Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONSOLES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

483 records · Page 27

Total number of longwall faces drops below 50

For the first time since Coal Age began its annual Longwall Census the number of faces has dropped below 50. A total of five mines operate two longwall faces. CONSOL Energy remains the leader with 12 faces. Arch Coal operates five longwall mines; Robert E. Murray owns five longwall mines. West Virginia has 13 longwalls, followed by Pennsylvania (8), Utah (6) and Alabama (6). A detailed table gives for each longwall installation, the ownership, seam height, cutting height, panel width and length, overburden, number of gate entries, depth of cut, model of equipment used (shearer, haulage system, roof support, face conveyor, stage loader, crusher, electrical controls and voltage to face). 2 tabs., 1 photo.

01 COAL, LIGNITE, AND PEAT↗

Telerobotic Control of Dexterous Dual-Arm Robots for D and D Operations - 18622

Robotic systems hold the potential to significantly reduce exposure of workers to hazardous environments such as in the deactivation and decommissioning (D and D) of nuclear facilities. Our goal is to enable an operator with minimal training to easily control a remote dual-arm robot to perform demolition tasks with hand tools. We propose a system that combines semi-autonomous coordination of the robot's arms with an intuitive operator interface based on virtual reality (VR) technology. A limb coordination system enables independent control of the robot arms, as well as coupled motion required to hold and manipulate rigid bodies such as reciprocating saws, angle grinders and crow bars. Using a VR head mounted display and stereo video from the robot for situational awareness and tracked VR hand controllers to command robot arm movement, an operator will be able to walk up to the control console, pick up the controllers, engage the manipulators, fly the grippers, grasp a tool with one or both robot arms and easily move them in unison to perform tasks. We present preliminary results using simulation and a physical dual-arm platform based on the Johns Hopkins University Applied Physics Laboratory's Modular Prosthetic Limb, an anthropomorphic device that provides hyper-dexterous human-like manipulation capabilities. Anticipated benefits of the robotic system for D and D operations include improved situational awareness, increased mission complexity, and reduced operator training time, workload, and task execution times. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advancing \textit{otsdaq}: Enhancements for Usability, Accuracy, and Robustness

High-energy physics (HEP) experiments require data acquisition (DAQ) systems that can orchestrate complex detector operations, high data throughput, and responsive, real-time feedback to operators. Traditional DAQ stacks, which are often bespoke, command-line driven and highly specific, impose large learning curves on users. The Off-The-Shelf Data Acquisition (\textit{otsdaq}) framework was created to address these issues by offering a highly customizable and scalable browser-based ’desktop’ environment, in which experiment-specific control and monitoring applications can be easily deployed and integrated. Although the initial development of the \textit{otsdaq} software was aimed at the Fermilab Test Beam Facility, \textit{otsdaq} is now being leveraged for broader deployment, including the upcoming Mu2e experiment, where real-time monitoring of field-programmable gate array (FPGA)-based Data Transfer Controllers (DTCs), Clock and Fanout (CFO) boards, and several other subsystems are critical. We contribute a set of targeted improvements to \textit{otsdaq}: bitmap visualization functionality for configured data, improved and corrected delta-based DTC throughput metrics, version control (VC)-backed source navigation for console messages, custom navigation hooks to eliminate disruptive user interface glitches, and copy-to-clipboard support for macro execution history. These changes improve usability, reduce debugging time, and increase accuracy in performance data as Mu2e moves toward commissioning.

Mohammed, A. [Unlisted, US]↗

Simulation of CO2 Sequestration and Enhanced Coalbed Methane Production in Multiple Appalachian Basin Coal Seams

A DOE-funded field injection of carbon dioxide is to be performed in an Appalachian Basin coal seam by CONSOL Energy and CNX Gas later this year. A preliminary analysis of the migration of CO2 within the Upper Freeport coal seam and the resulting ground movements has been performed on the basis of assumed material and geometric parameters. Preliminary results show that ground movements at the field site may be in a range that are measurable by tiltmeter technology.

01 COAL, LIGNITE, AND PEAT↗

Greenridge Multi-Pollutant Control Project Preliminary Public Design Report

The Greenidge Multi-Pollutant Control Project is being conducted as part of the U.S. Department of Energy's Power Plant Improvement Initiative to demonstrate an innovative combination of air pollution control technologies that can cost-effectively reduce emissions of SO{sub 2}, NO{sub x}, Hg, acid gases (SO{sub 3}, HCl, and HF), and particulate matter from smaller coal-fired electrical generating units (EGUs). The multi-pollutant control system includes a hybrid selective non-catalytic reduction (SNCR)/in-duct selective catalytic reduction (SCR) system to reduce NOx emissions by {ge}60%, followed by a Turbosorp{reg_sign} circulating fluidized bed dry scrubber system to reduce emissions of SO{sub 2}, SO{sub 3}, HCl, and HF by {ge}95%. Mercury removal of {ge}90% is also targeted via the co-benefits afforded by the in-duct SCR, dry scrubber, and baghouse and by injection of activated carbon upstream of the scrubber, as required. The technology is particularly well suited, because of its relatively low capital and maintenance costs and small space requirements, to meet the needs of coal-fired units with capacities of 50-300 MWe. There are about 440 such units in the United States that currently are not equipped with SCR, flue gas desulfurization (FGD), or mercury control systems. These smaller units are a valuable part of the nation's energy infrastructure, constituting about 60 GW of installed capacity. However, with the onset of the Clean Air Interstate Rule, Clean Air Mercury Rule, and various state environmental actions requiring deep reductions in emissions of SO{sub 2}, NO{sub x}, and mercury, the continued operation of these units increasingly depends upon the ability to identify viable air pollution control retrofit options for them. The large capital costs and sizable space requirements associated with conventional technologies such as SCR and wet FGD make these technologies unattractive for many smaller units. The Greenidge Project aims to confirm the commercial readiness of an emissions control system that is specifically designed to meet the environmental compliance requirements of these smaller coal-fired EGUs. The multi-pollutant control system is being installed and tested on the AES Greenidge Unit 4 (Boiler 6) by a team including CONSOL Energy Inc. as prime contractor, AES Greenidge LLC as host site owner, and Babcock Power Environmental Inc. as engineering, procurement, and construction contractor. All funding for the project is being provided by the U.S. Department of Energy, through its National Energy Technology Laboratory, and by AES Greenidge. AES Greenidge Unit 4 is a 107 MW{sub e} (net), 1950s vintage, tangentially-fired, reheat unit that is representative of many of the 440 smaller coal-fired units identified above. Following design and construction, the multi-pollutant control system will be demonstrated over an approximately 20-month period while the unit fires 2-4% sulfur eastern U.S. bituminous coal and co-fires up to 10% biomass. This Preliminary Public Design Report is the first in a series of two reports describing the design of the multi-pollutant control facility that is being demonstrated at AES Greenidge. Its purpose is to consolidate for public use all available nonproprietary design information on the Greenidge Multi-Pollutant Control Project. As such, the report includes a discussion of the process concept, design objectives, design considerations, and uncertainties associated with the multi-pollutant control system and also summarizes the design of major process components and balance of plant considerations for the AES Greenidge Unit 4 installation. The Final Public Design Report, the second report in the series, will update this Preliminary Public Design Report to reflect the final, as-built design of the facility and to incorporate data on capital costs and projected operating costs.

01 COAL, LIGNITE, AND PEAT↗

Correlating Log Messages for System Diagnostics

In large-scale computing systems, the sheer volume of log data generated presents daunting challenges for debugging and monitoring of these systems. The Oak Ridge Leadership Computing Facility s premier simulation platform, the Cray XT5 known as Jaguar, can generate a few hundred thousand log entries in less than a minute for many system level events. Determining the root cause of such system events requires analyzing and interpretation of a large number of log messages. Most often, the log messages are best understood when they are interpreted collectively rather than individually. In this paper, we present our approach to interpreting log messages by identifying their commonalities and grouping them into clusters. Given a set of log messages within a time interval, we group the messages based on source, target, and/or error type, and correlate the messages with hardware and application information. We monitor the Lustre log messages in the XT5 console log and show that such grouping of log messages assists in detecting the source of system events. By intelligent grouping and correlation of events in the log, we are able to provide system administrators with meaningful information in a concise format for root cause analysis.

97 MATHEMATICS AND COMPUTING↗

Roadrunner Supercomputer Breaks the Petaflop Barrier

At 3:30 a.m. on May 26, 2008, Memorial Day, the "Roadrunner" supercomputer exceeded a sustained speed of 1 petaflop/s, or 1 million billion calculations per second. The sustained performance makes Roadrunner more than twice as fast as the current number 1 system on the TOP500 list. The best sustained performance to date is 74.5% efficiency, 1.026 petaflop/s. "Petaflop/s" is computer jargon—peta signifying the number 1 followed by 15 zeros (sometimes called a quadrillion) and flop/s meaning "double-precision floating point operations per second." Los Alamos held the fastest supercomputer title in 1993 with the Thinking Machines CM-5, and inaugurated the supercomputer era, assisting in the development of the Cray-1 in 1976. The Laboratory and IBM go all the way back to the first card-programmable calculators, used at Los Alamos in 1949. Los Alamos also housed serial number 1 of the IBM 704 in 1956. The Roadrunner supercomputer, developed by IBM in partnership with the Laboratory and the National Nuclear Security Administration, uses commercially available hardware, including aspects of commercial game console and graphics technologies. Because of its off-the-shelf components, the computer costs significantly less than a one-of-a-kind machine. It also uses a Linux operating system. The secret to its record-breaking performance is a unique hybrid design. Each compute node in this cluster consists of two AMD OpteronTM dual-core processors plus four PowerXCell 8iTM processors used as computational accelerators. The accelerators used in Roadrunner are a special IBM-developed variant of the Cell processor used in the Sony PlayStation® 3. The node-attached Cell accelerators are what make Roadrunner different than typical clusters. The Lab and IBM have been working on Roadrunner since 2006, but collaboration on Cell dates back to 2002. The first phase of the project included delivery of an initial Opteron-only cluster that operates at a speed of 71 teraflop/s. This initial system has been in full production at Los Alamos for almost a year, and Laboratory researchers are using this machine for classified weapons applications. The full-scale Roadrunner machine operates more than 10 times faster than the current installed system. Phase 2 of the Roadrunner project was completed in October 2007. Two external assessments, one by NNSA headquarters and one by an independent team of high performance computing experts, evaluated the machine's potential use for Laboratory applications, the Laboratory's ability to successfully manage the computing system, IBM's ability to deliver the product, and whether computer programs could be adapted to the new system. Based on the positive outcome of the assessments, the Laboratory and NNSA decided to pursue the final phase of the Roadrunner project. The powerful cluster of nodes will process information enabling the Laboratory to use Roadrunner for advanced physics and predictive simulations of complex scientific processes. Weapons science applications that can be processed by Roadrunner are applicable to all three of the U.S. Department of Energy weapons laboratories. The machine will also be well equipped to tackle the intricacies of modeling processes, ranging from the biomolecular to the cosmological. In addition, Los Alamos intends to purchase additional Roadrunner resources to support open science and technology applications. The full-scale Roadrunner system, named in honor of New Mexico's speedy state bird, broke the performance record at IBM's Poughkeepsie, New York, facility. The full machine will be moved to Los Alamos beginning in July and housed in the Nicholas Metropolis Center for Modeling and Simulation. The first computing applications are expected to begin running on the machine in January 2009. The cost of all phases of the Roadrunner project is approximately $120 million. More than 200 Laboratory employees have been involved in this effort. For more information about Roadrunner at Los Alamos National Laboratory, see the Roadrunner website at http://www.lanl.gov/roadrunner.

CELL BASED PROCESSOR↗

Towards a new generation of solid total-energy detectors for neutron-capture time-of-flight experiments with intense neutron beams

Challenging neutron-capture cross-section measurements of small cross sections and samples with a very limited number of atoms require high-flux time-of-flight facilities. In turn, such facilities need innovative detection setups that are fast, have low sensitivity to neutrons, can quickly recover from the so-called γ-flash, and offer the highest possible detection sensitivity. In this paper, we present several steps towards such advanced systems. Specifically, we describe the performance of a high-sensitivity experimental setup at CERN n_TOF EAR2. It consists of nine sTED detector modules in a compact cylindrical configuration, two conventional used large-volume C 6 D 6 detectors, and one LaCl 3 (Ce) detector. The performance of these detection systems is compared using 93 Nb(n, γ) data. We also developed a detailed G EANT small4 Monte Carlo model of the experimental EAR2 setup, which allows for a better understanding of the detector features, including their efficiency determination. This Monte Carlo model has been used for further optimization, thus leading to a new conceptual design of a γ detector array, STAR, based on a deuterated-stilbene crystal array. Finally, the suitability of deuterated-stilbene crystals for the future STAR array is investigated experimentally utilizing a small stilbene-d12 prototype. The results suggest a similar or superior performance of STAR with respect to other setups based on liquid-scintillators, and allow for additional features such as neutron-gamma discrimination and a higher level of customization capability.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Catalyst Deactivation Modes of PdO/γ-Al 2 O 3 Catalysts for Lean Methane Oxidation

PdO/γ-Al 2 O 3 catalysts are one of the most active catalytic components for the complete oxidation of methane. Under reaction conditions, especially in a wet feed, the catalysts suffer severe performance degradation. This study establishes a series of testing protocols to systematically investigate the causes of catalyst deactivation under methane oxidation reaction conditions. Four distinct catalyst deactivation modes are identified. Two of the deactivation modes are directly related to H 2 O, either from the feed gas or as a part of the reaction products, with one (Mode 2) being attributed to the formation of surface hydroxyl groups and the other (Mode 3) to the competitive adsorption of H 2 O on the catalysts. The impact of the two deactivation modes is acute and severe but reversible. In contrast, the other two deactivation modes are gradual and persistent but irreversible. Both modes are induced by CH 4 oxidation reaction, with the impact of a wet feed (Mode 4) being substantially more severe than that of a dry feed (Mode 1). The major cause of the irreversible catalyst deactivation is attributed to surface reconstruction of PdO nanoparticles, which behaves as a passivation layer lowering the number of coordinately unsaturated Pd sites for CH 4 activation. Although the passivation layer is relatively stable against thermal or hydrothermal treatment, it is not completely inert. Formation and partial regeneration of the passivation layer is a highly dynamic process and heavily depends on the reaction temperature: a lower reaction temperature (≤ 450 ℃) can lead to quicker catalyst deactivation; but a higher reaction temperature (between 500 – 550 ℃) can result in a greater extent of catalyst deactivation.

PdO/γ-Al2O3↗

A Research Framework for Demonstrating Benefits of Advanced Control Room Technologies

Control Room modernization is an important part of life extension for the existing light water reactor fleet. None of the 99 currently operating commercial nuclear power plants in the U.S. has completed a full-scale control room modernization to date. A full-scale modernization might, for example, entail replacement of all analog panels with digital workstations. Such modernizations have been undertaken successfully in upgrades in Europe and Asia, but the U.S. has yet to undertake a control room upgrade of this magnitude. Instead, nuclear power plant main control rooms for the existing commercial reactor fleet remain significantly analog, with only limited digital modernizations. Previous research under the U.S. Department of Energy’s Light Water Reactor Sustainability Program has helped establish a systematic process for control room upgrades that support the transition to a hybrid control. While the guidance developed to date helps streamline the process of modernization and reduce costs and uncertainty associated with introducing digital control technologies into an existing control room, these upgrades do not achieve the full potential of newer technologies that might otherwise enhance plant and operator performance. The aim of the control room benefits research presented here is to identify previously overlooked benefits of modernization, identify candidate technologies that may facilitate such benefits, and demonstrate these technologies through human factors research. This report serves as an outline for planned research on the benefits of greater modernization in the main control rooms of nuclear power plants.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Design and Development of Functionally Effective Human-Machine Interfaces for Firing Room Displays

This project involves creating software for support equipment used on the Space Launch System (SLS). The goal is to create applications and displays that will be used to remotely operate equipment from the firing room and will continue to support the SLS launch vehicle to the extent of its program. These displays include design practices that help to convey information effectively, such as minimizing distractions at normal operating state and displaying intentional distractions during a warning or alarm state. The general practice for creating an operator display is to reduce the detail of unimportant aspects of the display and promote focus on data and dynamic information. These practices include using minimalist design, using muted tones for background colors, using a standard font at a readable text size, displaying alarms visible for immediate attention, grouping data logically, and displaying data appropriately varying on the type of data. Users of these displays are more likely to stay focused on operating for longer periods by using design practices that reduce eye strain and fatigue. Effective operator displays will improve safety by reducing human errors during operation, which will help prevent catastrophic accidents. This report entails the details of my work on developing remote displays for the Hypergolic fuel servicing system. Before developing a prototype display, the design and requirements of the system are outlined and compiled into a document. Then each subsystem has schematic representations drawn that meet the specifications detailed in the document. The schematics are then used as the outline to create display representations of each subsystem. Each display is first tested individually. Then the displays are integrated with a prototype of the master system, and they are tested in a simulated environment then retested in the real environment. Extensive testing is important to ensure the displays function reliably as intended.

displays↗

System Upgrades at the Advanced Test Reactor Help Ensure that Nuclear Energy Research Continues at the Idaho National Laboratory

Fully operational in 1967, the Advanced Test Reactor (ATR) is a first-of-its-kind materials test reactor. Located on the Idaho National Laboratory’s desert site, this reactor remains at the forefront of nuclear science, producing extremely high neutron irradiation in a relatively short time span. The Advanced Test Reactor is also the only U.S. reactor that can replicate multiple reactor environments concurrently. The Idaho National Laboratory and the Department of Energy recently invested over 13 million dollars to replace three of ATR’s instrumentation and control systems. The new systems offer the latest software and technology advancements, ensuring the availability of the reactor for future energy research. Engineers and project managers successfully completed the four year project in March while the ATR was in a scheduled maintenance outage. “These new systems represent state-of-the-art monitoring and annunciation capabilities,” said Don Feldman, ATR Station Manager. “They are comparable to systems currently used for advanced reactor designs planned for construction in the U.S. and in operation in some foreign countries.”

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

NBSR reactor control room upgrade - 215

The maintenance and modernization of the National Institute of Standards and Technology (NIST) Center for Neutron Research (NCNR) reactor, known as the NBSR, is an ongoing process to endure until the eventual decommissioning of the reactor. As part of the renovation effort, the reactor control system is to be upgraded. Following some initial outsourcing efforts, the NBSR reactor control system upgrade has been restructured to be implemented by in-house means. The beginning stage of the upgrade involved the development of a simulator environment based on a PC system and digitization of the majority of nuclear reactor monitoring data. The NBSR reactor surveillance data consists of approximately thirteen hundred input/output points, including analog/digital sensor signals, signal conditioners, and relay logic. The aim of the current phase is to implement a new reactor data acquisition and display system (RDS) and lay out the infrastructure for the upgrade of the reactor control system (RCS). Key design criteria are to implement a reliable, redundant, diverse, modular and candid system where any complex digital manipulations are taken outside of the control room. Basically, the data analytics and custom codes are separated from reactor operation control and decision making logic. Furthermore, the new RDS is designed such that it could be maintained internally by NCNR personnel. The RDS is unique in design and modularity, minimizing custom codes and testing, making it ideal for research reactors. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Neutron-Gamma flux and Dose calculations in a Pressurized Water Reactor (PWR)

The Institute of Radiological Protection and Nuclear Safety (IRSN) acts as technical support to the French nuclear safety authorities. In this context, one of its missions is to improve nuclear safety through the enhancement of knowledge regarding operating nuclear power reactors. The issues concerning the aging and the characterisation of the reactor vessel require knowledge of the neutron and gamma radiation environment on the vessel and beyond. Since few years, ENEA (Energia Nucleare e Energie Alternative, i.e. Nuclear Energy and Alternative Energy agency) and IRSN collaborate on Monte-Carlo simulations and Variance Reduction Techniques (VRT), which are used to determine neutron and gamma spectra in and out of the core. Additionally, IRSN participates in the DISCOMS project, which stands for 'Distributed Sensing for Corium Monitoring and Safety', aiming at examining the status of the third barrier of confinement, in order to define possible mitigation strategies in case of a severe accident, namely: i) reactor pressure vessel breakthrough and corium relocation outside the vessel, ii) reactor pit concrete erosion and iii) corium cooling. One of the IRSN tasks in the frame of the DISCOMS project is to provide the radiation level in terms of neutron and gamma doses and flux energy spectra at various locations. This paper summarizes the study performed on the radiation transport in the Tihange-I Belgian nuclear reactor and contributes to several issues requiring the knowledge of the radiation environment in and outside the reactor vessel. This paper gives an overview of the work presented at the ICRS-13 and RPSD-2016 conference (for more details see the proceedings paper)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗