Quality Guidelines for Energy System Studies: Carbon Dioxide Transport and Storage Costs in NETL Studies
Transport, storage, and combined T&S costs are reported in this guideline as first-year break even (FYBE) costs in real 2023 dollars per metric ton (tonne) (2023$/tonne). These FYBE costs are from the perspective of a CO 2 pipeline project owner and/or a CO 2 saline storage project owner, and represent a minimum price the owner(s) can charge a CO 2 capture project owner over 30 operating years to transport and/or store a tonne of CO 2 and remain economically viable.