunch-compression factor of at least 2 in the IOTA ring while examining the impact of intense space-charge effects on the compression process.

43 PARTICLE ACCELERATORS↗

Flattening the field during injection in the Fermilab booster using dipole corrector magnets

The FNAL Booster is a fast cycling 15 Hz resonant circuit synchrotron accelerating proton beam from 400 MeV to 8 GeV. The linac pulse injected into the Booster is ~32 μsec long and fills the ring by multi-turn charge-exchange injection. As part of the PIP-II project, the Booster injection energy and repetition rate will be increased to 800 MeV and 20 Hz respectively. Due to much reduced average current in the new superconducting PIP-II linac, the injection time will increase to 550 μs. A shorter machine cycle coupled to a longer injection time make flattening the injection porch B-field during injection important requirement for successful PIP-II operation. We aim to achieve: (1) flattening of the net bending during injection using dipole correctors, and (2) using a new system based on an Altera FPGA board, reduction of the cycle-to-cycle bending field variation caused by current jitter in the Gradient Magnet Power Supply (GMPS). While the flat injection scheme is essential to future PIP-II operations, it should also noticeably improve efficiency for present HEP operations.

43 PARTICLE ACCELERATORS↗

Progress towards the completion of the proton power upgrade project

The Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.

43 PARTICLE ACCELERATORS↗

Cavity Qualification and Production Update for SNS-PPU Cryomodules at Jefferson Lab

The Proton Power Upgrade (PPU) project at Oak Ridge National Lab’s Spallation Neutron Source (SNS) currently being constructed will double the proton beam power capability from 1.4 to 2.8 MW by adding seven cryomodules, each containing four six-cell high-beta (β = 0.81) superconducting radio frequency cavities. Research Instruments, located in Germany, built and processed the cavities at the vendor site, including electropolishing as the final active chemistry step. Twenty-eight cavities for seven cryomodules and an additional four cavities for a spare cryomodules were delivered to Jefferson Lab and first qualification tests were completed on all cavities as received from the vendor. The performance largely exceeded the requirements on quality factor and accelerating gradient. Here we present the status of initial cavity qualification tests, rework on unqualified cavities and final cavity qualification with helium vessel prior to installation in cryomodules. In addition, an update on cryomodule production is presented.

Dhakal, P.↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Design Considerations and Operational Features of the Collimators for the Fermilab Main Injector and Recycler

The Fermilab Main Injector system delivers 700 kW of 120 GeV Proton beam for neutrino experiments. Since 2013 this has been achieved using slip stacking accumulation in the Recycler with up to 12 batches from the Fermilab Booster per Main Injector Ramp Cycle. To control activation from beam loss, collimation systems in the Booster to Recycler transfer line, in the Recycler and in the Main Injector are employed. Residual radiation measurements around the ring with detailed studies at the collimators are required to maintain adequate loss control. We will review design considerations, operational parameters and activation results for more than ten years of operation. Simulations with MARS15 are used to explore the activation rates and the isotopic composition of the resulting activation.

43 PARTICLE ACCELERATORS↗

Residual Dose and Environmental Monitoring for the Fermilab Main Injector Tunnel Using the Data Acquisition Logging Engine (Dale)

The Recycler and the Main Injector are part of the Fermilab Accelerator complex used to deliver proton beam to the different experiments. It is very important to control and minimize losses in both machines during operation, to reduce personnel dose from residual activation and to preserve component lifetime. To minimize losses, we need to identify the loss points and adjust the components accordingly. The Data Acquisition Loss Engine (DALE) platform has been developed within the Main Injector department and upgraded throughout the years. DALE is used to survey the entire enclosure for residual dose rates and environmental readings when unrestricted access to the enclosure is possible. Currently DALE has two radiation meters, which are aligned along each machine, so loss points can be identified for both at the same time. DALE attaches to the enclosure carts and is continuously in motion monitoring dose rates and other environmental readings. In this paper we will describe how DALE is used to provide radiation maps of the residual dose rates in the enclosure. We will also compare the loss points with the Beam Loss monitor data.

43 PARTICLE ACCELERATORS↗

The Effect of the Main Injector Ramp on the Recycler

The Recycler and Main Injector are part of the Fermilab Accelerator complex used to deliver a high power proton beam. Both machines share the same enclosure with the Recycler mounted 6 ft above the Main Injector. The Main Injector accelerates beam from 8 GeV to 120 GeV. While the majority of the Recycler has mu metal shielding, the effect of the Main Injector ramp is still significant and can affect both the tunes and the orbit. In this paper, we detail the size of these effects.

43 PARTICLE ACCELERATORS↗

Second Generation Fermilab Main Injector 8 GeV Beamline Collimation Preliminary Design

The current Fermilab Main Injector 8 GeV beamline transverse collimation system was installed in 2006. Since then, proton beam intensities and rates have increased significantly. With the promise of even greater beam intensities and a faster repetition rate when the PIP-II upgrade completes later this decade, the current collimation system will be insufficient. Over the past 18 months, multiple collimation designs have been investigated, some more traditional and others novel. A preliminary design review was conducted and a design chosen. Work is underway to finalize the chosen design, prototype some of its novel components and procure parts for installation Summer 2023.

43 PARTICLE ACCELERATORS↗