Search NASA⌕ Search

SEARCH · Search NASA

Results for “Certificate Program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Use of COTS Batteries on ISS and Shuttle

This presentation focuses on COTS Battery testing for energy content, toxicity, hazards, failures modes and controls for different battery chemistries. It also discusses the current program requirements, challenges with COTS Batteries in manned vehicle COTS methodology, JSC test details, and gives a list of incidents from consumer protection safety commissions. The Battery test process involved testing new batteries for engineering certification, qualification of batteries, flight acceptance, cell and battery, environment, performance and abuse. Their conclusions and recommendations were that: high risk is undertaken with the use of COTS batteries, hazard control verification is required to allow the use of these batteries on manned space flights, failures during use cannot be understood if different scenarios of failure are not tested on the ground, and that testing is performed on small sample numbers due to restrictions on cost and time. They recommend testing of large sample size to gain more confidence in the operation of the hazard controls.

Jeevarajan, Judith A.↗

Thermal Testing of Woven TPS Materials in Extreme Entry Environments

NASAs future robotic missions to Venus and outer planets, namely, Saturn, Uranus, Neptune, result in extremely high entry conditions that exceed the capabilities of current mid density ablators (PICA or Avcoat). Therefore mission planners assume the use of a fully dense carbon phenolic heatshield similar to what was flown on Pioneer Venus and Galileo. Carbon phenolic (CP) is a robust TPS however its high density and thermal conductivity constrain mission planners to steep entries, high heat fluxes, high pressures and short entry durations, in order for CP to be feasible from a mass perspective. In 2012 the Game Changing Development Program in NASAs Space Technology Mission Directorate funded NASA ARC to investigate the feasibility of a Woven Thermal Protection System to meet the needs of NASAs most challenging entry missions. The high entry conditions pose certification challenges in existing ground based test facilities. Recent updates to NASAs IHF and AEDCs H3 high temperature arcjet test facilities enable higher heatflux (2000 Wcm2) and high pressure (5 atm) testing of TPS. Some recent thermal tests of woven TPS will be discussed in this paper. These upgrades have provided a way to test higher entry conditions of potential outer planet and Venus missions and provided a baseline against carbon phenolic material. The results of these tests have given preliminary insight to sample configuration and physical recession profile characteristics.

TPS↗

NASA Lunar and Meteorite Sample Disk Program

The Lunar and Meteorite Sample Disk Program is designed for K-12 classroom educators who work in K-12 schools, museums, libraries, or planetariums. Educators have to be certified to borrow the Lunar and Meteorite Sample Disks by attending a NASA Certification Workshop provided by a NASA Authorized Sample Disk Certifier.

Foxworth, Suzanne↗

Kennedy Space Center Coronary Heart Disease Risk Screening Program

The number one cause of death in the U.S. is coronary heart disease (CHD). It is probably a major cause of death and disability in the lives of employees at Kennedy Space Center (KSC) as well. The KSC Biomedical Office used a multifactorial mathematical formula from the Framingham Heart Study to calculate CHD risk probabilities for individuals in a segment of the KSC population that required medical evaluation for job certification. Those assessed to be high-risk probabilities will be targeted for intervention. Every year, several thousand KSC employees require medical evaluations for job related certifications. Most medical information for these evaluations is gathered on-site at one of the KSC or Cape Canaveral Air Station (CCAS) medical clinics. The formula used in the Framingham Heart Study allows calculation of a person's probability of acquiring CHD within 10 years. The formula contains the following variables: Age, Diabetes, Smoking, Left Ventricular Hypertrophy, Blood Pressure (Systolic or Diastolic), Cholesterol, and HDL cholesterol. The formula is also gender specific. It was used to calculate the 10-year probabilities of CHD in KSC employees who required medical evaluations for job certifications during a one-year time frame. This KSC population was profiled and CHD risk reduction interventions could be targeted to those at high risk. Population risk could also be periodically reevaluated to determine the effectiveness of intervention. A 10-year CHD risk probability can be calculated for an individual quite easily while gathering routine medical information. An employee population's CHD risk probability can be profiled graphically revealing high risk segments of the population which can be targeted for risk reduction intervention. The small audience of NASA/contractor physicians, nurses and exercise/fitness professionals at the breakout session received the lecture very well. Approximately one third indicated by a show of hands that they would be interested in implementing a similar program at their NASA Center. Questions were asked pertaining to standardization for age, the validity of using the idealized male values also for the female population, and indications of the screening test's sensitivity and specificity.

Tipton, David A.↗

Status of beamed power transmission technology and applications at 2.45 gigahertz

Demonstrations and unique components of the 2.45 GHz beamed power transmission technology are reviewed. Attention is given to the following projects and developments: a microwave power helicopter demonstration; certification of overall dc to dc efficiency of 54 percent in the laboratory; demonstration of the transmission of significant amounts of power over significant distances; the solar power satellite and beamed power transmission; the Canadian SHARP program; space applications; an equatorially based beam power transmission system; an all-electronic LEO to GEO transportation system; and an orbiting industrial park system.

Brown, William C.↗

Automatic Estimation of Verified Floating-Point Round-Off Errors via Static Analysis

This paper introduces a static analysis technique for computing formally verified round-off error bounds of floating-point functional expressions. The technique is based on a denotational semantics that computes a symbolic estimation of floating-point round-o errors along with a proof certificate that ensures its correctness. The symbolic estimation can be evaluated on concrete inputs using rigorous enclosure methods to produce formally verified numerical error bounds. The proposed technique is implemented in the prototype research tool PRECiSA (Program Round-o Error Certifier via Static Analysis) and used in the verification of floating-point programs of interest to NASA.

Moscato, Mariano↗

T0TEM - T0 Test Evaluation Module Development and Verification

Transition temperature testing of ferritic steels evaluates the ductile to brittle transition temperature, where the behavior of the steel changes from controlled ductile tearing to uncontrollable brittle fracture. This testing is governed by ASTM (American Society of Testing and Materials) E1921 standard. The calculations and plots required by this standard are iterative in nature and require significant effort to produce by standard hand calculations. In addition to analysis of a complete data set, intermediate analysis during testing is beneficial to determine optimal test temperatures. Given the exhaustive nature of calculating the transition temperature, being able to quickly update target temperatures is a significant benefit to not only the quality of tests, but the number of required tests as well. T0 Test Evaluation Module (T0TEM) v1.5 is a software application created under the Layered Pressure Vessel (LPV) certification effort. To reduce the analysis time of transition temperature test data sets producedfor this effort, T0TEM was created to calculate the E1921 Master Curve along with all required data and validity checks. By creating this program, hundreds of hours of analysis time were saved. In addition, the creation of a standard program provided a significant improvement in the consistency with which results were reported. T0TEM also calculates the results and plots required for the E1921 inhomogeneity annex to determine whether a material behaves in a homogenous manner. This program was created by Levi Shelton and Cameron Bosley at NASA, with input and review from the E1921 committee. The results generated by T0TEM were compared to the validation data sets provided by ASTM with good concurrence. ASTM committee members have reviewed and applied T0TEM to other data sets with satisfactory results. T0TEM was originally released to the NASA Software Repository and publicly via SourceForge in May of 2020. Version 1.5 was released in April of 2021 with minor functionality updates and additional statistical analysis methods.

Levi Shelton↗

Proposal to Accomplish Phase B Space Shuttle Program

This proposal has been prepared in response to National Aeronautics and Space Administration Request for Proposal No. 10-8423, dated February 20, 1970, and Amendments No.1, 2, 3, & 4 thereto. It is firm for a period of not less than one hundred twenty (120) days from March 30, 1970. The executed certifications requested in Enclosures 5 and 6 of the Request for Proposal are appended at the end of this proposal. Grumman Aerospace Corporation, along with its associates -- the General Electric Company, Eastern Airlines, the Northrop Corporation, and the Aerojet-General Corporation -- are pleased to submit this proposal. This study must prove that technical challenges can be met at a cost commensurate with realistic national funding levels at an early date, (perferably prior to the late 1977 initial operating capability (IOC) indicated in the Statement of Work). We have assembled a team of extremely competent associates. Together, we are fully qualified to study all facets of the proposed Phase B study, and to develop and build the product. We believe we have already made a promising start toward defining the concept of the space shuttle system.

Mead, Lawrence M.↗

Space Shuttle main engine product improvement

The current design of the Space Shuttle Main Engine has passed 11 certification cycles, amassed approximately a quarter million seconds of engine test time in 1200 tests and successfully launched the Space Shuttle 17 times of 51 engine launches through May 1985. Building on this extensive background, two development programs are underway at Rocketdyne to improve the flow of hot gas through the powerhead and evaluate the changes to increase the performance margins in the engine. These two programs, called Phase II+ and Technology Test Bed Precursor program are described. Phase II+ develops a two-tube hot-gas manifold that improves the component environment. The Precursor program will evaluate a larger throat main combustion chamber, conduct combustion stability testing of a baffleless main injector, fabricate an experimental weld-free heat exchanger tube, fabricate and test a high pressure oxidizer turbopump with an improved inlet, and develop and test methods for reducing temperature transients at start and shutdown.

Lucci, A. D.↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

NASA's Initial Artemis Human Landing System

In April 2020, NASA announced the selection of three companies to begin the initial phase of development of human landing systems to take the first woman and the first person of color to the lunar surface through NASA’s Artemis lunar exploration program. The selected companies were a Blue Origin-led team with Lockheed Martin, Northrup Grumman, and Draper; Dynetics (a Leidos company); and SpaceX. Contracts were awarded shortly after, kicking off a ten-month base period during which NASA worked closely with each company to finalize functional and performance requirements, confirm lander development standards, and establish baseline designs, schedules, and management plans for contract execution and human spaceflight certification. At the end of the base period, in the Spring of 2021, NASA awarded a single follow-on Option A contract to SpaceX to continue their work on Human Landing System (HLS) Starship development. Currently NASA and SpaceX are working collaboratively on Option A which will ultimately culminate in one uncrewed and one crewed mission to the lunar surface under Artemis III. This paper will provide a look at the Option A phase of development for the Human Landing System Program, including publicly available information on SpaceX’s HLS Starship design as well as near-term and future milestones for HLS and the Artemis program.

Lisa Watson-Morgan↗

STOL research at NASA.

Review of the overall goals, individual objects of ongoing and proposed programs, target dates, and fund requests of NASA's STOL research effort. The realization of a separate STOL short-haul transportation system with a 2000-foot field length capability is shown likely to reduce airport acreage requirements to less than one tenth, approach speed to nearly one half, and airspace required for terminal maneuvering to less than 10% of what conventional high-performance jet aircraft necessitate, and to promise terminal congestion alleviation in areas of high traffic density, improved safety in steep approach, noise abatement, and community annoyance reduction. NASA's described programs will provide the technical foundation upon which industry can base the design and development of aircraft and avionics for the new STOL systems in the latter 1970s, and upon which the government can establish criteria for the certification and regulation of such systems.

Kayton, G. G.↗

Synergistic Development, Test, and Qualification Approaches for the Ares I and V Launch Vehicles

The U.S. National Aeronautics and Space Administration is designing and developing the Ares I and Ares V launch vehicles for access to the International Space Station (ISS) and human exploration of the Moon. The Ares I consists of a first stage reusable five-segment solid rocket booster, a upper stage using a J-2X engine derived from heritage experience (Saturn and Space Shuttle External Tank programs), and the Orion crew exploration vehicle (CEV). The Ares V is designed to minimize the development and overall life-cycle costs by leveraging off of the Ares I design. The Ares V consists of two boosters, a core stage, an earth departure stage (EDS), and a shroud. The core stage and EDS use LH2/LO2 propellants, metallic propellant tanks, and composite dry structures. The core stage has six RS-68B upgraded Delta IV engines while the EDS uses a J-2X engine for second stage ascent and trans-lunar injection (TLI) burn. System and propulsion tests and qualification approaches for Ares V elements are being considered as follow-on extensions of the Ares I development program. Following Ares I IOC, testing will be conducted to verify the J-2X engine's orbital restart and TLI burn capability. The Ares I upper stage operation will be demonstrated through integrated stage development and acceptance testing. The EDS will undergo similar development and acceptance testing with additional testing to verify aspects of cryogenic propellant management, operation of sub-systems in a space simulation environment, and orbital re-start of the main propulsion system. RS-68B certification testing will be conducted along with integrated core stage development and acceptance testing. Structural testing of the Ares V EDS and core stage propellant tanks will be conducted similar to the Ares I upper stage. The structural qualification testing may be accomplished with separate propellant tank test articles. Structural development and qualification testing of the dry structure will be pursued as part of the design and development process. Especially critical is the development test program for the composite structures. The Ares V payload shroud will undergo acoustic, vibration, structural qualification, and deployment testing in a space simulation environment. Similar to Ares I, requirements for full-scale structural dynamic testing are being studied. Both Ares I and Ares V include validation flight testing as part of the qualification programs.

Cockrell, Charles E.↗

Airborne Wind Shear Detection and Warning Systems: First Combined Manufacturers' and Technologists' Conference

The purpose of the meeting was to transfer significant, ongoing results gained during the first year of the joint NASA/FAA Airborne Wind Shear Program to the technical industry and to pose problems of current concern to the combined group. It also provided a forum for manufacturers to review forward-looking technology concepts and for technologists to gain an understanding of FAA certification requirements and the problems encountered by the manufacturers during the development of airborne equipment.

Spady, Amos A., Jr.↗

NASA’s Plans for Development of Standards for Additive Manufactured Components

There are currently no NASA standards providing specific design and construction requirements for certification of additively manufactured parts. Several international standards organizations are developing standards for additive manufacturing; however, NASA mission schedules preclude the Agency from relying on these organizations to develop standards that are both timely and applicable. NASA and its program partners in manned spaceflight (the Commercial Crew Program, the Space Launch System and the Orion Multi-purpose Crew Vehicle) are actively developing additively manufactured parts for flight as early as 2018. To bridge this gap, NASA Marshall Space Flight Center (MSFC) has authored a center-level standard (MSFC-STD-3716)1 to establish standard practices for the Laser Powder Bed Fusion (L-PBF) process. In its draft form, the MSFC standard has been used as a basis for L-PBF process implementation for each of the manned space flight programs. The development of an Agency-level standard is proposed, which based upon the principles of MSFC-STD-3716, would have application to multiple additive manufacturing processes and be readily adaptable to all NASA programs.

Russell, Richard W.↗

TPSAS-NF1676L-25778-DND

Testing required to design and certify aircraft structures has increased dramatically with the growth in use of composite materials, and the development time and cost have become an issue as industry looks towards the next generation of aircraft. To help address this challenge, NASA has formed an industry-spanning consortium with the goal of cutting by 30% today's 10-year timeline for developing and certifying composite aircraft structures. This goal is to be achieved by infusing leading edge, physics-based tools to improve the prediction of the response and failure of composite aerospace structures. The plan for the public-private partnership of NASA, the FAA, airframe manufacturers, aircraft engine manufacturers, and several universities is to conduct joint research under the five-year Advanced Composites Program (ACP). The emphasis of the ACP project is the development of damage prediction and non-destructive inspection methods capabilities that are sufficiently reliable to enable a reduction in the element and subcomponent testing necessary for design and certification. ACP also is expected to create rapid design tools to speed preliminary design and improve safety and performance. A critical element of this research concerns the residual strength of postbuckled stiffened panels with impact damage. This presentation will discuss different aspects of ongoing research on the prediction of structural collapse due to skin/stiffener separation. In particular, the presentation will examine issues that must be addressed in the analysis, such as R-curve toughening, delamination migration, bridging, as well as some unexpected effects of ply orientation.

Carlos G Davila↗

NASA's Space Launch System: Systems Engineering Approach for Affordability and Mission Success

NASA is working toward the first launch of the Space Launch System, a new, unmatched capability for deep space exploration with launch readiness planned for 2019. Since program start in 2011, SLS has passed several major formal design milestones, and every major element of the vehicle has produced test and flight hardware. The SLS approach to systems engineering has been key to the program's success. Key aspects of the SLS SE&I approach include: 1) minimizing the number of requirements, 2) elimination of explicit verification requirements, 3) use of certified models of subsystem capability in lieu of requirements when appropriate and 4) certification of capability beyond minimum required capability.

Hutt, John J.↗

Demonstration of Probabilistic Sensitivity Analyses Tools on the Structural Response of a Representative Inflatable Space Structure

This work provides an initial step toward demonstrating a probabilistic numerical simulation capability to support trade studies and the development of a certification plan for inflatable space habitats. This study concentrates on interpreting the results from probabilistic analysis and numerical simulation tools to identify parameter sensitivities for a novel inflatable airlock concept, specifically the Non‐Axisymmetric Inflatable Pressure Structure (NAIPS) that was designed and tested under NASA's Minimalistic Advanced Softgoods Hatch (MASH) Program. A brief overview of the finite element model is provided along with the probabilistic sensitivity analysis approach. The sensitivity studies required a model that was numerically stable and efficient enough that hundreds of simulations could be completed in the allotted time. Therefore, the existing full model was simplified by: extracting a quarter symmetry section of the dome; focusing on a single inflation pressure; and replacing the non‐linear material stress‐strain curves with linear, isotropic materials defined by elastic moduli. Responses of interest include the sensitivity of various structural component loads to material properties, cord lengths, inflation pressure and friction. Multiple sensitivity studies were completed and three are reported here. The first study focused on utilizing wide input parameter ranges to provide an opportunity to assess numerical robustness. The next two studies narrowed the parameter ranges to enable focus on understanding uncertainty at a fixed operating condition. The completion of the sensitivity studies improved understanding of the interdependence of multiple inputs on the responses. In addition, numerical stability of the simulations over wide parameter ranges, shows the feasibility of incorporating uncertainty‐based methods in the design and certification of inflatable space habitats. With the experience and trust gained, it is anticipated that these same methods will be applied to nonlinear, orthotropic models in the future.

Lyle, Karen H.↗