Port Hope Are Initiative Port Granby Project - Water Management in Extreme Weather Conditions - 19257
The Port Granby Project is part of the Port Hope Area Initiative (PHAI) through which Canadian Nuclear Laboratory (CNL) is managing long-term historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the urban setting of Port Hope, Ontario. Port Granby remediation scope includes 1) constructing a new, secure long-term waste management facility (LTWMF) and supporting infrastructure, and 2) excavating and relocating LLRW and marginally contaminated soil from the Port Granby Waste Management Facility (PGWMF), which accepted waste until the 1980's, to the newly constructed LTWMF. This paper provides an overview of the challenges of water management (control of storm and groundwater at the LTWMF and PGWMF) on a large-scale construction project with changing and unpredictable weather patterns. Consistent with increased observations of extreme weather events, over two consecutive construction seasons, weather changed from one of the driest on record (high temperatures, dry conditions and strong wind) to one of the wettest on record (short duration high-intensity rainfall that flooded the LTWMF, excavations and on-site PGWMF and LTWMF retention ponds). This paper describes the collaborative approach among Wood (Constructor), AECOM (Engineer of Record), and CNL to adjust to extremes in weather to control dust and excessive water during construction. The summer of 2016, one of the driest summers on record in southern Ontario, was followed by one of the wettest in 2017. In 2016, the project team used water from the uncontaminated on-site storm water ponds, applied a polymer product for dust control across the site to augment water applications, obtained a Permit to Take Water from the provincial government to pump water from Lake Ontario, procured large tanks for storage of Lake Ontario water to meet peak demand, and retained additional water trucks/operators for day to day site operations. In stark contrast, to accommodate heavy rains in 2017 the project team installed ∼6 million liter aboveground storage tanks with secondary containment for contaminated water storage; procured 100+ mobile water storage tanks to supplement the on-site storage, utilized LTWMF cells sumps, excavations and retention ponds to store and manage onsite water; and adjusted additional staff resources (more staff and longer shifts) during anticipated periods of high-intensity rainfall, at times managing water around the clock. Recognizing the need to minimize the release of contaminated soil and water from the construction site at all times, these efforts illustrate the importance of anticipating and reacting to extreme weather events on a more regular basis. (authors)