Search NASA⌕ Search

SEARCH · Search NASA

Results for “Power Distribution Faults”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generic Photovoltaic Inverter Model in an Electromagnetic Transients Simulator for Transmission Connected Plants

This report proposes a generic model specification of a photovoltaic inverter applied in transmission-connected plants for implementation in an electromagnetic transients simulator. The model specification contains the necessary control loops to meet the fault ride-through performance requirements in the IEEE 2800-2022 standard. The report details the implementation and example parameterization of the model in PSCAD™. Simulation results verify the model meets the performance requirements. Comparisons of the model’s response to laboratory test measurements of a commercial 2.2 MVA storage inverter show the model can reasonably predict the response of commercial equipment.

14 SOLAR ENERGY↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Study the Protection Improvements for a Weak Grid Area With High IBRs

NLR is collaborating with Florida Power & Light (FPL) and GE to investigate power system stability and protection reliability challenges in a weak-grid region with high penetration of inverter-based resources (IBRs). This presentation will primarily focus on the protection aspects of the study. We will share key insights from this real-world project, including best practices for developing high-fidelity fault study models, establishing a controller-hardware-in-the-loop (CHIL) platform for testing physical relays, identifying system-level protection challenges, and designing enhanced protection schemes to address those issues. Through this discussion, the audience will gain practical understanding of protection studies in IBR-dominated systems, the emerging challenges associated with reduced fault current and altered transient behavior, and effective mitigation strategies. In particular, we will highlight the critical importance of IBR compliance with IEEE 2800-2022 to ensure dependable and secure protection relay operation in modern transmission systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Managing Wildfire Risk and Promoting Equity through Optimal Configuration of Networked Microgrids

As climate change increases the risk of large-scale wildfires, wildfire ignitions from electric power lines are a growing concern. To mitigate the wildfire ignition risk, many electric utilities de-energize power lines to prevent electric faults and failures. These preemptive power shutoffs are effective in reducing ignitions, but they could result in wide-scale power outages. Advanced technology, such as networked microgrids, can help reduce the size of the resulting power outages; however, even microgrid technology might not be sufficient to supply power to everyone, thus forcing hard questions about how to prioritize the provision of power among customers. In this paper, we present an optimization problem that configures networked microgrids to manage wildfire risk while maximizing the power served to customers; however, rather than simply maximizing the amount of power served in kilowatts, our formulation also considers the ability of customers to cope with power outages, as measured by social vulnerability, and it discourages the disconnection of particularly vulnerable customer groups. To test our model, we leverage a synthetic but realistic distribution feeder, along with publicly available social vulnerability indices and satellite-based wildfire risk map data, to quantify the parameters in our optimal decision-making model. Our case study results demonstrate the benefits of networked microgrids in limiting load shed and promoting equity during scenarios with high wildfire risk.

distribution systems↗

An Innovative Circuit Breaker for Renewable Power Grids

A key step towards a carbon-neutral future could be reached through dispersed power grids, featuring networks of local-scale renewable energy and battery storage plants. To prevent these power grids from damaging themselves and their surroundings when electrical faults arise, they must be integrated with ‘circuit breakers’, which temporarily interrupt the current flowing through them. However, currently available circuit breakers cannot handle the medium-voltage direct currents best suited for these grids. Through an innovative new circuit breaker design, Steve Schmalz and his colleagues at Eaton Corporation, the Illinois Institute of Technology (IIT), Virginia Tech and the National Energy Technology Laboratory (NETL), hope that this challenge will soon be overcome.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transient Stability Assessment of Multi-Machine Multi-Converter Power Systems

Transmission faults caused by recent wildfires in California induced the disconnection of utility-scale converters in photovoltaic (PV) power plants. Postmortem investigations reported that tripping commands were caused by phase-locked loops (PLLs) and dc-side dynamics, which are typically unmodeled in transient stability studies. Since existing simulation packages rely on simplified models that neglect these dynamics, they have a limited capability to predict converter behavior during faults. To address this shortcoming, we set forth a positive-sequence model for PV power plants that is derived from physics and controls first principles. As seen on utility-scale three-phase converters, the model includes PLLs, dc-side dynamics, and closed-loop controllers. Instances of the developed model are integrated into illustrative power systems containing also conventional generators. Numerical simulations of the obtained multi-machine multi-converter power systems are assessed via a suitable set of stability and performance metrics.

14 SOLAR ENERGY↗

Design of a Microgrid Transition Controller II: System Recovery Under Abnormal Conditions

This paper presents a microgrid transition controller for managing emergency operation when the microgrid experiences a system blackout caused by an internal or external fault. The developed transition controller consists of various application function blocks, including normal operation, emergency operation, and coordination between them. The developed microgrid transition controller is validated by a sample microgrid, and two test cases are investigated: islanded black start and grid-connected black start. The simulation results demonstrate the feasibility and effectiveness of the proposed microgrid transition controller for handling emergency operation and transitioning to normal operation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Experience with Inverter Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. In several cases, the available literature does not provide any clear solution for the issues when the protection scheme does not operate properly near IBRs. This report identifies various protection challenges due to IBRs that industry is facing, from the utility perspective. It includes a broad review of all challenges that system protection has experienced so far with high penetration of IBRs. Key issues have been identified based on a survey of different utility protection engineers. Finally, fault event recordings are shown to demonstrate some actual cases of mis-operations of relays near IBRs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrical Arc Fault Particle Size Characterization

In this investigation a series of small-scale tests were conducted, which were sponsored by the Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research (RES) and performed at Sandia National Laboratories (SNL). These tests were designed to better understand localized particle dispersion phenomena resulting from electrical arcing faults. The purpose of these tests was to better characterize aluminum particle size distribution, rates of production, and morphology (agglomeration) of electrical arc faults. More specifically, this effort characterized ejected particles and high-energy dispersion, where this work characterized HEAF electrical characteristics, particle movement/distributions, and morphology near the arc. The results and measurements techniques from this investigation will be used to inform an energy balance model to predict additional energy from aluminum involvement in the arc fault. The experimental setup was developed based on prior work by KEMA and SNL for phase-to-ground and phase-to-phase electrical circuit faults. The small-scale tests results should not be expected to be scale-able to the hazards associated with full-scale HEAF events. Here, the test voltages will consist of four different levels: 480V, 4160V, 6900V and 10kV, based on those realized in nuclear power plant (NPP) HEAF events.

36 MATERIALS SCIENCE↗

Automated Grid Disruption Response System: Robust Adaptive Topology Control (RATC)

GENI Project: The RATC research team is using topology control as a mechanism to improve system operations and manage disruptions within the electric grid. The grid is subject to interruption from cascading faults caused by extreme operating conditions, malicious external attacks, and intermittent electricity generation from renewable energy sources. The RATC system is capable of detecting, classifying, and responding to grid disturbances by reconfiguring the grid in order to maintain economically efficient operations while guaranteeing reliability. The RATC system would help prevent future power outages, which account for roughly $80 billion in losses for businesses and consumers each year. Minimizing the time it takes for the grid to respond to expensive interruptions will also make it easier to integrate intermittent renewable energy sources into the grid.

ARPA-E↗

AI-Based Protective Relays for Electric Grid Resiliency

The protection systems (circuit breakers, relays, reclosers, and fuses) of the electric grid are the primary component responding to resilience events, ranging from common storms to extreme events. The protective equipment must detect and operate very quickly, generally <0.25 seconds, to remove faults in the system before the system goes unstable or additional equipment is damaged. The burden on protection systems is increasing as the complexity of the grid increases; renewable energy resources, particularly inverter-based resources (IBR) and increasing electrification all contribute to a more complex grid landscape for protection devices. In addition, there are increasing threats from natural disasters, aging infrastructure, and manmade attacks that can cause faults and disturbances in the electric grid. The challenge for the application of AI into power system protection is that events are rare and unpredictable. In order to improve the resiliency of the electric grid, AI has to be able to learn from very little data. During an extreme disaster, it may not be important that the perfect, most optimal action is taken, but AI must be guaranteed to always respond by moving the grid toward a more stable state during unseen events.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Building Decision Trees for Characteristic Ellipsoid Method to Monitor Power System Transient Behaviors

The characteristic ellipsoid is a new method to monitor the dynamics of power systems. Decision trees (DTs) play an important role in applying the characteristic ellipsoid method to system operation and analysis. This paper presents the idea and initial results of building DTs for detecting transient dynamic events using the characteristic ellipsoid method. The objective is to determine fault types, fault locations and clearance time in the system using decision trees based on ellipsoids of system transient responses. The New England 10-machine 39-bus system is used for running dynamic simulations to generate a sufficiently large number of transient events in different system configurations. Comprehensive transient simulations considering three fault types, two fault clearance times and different fault locations were conducted in the study. Bus voltage magnitudes and monitored reactive and active power flows are recorded as the phasor measurements to calculate characteristic ellipsoids whose volume, eccentricity, center and projection of the longest axis are used as indices to build decision trees. The DT performances are tested and compared by considering different sets of PMU locations. The proposed method demonstrates that the characteristic ellipsoid method is a very efficient and promising tool to monitor power system dynamic behaviors.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of a Microgrid Transition Controller II: System Recovery Under Abnormal Conditions: Preprint

This paper presents a microgrid transition controller for managing emergency operation when the microgrid experiences a system blackout caused by an internal or external fault. The developed transition controller consists of various application function blocks, including normal operation, emergency operation, and coordination between them. The developed microgrid transition controller is validated by a sample microgrid, and two test cases are investigated: islanded black start and grid-connected black start. The simulation results demonstrate the feasibility and effectiveness of the proposed microgrid transition controller for handling emergency operation and transitioning to normal operation.

14 SOLAR ENERGY↗

Digital Grid Twin–Direct Communication Scheme Test Bed for Assessing Relay-to-Relay Radio Antenna and Optical Fiber Performance and Misoperations

This study introduces a novel “Digital Grid Twin–Direct Communication Scheme” test bed. This advanced platform evaluates point-to-point communication between transmitter and receiver relays with optical fiber and radio omnidirectional antenna systems, implemented at the Advanced Protection lab in the Grid Research Innovation and Development Center at Oak Ridge National Laboratory. The increased diversity of energy sources has led to more protective relay misoperations. In North America, microgrid protection schemes now use point-to-point communication along distribution lines between relays to implement advanced logic in nonradial grids that include both high- and low-inertia generators. This trend challenges utilities to minimize misoperations while ensuring rapid fault clearance and accurate selectivity coordination between primary and backup relays. This study assesses relay-to-relay communication schemes by introducing an advanced testing platform based on a digital grid twin protection test bed using a synchronized time source system. The platform evaluates the communication system using radio antennas or optical fiber links by integrating protective relays that operate breakers within the digital twin and record relay events and communication signals. In the experiments, transmitter and receiver relays were configured with inverse time overcurrent and breaker trip detection logic to assess the total time of the communication protection schemes based on the sum of the relay protection element operating time, radio latency, propagation delay, baud rate delay, and relay processing time. These delays were derived from recorded relay events and communication signals from the interface of a real-time simulator set as a digital grid twin. The test bed successfully simulated various electrical faults along a distribution line while ensuring effective and reliable point-to-point communication between transmitter and receiver relays. The radio antenna communication system exhibited latency because of the radio. This latency depends on the baud rate setting and type of radio application; in general, the higher the baud rate, the lower the radio latency. The measured radio latency (for Mirrored Bits with an encryption card at 9,600 bps) was about 9–10 ms. Additionally, calculated propagation delay per mile for radio antennas and optical fiber was 5.36 µs/mi and 8.04 µs/mi, respectively. Optical fiber communication did not demonstrate radio latency. Instead, the protection element operating time depends mainly on the protection logic function set in the relay, and the relay processing time depends on the processing rate of the relay in samples per power system cycle.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Utility Experience with Inverter-Based Resource Impacts on Transmission Protection

High penetration of inverter-based resources (IBR) can adversely affect the transmission protection schemes in the area. With the proliferation of IBRs, utilities are finding out that conventional protection schemes are not adequately equipped to protect the electric systems because the existing system has been designed based on the fault current response of conventional rotating-machine-based generators. This report identifies various protection challenges due to IBRs that industry is facing.

24 POWER TRANSMISSION AND DISTRIBUTION↗

IBR Short Circuit Modeling in ETAP

Mohammad Zadeh from ETAP presented various modeling improvements that included the following: • Address convergence issues by using complete Norton Equivalent model including the IBR series filter impedance. • Fault ride through identification within iterations while short circuit results have not been converged and how that may impact final SC results. • Options for FRT curve 1- using a timer to lock FRT logic vs a hysteresis in FRT curve to avoid unwanted toggling. • Report recent co-operation between software vendors (Aspen, CAPE and ETAP) for adopting a C++ interface for IBR blackbox SC modeling. There was lot of interest to know about the model improvements that are being considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Advanced Reconfiguration and Protection of Distribution Systems: Four Areas of Supporting Research

Historically, distribution systems have been very susceptible to transmission- and distribution-level events, such as line trips and faults within substations, because local sources of energy, if available at all, were only designed to operate in the context of a fully functional grid. However, the increasing deployment of advanced measuring devices, distributed energy resources (DERs), and energy storage provide the opportunity to improve reliability at the distribution level using advanced measurement-based reconfiguration and protection methods. This report discusses research regarding 1) a transmission equivalent model, 2) an algorithm for distinguishing between transmission- and distribution-level events, 3) a spreadsheet to help site new measurement devices, and 4) network theory to enable smart reconfiguration of distribution systems. Each of these areas of research support the development and study of advanced reconfiguration and protection methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗