Search NASASearch

SEARCH · Search NASA

Results for “20 FOSSIL-FUELED POWER PLANTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

995 records · Page 3

Nuclear Safety [Vol. 30, No. 1, January-March 1989]

Nuclear Safety is a review journal that covers significant developments in the field of nuclear safety. Its scope includes the analysis and control of hazards associated with nuclear energy, operations involving fissionable materials, and the products of nuclear fission and their effects on the environment. Primary emphasis is on safety in reactor design, construction, and operation; however, the safety aspects of the entire fuel cycle, including fuel fabrication, spent-fuel processing, nuclear waste disposal, handling of radioisotopes, and environmental effects of these operations, are also treated. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 1 International Conference on Thermal Reactor Safety: NUCSAFE 88 by A. P. Malinauskas and J. G. Pruett; ACCIDENT ANALYSIS: 18 Chernobyl Today: State of Research by A. Yu. Gagarinskii; CONTROL AND INSTRUMENTATION: 23 Problems Associated with Routine In-Plant Radioactive Effluent Monitoring Systems at U.S. Light-Water Reactors by Barry G. Wahlig, David M. Walker, Mahmoud R. Ghavi, and John M. Palms; DESIGN FEATURES: 34 Twentieth DOE/NRC Nuclear Air-Cleaning Conference by R. R. Bellamy, D. W. Moeller, and M. W. First, 46 Design Options for the Core Support Structure for Liquid-Metal-Cooled Reactor Plants by J. P. Burelbach, W. J. Kann, J. G. Saiveau, and R. W. Seidensticker; ENVIRONMENTAL EFFECTS: 53 The Radiological Consequences of the Chernobyl Accident by L. V. Konstantinov and A. J. González; WASTE AND SPENT FUEL MANAGEMENT: 70 Activities Related to Waste Management Compiled by E. G. Silver; OPERATING EXPERIENCES: 80 Fuel Performance Annual Report for 1986 by W. J. Bailey, 103 Safety Considerations Related to 12-Hour Shift Schedules by S. Gould, 105 Reactor Shutdown Experience Compiled by J. W. Cletcher, 108 Operating U.S. Power Reactors Compiled by E. G. Silver; RECENT DEVELOPMENTS: 130 General Administrative Activities Compiled by E. G. Silver, 140 Reports, Standards, and Safety Guides by D. S. Queener, 145 Status of Power-Reactor Licensing Activities Compiled by E. G. Silver, 153 Proposed Rule Changes as of Sept. 30, 1988; ANNOUNCEMENTS: 69 Northwestern University Short Course on Radiation Safety, 79 International Seminar on Fission Product Transport Processes in Reactor Accidents, 129 Harvard School of Public Health Offers Short Courses, 152 MIT Offers Summer Short Courses on Reactor Safety and Nodal Analysis, 152 Seminar on Use of PCs in Probabilistic Safety Analysis, 157 The Authors, 160 Indexes to Nuclear Safety, Volume 29.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Salt to Metal to Salt Heat Transfer in Narrow Fuel Pins (Final CRADA Report)

This work focused on improving the understanding and modeling of conjugate heat transfer in the Stable Salt Reactor (SSR), particularly the transfer of heat from molten fuel salt inside narrow fuel pins, through the metal cladding and into the surrounding coolant salt.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS

Nuclear Safety [Vol. 37, No. 3, July-September 1996]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS 181 Attitudes and Practices Regarding Disposal of Liquid Nuclear Waste at Clinton Laboratories in the Very Early Years: A Historical Analysis, S. H. Stow; 202 Off-Site Nuclear Emergency Management in Germany Under the Auspices of the Federal Structure, A. Bayer, S. Bittner, and H. Korn; DESIGN FEATURES: 211 Twenty-Fourth DOE/NRC Nuclear Air-Cleaning and Treatment Conference, R. R. Bellamy, J. J. Hayes, R. D. Porco, and M. W. First; OPERATING EXPERIENCES: 222 Explosion in the Tomsk-7 Reprocessing Plant on April 6, 1993, M. L. Hyder, W. G. Lussie, and F. E. Witmer; 234 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 237 Assessment of Spent Fuel Cooling, J. G. Ibarra, W. R. Jones, G. F. Lanik, H. L. Ornstein, and S. V. Pullani; RECENT DEVELOPMENTS: 256 Reports, Standards, and Safety Guides, D. S. Queener; 260 Proposed Rule Changes as of June 30, 1996; ANNOUNCEMENTS: 210 Tennessee Industries Week; 221 21st International Symposium on The Scientific Basis for Nuclear Waste Management; 259 IAEA Programme of Scientific Meetings for 1997; 270 PSAM 4 (International Conference on Probabilistic Safety Assessment and Management); 265 The Authors; 268 Errata.

05 NUCLEAR FUELS

Nuclear Safety [Vol. 37, No. 2, April-June 1996]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. GENERAL SAFETY CONSIDERATIONS: 97 The Nuclear Community and the Public: Cognitive and Cultural Influences on Thinking About Nuclear Risk, M. A. Meyer; 109 Twenty-Third Water Reactor Safety Information Meeting, D. A. Copinger; ACCIDENT ANALYSIS: 126 Analysis of a PWR LBLOCA Without SCRAM, Trevor N. Tyler, Rafael Macian-Juan and John H. Mahaffy; DESIGN FEATURES: 139 Vulnerability of Multiple-Barrier Systems, N. C. Lind; ENVIRONMENTAL EFFECTS: 149 A Study of Wet Catalytic Oxidation of Radioactive Spent Ion Exchange Resin by Hydrogen Peroxide, Xingchao Jian, Tianbao Wu, and Guichun Yun; 157 A Comparison Study and Resolution of Differences Between Emergency Response and Safety Analysis Codes Used at the Savannah River Site, A. A. Simpkins; OPERATING EXPERIENCES: 164 Reactor Shutdown Experience, Compiled by J. W. Cletcher; RECENT DEVELOPMENTS: 167 Reports, Standards, and Safety Guides, D. S. Queener; 172 Proposed Rule Changes as of Dec. 31,1995; ANNOUNCEMENTS: 178 American Nuclear Society 1997 Annual Meeting; 178 American Nuclear Society Nuclear Criticality and Safety Division Topical Meeting; 176 The Authors.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS

Hazard and risk analysis framework for nuclear power plant–based integrated energy systems

Employing integrated energy systems (IESs) with nuclear power plants (NPPs) can improve NPP utilization by leveraging dedicated thermal and electric power delivery, but it may also increase operational safety risks. This paper presents a framework to identify and quantify hazards and risks for such IESs. The framework combines accidentology to review past industrial accidents with failure modes and effects analysis (FMEA) to identify potential future incidents. Hydrogen explosion and toxic chemical release hazards are of particular concern. Explosion consequences are quantified using the Bauwens-Dorofeev (Bauwens) and trinitrotoluene equivalent mass (TNT-EM) methods, while chemical release consequences are computed using the Gaussian atmospheric dispersion method. Operational disturbances from direct electrical and thermal integration that may affect NPP safety are modeled using probabilistic risk analysis (PRA). Hazards and risks are then evaluated for regulatory compliance. The framework is applied to IESs comprising pressurized or boiling water reactors supplying three levels of thermal and electrical power to industrial customers. Case studies include high-temperature steam electrolysis hydrogen plants of varying capacities and a synthetic fuel production plant. Sensitivity analysis examines piping component failures in the PRA model as a precursor to cost estimation for thermal extraction line design. Additionally, Fussel-Vessely (FV) and risk increase importance (RII) measures identify risk-informed design improvements for the thermal extraction system. FMEA highlights hazards such as loss of offsite power, prompt loss of electrical load, loss of thermal output, and immediate steam diversion, in addition to hydrogen explosions and toxic chemical releases. Both Bauwens and TNT-EM methods suggest maintaining several hundred meters of separation between the NPP and hydrogen facility to mitigate explosion risks. PRA results show a maximum initiating event frequency increase of 1.15% and an overall risk increase of 0.28%. Importance measure analysis identifies upstream pipe leak isolation components as critical. Evaluating the results against safety regulations, it is concluded that hazards and risks can be managed to comply with regulations through risk-informed thermal and electrical connection designs, component selection, maintenance programs, and safe separation distances between NPPs and integrated industrial facilities.

08 - HYDROGEN

Optimizing Renewable Ammonia Production for a Sustainable Fertilizer Supply Chain Transition

Local renewable ammonia production using electrolytic hydrogen is an emerging approach to alleviate emissions attributed to synthetic nitrogen fertilizer production while also insulating against fluctuations in fertilizer prices and mitigating transportation costs and emissions. However, replacing ammonia currently produced using fossil fuels will not be immediate. To this end, we develop a supply chain transition model, which first optimizes the design and hourly operation of new renewable ammonia facilities to minimize production costs and then optimizes the annual installation timing, production scale, and location of these new renewable facilities along with ammonia transportation to meet county resolution demands. The objective is to augment and eventually replace conventional ammonia market imports in an economically competitive manner. We performed a case study for Minnesota's ammonia supply chain and found that a full transition to in-state renewable production by 2032 is optimal. This is incentivized by the U.S. federal government's clean hydrogen production credits. This transition results in 99 % reduction in carbon intensity along with stable supply costs below $475 per metric tonne. New renewable production facilities are an order of magnitude smaller than existing conventional plants. They use both wind and solar resources and operate dynamically to minimize expensive battery and hydrogen storage capacities.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI

Innovations Driven by Advanced Characterization to Strategize Critical Mineral Production and Beneficial Reuse from Fossil Energy Waste

Critical minerals (CM), such as rare earth elements (REE), cobalt, nickel, and lithium, have important uses in modern electronics and advanced manufacturing, yet are vulnerable to potential supply chain disruptions. Relatively abundant and readily available fossil energy (FE) wastes, such as coal combustion ash, acid mine drainage (AMD) and treatment solids (AMD solids), and Oil and Gas (O&G) drilling wastes (drill cuttings and produced waters) are under consideration as CM feedstocks. The National Energy Technology Laboratory (NETL) has studied CM resources for various FE wastes as part of the U.S. Department of Energy’s mission of bolstering the domestic CM supply, and makes the data available to the public on EDX at sites such as the NEWTS group. Advanced characterization utilizing synchrotron x-ray techniques coupled with laboratory extractions has been performed to identify CM hosting phases in these FE wastes to inform CM recoverability mechanisms. Novel methods to selectively recover CMs while co-producing other valuable byproducts have been developed. Successful examples discussed here include: (1) The identification of REE/Co/Ni/Sc binding and hosting phases in select FE waste (coal combustion ash and AMD solids), resulting in the development of a patented CM step-extraction process, (2) coupled production of functional sorbents from these extraction wastes and for CM recovery. A pilot-scale testing to evaluate the patent’s technical feasibility for extracting REE from coal ash on a barrel scale has been successfully performed. Additionally, (3) evaluation and measurements of brine geochemistry from U.S. O&G produced waters has informed a high Li recovery potential from Marcellus Shale produced water. NETL researchers have been developing tailored pre-treatment processes, an innovative and highly durable lithium sorbent, and geochemical model guided precipitation to accelerate Li production from the Marcellus Shale produced waters. These innovations driven by characterization are integral for maximizing and advancing the potential for CM recovery while offsetting the cost and environmental footprint for FE waste management.

critical mineral processing

Recommendations for Establishing Local Rural Electrification Programs Using Photovoltaic Systems [Recomendaciones Para la Implantacidn de Programas Locales de Electrificacidn Rural con Sistemas Fotovoltaicos]

Photovoltaic (PV) technology is becoming one the best options for supplying electricity to rural communities far from electrical networks and which have a small and disperse demand for electricity. As the cost of the technology goes down and its development advances, opportunities for applying it continue to grow. As a result, in the near future we will probably see an increase in massive application programs of this technology in rural Mexico. This document presents some of the most relevant problems needing immediate solution to increase the possibility of success in establishing photovoltaic programs for rural electrification in Mexico. These problems are influenced by economic, technological, engineering, infrastructural, social and political issues. The paper presents the requirements for an industrial center based on PV technology, the accessibility of replacement parts and maintenance service, development of financial solutions, training of the users and introducing norms and technical regulations. The document summarizes the issue of rural electrification in Mexico, emphasizing the low population density in these areas. A brief description is given of photovoltaics showing different configurations that can be utilized for supplying electricity to the rural areas. The issues involved and recommendations for introducing PV systems to the rural area are described.

14 SOLAR ENERGY

Queued Up: 2026 Edition, Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2025 [Slides]

Electric transmission system operators (ISOs, RTOs, or utilities) require proposed power plants seeking to connect to the transmission grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. The lists of projects in this process are known as “interconnection queues”. In collaboration with https://www.interconnection.fyi. Berkeley Lab compiled, aggregated, and cleaned interconnection queue data from >50 transmission grid operators (7 ISO/RTOs and 50 non-ISO balancing areas), which collectively represent ~98% of currently installed U.S. electric generating capacity.

24 POWER TRANSMISSION AND DISTRIBUTION

Maintenance strategy, structural design, and site layout of the ST-E1 fusion power plant

An effective fusion reactor maintenance scheme enables safe operations and short downtimes. This in turn leads to high availability, which is critical to the commercial viability of a power-producing plant. In tokamak-based fusion power plants, the chosen maintenance approach has a significant impact on the spatial design of the tokamak, as well as the surrounding infrastructure, and therefore needs to be considered from the outset. Tokamak Energy has developed a pre-concept design of a fusion power plant, ST-E1. This work describes the major drivers and constraints that have been considered, presents the tokamak architecture and chosen maintenance regime, and discusses how this enables the plant’s two-phased approach to demonstrating commercial operations. It also shows the implications for the design of other systems areas, in particular the machine structural arrangement and bioshield and hot cell layout. The reactor core segmentation and removal scheme replaces entire toroidal segments radially through a large vacuum port, along a single axis only. The result is a change-tolerant machine and plant layout that can accommodate the evolving designs of the tokamak.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY

Paleotribological models using preserved fossil tissue properties reveal functional significance of Eurasian mammoth dental evolution

Eurasian mammoths (Mammuthus) underwent substantial modifications in molar morphology as later-diverging species evolved progressively thinner enamel and increased enamel crest complexity. These features have been hypothesized to reduce whole-tooth wear and extend dental longevity as increasingly graze-dominated diets evolved within the lineage. This hypothesis has yet to be directly tested. Here, in this study, we developed an in-silico wear model using experimentally derived wear rates from fossil and extant proboscidean dental tissues. The models revealed that shifts in tissue topology do not affect whole-tooth wear rate, as inverse trends in lamellar frequency and enamel thickness preserve a consistent surface enamel area fraction; the determining factor of wear. Rather, topological shifts produce a wear-emergent secondary occlusal surface with greater numbers of triturating crests that create a regular, low-relief, file-like shearing pavement. These changes in occlusal architecture likely directly impacted the mastication capacity of Mammuthus dentitions, facilitating their dietary expansion to incorporate fibrous, lower-nutrient graze.

Dental wear

Time-dependent scenario modeling for the ST-E1 fusion power plant

ST-E1 is a low aspect ratio fusion power plant being designed by Tokamak Energy targeting 1.5 GW of fusion power. Characterization of the ST-E1 flat-top scenario is described elsewhere McNamara et al (2026 Nucl. Fusion 66 086008); here we focus on addressing the question of how to ramp-up the ST-E1 plasma from an initial state following breakdown and flux-surface formation to the target flat-top state. Being low-aspect ratio, the available solenoid flux of ST-E1 is limited. Therefore, particular consideration is placed on developing ramp-up scenarios that predominantly use inductive flux provided by external vertical field coils. Through time-dependent modeling with METIS, we show that this is possible when the ramp-up is performed at relatively high plasma density: although auxiliary current drive efficiency is reduced, this is significantly outweighed by (1) higher electron-ion collisional equilibration, (2) higher fusion power once ions become sufficiently hot, (3) higher poloidal beta for increased vertical-field flux, and (4) potentially favorable exhaust compatibilities. Ultimately, we show the target ST-E1 flat-top performance can be reached after a ramp-up period lasting 150 s using less than 40 Vs of solenoid flux (with vertical field providing ∼ 90 Vs of flux). The sensitivity to model assumptions are presented, with the general observation that deleterious effects can be mitigated through minor alterations of the auxiliary power temporal waveform and/or total auxiliary power level. The impact of a solenoid and the auxiliary power mix (electron cyclotron heating only versus electron and ion cyclotron heating) on the ST-E1 ramp-up success are also discussed in appendices. On this latter topic, we show that the effect of direct-ion heating during ramp-up is obscured by the uncertainty in the pedestal dynamics, identifying a clear line of future work required to make a definite decision on the ST-E1 auxiliary power mix.

current ramp-up

The U.S. Fusion Materials Community Roadmap: Near-term research priorities for the development of plasma-facing and structural materials for fusion power plants

In response to the needs of a rapidly growing private fusion industry, the U.S. Fusion Materials Coordinating Committee (FMCC) and the broader U.S. fusion materials research community undertook an extensive effort to create a comprehensive roadmap for fusion materials development. The result of this effort was the U.S. Fusion Materials Community Roadmap (US-FMCR), which describes the steps needed to advance the technical maturity of leading candidates for plasma-facing materials and structural materials for fusion power plants from laboratory-scale experiments to a point of sufficient technological readiness for industrial adoption and implementation. However, researchers face significant resource constraints as well as very aggressive pilot plant development timelines. Thus, the research strategies detailed in the US-FMCR require further assessment to downselect the specific tasks that must be prioritized within the next two to three years, in order to make the most efficient use of funding, human resources, and experimental facilities. This paper presents an overview of the US-FMCR and its development process. We also present the subset of research objectives that the FMCC identified as the most urgent research priorities for the U.S. fusion materials research community. The state-of-the-art of materials research is also highlighted for each class of materials considered in the US-FMCR. The recommendations presented here integrate an extensive evaluation of the current status of fusion materials research with a broad cross-section of opinion from the wider U.S. fusion community.

Ferry, Sara [Massachusetts Institute of Technology

Technoeconomic Analysis Round Robin of a Retrofit of the Ivanpah Concentrating Solar Plant with a Molten-Salt System with Thermal Energy Storage

While the fidelity of technoeconomic analysis (TEA) models for concentrating solar thermal systems has improved in recent years, there is a lack of consensus on the specific inputs used to forecast performance of a newly built tower system due to a lack of validations and post-mortems available to the public. This effort is a joint initiative between multiple international organizations to validate and compare their TEA models. The specific case study is a proposed retrofit of one unit of the Ivanpah Solar Energy Generating System to include molten-salt storage, replacing the steam generation system with a molten-salt receiver, salt-to-steam heat exchanger train, and new balance of plant while keeping the existing steam turbine, solar field, and interconnection in place, using plant data for calibration. This manuscript discusses several of the agreed-upon assumptions for this study as well as a preliminary analysis from prior work that motivates the study.

14 SOLAR ENERGY

Physics basis for the reference flat-top plasma scenario in the ST–E1 fusion power plant

As part of the U.S. Department of Energy’s Milestone-Based Fusion Energy Development Program, Tokamak Energy has completed the pre-concept design of the ST–E1 fusion power plant. ST–E1 is envisaged to operate in two phases: a pilot plant phase, targeting sustained net power production of 300 - 500 MWe for a duration >1 hr, followed by a commercial power plant phase targeting steady-state operations and a normalised overnight capital cost of ⩽12 000 $\$$/kWe. The design process adopted was highly iterative, integrating all major plant systems and progressing in a phased fidelity approach. At the pre-conceptual stage, the emphasis has been on exploring the design space, identifying the main system-level trade-offs, and making the key decisions that define the overall plant concept, rather than optimising a single operating point. This paper, part of a focused collection detailing the ST–E1 pre-concept design, addresses the development of a series of reference flat-top plasma operating points for the pilot plant phase. A modelling workflow was established to develop and assess candidate plasma design points and explore key dependencies. The workflow includes integrated core plasma modelling, magnetohydrodynamic (MHD) stability assessment, equilibrium generation, scrape-off-layer and exhaust modelling, heating & current drive design and optimisation, and turbulent transport modelling. Using this framework, the impact of several key parameters on the flat-top operating space was investigated, including the density limit, core radiation fraction and divertor power loading, level of external heating and curent drive power and assumed pedestal characteristics. The MHD stability, controllability and micro-stability characteristics of these plasmas were also analysed. These investigations informed the definition of a set of fully non-inductive, flat-top reference operating points that satisfy the high-level ST–E1 mission, including a low and high density case, a case that is stable to resistive wall modes and a case with reduced divertor power loading.

ST–E1

Technoeconomic Studies for the Rorex Creek Pumped Storage Hydro Project: An Evaluation of New Pumped Storage Hydro in the Tennessee Valley Authority System

This report evaluates the economic viability of the proposed 1,200 MW, 23,365 MWh Rorex Creek Pumped Storage Hydro (PSH) plant that would be located near Pisgah, Alabama. In addressing this question, this study has developed processes, models and data that better value PSH from a utility perspective, more specifically a vertically integrated utility, enabling optimal PSH design and deployment. This study is designed to enhance TVA’s toolset in making PSH investment decisions and contribute to the design of a more cost-effective, stable future grid. These techniques can then be applied to a broader range of assets and utilities.

Cohen, Stuart