Search NASA⌕ Search

SEARCH · Search NASA

Results for “Reliability Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

A Comparison of Solar p-Mode Parameters from MDI and Gong: Mode Frequencies and Structure Inversions

Helioseismic analysis of solar global oscillations allows investigation of the internal structure of the Sun. One important test of the reliability of the inferences from helioseismology is that the results from independent sets of contemporaneous data are consistent with one another. Here we compare mode frequencies from the Global Oscillation Network Group and Michelson Doppler Imager on board SOHO and resulting inversion results on the Sun's internal structure. The average relative differences between the data sets are typically less than 1 x 10(exp -5) substantially smaller than the formal errors in the differences; however, in some cases the frequency differences show a systematic behavior that might nonetheless influence the inversion results. We find that the differences in frequencies are not a result of instrumental effects but are almost entirely related to the data pipeline software. Inversion of the frequencies shows that their differences do not result in any significant effects on the resulting inferences on solar structure. We have also experimented with fitting asymmetric profiles to the oscillation power spectra and find that, compared with the symmetric fits, this causes no significant change in the inversion results.

Basu, S.↗

Ribosomal RNA: a key to phylogeny

As molecular phylogeny increasingly shapes our understanding of organismal relationships, no molecule has been applied to more questions than have ribosomal RNAs. We review this role of the rRNAs and some of the insights that have been gained from them. We also offer some of the practical considerations in extracting the phylogenetic information from the sequences. Finally, we stress the importance of comparing results from multiple molecules, both as a method for testing the overall reliability of the organismal phylogeny and as a method for more broadly exploring the history of the genome.

NASA Program Exobiology↗

Stirling Convertor Fasteners Reliability Quantification

Onboard Radioisotope Power Systems (RPS) being developed for NASA s deep-space science and exploration missions require reliable operation for up to 14 years and beyond. Stirling power conversion is a candidate for use in an RPS because it offers a multifold increase in the conversion efficiency of heat to electric power and reduced inventory of radioactive material. Structural fasteners are responsible to maintain structural integrity of the Stirling power convertor, which is critical to ensure reliable performance during the entire mission. Design of fasteners involve variables related to the fabrication, manufacturing, behavior of fasteners and joining parts material, structural geometry of the joining components, size and spacing of fasteners, mission loads, boundary conditions, etc. These variables have inherent uncertainties, which need to be accounted for in the reliability assessment. This paper describes these uncertainties along with a methodology to quantify the reliability, and provides results of the analysis in terms of quantified reliability and sensitivity of Stirling power conversion reliability to the design variables. Quantification of the reliability includes both structural and functional aspects of the joining components. Based on the results, the paper also describes guidelines to improve the reliability and verification testing.

Shah, Ashwin R.↗

Gliding Experiments of the Wright Brothers: The Wrights and Flight Research 1899-1908

This viewgraph presentation reviews the Wright Brothers's flight research during the 10 years between 1899 and 1908. The Wright Brothers began their research in flight with gliders. The presentation shows pictures, replicas and characteristics of the gliders that the Wright Brothers used. This presentation is not just a history lesson. In the end it investigates "What Does Flight Research Accomplish?" Flight research can serve many uses, such as Separates the Real from the Imagined, Uncovers the Unexpected and the Overlooked, Forces the Realistic Integration of the Pilot, Forces the Development of Reliable Prediction and Test Processes, Requires Every Problem to Be Addressed, Promotes Technology Transfer, and Builds a Core Technical Team,

Bowers, Al↗

Update - Concept of Operations for Integrated Model-Centric Engineering at JPL

The increasingly ambitious requirements levied on JPL's space science missions, and the development pace of such missions, challenge our current engineering practices. All the engineering disciplines face this growth in complexity to some degree, but the challenges are greatest in systems engineering where numerous competing interests must be reconciled and where complex system level interactions must be identified and managed. Undesired system-level interactions are increasingly a major risk factor that cannot be reliably exposed by testing, and natural-language single-viewpoint specifications areinadequate to capture and expose system level interactions and characteristics. Systems engineering practices must improve to meet these challenges, and the most promising approach today is the movement toward a more integrated and model-centric approach to mission conception, design, implementation and operations. This approach elevates engineering models to a principal role in systems engineering, gradually replacing traditional document centric engineering practices.

The Concept of Operations (ConOps)↗

Capacitor Test, Evaluation. and Modeling Within NASA Electronic Parts and Packaging (NEPP) Program. "Why Ceramic Capacitors Fracture During Manual Soldering and How to Avoid Failures"

Presentation discusses: (1) Why Multi-Layer Ceramic Capacitors(MLCCs) crack during manual soldering? Workmanship and parts issues. (2) Do existing qualification requirements assure crack-free soldering? MIL-spec Thermal Shock (TS) testing. MIL-spec Resistance to Soldering Heat (RSH) test. (3) What test can assure reliable soldering? Mechanical characteristics of ceramics. Comparison of three TS techniques: LND, TSD, and IWT. (4) Simulation of TS conditions.

Teverovsky, Alexander↗

Performance Evaluation of Pressure Transducers for Water Impacts

The Orion Multi-Purpose Crew Vehicle is being designed for water landings. In order to benchmark the ability of engineering tools to predict water landing loads, test programs are underway for scale model and full-scale water impacts. These test programs are predicated on the reliable measurement of impact pressure histories. Tests have been performed with a variety of pressure transducers from various manufacturers. Both piezoelectric and piezoresistive devices have been tested. Effects such as thermal shock, pinching of the transducer head, and flushness of the transducer mounting have been studied. Data acquisition issues such as sampling rate and anti-aliasing filtering also have been studied. The response of pressure transducers have been compared side-by-side on an impulse test rig and on a 20-inch diameter hemisphere dropped into a pool of water. The results have identified a range of viable configurations for pressure measurement dependent on the objectives of the test program.

Vassilakos, Gregory J.↗

Advanced Stirling Convertor (ASC) Technology Maturation in Preparation for Flight

The Advanced Stirling Convertor (ASC) is being developed by an integrated team of Sunpower and National Aeronautics and Space Administration s (NASA s) Glenn Research Center (GRC). The ASC development, funded by NASA s Science Mission Directorate, started as a technology development effort in 2003 and has since evolved through progressive convertor builds and successful testing to demonstrate high conversion efficiency, low mass, and capability to meet long-life Radioisotope Power System (RPS) requirements. The technology has been adopted by the Department of Energy and Lockheed Martin Space Systems Company s Advanced Stirling Radioisotope Generator (ASRG), which has been selected for potential flight demonstration on Discovery 12. This paper provides an overview of the status of ASC development including the most recent ASC-E2 convertors that have been delivered to GRC and an introduction to the ASC-E3 and ASC flight convertors that Sunpower will build next. The paper also describes the technology maturation and support tasks being conducted at GRC to support ASC and ASRG development in the areas of convertor and generator extended operation, high-temperature materials, heater head life assessment, organics, nondestructive inspection, spring fatigue testing, and other reliability verification tasks.

Wong, Wayne A.↗

Radiance Measurement for Low Density Mars Entry

We report measurements of radiance behind a shock wave in Martian simulant (96% CO2, 4% N2) atmosphere at conditions relevant for aerodynamic decelerators. Shock waves are generated in the NASA Ames Electric Arc Shock Tube (EAST) facility at velocities from 6-8 km/s and freestream densities from 1.2-5.9 x 10(exp -4) kilograms per cubic meter (0.05-0.25 Torr, corresponding to 35-50 km altitude). Absolute radiance is measured as a function of wavelength and position in the shock. Radiance measurements extend from the vacuum ultraviolet to near infrared (120-1650 nm). As at higher density/velocity, radiation is dominate by CO 4th positive radiation in the vacuum ultraviolet, though CN contribution is also significant. At most low density conditions, the shock does not relax to equilibrium over several centimeters. A small number of measurements in the mid-infrared were performed to quantify radiation from the fundamental vibrational transition in CO, and this is found to be a minor contributor to the overall radiance at these speeds. Efforts to extend test time and reliability in the 60 cm (24) shock tube will be discussed in the full paper.

Cruden, Brett A.↗

On-Orbit Lunar Modulation Transfer Function Measurements for the Moderate Resolution Imaging Spectroradiometer

Spatial quality of an imaging sensor can be estimated by evaluating its modulation transfer function (MTF) from many different sources such as a sharp edge, a pulse target, or bar patterns with different spatial frequencies. These well-defined targets are frequently used for prelaunch laboratory tests, providing very reliable and accurate MTF measurements. A laboratory-quality edge input source was included in the spatial-mode operation of the Spectroradiometric Calibration Assembly (SRCA), which is one of the onboard calibrators of the Moderate Resolution Imaging Spectroradiometer (MODIS). Since not all imaging satellites have such an instrument, SRCA MTF estimations can be used as a reference for an on-orbit lunar MTF algorithm and results. In this paper, the prelaunch spatial quality characterization process from the Integrated Alignment Collimator and SRCA is briefly discussed. Based on prelaunch MTF calibration using the SRCA, a lunar MTF algorithm is developed and applied to the lifetime on-orbit Terra and Aqua MODIS lunar collections. In each lunar collection, multiple scan-directionMoon-to-background transition profiles are aligned by the subpixel edge locations from a parametric Fermi function fit. Corresponding accumulated edge profiles are filtered and interpolated to obtain the edge spread function (ESF). The MTF is calculated by applying a Fourier transformation on the line spread function through a simple differentiation of the ESF. The lifetime lunar MTF results are analyzed and filtered by a relationship with the Sun-Earth-MODIS angle. Finally, the filtered lunarMTF values are compared to the SRCA MTF results. This comparison provides the level of accuracy for on-orbit MTF estimations validated through prelaunch SRCA measurements. The lunar MTF values had larger uncertainty than the SRCA MTF results; however, the ratio mean of lunarMTF fit and SRCA MTF values is within 2% in the 250- and 500-m bands. Based on the MTF measurement uncertainty range, the suggested lunar MTF algorithm can be applied to any on-orbit imaging sensor with lunar calibration capability.

Choi, Taeyong↗

Performance Measurement of Advanced Stirling Convertors (ASC-E3)

NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing data of the Advanced Stirling Convertor (ASC). The latest version of the ASC (ASC-E3, to represent the third cycle of engineering model test hardware) is of a design identical to the forthcoming flight convertors. For this generation of hardware, a joint Sunpower and GRC effort was initiated to improve and standardize the test support hardware. After this effort was completed, the first pair of ASC-E3 units was produced by Sunpower and then delivered to GRC in December 2012. GRC has begun operation of these units. This process included performance verification, which examined the data from various tests to validate the convertor performance to the product specification. Other tests included detailed performance mapping that encompassed the wide range of operating conditions that will exist during a mission. These convertors were then transferred to Lockheed Martin for controller checkout testing. The results of this latest convertor performance verification activity are summarized here.

Stirling Cycle↗

NASA Glenn Research Center Support of the ASRG Project

A high efficiency radioisotope power system is being developed for long-duration NASA space science missions. The U.S. Department of Energy (DOE) managed a flight contract with Lockheed Martin Space Systems Company (LMSSC) to build Advanced Stirling Radioisotope Generators (ASRGs), with support from NASA Glenn Research Center (GRC). Sunpower Inc. held two parallel contracts to produce Advanced Stirling Convertors (ASCs), one with DOELockheed Martin to produce ASC-F flight units, and one with GRC for the production of ASC-E3 engineering unit pathfinders that are built to the flight design. In support of those contracts, GRC provided testing, materials expertise, government furnished equipment, inspections, and related data products to DOELockheed Martin and Sunpower. The technical support includes material evaluations, component tests, convertor characterization, and technology transfer. Material evaluations and component tests have been performed on various ASC components in order to assess potential life-limiting mechanisms and provide data for reliability models. Convertor level tests have been used to characterize performance under operating conditions that are representative of various mission conditions. Technology transfers enhanced contractor capabilities for specialized production processes and tests. Despite termination of flight ASRG contract, NASA continues to develop the high efficiency ASC conversion technology under the ASC-E3 contract. This paper describes key government furnished services performed for ASRG and future tests used to provide data for ongoing reliability assessments.

Technology Transfer↗

Radiation -- A Cosmic Hazard to Human Habitation in Space

Radiation exposure is one of the greatest environmental threats to the performance and success of human and robotic space missions. Radiation permeates all space and aeronautical systems, challenges optimal and reliable performance, and tests survival and survivability. We will discuss the broad scope of research, technological, and operational considerations to forecast and mitigate the effects of the radiation environment for deep space and planetary exploration.

Radiation mitigation↗

Rehydration Data for the Materials International Space Station Experiment (MISSE) Polymer Films

Atomic oxygen erosion of polymers in low Earth orbit (LEO) poses a serious threat to spacecraft performance and durability. Forty thin film polymer and pyrolytic graphite samples, collectively called the PEACE (Polymer Erosion and Contamination Experiment) Polymers, were exposed to the LEO space environment on the exterior of the ISS for nearly four years as part of the Materials International Space Station Experiment 1 & 2 (MISSE 1 & 2) mission. The purpose of the MISSE 2 PEACE Polymers experiment was to determine the atomic oxygen (AO) erosion yield (E(sub y), volume loss per incident oxygen atom) of a wide variety of polymers exposed to the LEO space environment. The Ey values were determined based on mass loss measurements. Because many polymeric materials are hygroscopic, the pre-flight and post-flight mass measurements were obtained using dehydrated samples. To maximize the accuracy of the mass measurements, obtaining dehydration data for each of the polymers was desired to ensure that the samples were fully dehydrated before weighing. A comparison of dehydration and rehydration data showed that rehydration data mirrors dehydration data, and is easier and more reliable to obtain. Tests were also conducted to see if multiple samples could be dehydrated and weighed sequentially. Rehydration curves of 43 polymers and pyrolytic graphite were obtained. This information was used to determine the best pre-flight, and post-flight, mass measurement procedures for the MISSE 2 PEACE Polymers experiment, and for subsequent NASA Glenn Research Center MISSE polymer flight experiments.

de Groh, Kim K.↗

Dormancy Should Be Avoided for Mars and Deep Space Recycling Life Support

Mars is the crucial goal of human exploration beyond the Earth-moon system. The Mars round trip transit vehicle has been expected to use a regenerative Life Support System (LSS) similar to the one on the International Space Station (ISS). It often assumed that the Mars transit LSS will be operated on the outward trip to Mars, placed in dormancy while the full crew explores the surface, and then restored to operation for the return trip to Earth. The major difference between Mars missions and operations in the Earth-moon system is the need for much higher reliability for Mars missions, since rapid resupply of parts and materials or a quick crew return to Earth are not possible. Mars systems must achieve intrinsic high reliability by design, test, failure analysis, and redesign and then increase operational robustness by providing spare parts and redundant systems. Further requiring the LSS to be capable of dormancy and restoration to operation greatly increases the difficulty of design, test, and verification. The process of implementing dormancy and then restoring operation would add significant risk to the mission. Dormancy should be avoided for Mars and can be avoided several ways. First and most obvious, some crew can remain continually on board. If no crew can remain onboard, dormancy can still be avoided if an unused spare LSS is activated for the return trip, rather than restarting the used out bound system. Systems similar to the ISS LSS would have a significant probability of failure on a Mars trip and therefore would require two or three spares. Another full spare LSS could be provided as the return trip system, rather than refurbishing a used LSS.

dormancy↗

The Case for a 50+ Year Radioisotope Power System

The Johns Hopkins University Applied Physics Laboratory (JHU/APL) is leading the NASA funded Interstellar Probe study to explore the “Very Local” interstellar medium. To perform this exploration the mission will be required to last at least 50 years in regions of space where solar power is no longer practical. Additionally, several new studies for the National Academies’ Planetary Science and Astrobiology Decadal Survey are planning missions lasting 20-35 years. The Decadal Survey is used to build consensus on priority of national science goals. These proposed missions are inconsistent with the NASA’s current Radioisotope Power Systems (RPS) life requirement of 14 years (flight). Paramount to these proposed long-duration missions are questions about the longevity of such a mission. Evidence exists that space-borne Radioisotope Power Systems can indeed last a long time. LES-9, Voyager I, and Voyager II are over 40 years old, LES-8, Pioneer 10, and Pioneer 11 lasted 28, 30, and 22 years, respectively, and New Horizons is still active 15 years after launch. This paper explores the need for RPS designs that are intended to last much longer than the current requirement of 14 years (17 years after fueling) and explores the historical record for actual vs design lifetimes to show the feasibility of building long lasting RPS. We also exercise a current RTG performance model of the General-Purpose Heat Source RTG using the JPL Lifetime Performance Prediction (LPP) tool to make top-level inferences about power output at end-of-mission, and discusses how reliability engineering and testing methods can be brought to bear to increase confidence in delivering sufficient power at end-of-mission.

Phan, Brian↗

Risk Trade-Space Analysis for Safe Human Expeditions to Mars

We assessed the integrated safety, health, and performance risk to crews on long-duration missions, specifically to Mars. Using a systems approach rather than one focused on individual countermeasures, we examined the trade space around several such risks to identify high-potential risk mitigation strategies and characterize aspects of Mars mission architectures that could lower aggregated risk. Current Mars Design Reference missions would require durations well over two years and would increase crew exposure to radiation and microgravity well beyond ISS levels, likely resulting in significantly reduced performance beyond our current capability to mitigate that could jeopardize mission success. A “fast Mars transit” round-trip mission concept was studied using an innovative flight dynamics approach to quantify the minimum total mission energy required for a Mars transit with total mission duration less than 400 days. This approach holds promise for sending humans to Mars and returning them safely with acceptable, potentially mitigatable, exposure to microgravity and radiation using current or near-term technologies. The fast transit concept would also result in fewer time-driven vehicle failures and enable sustainable deployment of humans and infrastructure to Mars on a regular cadence, allowing steady exploration and colonization of Mars. Finally, we conclude that reliance on the Low Earth Orbit (LEO) mission operations paradigm – i.e., one of near-complete real-time dependence on experts at Mission Control to manage the combined state of the mission, vehicle, and crew – is high risk given the communication delays and limited resupply of any Mars mission, and this risk is not eliminated by the shorter missions durations of fast transit scenarios. Based on historical trends, it is highly likely that the crew will face a high-consequence problem of uncertain origin during Mars transit when ground support will be greatly reduced. While it may be possible to reduce anomaly rates through improved reliability analysis and testing, and to reduce anomaly impacts through added robustness, such mitigations address only known failure modes and known uncertainties. Therefore, a radical shift in the Human-Systems Integration Architecture (HSIA) that defines the operational paradigm, systems design, and human-systems interactions is required to improve the risk posture to an acceptable level regardless of mission duration.

Mars↗

High Temperature Devices for Aerospace Applications

This presentation will overview important new capabilities and benefits that next-generation higher temperature electronics promise for a variety of aerospace systems and missions. Initial aerospace infusions of higher temperature electronics to be discussed include jet engines and the prolonged robotic exploration of the Venus surface. Complete redesign of systems compared to prior conventional electronics practices would yield the most revolutionary benefits. However, the inherent higher risk and expense associated with new technology adoption will likely drive a more evolutionary technology infusion process, especially since flight qualification demands large safety margins and testing that ensures reliable operation for far longer than actual mission duration. SiC pn-junction based devices are inherently capable of the most durable operation at the highest application temperatures compared other transistor technologies, but such integrated circuits (ICs) will never achieve integration levels near today’s silicon ICs. Extreme temperature high-power devices will also be de-rated compared to room-temperature performance. While the high temperature market will always be small compared to the conventional temperature mass-market, compatibility and leveraging of existing foundry manufacturing is vital to the establishment of a sustainable high temperature electronics ecosystem sufficient to significantly improve aerospace systems.

High Temperature↗