Search NASA⌕ Search

SEARCH · Search NASA

Results for “electrical connectivity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 505 records · Page 28

How to Build a Connected Community: Policies to Promote Grid-interactive Efficient Buildings and Demand Flexibility

Efficient, connected, grid-interactive, smart, and flexible buildings are key to decarbonizing the U.S. energy economy, optimizing energy use, reducing electric consumers’ bills, integrating variable renewable energy resources, and improving the reliability and performance of the nation’s electricity grids. Such grid-interactive efficient buildings have high levels of energy efficiency layered with other distributed energy resources (DERs) and intelligent controls to provide demand flexibility. Policy support is unfolding at the federal, state, and local levels to transform homes and workplaces into state-of-the-art energy-efficient buildings and community-level grid services. This paper starts by describing the potential benefits. Next, it highlights existing policies — with a focus on state-level actions — that support grid-interactive efficient building deployment and demand flexibility. Finally, it identifies current trends and gaps, policies and programs that promote grid-interactive efficient buildings, and aggregations of grid-interactive efficient buildings referred to as Virtual Power Plants.

Schwartz, Lisa C↗

Scanning tunneling thermometer

Various examples are provided related to scanning tunneling thermometers and scanning tunneling microscopy (STM) techniques. In one example, a method includes simultaneously measuring conductance and thermopower of a nanostructure by toggling between: applying a time modulated voltage to a nanostructure disposed on an interconnect structure, the time modulated voltage applied at a probe tip positioned over the nanostructure, while measuring a resulting current at a contact of the interconnect structure; and applying a time modulated temperature signal to the nanostructure at the probe tip, while measuring current through a calibrated thermoresistor in series with the probe tip. In another example, a device includes an interconnect structure with connections to a first reservoir and a second reservoir; and a scanning tunneling probe in contact with a probe reservoir. Electrical measurements are simultaneously obtained for temperature and voltage applied to a nanostructure between the reservoirs.

Chinivaranahalli Shastry, Abhay Shankar↗

2021 Small Turbine Certification Awardee: Intergrid LLC

Currently, there are no U.S., fully certified inverters for wind turbines in the 10-15-kilowatt (kW) range. The federal government's Competitiveness Improvement Project (CIP) and Small Business Innovation Research programs present the most viable paths for manufacturers in the distributed wind energy industry to conduct research, develop their products, and, ultimately, commercialize them. Through CIP, Intergrid LLC is reducing the cost, size, and weight of its legacy inverter for distributed wind turbines while increasing efficiency, reliability, and serviceability. To accomplish this, Intergrid will address three areas related to power electronics for distributed wind turbines: (1) Software verification and functional safety certification; (2) Simulation for grid-interconnecting testing; (3) Component alternatives that reduce cost and improve reliability and serviceability. The first two areas relate to long-term management of inverter software, which, for grid-connected inverters, must comply with three standards - one issued by Underwriters Laboratories (UL) and two issued by the Institute of Electrical and Electronics Engineers.

CIP↗

Rheo–Electric Foundations and Engineering of Carbon Slurry Flow Electrodes

Flowable carbon slurry electrodes promise continuous, scalable electrochemical desalination and energy storage when their rheology (flow and stability) and electronic connectivity are jointly optimized. This report integrates six complementary thrusts that we executed under the Laboratory Directed Research and Development (LDRD) project: (i) a fast, ex situ, centrifuge-compatible method to quantify pellet (packed slurry) electronic conductivity, with a validated cell constant (“shape factor”) and quantitative structure–property insights for carbon mixtures; (ii) a controlled circulation study showing that peristaltic pumping can irreversibly alter particle size and morphology over laboratory-relevant durations; (iii) development of a miniature jet pump that preserves particle integrity while achieving entrainment ratios of 2–4 at practical flow rates; (iv) a comprehensive mapping of how a representative non-ionic surfactant (Tween 20) collapses the carbon gel network, separating network-percolation losses from intrinsic particle contact resistance; (v) in-situ visualization revealing how gravitational settling and flow-driven mixing compete to control charge transport, with dynamic bed layers preventing saturation while achieving 30-fold local concentration enhancement; and (vi) a simple, widely adoptable fabrication route to structured, gas-nitrided titanium nitride (TiN) titanium current collectors that dramatically lower interfacial losses and enable geometry-driven performance gains. Together, these results provide a coherent toolchain and design rules to accelerate formulation screening, de-risk device prototyping, and standardize characterization for carbon slurry electrodes in flow-electrode capacitive deionization (FCDI), electrochemical flow capacitor (EFC), and related systems.

25 ENERGY STORAGE↗

Smart Adaptive Structures for an Ocean Wave Energy Converter

Ocean wave energy converters face significant challenges including cost-effectiveness, minimizing maintenance requirements, and withstanding extreme conditions. However, by utilizing smart materials, these converters could overcome these challenges. Such energy harvesters could use dielectric elastomer generators to convert ocean wave energy into electricity through their dynamic straining. Conversely, by applying electricity to these generators, they become actuators - dielectric elastomer actuators - thereby enabling them to alter their stiffness and adapt to the ever-changing ocean energy environments. Such active adaptation could enhance the converter's ability to: reach resonance with ocean waves and protect itself from dangerous waves. This study utilizes numerical analyses through the COMSOL software framework to evaluate the potential energy that could be harvested by a conceptual ocean wave energy converter based upon dielectric elastomer generators/actuators. The converter is composed of an external hull (that is a hollow cylinder), an inertial mass (that is a hollow cylinder and concentric with the hull), and 'spokes' - made of dielectric elastomer generators/actuators - that connect the hull to the inertial mass. Results of the numerical analyses include those outcomes arising from the conceptual converter being simulated via a sinusoidal motion analogous to ocean waves. That motion, therefore, causes relative motion between the converter's hull and inertial mass thereby dynamically stretching the corresponding connecting elastomers. The stretching of the elastomers enables them to 'gain elastic strain energy' and is, therefore, considered to be the theoretical limit of possible electrical energy conversion for the dielectric elastomer generator/actuator spokes. Additionally, the elastomer material properties of the spokes were altered to simulate the actuation of those same elastomers; with overall strain energy being subsequently investigated. Ultimately this is a preliminary study exploring the ability of such smart materials - electricity-generating and self-actuating elastomers - to actively adapt an ocean wave energy converter's structure to address and overcome the aforementioned challenges.

active materials↗

DOE EV Data Collection - Facility Data

Facility data includes information on electricity consumption by larger-scale infrastructure, including buildings, solar arrays, and energy storage systems. Parameter definitions can be found in the data dictionary. If a connection between specific vehicle information and facility data exists, it will be available in the vehicle attributes table. Vehicle ID can be used as a key between vehicle data and vehicle attribute tables. Data is being uploaded quarterly through 2023 and subject to change until the conclusion of the project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hierarchical, Grid-Aware, and Economically Optimal Coordination of Distributed Energy Resources in Realistic Distribution Systems

Renewable portfolio standards are targeting high levels of variable solar photovoltaics (PV) in electric distribution systems, which makes reliability more challenging to maintain for distribution system operators (DSOs). Distributed energy resources (DERs), including smart, connected appliances and PV inverters, represent responsive grid resources that can provide flexibility to support the DSO in actively managing their networks to facilitate reliability under extreme levels of solar PV. This flexibility can also be used to optimize system operations with respect to economic signals from wholesale energy and ancillary service markets. Here, we present a novel hierarchical scheme that actively controls behind-the-meter DERs to reliably manage each unbalanced distribution feeder and exploits the available flexibility to ensure reliable operation and economically optimizes the entire distribution network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

distribution network↗

Hydropower Black Start: A Guidebook for Retrofitting Grid Dependent Hydropower

Not all United States (US) hydropower plants were designed to provide black start, but they are increasingly needed to uphold resilience in the evolving electric grid. This guidance is designed to help understand the minimal retrofits required for grid dependent hydropower (GDH) plants behind the point of interconnection (POI). For distribution connected hydropower plants or those with dedicated cranking paths, such upgrades can be sufficient for the plant to provide black start. For others, more coordination with the transmission system operator will be needed. This guidebook answers a number of questions relevant to retrofitting hydropower plants with black start capabilities. For example, the guidebook answers: • How flexible do the wicket gate controls need to be? • Who needs to do hydro governor model validation, why, and how? • How robust and flexible do the excitation and AVR controls need to be? • What protection settings need to be adjusted? • What relay(s) will need to be bypassed or overridden and at what risk? • What is the electrical energy demand of the station load or auxiliary power systems? • What should the strategy to energize transformer(s) along cranking path to address inrush currents be? • How should the critical load restoration be sequenced? In addition to outlining the specifications that hydropower plants need to meet for each component to be able to perform black start, this guidebook provides a set of case studies for specific upgrades needed at actual plants. Between the case studies of plants that have already performed black start retrofits and the examples of how this guidebook can be applied to scope future retrofits, five key themes have been identified for retrofit needs. 1. Protection needs “black start” mode: hydropower plants that are not designed with black start capabilities will have protections that prevent them from interconnecting to a “dead bus.” These protections will need to be overridden in every retrofit case and a separate black start mode should be established so that operators can safely switch between black start and grid connected modes, minimizing the risk to the plant. 2. Wicket gates need modern controls: digital governors accelerate the parameter tuning process and gate position sensors improve controllability, so plants with mechanical governors should be upgraded. Furthermore, a black start and islanding mode should be established for controls to maximize plant performance. 3. Robust excitation support: the DC system or excitation generator needs to be reliable enough to form and sustain the rotor electromagnetic field. These systems are typically undersized in plants that were not designed for black start, so they will need to be upgraded. 4. Turbine-governor model validation and operator training: validation of a standard hydro governor model is needed to characterize the dynamic response (i.e., inertial and primary frequency response) of the GDH. This is required for control development and old hydropower plants often have outdated or incorrect models. Operator training is also typically required to ensure the hardware retrofits are utilized correctly during the black start process. 5. Transformer and cranking path energization: any upgradation and control adjustment in front of the POI will depend upon the existing interconnection. Coordination with the transmission or distribution operator may be required.

13 HYDRO ENERGY↗

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers: Preprint

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network--that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest--in the sense of electrical distance--from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for real-time operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

On the Use of Smart Meter Data to Estimate the Voltage Magnitude on the Primary Side of Distribution Service Transformers

This paper develops a novel method to estimate the voltage magnitude on the primary side of distribution service transformers. The proposed method relies exclusively on smart meters, and therefore it is fully data-driven. This is an important feature because electric utilities have detailed models of only the primary network - that is, the network between the distribution substation and the primary side of service transformers that are installed closer to end-customer sites. The network that connects the secondary side of service transformers to end-customer sites, referred to as the secondary network, is simply represented by a lumped load. For each secondary network, the proposed method uses data acquired from only 2 smart meters: the closest and the farthest-in the sense of electrical distance - from the service transformer. As a reference to this feature, the proposed method is named SM2Vp. To our knowledge, this is the first time a method is shown to provide actionable information for realtime operation and control of power distribution grids using only two smart meters per secondary network. This is important because utilities have experienced barriers in managing and using large data sets for real-time operation and control. SM2Vp is primarily intended to provide pseudo-measurements for distribution system state estimation, but it can also be used directly for voltage control schemes. The performance of SM2Vp is demonstrated by numerical simulations carried out on three secondary network synthetic models and by using field data provided by a utility partner serving customers in southwestern California. A maximum relative error of approximately 3.9% or less is observed for the primary voltage magnitude estimates in all numerical experiments.

distribution service transformer↗

Vehicle Powertrain Simulation Accuracy for Various Drive Cycle Frequencies and Upsampling Techniques

As connected and automated vehicle technologies emerge and proliferate, lower frequency vehicle trajectory data is becoming more widely available. In some cases, entire fleets are streaming position, speed, and telemetry at sample rates of less than 10 seconds. This presents opportunities to apply powertrain simulators such as the National Renewable Energy Laboratory's Future Automotive Systems Technology Simulator to model how advanced powertrain technologies would perform in the real world. However, connected vehicle data tends to be available at lower temporal frequencies than the 1-10 Hz trajectories that have typically been used for powertrain simulation. Higher frequency data, typically used for simulation, is costly to collect and store and therefore is often limited in density and geography. This paper explores the suitability of lower frequency, high availability, connected vehicle data for detailed powertrain simulation. A large data set of 1 Hz trajectories is used to quantify the accuracy loss when simulating energy consumption for conventional, hybrid, and battery electric powertrains using less than 1 Hz data. Techniques to upsample lower frequency drive cycle data in order to increase accuracy are also explored. Median energy consumption errors when simulating energy consumption for a 1/10 Hz trajectory are found to be 3-6% when compared to 1 Hz trajectories. Applying upsampling and interpolation techniques are shown to reduce the simulation errors by roughly 50%. The findings in this work can guide connected vehicle data collection specifications and processing techniques applied when using collected data for powertrain simulation.

ADVANCED PROPULSION SYSTEMS↗

Grid-tied Multilevel Inverter with Phase-locked Loop Algorithm

A multilevel inverter is an electronic device capable of changing direct current energy to alternant current energy with a voltage and frequency established by the user. They are ideal for connecting renewable energy sources to the AC grid, energy plants, and smart grids. The voltage must be balanced and synchronized with the electrical network for adequate performance. This paper shows the voltage synchronization between an inverter output voltage and the AC grid using a phase-locked loop based on an adaptive observer. The proposed algorithm can perform under grid uncertainties such as noise and generates a reference signal for the modulation used in the inverter. The algorithm is robust and computationally efficient and can be implemented through basic elements such as operational amplifiers, resistors, and capacitors, reducing its difficulty in executing it in a system.

42 ENGINEERING↗

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Light-duty Plug-in Electric Vehicles in China: Evolution, Competition, and Outlook

China's plug-in electric vehicle (PEV) market with stocks at 7.8 million is the world's largest in 2021, and it accounts for half of the global PEV growth in 2021. The PEV market in China has dramatically evolved since the pandemic in 2020: over 20% of all new PEV sales are from China by mid-2022. Recent features of PEV market dynamics, consumer acceptance, policies, and infrastructure have important implications for both the global energy market and manufacturing stakeholders. From the perspective of demand pull-supply push, this study analyzes China's PEV industry with a market dynamics framework by reviewing sales, product and brand, infrastructure, and government policies from the last few years and outlooking the development of the new government’s 14th Five-Year Plan (2021-2025). From the demand side, small-sized sedans and compact sport utility vehicles with increased electric ranges are both popular for PEVs, and the electric range of over 60% of new battery electric vehicles in 2021 has been longer than 400 km. From the supply side, although foreign brands like Tesla are still competitive, the products by Chinese domestic automakers like BYD are becoming more attractive and cannibalizing the high-end market. However, the production capacity and cost of PEVs may be limited by the upstream of the supply chain – the battery manufacturing and supply chain inflation. In addition, it is also uncertain how much sales demand impacts will be caused by the potential global economic recession. The government firmly supports electrification and decarbonization of the vehicle industry by emphasizing the importance of the vehicle industry for promoting the greenhouse gas net zero by 2060. The dual-credit policy is regarded as the most critical regulation in a bid to restrain fuel consumption and promote PEV share. Still, the market is facing some technological obstacles, such as battery safety and driving range anxiety, before real prosperity. In addition, the Chinese electric vehicle market is seeing a trend toward the development of new technologies such as vehicle-to-X, autonomous driving, and connected vehicles.

Hao, Xu↗

The Future of Zero Energy Buildings: Produce, Respond, Regenerate: Preprint

The zero energy buildings concept is more than 20 years old, and the paradigm shift from buildings as energy consumers to buildings as energy producers is underway. Buildings also consume land and material resources, however, with attendant environmental impacts. Another paradigm is emerging: a built environment that produces energy and is environmentally responsive and regenerative. This paper investigates an updated framework for thinking about zero energy buildings that includes discussions of prioritizing renewables; determining on-site versus off-site generation; exploring how and when buildings should use energy; and balancing renewables, storage, and energy efficiency. Buildings are typically connected to the utility grid and the utility grid develops largely in response to the built environment. If more buildings’ real time electricity use aligned with renewable generation, more renewables would be added to the grid. Ultimately, the goal for zero energy buildings will be to use 100% renewables, 100% of the time, matching loads with energy storage and renewable generation at each discrete timestep over a year. This target is beyond the current zero energy definitions, which focus on an annual balance of renewable supply and energy demand and use the grid to “store” excess production to make up for hours without sufficient on-site renewable generation. This paper expands this upgraded concept and outlines simple metrics to evaluate the alignment of renewable sources and storage with building loads. This process can provide insights on building design considerations, including the use of flexible loads and optimal resource management.

ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATION↗

Power inverter module with reduced inductance

A power inverter module includes a base module having a plurality of electrically conductive layers, including a first conductive layer, a second conductive layer and a third conductive layer. A first terminal is operatively connected to the first conductive layer at a first end and a second terminal is operatively connected to the second conductive layer at the first end. An isolation sheet is sandwiched between the first and second terminals. The first terminal and the second terminal include a respective proximal portion composed of a first material and a respective distal portion composed of a second material. At least one of the first terminal and the second terminal is bent to create an overlap zone such that a gap between the first terminal and the second terminal in the overlap zone is less than a threshold distance. The power inverter module is configured to reduce parasitic inductance.

Jaksic, Marko↗