Search NASA⌕ Search

SEARCH · Search NASA

Results for “Concept of Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

Comparing Apollo and Mars Exploration Rover (MER) Operations Paradigms for Human Exploration During NASA Desert-Rats Science Operations

NASA's Desert Research and Technology Studies (D-RATS) field test is one of several analog tests that NASA conducts each year to combine operations development, technology advances and science under planetary surface conditions. The D-RATS focus is testing preliminary operational concepts for extravehicular activity (EVA) systems in the field using simulated surface operations and EVA hardware and procedures. For 2010 hardware included the Space Exploration Vehicles, Habitat Demonstration Units, Tri-ATHLETE, and a suite of new geology sample collection tools, including a self-contained GeoLab glove box for conducting in-field analysis of various collected rock samples. The D-RATS activities develop technical skills and experience for the mission planners, engineers, scientists, technicians, and astronauts responsible for realizing the goals of exploring planetary surfaces.

Yingst, R. A.↗

Mars Surface Operations via Low-Latency Telerobotics from Phobos

To help assess the feasibility and timing of Low-Latency Telerobotics (LLT) operations on Mars via a Phobos telecommand base, operations concepts (ops cons) and timelines for several representative sequences for Mars surface operations have been developed. A summary of these LLT sequences and timelines will be presented, along with associated assumptions, operational considerations, and challenges.

telerobotics↗

Cruise Speed Sensitivity Study for Transonic Truss Braced Wing

NASA's investment and research in aviation has led to new technologies and concepts that make aircraft more efficient and environmentally friendly. One aircraft design operational concept is the reduction of cruise speed to reduce fuel burned during a mission. Although this is not a new idea, it was used by all of the contractors involved in a 2008 NASA sponsored study that solicited concept and technology ideas to reduce environmental impacts for future subsonic passenger transports. NASA is currently improving and building new analysis capabilities to analyze advanced concepts. To test some of these new capabilities, a transonic truss braced wing configuration was used as a test case. This paper examines the effects due to changes in the design cruise speed and other tradeoffs in the design space. The analysis was baselined to the Boeing SUGAR High truss braced wing concept. An optimization was run at five different design cruise Mach numbers. These designs are compared to provide an initial assessment space and the parameters that should be considered when selecting a design cruise speed. A discussion of the design drivers is also included. The results show that the wing weight in the current analysis has more influence on the takeoff gross weight than expected. This effect caused lower than expected wing sweep angle values for higher cruise speed designs.

Wells, Douglas P.↗

Space Station Program implications from the viewpoint of the Space Station Operations Task Force

An operational concept for the Space Station which has been developed by the Space Station Operations Task Force is described. The operations functions are described, and the relationships of these functions to the overall framework for operations are defined. Product flows for the recommended framework are discussed, and the roles and responsibilities for the proposed operations organization during both the development and the mature operations phases of the Space Station Program are examined.

Paules, Granville E.↗

X-33, Demonstrating Revolutionary Operations for VentureStar(TM)

The X-33, reusable space plane technology demonstrator is on course to begin the flights of the X-33 by the end of 2002 that will serve as a basis for industry and government decisions that could lead to VentureStar(Trademark). Lockheed Martin has placed the VentureStar LLC in it's Space Company and is now competing in an industry wide effort that will permit NASA to select a Second Generation RLV source by 2005. This move provides the focus for firm business planning needed to enable the decision by the time X-33 flies in mid 2002 and possibly with upgraded technologies a year or so later. The operations concept for the X-33 is an integration of launch vehicle and aircraft operations approaches. VentureStar is a Single Stage To Orbit (SSTO) and will therefore enable a new approach to Space Launch Operations that is more "aircraft like" and can produce substantially lower operating costs over current systems. NASA's initiatives over the past several years in Reusable Launch Vehicles (RLV) have had as a primary objective to demonstrate technologies that will result in significant reduction in costs of space access. Further, the end objective is to commercialize the development and operations of the next generation RLV. Hence, the X-33 and its operations demonstration is a major contributor to that next generation system.

Austin, Robert E.↗

Aircraft Wake Vortex Spacing System (AVOSS) Performance Update and Validation Study

An analysis has been performed on data generated from the two most recent field deployments of the Aircraft Wake VOrtex Spacing System (AVOSS). The AVOSS provides reduced aircraft spacing criteria for wake vortex avoidance as compared to the FAA spacing applied under Instrument Flight Rules (IFR). Several field deployments culminating in a system demonstration at Dallas Fort Worth (DFW) International Airport in the summer of 2000 were successful in showing a sound operational concept and the system's potential to provide a significant benefit to airport operations. For DFW, a predicted average throughput increase of 6% was observed. This increase implies 6 or 7 more aircraft on the ground in a one-hour period for DFW operations. Several studies of performance correlations to system configuration options, design options, and system inputs are also reported. The studies focus on the validation performance of the system.

Rutishauser, David K.↗

A Virtual Mission Operations Center - Collaborative Environment

Development of technologies that enable significant reductions in the cost of space mission operations is critical if constellations, formations, federations and sensor webs, are to be economically feasible. One approach to cost reduction is to infuse automation technologies into mission operations centers so that fewer personnel are needed for mission support. But missions are more culturally and politically adverse to the risks of automation. Reducing the mission risk associated with increased use of automation within a MOC is therefore of great importance. The belief that mission risk increases as more automation is used stems from the fact that there is inherently less direct human oversight to investigate and resolve anomalies in an unattended MOC. The Virtual Missions Operations Center - Collaborative Environment (VMOC-CE) project was launched to address this concern. The goal of the VMOC-CE project is to identify, develop, and infuse technology to enable mission operations between onsite operators and on-call personnel in geographically dispersed locations. VMOC-CE enables missions to more readily adopt automation because off-site operators and engineers can more easily identify, investigate, and resolve anomalies without having to be present in the MOC. The VMOC-CE intent is to have a single access point for all resources used in a collaborative mission operations environment. Team members will be able to interact during spacecraft operations, specifically for resolving anomalies, utilizing a desktop computer and the Internet. Mission operations management can use the VMOC-CE as a tool to participate in and monitor status of anomaly resolution or other mission operations issues. In this paper we present the VMOC-CE project, system capabilities and technologies, operations concept, and results of its pilot in support of the Earth Science Mission Operations System (ESMOS).

Medina, Barbara↗

The flight telerobotic servicer Tinman concept: System design drivers and task analysis

A study was conducted to develop a preliminary definition of the Flight Telerobotic Servicer (FTS) that could be used to understand the operational concepts and scenarios for the FTS. Called the Tinman, this design concept was also used to begin the process of establishing resources and interfaces for the FTS on Space Station Freedom, the National Space Transportation System shuttle orbiter, and the Orbital Maneuvering vehicle. Starting with an analysis of the requirements and task capabilities as stated in the Phase B study requirements document, the study identified eight major design drivers for the FTS. Each of these design drivers and their impacts on the Tinman design concept are described. Next, the planning that is currently underway for providing resources for the FTS on Space Station Freedom is discussed, including up to 2000 W of peak power, up to four color video channels, and command and data rates up to 500 kbps between the telerobot and the control station. Finally, an example is presented to show how the Tinman design concept was used to analyze task scenarios and explore the operational capabilities of the FTS. A structured methodology using a standard terminology consistent with the NASA/National Bureau of Standards Standard Reference Model for Telerobot Control System Architecture (NASREM) was developed for this analysis.

Andary, J. F.↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE)

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Mission

NASA has partnered with Advanced Space to develop and build the Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission which will serve as a pathfinder for Near Rectilinear Halo Orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) will be the intended orbit for the NASA’s Artemis Gateway lunar orbital platform. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for the Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The baseline for CAPSTONE is to fly a 12U cubesat developed, integrated, and tested by Tyvak Nanosatellite Systems carrying a payload communications system capable of cross-link ranging with the Lunar Reconnaissance Orbiter (LRO), a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA Launch Services Program, will be provided by a Rocket Lab launch vehicle utilizing their new Proton upper stage to deploy the CAPSTONE spacecraft into the lunar orbit. The CAPSTONE mission is targeting a launch no earlier than September 23, 2021. Upon launch, the spacecraft will traverse a highly efficient transfer taking approximately three months to enter a primary demonstration phase in an NRHO for six months followed by a twelve month technology enhancement operations phase. The CAPSTONE Project is lead by Advanced Space, LLC of Boulder Colorado. Spacecraft development and mission operations will be conducted by Tyvak Nanosatellite Systems of Irvine, California. Noted objectives for the CAPSTONE mission will be to demonstrate the accessibility of NHROs, validate key operational concepts in the NHRO environment, lay a foundation for commercial support of future lunar operations and accelerate the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology Program (SSTP), which is one of several programs in NASA’s Space Technology Mission Directorate. SSTP is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The launch for the CAPSTONE Mission is provided by Human Exploration & Operations Missions Directorate Advanced Exploration Systems Division. Coordination and Acquisition of the Launch is managed by NASA’s Launch Services Program. The CAPSTONE Mission and project status will be presented.

CAPSTONE↗

Integrated Demand Management Techport Closeout

Over the period 2016 to 2020, Integrated Demand Management (IDM) concept, procedures, and tools have been developed - first for clear-weather and a single airport constraint and then expanded to handle a multi-constraint problem during convective weather at Newark (EWR), LaGuardia (LGA) and Philadelphia (PHL) airports. The concept was evaluated in a series of human-in-the-loop simulations to confirm concept benefits in terms of better schedule predictability, reduction of delays, and increased throughput, especially during convective weather. In addition, other conditions with mixed participation of multi-trajectories from the airlines were evaluated that showed significant benefits to the individual airlines as well as the overall traffic flow. The IDM concept was initiated in the SMART-NAS project, was completed under the ATM-X project, and was developed collaboratively with the FAA and airline partners. Over the course of IDM development, NASA researchers produced 19 conference papers and publications. Outside supporting organizations, funded by IDM, produced 20 additional conference papers and publications, in which they advanced fundamental research on topics such as better stochastic traffic demand prediction, and application of machine learning techniques for modeling traffic management initiatives. Final concept procedures and tool specifications have been transferred to the FAA Air Traffic Organization Operational Concepts, Validation, and Requirements group.

William N Chan↗

Comparing Pre-Launch Assumptions to In-Flight Navigation Performance of OSIRIS-REx

The Sample Return Capsule (SRC) onboard the NASA Origins, Spectral Inter-pretation, Resource Identification, and Security–Regolith Explorer (OSIRIS-REx)spacecraft is currently carrying samples of the B-type asteroid Bennu for safe re-turn to Earth at the Utah Test and Training Range on September 24, 2023. These samples were collected during the Touch And Go (TAG) sampling event on October 20, 2020, when the spacecraft contacted the surface for a few seconds at a location less than 1 meter from the target. The unprecedented navigation performance achieved during that event was the culmination of experience gained during two years of cruise and two years of increasingly challenging operation sat Bennu. As we had hoped, the proximity navigation performance at Bennu exceeded pre-launch analysis. This paper will compare the navigation performance through the proximity operation phases to our pre-launch analysis and will quantify how refinements of the small force models governing the spacecraft motion near Bennu considerably improved the down-track state predictions leading up to the successful TAG event. It was evident to the team and to expert peer reviewers during the design phase that exquisite model fidelity and aggressive operational concepts, which challenged and advanced the state of the art for deep space proximity operations, would be required to meet the mission’s objectives. This paper summarizes the superlative achievements of the team in rising to and overcoming these challenges.

Peter G Antresian↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and station-keeping requirements for Gateway’s Power and Propulsion Element. Thus, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U) CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of cross-link ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle utilizing their Photon upper stage to deploy the CAPSTONE spacecraft into lunar orbit. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from Rocket Lab’s Photon stage and traversed an approximately 4 month highly efficient transfer phase entering the NRHO Novermber 13, 2022 for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is lead by Advanced Space, LLC. Spacecraft development and mission operations is conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstration of the accessibility of NHROs, validation of key operational concepts in the NHRO environment, laying the foundation for commercial support of future lunar operations, and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA's Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) Pathfinder for Artemis Gateway

The Cislunar Autonomous Positioning System Technology Operations and Navigation Experiment (CAPSTONE) mission was developed by NASA in collaboration with Advanced Space, LLC of Westminster, Colorado. This technology demonstration mission serves as a pathfinder for near rectilinear halo orbit (NHRO) operations around the Moon. The NHRO, (Perilune = 3,200 km; Apolune = 70,000 km) is the intended orbit for NASA’s Artemis Gateway, a small, human-tended space station planned for lunar orbit. The CAPSTONE mission will validate simulations and confirm operational planning for Gateway while also validating performance of navigation and stationkeeping requirements for Gateway’s Power and Propulsion Element. Therefore, this mission will provide operational experience to NASA, commercial, and international missions for operations in a demanding orbital regime. The CAPSTONE mission consists of a 12-unit (U)+ CubeSat developed, integrated, and tested by the Terran Orbital Corporation that carries a payload communications system capable of crosslink ranging with NASA’s Lunar Reconnaissance Orbiter (LRO). CAPSTONE contains a chip-scale atomic clock (CSAC) for a one-way ranging experiment with NASA’s Deep Space Network, a dedicated payload flight computer for software demonstration, and a camera. The launch, coordinated by NASA’s Launch Services Program, was provided by Rocket Lab on its Electron launch vehicle using their Photon upper stage to deploy the CAPSTONE spacecraft. The mission launched June 28, 2022. The CAPSTONE spacecraft deployed from the Photon stage and traversed an approximately 4-month, highly fuel-efficient transfer phase entering the NRHO November 13, 2022, for a six-month primary mission phase. The mission is currently in a twelve-month technology enhancement operations phase. The CAPSTONE technology demonstration mission is led by Advanced Space, LLC. Spacecraft development and mission operations are conducted by Terran Orbital Corporation of Irvine, California. Noted accomplishments for the CAPSTONE mission include demonstrating the accessibility of NHROs; validating key operational concepts in the NHRO environment; laying the foundation for commercial support of future lunar operations; and accelerating the availability of peer-to-peer navigation capabilities provided by the Cislunar Autonomous Positioning System (CAPS). The CAPSTONE mission is funded through NASA’s Small Spacecraft Technology (SST) program, which is one of several programs within NASA’s Space Technology Mission Directorate. The program is chartered to develop and demonstrate technologies to enhance and expand the capabilities of small spacecraft with a particular focus on enabling new mission architectures through the use of small spacecraft, expanding the reach of small spacecraft to new destinations, and augmenting future missions with supporting small spacecraft. The CAPSTONE mission launch was provided by NASA’s Exploration Systems Development Missions Directorate’s Advanced Exploration Systems Division. Coordination and acquisition of the launch was managed by NASA’s Launch Services Program. The CAPSTONE mission and project status will be presented.

Elwood Agasid↗

Alternative Strategies for Exploring Mars and the Moons of Mars

The possible human exploration of Mars represents one of civilization s next major challenges and is an enterprise that would confirm the potential of humans to leave our home planet system and make our way outward into the cosmos. As exploration endeavors begin to set sights beyond low Earth orbit, potential exploration of the surface of Mars continues to serve as the horizon destination to help focus technology development and research efforts. Recent thoughts on exploration follow a flexible path approach beginning with missions that do not extend down into planetary gravity wells including surface exploration. Consistent with that flexible path strategy is the notion of exploring the moons of Mars, namely Phobos and Deimos, prior to exploring the surface. The premise behind this thought is that exploring Mars moons would be less costly and risky since these missions would avoid the difficulties associated with landing on the surface and subsequent ascent back to orbit. A complete assessment of this strategy has not been performed in the context of the flexible path approach and is needed to clearly understand all of the advantages and disadvantages. This paper examines the strategic implications of possible human exploration of the moons of Mars as a potential prelude to surface exploration. Various operational concepts for Phobos and Deimos exploration that include the infusion of different propulsion technologies are assessed in terms of mission duration, technologies required, overall risk and difficulty, and operational construct. Finally, the strategic implications of each concept are assessed to determine the overall key challenges and strategic links to other key flexible path destinations.

Drake, Bret G.↗

Alternative Strategies for Exploring Mars and the Moons of Mars

The human exploration of Mars represents one of civilizations next major challenges and is an enterprise that would confirm the potential of humans to leave our home planet system and make our way outward into the cosmos. As exploration endeavors begin to set sights beyond low-Earth orbit, exploration of the surface of Mars continues to serve as the horizon destination to help focus technology development and research efforts. Recent thoughts on exploration follow a flexible path approach beginning with missions which do not extend down into planetary gravity wells including surface exploration. Consistent with that flexible path strategy is the notion of exploring the moons of Mars, namely Phobos and Deimos, prior to exploring the surface. The premise behind this thought is that exploring Mars moons would be less costly and risky since these missions would avoid the difficulties associated with landing on the surface and subsequent ascent back to orbit. A complete assessment of this strategy has not been performed in the context of the flexible path approach and is needed to clearly understand all of the advantages and disadvantages. This paper examines the strategic implications of human exploration of the moons of Mars as a potential prelude to surface exploration. Various operational concepts for Phobos and Deimos exploration that include the infusion of different propulsion technologies are assessed in terms of mission duration, technologies required, overall risk and difficulty, and operational construct. Finally, the strategic implications of each concept are assessed to determine the overall key challenges and strategic links to other key flexible path destinations.

Drake, Bret G.↗

Orbital operation for large automated satellites

Orbital operations concepts for the shuttle launched Large Automated Satellites (LAS) are discussed. It includes the orbital operations elements and the major options for accomplishing each element. This study is based on the preliminary payload information available in Level I and II documents and on orbital operations methods used on past programs, both manned and unmanned. It includes a definition of detailed trade studies which need to be performed as satellite design details and organization responsibilities are defined. The major objectives of this study were to define operational methods and requirements for the long duration LAS missions which are effective and primarily economical to implement.

Lusk, J. L.↗

Science Support Room Operations During Desert RATS 2009

NASA s Desert Research and Technology Studies (D-RATS) field test is a demonstration that combines operations development, technology advances and science in analog planetary surface conditions. The focus is testing preliminary operational concepts for extravehicular activity (EVA) systems by providing hands-on experience with simulated surface operations and EVA hardware and procedures. The DRATS activities also develop technical skills and experience for the engineers, scientists, technicians, and astronauts responsible for realizing the goals of the Lunar Surface Systems Program. The 2009 test is the twelfth for the D-RATS team.

Lofgren, Gary E.↗