Search NASA⌕ Search

SEARCH · Search NASA

Results for “Staging Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 487 records · Page 27

Human Missions to Mars Orbit, Phobos, and Mars Surface Using 100-kWe-Class Solar Electric Propulsion

Solar electric propulsion (SEP) tugs in the 100-kWe range, may be utilized to preposition cargo in the Mars system to enable more affordable human missions to Phobos and to the surface of Mars. The SEP tug, a high heritage follow-on to the 50-kWe SEP spacecraft proposed for the Asteroid Redirect Robotic Mission (ARRM), would have the same structure, tankage, electric propulsion components, and avionics as the ARRM version, But with double the number of solar arrays, Hall thrusters, and power processor units (PPUs) and would be accommodated within the same launch envelope defined for ARRM. As a feasibility study, a 950-day human mission to Phobos using a conjunction class trajectory, such as the 2033 opportunity, was developed using two 100-kWe SEP vehicles to preposition a habitat at Phobos and propulsion stages in high Mars orbit (HMO). An architecture concept for a crewed Mars surface lander mission was also developed as a reference to build on the Phobos mission architecture, adding a lander element that could be delivered using chemical propulsion and aerocapture.

Price, Humphrey W.↗

Developing and Testing a Common Space Systems Ontology using the Ontological Modeling Language

This paper describes the development and testing of the initial version of a common space systems ontology (CoSSO) for use by the Advanced Concepts Office (ACO) at NASA's Marshall Space Flight Center. The ontology provides a shared conceptualization of concepts of interest to the ACO for modeling aerospace systems concepts in a pre-phase A context to aid with the transition to a more model-based paradigm. The ontological concepts and relations, as well as the anticipated use cases, were developed through interactions with the relevant subject matter experts at the ACO and implemented in the Ontological Modeling Language (OML). The ontology builds on the Basic Formal Ontology (BFO) and the Common Core Ontologies (CCO). While most of the ontology is still in the initial stages, an Environmental Control and Life Support System (ECLSS) ontology is being built on top of the main CoSSO and heavily developed as a proof of concept. The ECLSS ontology is designed with different use cases in mind, namely predicting and diagnosing errors in ECLS systems on long-duration missions, with a focus on the Four-Bed CO$_2$ carbon dioxide scrubber currently on board the ISS. The ECLSS ontology is being developed in a similar manner to the CoSSO, and designed to be compatible with it. The current state of both ontologies is presented and discussed, along with plans for future development and testing.

Conceptual Design↗

Verification of the Serpent-Griffin Workflow using the SNAP 8 Experimental Reactor

The Systems for Nuclear Auxiliary Power (SNAP) program accumulated extensive experimental measurements over a span of 15 years. This work builds upon previous studies which validated Serpent against experimental data for various criticality configurations of the SNAP 8 Experimental Reactor (S8ER). A 2-stage sequence is applied here with Serpent used for the generation of few-group cross sections and Griffin as the transport eigenvalue solver. Sensitivity studies are performed to qualify the effect and uncertainty of various parameters, comparing against reference models for the S8ER. The results from this work will then be expanded to create a generalized methodology for the Serpent-Griffin 2-stage approach for microreactor applications.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Managing work flow and logistic at waste processing facilities using the waste compliance and tracking system - 15392

Work flow and logistics at a busy radioactive waste processing complex or permitted treatment, storage, and disposal facility (TSDF) can pose a monumental challenge. An efficient operation requires good communication between engineering, logistics, and waste operators. The Los Alamos National Laboratory (LANL) has implemented an application that facilitates seamless communication of work flow requirements, between engineering, logistics, and waste operations personnel in the field. The Waste Compliance and Tracking System (WCATS), a comprehensive waste management system designed at LANL, provides four key elements to support logistics: (a) the container work path, (b) directed unit operation requests, (c) notification of pending operations, and (d) real-time status tools for office and field workers. The combination of these elements allows everyone to function as a team, with a shared knowledge of what is needed to accomplish facility objectives. The first element is like a road map indicating which unit operations are needed and in what sequence they should be performed; this is referred to as a 'work path'. It automatically routes a waste item or container from operation to operation. For example, a given work path might indicate that waste items require radiological survey, radioassay, and a technical review, in that order. When the work path is assigned to a container, the system enforces the correct order of operations. Directed unit operation 'requests', the second element, fills a gap between pre-planned, formal 'work path' activities and the need for flexibility to direct preparatory operations or deal with unexpected issues, like staging or mining containers in preparation for a shipment or transferring containers from one storage unit to another to clear a path for building maintenance. Logistics engineers prepare these 'requests', and the system monitors the status and completion of the work. The third element, notifications, allows team members to subscribe to and receive notice that an operation is pending, initiated, or complete. This functionality supports a range of communication options, including e-mail, cell phone, pager, or application in-box messaging. Notifications allow waste operations personnel to multi-task, and remain in the loop on the status of facility-wide activities. Finally, the fourth element provides tools that communicate work path pending operations and directed requests to field workers on their mobile computer, allowing them to mine or pick containers from storage units, and leverage the capabilities of a bar-code scanner to avoid selection mistakes. Oversight and summary tools are provided, allowing logistics personnel to monitor work path and request task status, identify work-flow bottlenecks, and maximize the efficiency of waste operations. The Waste Compliance and Tracking System (WCATS) provides an innovative, comprehensive set of tools that allow large-scale radioactive waste processing facilities to manage logistics, maximize efficient use of the workforce, and create a team environment, where everyone from management to the waste handlers have an understanding of the work load and what needs to be accomplished. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Multidisciplinary concurrent optimization framework for multi-phase building design process

Modern day building design projects require multidisciplinary expertise from architects and engineers across various phases of the design (conceptual, preliminary, and detailed) and construction processes. The Architecture Engineering and Construction (AEC) community has recently shifted gears toward leveraging design optimization techniques to make well-informed decisions in the design of buildings. However, most of the building design optimization efforts are either multidisciplinary optimization confined to just a specific design phase (conceptual/preliminary/detailed) or single disciplinary optimization (structural/thermal/daylighting/energy) spanning across multiple phases. Complexity in changing the optimization setup as the design progresses through subsequent phases, interoperability issues between modeling and physics-based analysis tools used at later stages, and the lack of an appropriate level of design detail to get meaningful results from these sophisticated analysis tools are few challenges that limit multi-phase multidisciplinary design optimization (MDO) in the AEC field. Here this paper proposes a computational building design platform leveraging concurrent engineering techniques such as interactive problem structuring, simulation-based optimization using meta models for energy and daylighting (machine learning based) and tradespace visualization. The proposed multi-phase concurrent MDO framework is demonstrated by using it to design and optimize a sample office building for energy and daylighting objectives across multiple phases. Furthermore, limitations of the proposed framework and future avenues of research are listed.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ResStock Measure Documentation: Residential Two-Stage Geothermal Heat Pump (4.0 COP, 20.5 EER) With Envelope Improvements and Advanced Air Sealing

The goal of this work is to develop energy efficiency, demand flexibility, and other retrofit end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to retrofits that can be applied to buildings during modeling. An "end-use savings shape" is the difference in energy consumption between a baseline building and a building with an energy efficiency, demand flexibility, or other retrofit measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ResStock is a highly granular, physics-based, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the residential building stock across the United States. The baseline model intends to represent the U.S. residential building stock as it existed in 2018. Technical documentation for the inputs and assumptions in the baseline building stock model is available in Reyna et al. (2025). Calibration and validation of the baseline model results are available in the final technical report of the End-Use Load Profiles project (Wilson, et al. 2022). This document focuses on a single end-use savings shape measure: Residential Two-Stage Geothermal Heat Pump (GHP) (4.0 COP, 20.5 EER) With Envelope Improvements. This measure combines a two-stage GHP with envelope improvements as a single package. As this package is a combination of two other measures, this document focused on documenting the results associated with this combination of technologies, with individual measure documents for two-stage GHPs and envelope improvements providing the information on the details of these measures. When the two technologies are combined, envelope improvements can modestly reduce energy consumption by a further 10%-15%, but also reduce the required size of the ground heat exchanger and heat pump by approximately 33% on average across all sites. The cost of installing envelope improvements in these homes is likely to be more than paid for by the reduction in equipment and drilling costs in these buildings for the majority of the stock.

15 GEOTHERMAL ENERGY↗

NASA’s Space Launch System: Building A Capability for Science and Exploration

NASA’s Space Launch System, designed for human exploration of deep space and offering enabling benefits for a variety of science missions, is entering the final stages of preparation for its first launch, while simultaneously making progress toward future missions. SLS offers robust payload mass, volume, and characteristic energy that can be used not only for human exploration but for a variety of science missions, including probes to the outer solar system and beyond. In addition, while the vehicle is optimized to be a super-heavy lifter for lunar orbit as a staging area for the lunar surface or Mars, the addition of commercially available propulsion systems as third and/or fourth stages allows SLS to deliver unmatched performance for ultra-high C3 missions. Studies show that while the baseline SLS Block 2 vehicle can deliver about 8 t directly to the Jovian system at a C3 of 83, the addition of a Centaur upper stage would raise that mass to more than 15 t. The New Horizons spacecraft, with mass less than 0.5 t, launched toward Pluto with a record C3 of 158 km2/sec2. By comparison, an SLS Block 2 with an Orion 30B and Star 48BV payload stages could launch equivalent mass to a C3 more than double that of the New Horizons launch. (While the study has been conducted based on contemporary cryo stages and solid stages, this analysis provides real-world data for the range of performance this capability enables even as the specific stages available evolve.) Studies have shown it may be possible to reach 80-90 AU within a decade. The initial Block 1 vehicle for the first launch, Artemis I, is completely manufactured and all the elements are at NASA’s Kennedy Space Center (KSC) with the exception of the core stage, and manufacturing is in progress for the next several flights. Following the completion of the Green Run test series at NASA’s Stennis Space Center, the Artemis I core stage will be refurbished and delivered to KSC for stacking for launch in the second half of 2021. With the Artemis I vehicle fully manufactured and assembly of solid rocket boosters beginning, NASA and its industry partners have made significant progress manufacturing successive vehicles. Hardware for the next two launches is currently in production. NASA is committed to SLS as a key component of its launch architecture. Agency planning manifests outline the launch vehicle’s role in human lunar exploration over the next decade as it moves from its Block1 configuration to its intermediate Block 1B configuration and its ultimate Block 2 configuration.In addition, NASA has issued contracts with prime contractors for SLS hardware for delivery well into the 2030s.

Robert W. Stough↗

Conceptual design of the modular detector and readout system for the CMB-S4 survey experiment

We present the conceptual design of the modular detector and readout system for the Cosmic Microwave Background – Stage four (CMB-S4) ground-based survey experiment. CMB-S4 will map the cosmic microwave background (CMB) and the millimeter-wave sky to unprecedented sensitivity, using 500,000 superconducting detectors observing from Chile and Antarctica to map over 60% of the sky. The fundamental building block of the detector and readout system is a detector module package operated at 100 mK, which is connected to a readout and amplification chain that carries signals out to room temperature. It uses arrays of feedhorn-coupled orthomode transducers (OMT) that collect optical power from the sky onto dc-voltage-biased transition-edge sensor (TES) bolometers. The resulting current signal in the TESs is then amplified by a two-stage cryogenic Superconducting Quantum Interference Device (SQUID) system with a time-division multiplexer to reduce wire count, and matching room-temperature electronics to condition and transmit signals to the data acquisition system. Sensitivity and systematics requirements are being developed for the detector and readout system over wide range of observing bands (20 to 300 GHz) and optical powers to accomplish CMB-S4’s science goals. While the design incorporates the successes of previous generations of CMB instruments, CMB-S4 requires an order of magnitude more detectors than any prior experiment. This requires fabrication of complex superconducting circuits on over 10 m2 of silicon, as well as significant amounts of precision wiring, assembly and cryogenic testing

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

ResStock Measure Documentation: Residential Single-Stage Geothermal Heat Pump (3.8 COP, 18.6 EER)

The goal of this work is to develop energy efficiency, demand flexibility, and other retrofit end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) measures. "Measures" refers to retrofits that can be applied to buildings during modeling. An "end-use savings shape" is the difference in energy consumption between a baseline building and a building with an energy efficiency, demand flexibility, or other retrofit measure applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ResStock is a highly granular, physics-based, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the residential building stock across the United States. The baseline model intends to represent the U.S. residential building stock as it existed in 2018. Technical documentation for the inputs and assumptions in the baseline building stock model is available in Reyna et al. (2025). Calibration and validation of the baseline model results are available in the final technical report of the End-Use Load Profiles project (Wilson et al. 2022). This documentation focuses on a single end-use savings shape measure: Residential Single-Stage Geothermal Heat Pump (GHP).?Single-stage GHPs are able to reduce energy consumption by 31% for the entire stock. Additional results provided below detail how savings changes for sections of the housing stock with different base heating fuel and in different climate zones, as well as the savings potential by state for both heating and cooling. Utility bills and electric panel impacts are also shown and discussed.

15 GEOTHERMAL ENERGY↗

Gear Test Assembly - Status Report For FY2019

The final stages of pre-sodium commissioning were completed for the Gear Test Assembly (GTA) in late 2018 and all the components were moved to building 308 for final preparations for insertion into the Mechanisms Engineering Test Loop (METL). The GTA was fully assembled in the experimental test assembly workstation and all supporting electrical and hardware systems were installed on the METL Mezzanine. The GTA was installed in Test Vessel 1 after performing a final systems check, and the vessel and article were raised to operating temperature and held for two weeks to bake-out any moisture present in the components. Test Vessel 1 was filled with sodium and a purification process was completed using the cold trap system. When the sodium was sufficiently clean, Test Vessel 1 was isolated from the rest of METL, and experimental operation of the GTA commenced. The experimental operations consisted of rotating two shafts using Parker servomotors to apply a prototypic torque of a fuel handling mechanism removing and inserting a sodium fast reactor fuel assembly. This removing and inserting motion was repeated until the system seized, indicating component degradation of either the gears or the bearings in the test gearbox. A total of 19,600 cycles were completed, corresponding to the removal and insertion of 9,800 fuel assemblies. The system was shut down and then prepared for removal. The Flexicask System was successfully used to remove the GTA from Test Vessel 1 while keeping both vessel and article inert during the process. The GTA was installed in the Carbonation System, where the process of slowly reacting the sodium away using moist CO 2 has been started. Once the GTA is fully cleaned, it will be disassembled and the gears will undergo the same NDE process performed before testing to quantify the wear that occurred. A report on this, along with the data analysis from the experimental operations will be submitted in late 2019.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Fan Concept to Meet the 2017 Noise Goals

The National Aeronautics and Space Administration has established a goal of a 20 EPNdB reduction of aircraft noise by the year 2017. This paper proposes a fan concept for an engine that may meet this noise goal. The concept builds upon technology established during the Advanced Subsonic Technology Program which should show a 10 dB reduction potential. The new concept uses a two stage fan which allows low tip speed while still maintaining a reasonable total pressure rise across the two stages. The concept also incorporates many other noise reduction techniques in addition to low tip speed including a low number of exit guide vanes, swept and leaned guide vanes, a high subsonic Mach number inlet and syncrophased rotors to obtain active noise cancellation. The fan proposed in this paper is calculated to be able to achieve the 2017 noise goal.

Dittmar, James H.↗

A Fan Concept to Meet the 2017 Noise Goals

The National Aeronautics and Space Administration has established a goal of a 20 EPNdB reduction of aircraft noise by the year 2017. This paper proposes a fan concept for an engine that may meet this noise goal. The concept builds upon technology established during the Advanced Subsonic Technology Program which should show a 10 dB reduction potential. The new concept uses a two stage fan which allows low tip speed while still maintaining a reasonable total pressure rise across the two stages. The concept also incorporates many other noise reduction techniques in addition to low tip speed including a low number of exit guide vanes, swept and leaned guide vanes, a high subsonic Mach number inlet and syncrophased rotors to obtain active noise cancellation. The fan proposed in this paper is calculated to be able to achieve the 2017 noise goal.

Dittmar, James H.↗

Launching to the Moon, Mars, and Beyond

America is returning to the Moon in preparation for the first human footprint on Mars, guided by the U.S. Vision for Space Exploration. This presentation will discuss NASA's mission today, the reasons for returning to the Moon and going to Mars, and how NASA will accomplish that mission. The primary goals of the Vision for Space Exploration are to finish the International Space Station, retire the Space Shuttle, and build the new spacecraft needed to return people to the Moon and go to Mars. Unlike the Apollo program of the 1960s, this phase of exploration will be a journey, not a race. In 1966, the NASA's budget was 4 percent of federal spending. Today, with 6/10 of 1 percent of the budget, NASA must incrementally develop the vehicles, infrastructure, technology, and organization to accomplish this goal. Fortunately, our knowledge and experience are greater than they were 40 years ago. NASA's goal is a return to the Moon by 2020. The Moon is the first step to America's exploration of Mars. Many questions about the Moon's history and how its history is linked to that of Earth remain even after the brief Apollo explorations of the 1960s and 1970s. This new venture will carry more explorers to more diverse landing sites with more capable tools and equipment. The Moon also will serve as a training ground in several respects before embarking on the longer, more perilous trip to Mars. The journeys to the Moon and Mars will require a variety of vehicles, including the Ares I Crew Launch Vehicle, the Ares V Cargo Launch Vehicle, the Orion Crew Exploration Vehicle, and the Lunar Surface Access Module. The architecture for the lunar missions will use one launch to ferry the crew into orbit on the Ares I and a second launch to orbit the lunar lander and the Earth Departure Stage to send the lander and crew vehicle to the Moon. In order to reach the Moon and Mars within a lifetime and within budget, NASA is building on proven hardware and decades of experience derived from the Apollo Saturn, Space Shuttle, and contemporary commercial launch vehicle programs. Less than one year after the Exploration Launch Projects Office was formed at NASA's Marshall Space Flight Center, engineers are testing engine components, firing test rocket motors, refining vehicle designs in wind tunnel tests, and building hardware for the first flight test of Ares I, scheduled for spring 2009. The Vision for Exploration will require this nation to develop tools, machines, materials, and processes never before invented, technologies and capabilities that can be turned over to the private sector to benefit nearly all aspects of life on Earth. This new pioneering venture, as did the Apollo Program before it, will contribute to America's economic leadership, national security, and technological global competitiveness and serve as an inspiration for all its citizens.

Sumrall, John P.↗

Environmental product declarations in accordance with EN 15804 and EN 16485 — How to account for primary energy of secondary resources?

As a core product category rule (PCR), EN 15804 defines rules for conducting the life cycle assessment (LCA) of building products in the context of environmental product declarations (EPDs). This European standard is complemented by EN 16485, which provides further guidance for specific aspects for the LCA of wood and wood-based construction products. For all life cycle stages under consideration, the renewable and non-renewable primary energy employed for energy generation or material use is accounted for. Furthermore, the inputs and outputs of secondary materials (SM), renewable secondary fuels (RSF) and non-renewable secondary fuels (NRSF) have to be reported. Especially in the end-of life stage as well as in the production stage, the standards do not exactly rule the accounting method of the primary energy contained in SM, RSF and NRSF. As both standards leave room for interpretation, we wrote this discussion article to introduce this issue to the LCA community and to present our developed accounting specifications. In general, we consider EN 15804 and EN 16485 as helpful tools for the LCA of building products. We hope that our ideas on certain aspects contribute to a better understanding of the standards, possibly leading to further improvement in the course of the standardization process.

09 BIOMASS FUELS↗

Spall fracture in additive manufactured Ti-6Al-4V

Here, we present a study on the spall strength of additive manufactured (AM) Ti-6Al-4V. Samples were obtained from two pieces of selective laser melted (SLM, a powder bed fusion technique) Ti-6Al-4V such that the response to dynamic tensile loading could be investigated as a function of the orientation between the build layers and the loading direction. A sample of wrought bar-stock Ti-6Al-4V was also tested to act as a baseline representing the traditionally manufactured material response. A single-stage light gas-gun was used to launch a thin flyer plate into the samples, generating a region of intense tensile stress on a plane normal to the impact direction. The rear free surface velocity time history of each sample was recorded with laser-based velocimetry to allow the spall strength to be calculated. The samples were also soft recovered to enable post-mortem characterization of the spall damage evolution. Results showed that when the tensile load was applied normal to the interfaces between the build layers caused by the SLM fabrication process the spall strength was drastically reduced, dropping to 60% of that of the wrought material. However, when loaded parallel to the AM build layer interfaces the spall strength was found to remain at 95% of the wrought control, suggesting that when loading normal to the AM layer interfaces, void nucleation is facilitated more readily due to weaknesses along these boundaries. Quasi-static testing of the same sample orientations revealed a much lower degree of anisotropy, demonstrating the importance of rate-dependent studies for damage evolution in AM materials.

36 MATERIALS SCIENCE↗

Ares I First Stage Booster Deceleration System: An Overview

In 2005, the Congressional NASA Authorization Act enacted a new space exploration program, the "Vision for Space Exploratien". The Constellation Program was formed to oversee the implementation of this new mission. With an intent not simply to support the International Space Station, but to build a permanent outpost on the Moon and then travel on to explore ever more distant terrains, the Constellation Program is supervising the development of a brand new fleet of launch vehicles, the Ares. The Ares lineup will include two new launch vehicles: the Ares I Crew Launch Vehicle and the Ares V Cargo Launch Vehicle. A crew exploration vehicle, Orion, will be launched on the Ares I. It will be capable of docking with the Space Station, the lunar lander, Altair, and the Earth Departure Stage of Ares V. The Ares V will be capable of lifting both large-scale hardware and the Altair into space. The Ares First Stage Team is tasked with developing the propulsion system necessary to liftoff from the Earth and loft the entire Ares vehicle stack toward low Earth orbit. The Ares I First Stage booster is a 12-foot diameter, five-segment, reusable solid rocket booster derived from the Space Shuttle's four segment reusable solid rocket booster (SRB). It is separated from the Upper Stage through the use of a Deceleration Subsystem (DSS). Booster Tumble Motors are used to induce the pitch tumble following separation from the Upper Stage. The spent Ares I booster must be recoverable using a parachute deceleration system similar to that of the Shuttle SRB heritage system. Since Ares I is much heavier and reenters the Earth's atmosphere from a higher altitude at a much higher velocity than the SRB, all of the parachutes must be redesigned to reliably meet the operational requisites of the new launch vehicles. This paper presents an overview of this new booster deceleration system. It includes comprehensive detail of the parachute deceleration system, its design and deployment sequences, including how and why it is being developed, the requirements it must meet, and the testing involved in its implementation.

King, Ron↗

From Interstellar PAHs and Ices to the Origin of Life

Tremendous strides have been made in our understanding of interstellar material over the past twenty years thanks to significant, parallel developments in observational astronomy and laboratory astrophysics. Twenty years ago the composition of interstellar dust was largely guessed at, the concept of ices in dense molecular clouds ignored, and the notion of large, abundant, gas phase, carbon rich molecules widespread throughout the interstellar medium (ISM) considered impossible. Today the composition of dust in the diffuse ISM is reasonably well constrained to micron-sized cold refractory materials comprised of amorphous and crystalline silicates mixed with an amorphous carbonaceous material containing aromatic structural units and short, branched aliphatic chains. In dense molecular clouds, the birthplace of stars and planets, these cold dust particles are coated with mixed molecular ices whose composition is very well constrained. Lastly, the signature of carbon-rich polycyclic aromatic hydrocarbons (PAHs), shockingly large molecules by earlier interstellar chemistry standards, is widespread throughout the Universe. The first part of this lecture will describe how infrared studies of interstellar space, combined with laboratory simulations, have revealed the composition of interstellar ices (the building blocks of comets) and the high abundance and nature of interstellar PAHs. The laboratory database has now enabled us to gain insight into the identities, concentrations, and physical state of many interstellar materials. Within a dense molecular cloud, and especially in the solar nebula during the star and planet formation stage, the materials frozen into interstellar/precometary ices are photoprocessed by ultraviolet light, producing more complex molecules. The remainder of the presentation will focus on the photochemical evolution of these materials and the possible role of these compounds on the early Earth. As these materials are thought to be the building blocks of comets and related to the carbonaceous components of micrometeorites, they are likely to have been important sources of complex organic materials on the early Earth and their composition may be related to the origin of life.

Allamandola, Louis J.↗