Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

MELCOR Accident Progression and Source Term Demonstration Calculations for a FHR

MELCOR is an integrated thermal hydraulics, accident progression, and source term code for reactor safety analysis that has been developed at Sandia National Laboratories for the United States Nuclear Regulatory Commission (NRC) since the early 1980s. Though MELCOR originated as a light water reactor (LWR) code, development and modernization efforts have expanded its application scope to include non-LWR reactor concepts. Current MELCOR development efforts include providing the NRC with the analytical capabilities to support regulatory readiness for licensing non-LWR technologies under Strategy 2 of the NRC's near- term Implementation Action Plans. Beginning with the Next Generation Nuclear Project (NGNP), MELCOR has undergone a range of enhancements to provide analytical capabilities for modeling the spectrum of advanced non-LWR concepts. This report describes the generic plant model developed to demonstrate MELCOR capabilities to perform fluoride-salt-cooled high-temperature reactor (FHR) safety evaluations. The generic plant model is based on publicly-available FHR design information. For plant aspects (e.g., reactor building leak rate and details of the cover-gas system) that are not described in the FHR references, the analysts made assumptions needed to construct a MELCOR full-plant model. The FHR model uses a TRi-structural ISOtropic (TRISO)-particle fuel pebble-bed reactor with a primary system rejecting heat to two coiled tube air heat ex changers. Three passive direct reactor auxiliary cooling systems provide heat removal to supplement or replace the emergency secondary system heat removal during accident conditions. Surrounding the reactor vessel is a low volume reactor cavity that insulates the reactor with fire bricks and thick concrete walls. A refractory reactor liner system provides water cooling to reduce the concrete wall temperatures. Example calculations are performed to show the plant response and MELCOR capabilities to characterize a range of accident conditions. The accidents selected for evaluation consider a range of degraded and failed modes of operation for key safety functions providing reactivity control, the primary system decay heat removal and also a piping leak of the line to the coolant drain tank.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MELCOR Accident Progression and Source Term Demonstration Calculations for a Heat Pipe Reactor

MELCOR is an integrated thermal hydraulics, accident progression, and source term code for reactor safety analysis that has been developed at Sandia National Laboratories for the United States Nuclear Regulatory Commission (NRC) since the early 1980s. Though MELCOR originated as a light water reactor (LWR) code, development and modernization efforts have expanded its application scope to includ e non-LWR reactor concepts. Current MELCOR development efforts include providing the NRC with the analytical capabilities to support regulatory readiness for licensing non-LWR techno logies under Strategy 2 of the NRC?s near- term Implementation Action Plans. Beginning with the Next Generation Nuclear Project (NGNP), MELCOR has undergone a range of enha ncements to provide analytical capabilities for modeling the spectrum of advanced non-LWR concepts. This report describes the generic plant model developed to demonstrate MELCOR capabilities to perform heat pipe reactor (HPR) safety evaluations. The generic plant mode l is based on a publicly-available Los Alamos National Laboratory (LANL) Megapower design as modified in the Idaho National Laboratory (INL) Design A description. For plant aspects (e.g., reactor building size and leak rate) that are not described in the LANL and INL references , the analysts made assumptions needed to construct a MELCOR full-plant model. The HP R uses high assay, low-enrichment uranium (HALEU) fuel with steel cladding that uses heat pipes to transfer heat to a secondary Brayton air cycle. The core region is surrounded by a stainless-steel shroud, alumina reflector, core barrel and boron carbide neutron shield. The reactor is secured inside a below-grade cavity, with the operating floor located above the cavity. Example calculations are performed to show the plant response and MELCOR capabilities to characterize a range of accident conditions. The accidents selected for evaluation consider a range of degraded and failed modes of operation for key safety functions providing re activity control, the primary and secondary system heat removal, and the effectiveness of th e confinement natural circulation flow into the reactor cavity (i.e., a flow blockage).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

MELCOR Accident Progression and Source Term Demonstration Calculations for a HTGR

MELCOR is an integrated thermal hydraulics, accident progression, and source term code for reactor safety analysis that has been developed at Sandia National Laboratories for the United States Nuclear Regulatory Commission (NRC) since the early 1980s. Though MELCOR originated as a light water reactor (LWR) code, development and modernization efforts over the past decades have expanded its application scope to include non-LWR reactor concepts. Current MELCOR development efforts include providing the NRC with the analytical capabilities to support regulatory readiness for licensing non-LWR technologies under Strategy 2 of the NRC's near-term Implementation Action Plans. Beginning with the Next Generation Nuclear Project (NGNP), MELCOR ha s undergone a range of enhancements to provide analytical capabilities for modeling the spectrum of advanced non-LWR concepts. This report describes the generic plant model developed to demonstrate MELCOR capabilities to perform high-temperature gas reactor (HTGR) safety evaluations. The generic plant model is based on publicly available PMBR-400 design information. For plant aspects (e.g., reactor building size and leak rate) that are not described in the PBMR-400 references, the analysts made assumptions needed to construct a MELCOR full-plant model. The HTGR model uses a TRi-structural ISOtropic (TRISO)-particle fuel pebble-bed reactor with a primary system rejecting heat to a recuperative heat exchange r. Surrounding the reactor vessel is a reactor cavity contained within a confinement room cooled by the Reactor Cavity Cooling System (RCCS). Example calculations are performed to show the plant response and MELCOR capabilities to characterize a range of accident conditions. The accidents selected for evaluation consider a range of degraded and failed modes of operation for key safety functions providing reactivity control, primary system heat removal and reactor vessel decay heat removal, and confinement cooling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

LANL Tritium Supply and Demand Model

The LANL Tritium Supply and Demand Model provides the capability to investigate the adequacy of future tritium supply subject to stockpile demand for variousscenarios. The tool includes the ability to change stockpile demand factors and adjust tritium production plans, while accounting for Tritium decay. The model has been used numerous times to identify potential tritium shortfalls and advocate for changes to tritium production planning and implementation.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Republic of Korea–United States Green Shipping Corridor Prefeasibility Study: Cargo Flows

This prefeasibility study, as a part of the decarbonization efforts through the Mission Innovation Zero Emission Shipping Mission, was conducted to provide a high-level assessment of the opportunities and challenges in planning and implementing green shipping corridors between major commercial seaports in the United States of America (USA) and the Republic of Korea (ROK). For each country, three major ports were included in the scope of this study: Seattle, Tacoma, and Everett (all in Washington State) for the USA and Busan, Ulsan, and Masan for the ROK. This prefeasibility study report focuses on describing operation characteristics of major vessel and cargo flows between the two countries. Vessel shipments directly affect energy use and demand. Therefore, it is critically important to understand which major vessel types and cargo types are operated or transported within the selected scope and to identify potential target segments for green shipping. Furthermore, this prefeasibility study also discusses limitations and additional assessments that need to be further analyzed in the next stage of the feasibility study. The summary findings and observations discussed in this report are not intended to be used to determine the final target corridors, but to guide later, deeper assessments of their potential impacts and challenges. In the following section, the data sources used in this study are discussed. Section 0 shows the overall vessel trades between the USA and ROK, considering all ports in the two countries. Then, a more detailed analysis by vessel type and cargo flow is presented in Sections 3–6 based on only the three-to-three ports between the two countries. Finally, Section 7 summarizes the findings with suggested target segmentations for the vessel types and discusses other limitations to be considered during the later feasibility stage.

42 ENGINEERING↗

Federal Automotive Statisical Tool: FAST Changes & Data Call Preparation (INTERFUEL - September 2023) [Slides]

This presentation presents an overview of and timeline for coming changes to how federal agencies with motor vehicles will submit required information about the motor vehicles, fueling centers, and electric vehicle supply equipment (EVSE) inventory through the Federal Automotive Statistical Tool (FAST). The presentation provides information on changes throughout the FAST system as well as changes planned for implementation in FY 2023 and later. This presentation is intended for delivery via WebEx/GoToMeeting at the September 13, 2023 meeting of the DOE-sponsored INTERFUEL working group. FAST is a web-based information management tool developed and maintained by Idaho National Laboratory and funded by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program.

33 ADVANCED PROPULSION SYSTEMS↗

INTERFUEL: FY22 Federal Fleet Reporting [Slides]

This presentation presents an overview of and timeline for coming changes to how federal agencies with motor vehicles will submit required information about the motor vehicles, fueling centers, and electric vehicle supply equipment (EVSE) inventory through the Federal Automotive Statistical Tool (FAST). The presentation provides information on changes throughout the FAST system as well as changes planned for implementation in FY 2023 and later. This presentation is intended for delivery via WebEx/GoToMeeting at the September 14, 2022 meeting of the DOE-sponsored INTERFUEL working group. FAST is a web-based information management tool developed and maintained by Idaho National Laboratory and funded by GSA's Office of Government-wide Policy and DOE's Federal Energy Management Program.

99 GENERAL AND MISCELLANEOUS↗

GEANT4 Simulations on Faraday Cup Design for PIP-II Laser Wire Scanner System

The PIP-II accelerator upgrade at Fermilab represents a groundbreaking leap forward in high-energy physics research. This ambitious initiative involves enhancing Fermilab's accelerator complex by replacing the current linear accelerator with a warm front end (WFE) capable of accelerating H- beams up to 2.1 MeV. Subsequently, a superconducting linac further accelerates these beams up to 800 MeV. To precisely measure the transverse beam profile, a combination of traditional wire scanners at the WFE section and Laser wire scanners along the superconducting linac are planned for implementation. This investigation centers on refining the Faraday cup design for the PIP-II Laser wire scanners by utilizing GEANT4, a Monte Carlo simulation toolkit. Leveraging this method enables a comprehensive analysis of particle trajectories, energy deposition, secondary electron emission, backscattering, etc., facilitating optimization through adjustments to cup geometries, materials, and placement to maximize its efficiency.

43 PARTICLE ACCELERATORS↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada (Volume 1 of 3)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), and the U.S. Department of Energy Environmental Management Nevada Program (EM NV) plan to implement corrective action activities (under the Federal Facility Agreement and Consent Order, agreed to by the State of Nevada) and demolition of the Engine Maintenance, Assembly, and Disassembly (E-MAD) facility and the Test Cell C Historic District. These are major components of the unrecorded Nuclear Rocket Development Station (NRDS) Historic District, which is eligible for inclusion in the National Register of Historic Places (NRHP, National Register). The NRDS is in Area 25 of the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, in Nye County, Nevada. Demolition and removal of the buildings and accessories constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800.

54 ENVIRONMENTAL SCIENCES↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Final Technical Report

During the 1-year duration of this project a new Shortwave Spectrometer (SWS) was designed and developed for deployment at the Southern Great Plains Central Facility to measure zenith solar spectral radiance. The SWS is comprised of two Zeiss miniature monolithic spectrometers (MMS-1 and MMS-NIR) for visible and near-infrared detection in the wavelength range between 350 and 2250 nm. Spectral resolution is 8 nm for the MMS-1 and 12 nm for the MMS-NIR. The light collector is a narrow field of view (±1.5 º) collimator at the front end of a high-grade custom-made fiber optic bundle. The data acquisition and control system is a 933 MHz Pentium based PC in a PC104 format with a USB interface between the computer and the spectrometers. Spectral sampling rate is approximately 1 Hz. A prototype SWS was deployed at SGP in November and December 2004 and it collected zenith-sky solar spectra at 1 Hz continuously over a 29 day period. Prior to deployment it was calibrated and characterized at the NASA Ames Airborne Sensor Facility (ASF) using a 30 inch Integrating Sphere. The SWS was also calibrated using a portable 12 inch integrating sphere at the Central Facility. The testing and calibration procedures were developed during this implementation. The planning and scheduling for permanent installation of the new SWS as well as data processing, calibration, archiving, and distribution was conducted.

47 OTHER INSTRUMENTATION↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through the Use of Setbacks in its Facilities"

Our testing at Office of Science and National Nuclear Security Administration facilities revealed that the Department either did not use or failed to properly maintain setback systems and equipment in a number of instances. At just the four sites we visited, the Department had not ensured that setback conservation methods were used for 35 of the 55 (approximately 64 percent) owned or leased buildings included in our review. The buildings that did not use setbacks capabilities to control energy consumption comprised over one million square feet of space. Specifically: Although in place or capable of being deployed, officials did not utilize setbacks in 20 separate buildings; and, Equipment in 15 other buildings had either never been enabled or had deteriorated and was no longer functional, thus making setbacks impossible. Typical of the problems we noted, the Y-12 National Security Complex recently leased two buildings that were constructed with setback capability. The property manager for these buildings told us that the setback equipment was not used because the owner of the properties had not purchased the software necessary to enable the capability. In another case, we learned that Los Alamos National Laboratory was not using the setback capability in two buildings because facility operators and tenants had not been trained on operating the setback control system. Finally, the Oak Ridge National Laboratory lost the ability to operate the setback equipment in two buildings when the electronic control system failed in 2008. Laboratory officials told us that they elected not to replace it because they planned to implement campus-wide energy conservation measures in the future. In spite of its energy conservation leadership role, we found that the Department and its facility contractors did not place adequate emphasis on reducing energy consumption through the application of setbacks. Of particular significance, we found that the Department had not always required the operation of setback capabilities in building lease agreements. This was especially troubling given the expanded use of leased space to house Departmental operations. Despite discussions with several Federal and contractor officials, we could not obtain what we considered to be a satisfactory explanation as to why the Department failed to take advantage of this conservation practice, one that is generally low cost and has limited, if any, adverse impact on operations or building occupants. Consistent with the lack of emphasis in this area, we noted that the Department had not required the four contractors included in our review to develop training requirements or energy policies and procedures governing the use of setback capabilities. Energy consumption reduction goals related to setbacks had also not been established to help incentivize contractor performance in this important area. With nearly $300 million in annual utility costs, the Department could realize significant savings by using setbacks in its buildings. We estimate that the Department could save over $11.5 million in annual utility costs. We developed the estimate based on the observation that approximately 64 percent of the facilities included in our review had not used setbacks. We then conservatively applied a 15 percent energy consumption savings estimate observed by Sandia National Laboratory and savings estimates contained in a study conducted by Pacific Northwest National Laboratory to the 40 percent of utility costs generally recognized as resulting from HVAC operation. Such savings could be used to fund high priority programs and install additional energy saving features. The consumption savings would be, at today's average residential electricity cost, sufficient to power over 9,800 homes each year. We recognize that while setbacks can be used in many situations, they are not appropriate for facilities that are continuously operated or those that house delicate equipment that depend on constant temperatures. However, during the course of our audit officials at four of the sites included in our review told us that they recognized the utility of using setbacks for most facilities. At two sites, implementation efforts began almost immediately after we briefed officials on our findings. We also noted that Department Headquarters facilities used setbacks in offices and many common areas. With over 9,000 buildings in its inventory, the consistent use of setbacks can help the Department significantly reduce its energy consumption and, as noted above, achieve substantial cost savings. Actions related to setbacks that officials began after we initiated our audit are noteworthy and should, if fully implemented, help further reduce energy consumption. However, additional action at sites across the complex is necessary to maximize energy efficient operations and to establish the Department as the leader in this effort in all of the Federal sector.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Pretreatment Engineering Platform Phase 1 Final Test Report

Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Impact of Intersection Control on Battery Electric Vehicle Energy Consumption

Battery electric vehicle (BEV) sales have significantly increased in recent years. They have different energy consumption patterns compared to the fuel consumption patterns of internal combustion engine vehicles (ICEVs). This study quantified the impact of intersection control approaches—roundabout, traffic signal, and two-way stop controls—on BEVs’ energy consumption. The paper systematically investigates BEVs’ energy consumption patterns compared to the fuel consumption of ICEVs. The results indicate that BEVs’ energy consumption patterns are significantly different than ICEVs’ patterns. For example, for BEVs approaching a high-speed intersection, the roundabout was found to be the most energy-efficient intersection control, while the two-way stop sign was the least efficient. In contrast, for ICEVs, the two-way stop sign was the most fuel-efficient control, while the roundabout was the least efficient. Findings also indicate that the energy saving of traffic signal coordination was less significant for BEVs compared to the fuel consumption of ICEVs since more regenerative energy is produced when partial or poorly coordinated signal plans are implemented. The study confirms that BEV regenerative energy is a major factor in energy efficiency, and that BEVs recover different amounts of energy in different urban driving environments. The study suggests that new transportation facilities and control strategies should be designed to enhance BEVs’ energy efficiency, particularly in zero emission zones.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Software Sustainability $\&$ High Energy Physics

New facilities of the 2020s, such as the High Luminosity Large Hadron Collider (HL-LHC), will be relevant through at least the 2030s. This means that their software efforts and those that are used to analyze their data need to consider sustainability to enable their adaptability to new challenges, longevity, and efficiency, over at least this period. This will help ensure that this software will be easier to develop and maintain, that it remains available in the future on new platforms, that it meets new needs, and that it is as reusable as possible. This report discusses a virtual half-day workshop on "Software Sustainability and High Energy Physics" that aimed 1) to bring together experts from HEP as well as those from outside to share their experiences and practices, and 2) to articulate a vision that helps the Institute for Research and Innovation in Software for High Energy Physics (IRIS-HEP) to create a work plan to implement elements of software sustainability. Software sustainability practices could lead to new collaborations, including elements of HEP software being directly used outside the field, and, as has happened more frequently in recent years, to HEP developers contributing to software developed outside the field rather than reinventing it. A focus on and skills related to sustainable software will give HEP software developers an important skill that is essential to careers in the realm of software, inside or outside HEP. The report closes with recommendations to improve software sustainability in HEP, aimed at the HEP community via IRIS-HEP and the HEP Software Foundation (HSF).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

LIFETIME MEASUREMENT WITH PSEUDO MOVEABLE SEPTUM IN NSLS X-RAY RING

The National Synchrotron Light Source II (NSLS-II) is a state of the art 3 GeV third generation light source currently under construction at Brookhaven National Laboratory and starts to commission in 2014. The beam injection works with two septa and four fast kicker magnets in an injection section. To improve the injection stability and reproducibility, we plan to implement a slow local bump on top of the fast bump so that the fast kicker strength is reduced. This bump works as a pseudo movable septum. We can also use this 'movable' septum to measure the storage ring beam partial lifetime resulting from the septum edge and possibly increasing the lifetime by moving the stored beam orbit away from the edge. We demonstrate the feasibility of this idea, by implementing DC bump in NSLS X-ray ring. We report the results of beam lifetime measurements as a function of the amplitude of this bumped orbit relative to the septum and the idea of a slow bump that could reduce the fast bump magnet strengths.

43 PARTICLE ACCELERATORS↗

Performance of the H- Ion Source Supporting 1-MW Beam Operations at SNS

The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory reached 1-MW of beam power in September 2009, and now routinely operates near 1-MW for the production of neutrons. This paper reviews the performance, operational issues, implemented and planned mitigations of the SNS H- ion source to support such high power-level beams with high availability. Some results from R&D activities are also briefly described.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Enterprise analytics.

Ranking search results is a thorny issue for enterprise search. Search engines rank results using a variety of sophisticated algorithms, but users still complain that search can't ever seem to find anything useful or relevant! The challenge is to provide results that are ranked according to the users definition of relevancy. Sandia National Laboratories has enhanced its commercial search engine to discover user preferences, re-ranking results accordingly. Immediate positive impact was achieved by modeling historical data consisting of user queries and subsequent result clicks. New data is incorporated into the model daily. An important benefit is that results improve naturally and automatically over time as a function of user actions. This session presents the method employed, how it was integrated with the search engine,metrics illustrating the subsequent improvement to the users search experience, and plans for implementation with Sandia's FAST for SharePoint 2010 search engine.

99 GENERAL AND MISCELLANEOUS↗