Search NASA⌕ Search

SEARCH · Search NASA

Results for “Checkout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Study on Spacelab software development and integration concepts

A study was conducted to define the complexity and magnitude of the Spacelab software challenge. The study was based on current Spacelab program concepts, anticipated flight schedules, and ground operation plans. The study was primarily directed toward identifying and solving problems related to the experiment flight application and tests and checkout software executing in the Spacelab onboard command and data management subsystem (CDMS) computers and electrical ground support equipment (EGSE). The study provides a conceptual base from which it is possible to proceed into the development phase of the Software Test and Integration Laboratory (STIL) and establishes guidelines for the definition of standards which will ensure that the total Spacelab software is understood prior to entering development.

Source record↗

Economics in ground operations of the Space Shuttle

The physical configuration, task versatility, and typical mission profile of the Space Shuttle are illustrated and described, and a comparison of shuttle and expendable rocket costs is discussed, with special emphasis upon savings to be achieved in ground operations. A review of economies achieved by engineering design improvements covers the automated checkout by onboard shuttle systems, the automated launch processing system, the new maintenance concept, and the analogy of Space Shuttle and airline repetitive operations. The Space Shuttle is shown to represent a new level in space flight technology, particularly, the sophistication of the systems and procedures devised for its support and ground operations.

Gray, R. H.↗

Modularized instrument system for turbojet engine test facilities

A new modular instrument system is being developed to handle the many channels of data commonly encountered in turbojet engine testing. Each module contains a group of transducers and all the signal conditioning, multiplexing, and digitizing electronics necessary for direct interface with a digital computer. The digital interface within each module is the same for all modules. Each module provides a controlled environment for its contents. A minicomputer in the control room gathers the data, performs some on-line calculation and display, and interfaces with a shared recording and computing system. The advantages of this system are (1) reduced manpower for system installation, setup, and checkout; (2) standardized equipment interfaces; (3) increased reliability through automatic system testing and through minimization of manual adjustments; and (4) reduced cost through minimization of wiring and simplification of control room display.

Nieberding, W. C.↗

Environmental control system transducer development study

A development test program of transducers for aerospace projects is described. Stability and performance of existing transducers, and improvements compatible with shuttle ECS requirements are investigated. These requirements incorporate design and development features into the transducers, and include the following: (1) improvement of overall transducer ruggedness and reliability; (2) common transducers for all ECS fluids that will be unaffected by long quiescent periods in the space environment, that will require no maintenance or refurbishing for at least 100 launches; and (3) appropriate self-check features that simplify checkout and maintenance. Models of three different transducers, a three-way valve for pressure transducers from closed liquid loops, surface-type platinum-wire resistance temperature sensors, and a nuclenics gaging system are evaluated. Tests and development improvements are described.

Brudnicki, M. J.↗

Titan 3E/Centaur D-1T Systems Summary

A systems and operational summary of the Titan 3E/Centaur D-1T program is presented which describes vehicle assembly facilities, launch facilities, and management responsibilities, and also provides detailed information on the following separate systems: (1) mechanical systems, including structural components, insulation, propulsion units, reaction control, thrust vector control, hydraulic systems, and pneumatic equipment; (2) astrionics systems, such as instrumentation and telemetry, navigation and guidance, C-Band tracking system, and range safety command system; (3) digital computer unit software; (4) flight control systems; (5) electrical/electronic systems; and (6) ground support equipment, including checkout equipment.

Source record↗

STARPAHC. Part 1: Final summary report

A ground-based demonstration of IMBLMS Space Technology was conducted in a remote geographical area of the U.S. The STARPAHC program, designed to improve the capability for delivering health care to the Papago Indians, is divided into three areas: (1) design and definition; (2) system assembly, test, installation, checkout, and training; and (3) operations and evaluation. The accomplishments achieved in the program are summarized emphasizing system requirements in the areas of communication, specialized medical equipment, display, and computer software. Budgetary history and future cost plans are presented and planned activities are summarized.

Riley, F. E.↗

Conduct overall test operations and evaluate two Doppler systems to detect, track and measure velocities in aircraft wake vortices

A program plan for system evaluation of the two-dimensional Scanning Laser Doppler System (SLDS) is presented. In order to meet system evaluation and optimization objectives the following tests were conducted: (1) noise tests; (2) wind tests; (3) blower flowfield tests; (4) single unit (1-D) flyby tests; and (5) dual unit (2-D) flyby tests. Test results are reported. The final phase of the program included logistics preparation, equipment interface checkouts, and data processing. It is concluded that the SLDS is capable of accurately tracking aircraft wake vortices from small or large aircraft, and in any type of weather.

Wilson, D. J.↗

Apollo experience report: Electrical wiring subsystem

The general requirements of the electrical wiring subsystems and the problem areas and solutions that occurred during the major part of the Apollo Program are detailed in this report. The concepts and definitions of specific requirements for electrical wiring; wire-connecting devices; and wire-harness fabrication, checkout, and installation techniques are discussed. The design and development of electrical wiring and wire-connecting devices are described. Mission performance is discussed, and conclusions and recommendations for future programs are presented.

White, L. D.↗

Tug fleet and ground operations schedules and controls. Volume 2: part 2, addenda

The results of a study to assess the tug safing requirements at postlanding are presented. The study considered the normal (green light) conditions from orbiter landing to completion of preparations for the next launch. Normal tug ground turnaround operations include handling and transportation activities and the performance of inspections, tests, and checkout functions. These activities dictate that hazards to ground personnel, the tug, GSE, facilities, and ecology be reduced to the lowest practical level consistent with program objectives, cost, and schedules. During flight operations, the tug contains energy sources that constitute potential hazards but are required for mission accomplishment. These potential hazards have been reduced to an acceptable level for flight operation by design features and by providing for control of energy sources.

Source record↗

Spacelab user implementation assessment study. Volume 1: Concept development and evaluation

The total matrix of alternate Spacelab processing concepts and the rejection rationale utilized to reduce the matrix of 243 alternates to the final candidate processing concepts are developed. The work breakdown structure used for the systematic estimation and compilation of integration and checkout resources is presented along with descriptors of each element. Program models are provided of the space transportation system, the Spacelab, the orbiter, and the ATL that were used as the basis for the study trades, analyses, and optimizations. Resource requirements for all processing concepts are summarized along with the optimizations of the processing concepts. Concept evaluations including flight-rate sensitivities of the GSE, facilities, Spacelab hardware elements, and personnel are delineated. An analysis is presented of the applicability of the candidate concepts to potential spacelab users. The impact of the use of the western test range as an orbiter/spacelab launch site on the candidate processing concepts is evaluated. An assessment of the geographical co-location of experiment, Spacelab, and orbiter-cargo integration is included. Ownership options of the support module/system igloo are discussed.

Source record↗

Spacelab user implementation assessment study. Volume 2: Concept optimization

The integration and checkout activities of Spacelab payloads consist of two major sets of tasks: support functions, and test and operations. The support functions are definitized and the optimized approach for the accomplishment of these functions are delineated. Comparable data are presented for test and operations activities.

Source record↗

Solar residential heating and cooling system development test program

A solar heating and cooling system is described, which was installed in a simulated home at Marshall Space Flight Center. Performance data are provided for the checkout and initial operational phase for key subsystems and for the total system. Valuable information was obtained with regard to operation of a solar cooling system during the first summer of operation. Areas where improvements and modifications are required to optimize such a system are discussed.

Humphries, W. R.↗

Report to the administrator by the NASA Aerospace Safety Advisory Panel on the Skylab program. Volume 1: Summary report

Contractor and NASA technical management for the development and manufacture of the Skylab modules is reviewed with emphasis on the following management controls: configuration and interface management; vendor control; and quality control of workmanship. A review of the modified two-stage Saturn V launch vehicle which focused on modifications to accommodate the Skylab payload; resolution of prior flight anomalies; and changes in personnel and management systems is presented along with an evaluation of the possible age-life and storage problems for the Saturn 1-B launch vehicle. The NASA program management's visibility and control of contractor operations, systems engineering and integration, the review process for the evaluation of design and flight hardware, and the planning process for mission operations are investigated. It is concluded that the technical management system for development and fabrication of the modules, spacecraft, and launch vehicles, the process of design and hardware acceptance reviews, and the risk assessment activities are satisfactory. It is indicated that checkout activity, integrated testing, and preparations for and execution of mission operation require management attention.

Source record↗

The development of a solar residential heating and cooling system

The MSFC solar heating and cooling facility was assembled to demonstrate the engineering feasibility of utilizing solar energy for heating and cooling buildings, to provide an engineering evaluation of the total system and the key subsystems, and to investigate areas of possible improvement in design and efficiency. The basic solar heating and cooling system utilizes a flat plate solar energy collector, a large water tank for thermal energy storage, heat exchangers for space heating, and an absorption cycle air conditioner for space cooling. A complete description of all systems is given. Development activities for this test system included assembly, checkout, operation, modification, and data analysis, all of which are discussed. Selected data analyses for the first 15 weeks of testing are included, findings associated with energy storage and the energy storage system are outlined, and conclusions resulting from test findings are provided. An evaluation of the data for summer operation indicates that the current system is capable of supplying an average of 50 percent of the thermal energy required to drive the air conditioner. Preliminary evaluation of data collected for operation in the heating mode during the winter indicates that nearly 100 percent of the thermal energy required for heating can be supplied by the system.

Source record↗

Repair of major system elements on Skylab

In-flight maintenance, as conceived and preplanned for the Skylab mission was limited to simple scheduled and unscheduled replacement tasks and minor contingency repairs. Tools and spares were provided accordingly. However, failures during the mission dictated complicated and sophisticated repairs to major systems so that the mission could continue. These repairs included the release of a large structure that failed to deploy, the assembly and deployment of large mechanical devices, the installation and checkout of precision electronic equipment, troubleshooting and repair of precision electromechanical equipment, and tapping into and recharging a cooling system. The repairs were conducted both inside the spacecraft and during extravehicular activities. Some of the repair tasks required team effort on the part of the crewmen including close procedural coordination between internal and extravehicular crewmen. The Skylab experience indicates that crewmen can, with adequate training, make major system repairs in space using standard or special tools. Design of future spacecraft systems should acknowledge this capability and provide for more extensive in-flight repair and maintenance.

Pace, R. E., Jr.↗