Search NASASearch

SEARCH · Search NASA

Results for “two-dimensional magnetism”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

505 records · Page 28

Aerosol-deep convection interaction based on joint cell-thermal tracking in Large Eddy Simulations during the TRACER campaign

In cumulus clouds, aerosol concentrations control cloud droplet concentrations, modifying cloud radiative properties, precipitation processes, and cloud electrification. However, mechanisms of aerosol-deep convection interactions are not well understood due to complex cloud dynamics and microphysics. We investigate the interaction of aerosols with isolated deep convection using Large Eddy Simulations of two cases during the TRacking Aerosol Convection interactions ExpeRiment (TRACER) near Houston, Texas, using a joint cell-thermal tracking algorithm. Cumulus thermals are droplet generators, since supersaturation and droplet nucleation coincide with thermal centers, where the strongest updrafts occur. Primary ice crystal formation does not take place inside thermals, but at layers where previous thermals detrained moisture. As subsequent thermals containing supercooled droplets penetrate these layers, hail and graupel form at or near these thermals. Higher aerosol concentrations result in higher droplet concentrations that suppress drizzle, delay warm rain processes, and transport more moisture aloft. This increases snow and ice amount, as well as graupel and hail, leading to more lightning. Polluted thermals initiate at slightly higher altitudes, and are slightly larger and faster, suggesting a weak invigoration. We also find more thermals per cell, but fewer isolated cells, since convection is more aggregated and intense, especially near the end of the 24 h simulation. Non-linear mesoscale feedback likely triggered by temperature and moisture responses to aerosol-thermal interactions causes the aggregation. Time-lagged aerosol-reinitialization experiments show that the mesoscale response is the predominant forcing for the invigoration. These changes happen within one day, on a smaller scale than previously suggested.

54 ENVIRONMENTAL SCIENCES

Wide-Bandgap Semiconductor Amplifiers for Fusion Plasma Heating and Control

This paper discusses power electronics developed under the ARPA-E GAMOW program to support nuclear fusion power production. The goal of this project was to develop and assess the potential for wide-bandgap (WBG) semiconductor devices in power electronics to enable high-efficiency and high-voltage solid-state systems for fusion plasma generation, heating, and control. The power electronics use an architecture in which multiple high-power boards can be combined to produce megawatt-level power, where using multiple boards provides high reliability. Two main areas of power electronics boards are developed in this project for fusion plasma heating and control applications: (1) pulse generation and control and (2) radiofrequency generation. The first area is for boards capable of driving high-voltage millisecond pulses at high duty cycles. The envisioned application of these pulses is in plasma control of magnetohydrodynamic instabilities, plasma position, and edge-localized modes. Pulse-width modulation allows for the implementation of a wide variety of linear and nonlinear control systems. The boards developed for this project could actuate control coils based on digital input signals and can be parallelized to provide megawatts of output power. The design of the pulse generator is a low-side load switch. A load switch was designed and constructed that utilized 2-kV-rated field-effect transistor (FET)-based cascodes developed by Qorvo under this project to perform initial testing of these cascodes. The second area is being implemented using class E amplifiers with WBG devices and a reactance steering network to handle inductive or capacitive plasma loads. Applications include ion cyclotron resonance heating (ICRH) and high-harmonic fast-wave (HHFW) heating. A class E reactance steering network is demonstrated in modeling and experiment with a resistive-inductive load that models an inductively-coupled plasma. Power combining of boards with class E reactance steering networks is also simulated and demonstrated experimentally, to enable scaling up to high power. Modeling of high-power-density cooling and remaining useful life is conducted to enable reliable, effectively cooled high-power electronics for fusion applications.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Thermal Reservoir Networks for Modularly Expandable Thermal Microgrids

The Department of Defense (DoD) faces the substantial challenge of cost-effectively retrofitting one to two installations per month, each comprising approximately 1,000 buildings, to improve resilience, reduce energy consumption, and enhance energy supply security. Achieving these objectives requires optimal system selection and effective risk mitigation during system integration. To address this need, we introduce Platform-Based Design (PBD), a structured, hierarchical methodology adapted from other industrial sectors to the domain of energy system retrofits. We demonstrate the effectiveness of PBD through a techno-economic feasibility study comparing geothermal-coupled thermal energy networks (TENs) with conventional energy systems for heating, cooling, and powering 17 buildings at Joint Base Andrews (JBA) in Maryland. Our analysis illustrates that the PBD approach enables rigorous, data-driven, sequential decision making, resulting in a family of Pareto-optimal systems, among which the TEN emerged as the most promising solution. The selected TEN design integrates geothermal borefields, heat recovery heat pumps, photovoltaic (PV) arrays, and battery storage. Compared to the baseline system – gas heating combined with air-source chillers – the proposed TEN reduces annual imported energy by 74% and peak electricity demand by 45%, achieves a levelized cost of energy of $\$0.210$/kWh, and substantially enhances resilience. Life-cycle costs increase by approximately 6%, and initial investment costs are about 2.5 times higher than the baseline. However, if central plant infrastructure, district loops, and utility-scale PV and battery systems are privately funded and operated, the initial investment would fall below the baseline system cost. Critical to achieving these significant performance improvements were detailed nonlinear dynamic simulations coupling geothermal heat transfer, energy system operation, and realistic feedback control logic. These simulations identified essential design modifications and control strategy refinements that substantially reduced energy use, peak demand, and compressor shortcycling, thereby improving durability and reliability—issues that would have been significantly more expensive to resolve during operation. Additionally, the verification step highlighted sensitivities to key design parameters that could reduce initial investment by approximately $\$2$ million and reduce annual life-cycle costs more than $\$300,000$. We recommend adopting the PBD methodology for future feasibility studies and TEN pilot projects to gain valuable operational experience. Furthermore, we recommend that DoD invest in transferring and scaling the PBD methodology to other installations. This entails developing standardized computational frameworks and component libraries as well as training industry in conducting PBD. Such investments would enable rapid, robust, reliable, and cost-effective retrofits, supporting DoD’s ambitious energy system modernization goals.

Wetter, Michael [Lawrence Berkeley National Labora

Identifying Suitable Front Contacts for High‐Efficiency Cd(Se,Te) Solar Cells on Space‐Qualified Cover Glass

Deployment of photovoltaics in space requires devices that combine high-efficiency, low areal mass, and resilience to harsh environments. Historically, high-efficiency multijunction III–V materials have dominated space power systems; however, their high cost and limited manufacturing throughput motivate the exploration of scalable alternatives. While CdTe-based thin-film photovoltaics offer an attractive option, their performance on non-conventional substrates can suffer from front contact instability under higher-temperature processing. Here, the role of front contact chemistry in limiting cell performance is investigated using CdTe-based devices fabricated on 150 μm thick Ceria-doped space-qualified 0214 Corning glass. A matrix of four transparent conducting oxides (TCOs: CTO, AZO, ITO, IZO) combined with two n-type emitters (MZO, IGO) reveals chemical stability at the front interface—rather than absorber composition alone—governs recombination losses, voltage deficits, and device reproducibility. Chemically stable front contact combinations suppress elemental diffusion and interfacial degradation, resulting in significantly improved carrier lifetimes and junction quality. These insights are validated through record-certified Cd(Se,Te) cell efficiencies of 18.4% under AM1.5G and 16.2% under AM0 illumination on ultra-thin glass. Beyond CdTe, this work provides a general framework for the rational selection of TCO/emitter interfaces in superstrate thin-film photovoltaics, including emerging technologies like metal halide perovskites, while enabling high-efficiency, lightweight photovoltaics for space applications.

14 SOLAR ENERGY

Lunar accelerometer network gravitational observatory (LANGO)

With ground-based interferometers detecting hundreds of gravitational-wave (GW) events, GW astronomy has continued to blossom. U.S. and European scientists are developing plans to construct third-generation ground-based interferometers. ESA has proceeded through the mission formulation phase of space-based interferometer in a lower-frequency band, 10 –4 –0.1 Hz. Despite all these exciting developments, there is still a missing frequency band, 0.1–10 Hz. This mid-frequency band is rich with interesting astrophysical events. Coalescence and merger of intermediate-mass black holes (IMBHs) will occur in this frequency band. Coalescing stellar-mass BHs will pass through this frequency band days before they reach the frequency band of LIGO and Virgo. Detection of such signals would enable a mid-frequency detector to issue an advance notice to the high-frequency GW detectors, as well as to optical, x-ray and γ-ray telescopes. We propose Lunar Accelerometer Network Gravitational Observatory (LANGO) to detect GWs in this frequency band. In the first phase (LANGO 1), we propose to deploy four ambient-temperature (250 K) accelerometers in the tetrahedral or in a square configuration on the hemisphere facing the Earth. After successful operation at 250 K, LANGO would be upgraded to a cryogenic (4 K) version with over two orders of magnitude increased sensitivity (LANGO 2), with coherent rejection of seismic noise implemented. LANGO is a full-tensor detector, capable of determining the source direction and wave polarization. Each test mass (TM) is suspended as a pendulum with resonance frequency ∼ 0.01 Hz, thus is only weakly coupled to the lunar surface horizontally. LANGO is designed to detect the relative motion of globally separated, nearly free, TMs by using the Moon as a large quiet platform. LANGO 1 and 2 accelerometers aim at sensitivities ⩽ 10 –11 m s –2 Hz –1/2 and ⩽ 10 –13 m s –2 Hz –1/2 in the horizontal axes over the frequency band of 1 mHz–10 Hz, which yield GW sensitivities 1.1 x 10 -21 Hz -1/2 and 3.8 x 10 -24 Hz -1/2 at 1 Hz, respectively. The LANGO accelerometers will be 10 3 –10 5 times more sensitive than Apollo seismometers. With such sensitivity, LANGO will also make great contribution to the advancement of lunar geophysics.

79 ASTRONOMY AND ASTROPHYSICS

Erosion of high-Z refractory coatings for helicon plasma source window

Proto-MPEX (Materials Plasma Exposure eXperiment), a linear plasma device (LPD), using a high power radio frequency (RF) (⩾100 kW, 13.56 MHz) helicon plasma source, has suffered RF sheath-induced window erosion. The sputtered impurities from the window surface transport toward the downstream target affecting plasma-material interaction studies. The rectified sheath voltage formed was high enough to cause window erosion by light ions due to its low-Z components (e.g. Si 3 N 4 and AlN). Hence, we are proposing impurity mitigation strategies, which involve the application of a Faraday screen to lower the rectified sheath voltage and the application of high-Z refractory coatings on the existing window plasma-facing surface. In this work, we report the erosion of two different coatings, i.e., tantalum oxide (Ta 2 O 5 ) and hafnium oxide (HfO 2 ) on a silicon nitride (Si 3 N 4 ) window material under conditions of low-energy deuterium (D) ion impact, well below the Ta 2 O 5 sputtering energy threshold (i.e. 250 eV). The test samples were RF-biased and exposed to a high D-ion fluence (∼10 26 m −2 ) in Plasma Interaction with Surface Component Experimental Station (PISCES-A) LPD. The experimentally measured sputtering yields of the high-Z refractory coatings below the sputtering energy threshold of Ta 2 O 5 indicate an increased erosion due to the plasma impurities, especially due to oxygen. Improving the vacuum level could reduce the oxygen impurities and increase the lifespan of the coated helicon window for plasma operation. Post-surface analysis indicates no preferential erosion of oxygen or enrichment of the high-Z surface component. This is likely due to an effective energy transfer from the impurity ion for sputtering of the high-Z component in the coating. With the reduced rectified sheath voltage at the window surface and improved vacuum conditions, the proposed high-Z refractory coatings offer a promising solution for reducing window erosion in future MPEX plasma operations at ORNL.

RF bias

Software Validation Work With The ZPPR-15 Data

The analysis activities for fast reactors involve using many different pieces of software that are relied upon for their predictive capabilities. For this software to be considered reliable, documented proof that the predictions of the software are accurate is required. In this manuscript, the validation work that covers some of the Argonne software used in fast reactor design activities is discussed and displayed. This validation work includes neutron and gamma flux distributions, reaction rate distributions, and reactivity worth. In an ideal world, a reactor development program would have access to a comprehensive set of experimental facilities to help inform the design aspects of the reactor itself. While thermal-hydraulics experiments, and to a limited degree mechanical experiments, can be carried out today for validation needs, neutronics related experimental facilities are rather impractical because of the lack of experimental facilities. Given the desired time table for construction of new reactors, the reconstitution or creation of new neutronic experimental facilities is untenable and thus those reactor development programs must rely upon any available experimental measurements that are qualitatively similar to the design. While a methodology has been proposed to assess the similarity between the past experimental measurements and the reactor itself, that aspect is beyond the scope of this manuscript. In this manuscript, the focus is entirely placed on the analysis results for a series of experiments carried out at the ZPPR facility in Idaho in the mid-1980s. In this regard, this manuscript only shows the validation of the stated neutronics software for specific loadings of the ZPPR reactor. Because of the fuel form, its proposed enrichment, and the material content of the reactor core, the ZPPR-15 experiments were identified as potential validation data for the reactor. The ZPPR-15 experiments were intended as mockups of a 330 MWe Integral Fast Reactor program which was a follow on program to the Clinch River Breeder Reactor. In the ZPPR-15 series of experiments, measurements of the neutron spectrum, control rod worth, sodium void worth, foil reaction rate distributions, Doppler worth of heated samples, gamma dose, and axial expansion worth were all carried out and published. In many cases, these reactivity coefficients are good candidates to validate the reactivity coefficient calculation scheme used by the analysis software and included in the safety analysis activities of fast reactor development projects today. This manuscript discusses the modeling methodology and accuracy of the calculated experimental results using the LANL software MCNP and the ANL software package ARC (Argonne Reactor Codes). As will be shown, for many of the experimental measurements, the two software packages are found to be good predictive analysis tools for those experiments. In other cases, problems with the analysis methodology or underlying cross section data are exposed which indicates where predictive analysis is not as reliable. Finally, in some of the measurements the conclusion is reached that the experimental measurement cannot be reproduced with the analysis software as it is simply too difficult.

Aliberti, Gerardo

The DUNE Far Detector Vertical Drift Technology. Technical Design Report

DUNE is an international experiment dedicated to addressing some of the questions at the forefront of particle physics and astrophysics, including the mystifying preponderance of matter over antimatter in the early universe. The dual-site experiment will employ an intense neutrino beam focused on a near and a far detector as it aims to determine the neutrino mass hierarchy and to make high-precision measurements of the PMNS matrix parameters, including the CP-violating phase. It will also stand ready to observe supernova neutrino bursts, and seeks to observe nucleon decay as a signature of a grand unified theory underlying the standard model. The DUNE far detector implements liquid argon time-projection chamber (LArTPC) technology, and combines the many tens-of-kiloton fiducial mass necessary for rare event searches with the sub-centimeter spatial resolution required to image those events with high precision. The addition of a photon detection system enhances physics capabilities for all DUNE physics drivers and opens prospects for further physics explorations. Given its size, the far detector will be implemented as a set of modules, with LArTPC designs that differ from one another as newer technologies arise. In the vertical drift LArTPC design, a horizontal cathode bisects the detector, creating two stacked drift volumes in which ionization charges drift towards anodes at either the top or bottom. The anodes are composed of perforated PCB layers with conductive strips, enabling reconstruction in 3D. Light-trap-style photon detection modules are placed both on the cryostat's side walls and on the central cathode where they are optically powered. This Technical Design Report describes in detail the technical implementations of each subsystem of this LArTPC that, together with the other far detector modules and the near detector, will enable DUNE to achieve its physics goals.

47 OTHER INSTRUMENTATION

H 0 without the sound horizon (or supernovae): A 2% measurement in DESI DR1

The sound horizon scale rs is a key source of information for measurements of H 0 from early-time data, and is therefore a common target of new physics proposed to solve the Hubble tension. We present a sub-2% measurement of the Hubble constant that is independent of this scale, using data from the first data release of the Dark Energy Spectroscopic Instrument (DESI DR1). Building on previous work, we remove dependency on the sound horizon size using a heuristic rescaling procedure at the power spectrum level. A key innovation is the inclusion of uncalibrated (agnostic to r s ) post-reconstruction BAO measurements from DESI DR1, as well as using the CMB acoustic scale θ* as a high-redshift anchor. Uncalibrated type-Ia supernovae are often included as an independent source of Ω m information; here we demonstrate the robustness of our results by additionally considering two supernova-independent alternative datasets. We find somewhat higher values of H 0 relative to our previous work: 69.2 +1.3 -1.4 , 70.3 +1.4 -1.2 , and 69.6 +1.3 -1.8 km s -1 Mpc -1 respectively when including measurements from i) Planck/ACT CMB lensing × unWISE galaxies, ii) the DES Year 3 6×2pt analysis, and iii) Planck/ACT CMB lensing + the DES Year 5 supernova analysis. These remarkably consistent constraints achieve better than 2% precision; they are among the most stringent sound horizon-independent measurements from LSS to date, and provide a powerful avenue for probing the origin of the Hubble tension.

79 ASTRONOMY AND ASTROPHYSICS

Tokamak Energy’s pre-concept design for a fusion power plant: an overview of ST-E1

Climate change and rapidly rising energy demand, driven in part by artificial intelligence and data-centre growth, create an urgent need for stable, low-carbon, and abundant power. Fusion is a promising long-term solution, yet its commercialisation faces a fundamental paradox in today’s investment environment: pilot plants are essential to de-risk physics, engineering, and operations, but their limited lifetime energy output and high upfront costs make them difficult to finance. This paper presents Tokamak Energy’s response: ST-E1, a pre-concept design for a low-aspect-ratio tokamak power plant engineered specifically to overcome this challenge. ST-E1 is designed from the outset for phased operation—pilot and commercial phases, with an upgrade phase in between—with emphasis on commercial viability, maintainability, nuclear engineering, modularity, and upgradability. A key design principle is the deliberate separation of long-lived assets, such as the magnet cage and vacuum vessel, from replaceable in-vessel systems. This provides an attractive and credible investment approach to generate operational data and de-risk key technologies while preserving most capital-intensive assets for later commercial phases. The architecture supports continuous optimisation toward high net electric power (targeting 800–1000 MW net electric), a normalised capital expenditure of $\$$ 12–14k/kW of net electric power, and high availability (targeting > 80%). A tokamak core with a 5 m major radius, aspect ratio of 2.3, and on-plasma axis toroidal field of 5.25 T was selected to meet these objectives. This paper summarises the ST-E1 design philosophy, principal features, and development methodology. It introduces a Focus Collection of 11 papers detailing the pre-concept design of the entire tokamak and corresponding plant.

ST-E1

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Nuclear Safety [Vol. 29, No. 1, January-March 1988]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. THE CHERNOBYL ACCIDENT: 1 Core History and Nuclide Inventory of the Chernobyl Core at the Time of Accident by Gerald Kirchner and Cornelius C. Noack; GENERAL SAFETY CONSIDERATIONS: 6 Nonprescriptive Nuclear Safety Regulation: The Example of Loss of Offsite Power by M. W. Golay, V. P. Manno, and C. Vlahoplus, Jr., 20 Nuclear Power Safety Goals in Light of the Chernobyl Accident by C. Whipple and C. Starr; ACCIDENT ANALYSIS: 29 Containment Loads from Severe Accidents—U.S. Program by W. Kerr and M. K. Dey; PLANT SAFETY FEATURES: 36 Safety Characteristics of Modern High-Temperature Reactors: Focus on German Designs by W. Kröger, H. Nickel, and R. Schulten; ENVIRONMENTAL EFFECTS: 49 Radiation Hormesis and Nuclear Safety by C. C. Congdon; OPERATING EXPERIENCES: 58 Evaluation of Nonradiological Water Chemistry at Power Reactors by Harvey Zibulsky, James J. Kottan, Walter J. Pasciak, Mary Ann Castrogivanni, and Sujit Banerjee, 64 Reactor Shutdown Experience Compiled by J. W. Cletcher, 67 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 85 General Administrative Activities Compiled by E. G. Silver, 94 Reports, Standards, and Safety Guides by D. S. Queener, 100 Status of Power-Reactor Projects Undergoing Licensing Review Compiled by E. G. Silver, 103 Proposed Rule Changes as of Sept. 30, 1987; ANNOUNCEMENTS: 5 Northwestern University Short Course on Radiation Safety, 28 International Approach to Nuclear Safety (After Three-Mile Island and Chernobyl), 57 RPI Short Course on Modern Developments in Boiling Heat Transfer and Two-Phase Flow, 107 20th DOE/NRC Nuclear Air Cleaning Conference, 110 Third International Topical Meeting on Nuclear Power Plant Thermal Hydraulics and Operations, 108 The Authors, 111 Indexes to Nuclear Safety, Volume 28.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

De Novo Design of High‐Affinity Miniprotein Binders Targeting Francisella Tularensis Virulence Factor

Abstract Francisella tularensis poses considerable public health risk due to its high infectivity and potential for bioterrorism. Francisella‐like lipoprotein (Flpp3), a key virulence factor unique to Francisella, plays critical roles in infection and immune evasion, making it a promising target for therapeutic development. However, the lack of well‐defined binding pockets and structural information on native interactions has hindered structure‐guided ligand discovery against Flpp3. Here, we used a combination of physics‐based and deep‐learning methods to design high‐affinity miniprotein binders targeting two distinct sites on Flpp3. We identified four binders for site I with binding affinities ranging between 24–110 nM. For the second site, an initial binder showed a dissociation constant ( K D ) of 81 nM, and subsequent site saturation mutagenesis yielded variants with sub‐nanomolar affinities. Circular dichroism confirmed the topology of designed miniproteins. The X‐ray crystal structure of Flpp3 in complex with a site I binder is nearly identical to the design model (Cα root‐mean‐square deviation (RMSD): 0.9 Å). These designed miniproteins provide research tools to explore the roles of Flpp3 in tularemia and should enable the development of new therapeutic candidates.

Gokce‐Alpkilic, Gizem [Molecular Engineering and S

Recrystallization, cracking, and erosion of dispersoid-strengthened tungsten materials during exposure to divertor plasmas

In this study, we investigated the effects of combined intense particle and heat flux exposure on advanced tungsten plasma-facing materials within the DIII-D fusion facility. Our test matrix included two types of dispersoid-strengthened tungsten (containing either 100 nm diameter TiO 2 or Ni particles), along with high-purity polycrystalline tungsten as a reference. This experiment relied on a sample geometry angled at 15° relative to the divertor surface, thereby allowing the surfaces to intercept steady-state perpendicular heat fluxes (q ⟂ ) ranging from 10.1 to 19.6 MW/m 2 . During each shot, the samples were exposed to 42 Hz edge-localized modes (ELMs), allowing us to test the material response to transient heating. We correlated the exposure conditions with extensive post-test surface composition analysis and microscopy to determine how the plasma modified each surface. The angled specimens closest to the strike point received the highest combined heat and particle flux and melted midway through the experiment. EBSD analysis revealed they were completely recrystallized throughout, with an average grain size >100 µm. On the other hand, the specimens that received a lower steady state heat flux survived with more superficial surface damage. Whereas the high-purity polycrystalline tungsten exhibited a higher surface roughness, the dispersoid-strengthened material exhibited more extensive shallow inter-granular cracking. In addition, the surface was depleted of dispersoids following plasma exposure, possibly because of evaporation and/or sputtering. The results described here provide insights into the performance of these materials in a fusion environment which can guide further optimization for use in long-pulse devices.

Kolasinski, Robert D. [Sandia National Laboratorie

Electron temperature relations and the direct N, O, Ne, S, and Ar abundances of 49 959 star-forming galaxies in DESI data release 2

We present the largest direct-method abundance catalogue of galaxies to date, containing measurements of 49 959 star-forming galaxies at z<0.96 from DESI (Dark Energy Spectroscopic Instrument) data release 2. By directly measuring electron temperatures across multiple ionization zones, we provide constraints on a number of electron temperature relations. Using the temperature measurements, we derive reliable abundances for N, O, Ne, S, and Ar, and measure the evolution of abundances and abundance ratios of as a function of metallicity and other galaxy properties. Our measurements include direct oxygen abundances for 49 507 galaxies, leading to the discovery of the two most metal-poor galaxies in the nearby Universe, with oxygen abundances of 12+log⁡(O/H)=6.77−0.03+0.03 dex (1.2 per cent Z⊙⁠) and 12+log⁡(O/H)=6.81−0.04+0.04 dex (1.3 per cent Z⊙⁠). We identify a rare outlier population of 24 galaxies with high-N/O ratios at low metallicity, reminiscent of galaxy abundances observed in the early Universe. We find the Ne/O ratio is constant at low metallicity but increases gradually at 12+log(O/H)>8.105±0.004 dex. We show that the S/O and Ar/O abundance ratios are strongly correlated, consistent with the expected additional Type Ia enrichment channel for S and Ar. In this work, we present an initial survey of the key properties of the sample, with this data set serving as a foundation for extensive future work on galaxy abundances at low redshift.

Scholte, D. [Edinburgh U., Inst. Astron.] (ORCID:0

Gear Test Assembly - Experimental Testing and Analysis of Gears and Bearings - FY2026

The Gear Test Assembly (GTA) is an experimental test apparatus built and installed in the Mechanisms and Engineering Test Loop (METL) at Argonne National Laboratory (ANL). While designed to accommodate a variety of components intended for use in advanced compact in-vessel transfer machine, the focus of GTA been the testing of large radial spur gears. The performance of the components used in GTA motivates the choices made in the design, components, and material choices for the forthcoming METL test articles; the Gripper Test Assembly (GrTA), and the Bearing Test Assembly (BTA). To date, GTA has completed nine experimental testing campaigns and achieved over 21 million revolutions under prototypic sodium fast reactor loads and operating conditions. This report provides an overview and results for the two most recent experiments Campaign #8 and Campaign #9. `Campaign #8 was the first campaign to make use of a set of nickel alloy radial spur gears, made from Hastelloy C-22HS, and combined with heat-treated tapered roller bearings. The bearings and torque profile used allowed Campaign #8 to be directly compared with Campaign #1 where Inconel 718 gears were used instead. Campaign #8 attained 1,058,880 shaft revolutions within 23% of the 1,314,855 revolutions achieved in Campaign #1. These results demonstrate that the heat-treated tapered roller bearings show consistent increased lifetimes, approximately three times longer than for non heat-treated taper rollers, and that the particular material of the gear does not play a substantial role in performance. Similar to Campaign #7 where bearing failure resulted in fragmentation and transport of bearing material into the gear teeth led to tooth damage in the Inconel gears, a similar process led to the damage of the Hastelloy gears. Subsequent NDE analysis showed that the damage was only limited to the tooth surface and does not extend into the gear interiors. Based on the NDE reports, the Hastelloy gears can be reconditioned and put back into service for future campaigns as was done for the Inconel gears. Reconditioned Inconel 718 gears damaged in Campaign #7 were returned to service in Campaign #9 and paired with non heat-treated tapered roller bearings. In Campaign #9 a novel set of operating conditions were implemented whereby the gears and bearings were cycled between hot, submerged refueling conditions where fuel handling operations occurred and cold, dry, and inert conditions where the sodium was drained and the vessel was allowed to cool simulating long, ex-vessel storage of the fuel handling machine. A total of eight of these operating cycles were achieved before a bearing failure occurred after the accumulation of 475,692 shaft revolutions were achieved. During Campaign #9, one of the drive motors was damaged and over the course of a 240 day standby period, the entire GTA drive system was upgraded from a 480VAC system to a 240VAC system that provided the opportunity to consolidate wall-space in the METL facility and provide more space for additional test articles being installed in the coming year. The over 475,000 shaft revolutions achieved in Campaign #9 eclipses the previous record for lifetime of non heat-treated tapered roller bearings held by Campaign #3 of 392,000 shaft revolutions. Further analysis and future campaigns hope to shed light on the cause of this approximately 17% increase in lifetime.

42 ENGINEERING

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

Search for New Physics via Low-Energy Electron Recoils with a 4.2 Tonne-Year Exposure from the LZ Experiment

We report results from searches for new physics models through electron recoils using data collected by the LUX-ZEPLIN experiment during its first two science runs, with a total exposure of 4.2 tonne−years. The observed data are consistent with a background-only hypothesis. Constraints are derived for electromagnetic interactions of solar neutrinos, solar axionlike particles (ALPs), mirror dark matter, and the absorption of bosonic dark matter candidates. The inverse Primakoff process for 57 Fe deexcitation solar ALPs is considered for the first time. These results represent the most stringent constraints to date on keV-scale Primakoff and 57 Fe solar ALPs, bosonic dark matter, mirror dark matter, and neutrino millicharge, while remaining competitive for the other signal models investigated.

Axion-like particles