Search NASA⌕ Search

SEARCH · Search NASA

Results for “Asset Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Application of stochastic optimization to nuclear power plant asset management decisions

We describe the development and application of stochastic optimization models and algorithms to address an issue of critical importance in the strategic allocation of resources; namely, the selection of a portfolio of capital investment projects under the constraints of a limited and uncertain budget. This issue is significant and one that faces decision-makers across all industries. The objective of this strategic decision process is generally self evident - to maximize the value obtained from the portfolio of selected projects (with value usually measured in terms of the portfolio's net present value). However, heretofore, many organizations have developed processes to make these investment decisions using simplistic rule-based rank-ordering schemes. This approach has the significant limitation of not accounting for the (often large) uncertainties in the costs or economic benefits associated with the candidate projects or in the uncertainties in the actual funds available to be expended over the projected period of time. As a result, the simple heuristic approaches that typically are employed in industrial practice generate outcomes that are non-optimal and do not achieve the level of benefits intended. In this paper we describe the results of research performed to utilize stochastic optimization models and algorithms to address this limitation by explicitly incorporating the evaluation of uncertainties in the analysis and decision making process. (authors)

97 MATHEMATICS AND COMPUTING↗

A Case Study in NREL DERMS Asset Management Implementation

The National Renewable Energy Laboratory (NREL) and Smarter Grid Solutions (SGS) plan to present a case study on their implementation of SGS' Strata Grid Distributed Energy Resource Management System at NREL's Energy Systems Integration Facility (ESIF). The ESIF is one of the nation's premier energy systems integration laboratory facilities focused on development and deployment of clean energy technologies and resilient delivery systems. NREL looked for a DERMS to install at the ESIF that is capable of replicating real world scenarios to control and monitor distributed devices from small residential scale to the grid substation level. The DERMS system demonstrates the use cases of beneficial operation and coordination of modern grid devices, leverage DERs for improved grid planning and operation, demand-side management and customer engagement through bidirectional communication with utilities and energy market operations. The presentation will cover the delivery strategy of NREL and SGS, how the use cases help NREL's research, and NREL and SGS plan to expand the system and use cases.

ARIES↗

Using Facility Condition Assessments to Identify Actions Related to Infrastructure

To support cost effective, quality research it is essential that laboratory and testing facilities are maintained in a continuous and reliable state of availability at all times. NASA Langley Research Center (LaRC) and its maintenance contractor, Jacobs Technology, Inc. Research Operations, Maintenance, and Engineering (ROME) group, are in the process of implementing a combined Facility Condition Assessment (FCA) and Reliability Centered Maintenance (RCM) program to improve asset management and overall reliability of testing equipment in facilities such as wind tunnels. Specific areas are being identified for improvement, the deferred maintenance cost is being estimated, and priority is being assigned against facilities where conditions have been allowed to deteriorate. This assessment serves to assist in determining where to commit available funds on the Center. RCM methodologies are being reviewed and enhanced to assure that appropriate preventive, predictive, and facilities/equipment acceptance techniques are incorporated to prolong lifecycle availability and assure reliability at minimum cost. The results from the program have been favorable, better enabling LaRC to manage assets prudently.

Rubert, Kennedy F.↗

Bridging Equipment Reliability Data and Robust Decisions in a Plant Operation Context

In order to reduce operation and maintenance (O&M) costs, nuclear power plants (NPPs) are moving from corrective and periodic maintenance to predictive maintenance strategies. Such transition requires changes on the data that needs to be retrieved and on the type of decision processes to be employed. Advanced monitoring and data analysis technologies are essential to support predictive strategies. They can in fact provide precise information about health of a component, track its degradation trends, and provide information of its expected failure time. With such information, maintenance operations for a component can be performed right before its expected failure time. This dynamic context of O&M operations requires new methods to analyze data, propagate component health information from the component to the system level, and optimize plant resources. In this respect, the risk informed asset management (RIAM) project has been tasked to develop and test this new class of methods into a risk analytics toolset. This toolset consists of data analytics tools coupled with reliability methods designed to manage plant assets and performances in a predictive maintenance context. This report shows the latest improvements on such development and the initial testing of our methods on the three main research areas that the RIAM project is focusing on. These areas are the following: equipment reliability data analytics, system reliability modeling, and plant resources optimization methods. We show how the methods developed in these areas can support predictive maintenance strategies by: 1) analyzing equipment reliability data (either in numeric and textual form), 2) assessing component and system health through an innovative margin-based reliability approach, and 3) identifying the most critical components and set optimal maintenance schedule based on plant economic and operational constraints.

97 MATHEMATICS AND COMPUTING↗

TORONE: Total Characterisation by Remote Observation of Nuclear Environments - 20591

This paper describes the autonomous robotic systems developed in the TORONE project (Total Characterisation by Remote Observation of Nuclear Environments) for combined characterisation by remote techniques in nuclear environments. There are four main components to the system. Firstly, robot operation which uses a Robot Operating System (ROS) allowing ease of communication between hardware and software alongside robot vision systems such as Lidar and/or photogrammetry. Secondly, radiation detection instrumentation for gamma and neutron sources which is also collimated for spatial resolution. Thirdly, photonic characterisation instrumentation for remote material identification by means of Raman spectroscopy and Laser induced breakdown spectroscopy (LIBS). Finally, a data management system is described which contains the TORONE characterisation data with the ability to overlay material characterisation information onto 3D maps of the nuclear environment. Preliminary results are described alongside discussion of some of the synergies of the combined approach. There are many applications of such an autonomous system in nuclear decommissioning, waste management and asset management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Requirements Document for replacement of the Fleet Management System (FMS)

Asset Management and LivIT have identified the Fleet Management System (FMS) application technology to be not supported in the near future by LivIT. In previous reviews of Fleet applications, it was determined to move more functionality toward Fleet Focus and make that application the centerpiece for Fleet Operations at LLNL. The scope of the project is to combine both FMS and Fleet Focus applications together.

42 ENGINEERING↗

Marshall Space Flight Center Technology Capabilities for Use in Space Situational Awareness Activities

Marshall performs research, integrates information, matures technologies, and enhances science to bring together a diverse portfolio of products and services of interest for Space Situational Awareness (SSA) and Space Asset Management (SAM), all of which can be accessed through partnerships with Marshall. Integrated Space Situational Awareness and Asset Management (ISSAAM) is an initiative of NASA's Marshall Space Flight Center to improve space situational awareness and space asset management through technical innovation, collaboration, and cooperation with U.S. Government agencies and the global space community. Marshall Space Flight Center provides solutions for complex issues with in-depth capabilities, a broad range of experience, and expertise unique in the world, and all available in one convenient location. NASA has longstanding guidelines that are used to assess space objects. Specifically, Marshall Space Flight Center has the capabilities, facilities and expertise to address the challenges that space objects, such as near-Earth objects (NEO) or Orbital Debris pose. ISSAAM's three pronged approach brings together vital information and in-depth tools working simultaneously toward examining the complex problems encountered in space situational awareness. Marshall's role in managing, understanding and planning includes many projects grouped under each prong area: Database/Analyses/Visualization; Detection/Tracking/ Mitigation/Removal. These are not limited to those listed below.

Gagliano, Larry↗

Bridging Equipment Reliability Data and Risk Informed Decisions in a Plant Operation Context

Industry equipment reliability and asset management programs are essential elements that help ensure the safe and economical operation of nuclear power plants. The effectiveness of these programs is addressed in several industry-developed and regulatory programs. The Risk-Informed Asset Management (RIAM) project is tasked to develop tools in support of the equipment reliability and asset management programs at nuclear power plants. These tools are designed to create a direct bridge between component health/lifecycle data and decision making (e.g., maintenance scheduling and project prioritization). The goal of this article is to provide a guide for specific use cases that the RIAM project is targeting. We have grouped uses cases into three main areas. The first area focuses on the analysis of equipment reliability data with a particular emphasis on condition-based data, such as test/surveillance reports and component monitoring data. The second area focuses on the integration of equipment reliability into system/plant reliability models to determine system/plant health and identify the components that are critical to maintain an operational system. Lastly, the third area manages plant resources, such as maintenance activities and replacement scheduling using optimization methods. Here the primary focus is on supporting typical system engineer decisions regarding maintenance activity scheduling and component aging management. This is performed in a risk-informed context where the term “risk” is broadly constructed to include both plant reliability and economics. This framework combines data analytics tools to analyze equipment reliability data with risk-informed methods designed to support system engineer decisions (e.g., maintenance and replacement schedules, optimal maintenance posture) in a customizable workflow.

97 - MATHEMATICS AND COMPUTING↗

Identifying requisite changes to support modern maintenance practices - 294

Modern data science and processing require the use of modern maintenance records. With traditional record-keeping practices, the isolated nature of the data, as well as the presence of handwritten maintenance work orders and incomplete service logs, severely limit the amount of progress that can be made towards advanced condition-based maintenance. These condition-based methods of diagnostics, prognostics, and maintenance planning are a primary goal of next-generation plant operations and maintenance strategies, and are all dependent on the availability of quality plant data including maintenance data. By implementing changes to maintenance record-keeping practices, such as the use of a computerized maintenance management system, key data will become available to allow for implementation of state-of-the-art data analysis methods. This paper covers the benefits of utilizing digital record systems to increase maintenance data availability in terms of condition-based maintenance and asset management. The ability of these methods to enable state-of-the-art practices within industrial organizations is discussed to offer insight into ways that these improvements to operating strategy will contribute to improvements in world-class maintenance excellence. A discussion of the future of asset management in terms of data analytics, maintenance decision support, and data integration is provided to illustrate the changing landscape of plant management. The result is an examination of innovative maintenance strategies and discussion of challenges related to the future of asset management and implementing modern maintenance practices. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan

Ensuring the reliability of the NIF, including its support systems, laser systems, target diagnostic systems, and utilities, is essential to the availability of the NIF in its support of NNSA missions. NIF is a key capability in the DOE Stockpile Stewardship Program and supports high energy physics experiments for nuclear weapons, energy, and astrophysics applications. High system reliability provides opportunities for shots and scientific discoveries with opportunities to enhance and upgrade capabilities. This Maintenance Plan (MP) identifies the policies and procedures used to perform and support asset management of the NIF Facility and Infrastructure Systems (FInS), NIF Lasers & Alignment (LASE), NIF Target Experimental Operations (TOPS), NIF Target Area Science and Engineering (TASE), and NIF&PS Control Systems (NCS). The FInS systems include the facility, HVAC, contamination control, beampath, and Line Replaceable Units (LRUs) as well as utilities which create the beampath environments, such as vacuum, argon, or clean dry air. The LASE systems are Programmatic systems which include laser diagnostics, alignment, power conditioning, pulsed power, and input laser systems. The TOPS and TASE systems are also Programmatic systems which include target and diagnostic delivery systems and positioners, many different insertable and fixed target diagnostics, and cryogenic and target gas fill systems. Finally, the NCS systems include both software and hardware for industrial and shot operation control systems. Policies governing administrative and operational practices related to maintenance of FInS, LASE, TOPS, TASE, and NCS systems are described in this plan. In addition, the plan provides processes and procedures for managing, tracking, and documenting the work. This document, the NIF Operations Management Plan, NIF-5020544 (Ref. 1), and NIF Shot Operations Plan, NIF-5018506 (Ref. 2), together satisfy the requirements of the Conduct of Operations. Duties, responsibilities, and reporting requirements of the various positions associated with FInS, LASE, and TOPS maintenance are detailed in this plan. The FInS systems include both Real Property systems with asset management requirements specified in DOE Order 430.1C (Ref. 3) and Programmatic systems. In addition, for FInS, there is a list of the System Level Maintenance Plans (SLMPs) in NIF-1007419198 (Ref. 4) which provide the system descriptions and maintenance plan and schedule. In addition, the list includes the Reliability Centered Maintenance (RCM) and Experience Centered Maintenance (ECM) evaluations that have been performed for applicable FInS systems as well as reliability criticality per Section 3.5. The -AM version of the NIF Maintenance Plan focuses on the reliability program for FInS, LASE, TOPS, TASE, and NCS within the context of the overall NIF Reliability, Availability, and Maintainability (RAM) program and incorporates changes since the -AL version from August 2011 and has been updated to be fully consistent with the updates to Ref. 1. It also includes asset management considerations, updates to the Work Order (WO) process within the NIF Computerized Maintenance Management System (CMMS) which is EAM infor® System Maintenance and Reliability Tracking (SMaRT) (Ref. 5), and updates to metrics and key performance indicators (KPIs).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Commercial Building Operator Certificate Program [Final Report]

The overall objective of this project is for the Steven L. Newman Real Estate Institute, Baruch College, City University of New York (NREI) to create and deliver a web-based certificate program specifically designed for Commercial Building Operators, defined as Property Managers and Portfolio Asset Managers. The certificate program will consist of three 15-hour courses and will instruct students on how planning a path to Net Zero Energy (NZE) can be an effective element in creating asset value. NREI will develop curriculum with the help of dedicated staff working with consultants in the energy management and web-based education fields.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Spares Management : Optimizing Hardware Usage for the Space Shuttle Main Engine

The complexity of the Space Shuttle Main Engine (SSME), combined with mounting requirements to reduce operations costs have increased demands for accurate tracking, maintenance, and projections of SSME assets. The SSME Logistics Team is developing an integrated asset management process. This PC-based tool provides a user-friendly asset database for daily decision making, plus a variable-input hardware usage simulation with complex logic yielding output that addresses essential asset management issues. Cycle times on critical tasks are significantly reduced. Associated costs have decreased as asset data quality and decision-making capability has increased.

Gulbrandsen, K. A.↗

The Real Time Mission Monitor: A Situational Awareness Tool For Managing Experiment Assets

The NASA Real Time Mission Monitor (RTMM) is a situational awareness tool that integrates satellite, airborne and surface data sets; weather information; model and forecast outputs; and vehicle state data (e.g., aircraft navigation, satellite tracks and instrument field-of-views) for field experiment management RTMM optimizes science and logistic decision-making during field experiments by presenting timely data and graphics to the users to improve real time situational awareness of the experiment's assets. The RTMM is proven in the field as it supported program managers, scientists, and aircraft personnel during the NASA African Monsoon Multidisciplinary Analyses experiment during summer 2006 in Cape Verde, Africa. The integration and delivery of this information is made possible through data acquisition systems, network communication links and network server resources built and managed by collaborators at NASA Dryden Flight Research Center (DFRC) and Marshall Space Flight Center (MSFC). RTMM is evolving towards a more flexible and dynamic combination of sensor ingest, network computing, and decision-making activities through the use of a service oriented architecture based on community standards and protocols.

Blakeslee, Richard↗

Fleet-Wide Prognostic and Health Management Suite: Asset Fault Signature Database

Proactive online monitoring in the nuclear industry is being explored using the Electric Power Research Institute’s Fleet-Wide Prognostic and Health Management (FW-PHM) Suite software. The FW-PHM Suite is a set of web-based diagnostic and prognostic tools and databases that serves as an integrated health monitoring architecture. The FW-PHM Suite has four main modules: (1) Diagnostic Advisor, (2) Asset Fault Signature (AFS) Database, (3) Remaining Useful Life Advisor, and (4) Remaining Useful Life Database. The paper focuses on the AFS Database of the FW-PHM Suite, which is used to catalog asset fault signatures. A fault signature is a structured representation of the information that an expert would use to first detect and then verify the occurrence of a specific type of fault. The fault signatures developed to assess the health status of generator step-up transformers are described in the paper. The developed fault signatures capture this knowledge and implement it in a standardized approach, thereby streamlining the diagnostic and prognostic process. This will support the automation of proactive online monitoring techniques in nuclear power plants to diagnose incipient faults, perform proactive maintenance, and estimate the remaining useful life of assets.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

On the use of genetic algorithm to optimize industrial assets lifecycle management under safety and budget constraints

The purpose of this paper is to describe the method and tool dedicated to optimize investments planning for industrial assets. These investments may either be preventive maintenance tasks, asset enhancements or logistic investments such as spare parts purchases. The two methodological points to investigate in such an issue are: 1. The measure of the profitability of a portfolio of investments 2. The selection and planning of an optimal set of investments 3. The measure of the risk of a portfolio of investments The measure of the profitability of a set of investments in the IPOP tool is synthesised in the Net Present Value indicator. The NPV is the sum of the differences of discounted cash flows (direct costs, forced outages...) between the situations with and without a given investment. These cash flows are calculated through a pseudo-Markov reliability model representing independently the components of the industrial asset and the spare parts inventories. The component model has been widely discussed over the years but the spare part model is a new one based on some approximations that will be discussed. This model, referred as the NPV function, takes for input an investments portfolio and gives its NPV. The second issue is to optimize the NPV. If all investments were independent, this optimization would be an easy calculation, unfortunately there are two sources of dependency. The first one is introduced by the spare part model, as if components are indeed independent in their reliability model, the fact that several components use the same inventory induces a dependency. The second dependency comes from economic, technical or logistic constraints, such as a global maintenance budget limit or a safety requirement limiting the residual risk of failure of a component or group of component, making the aggregation of individual optimum not necessary feasible. The algorithm used to solve such a difficult optimization problem is a genetic algorithm. After a description of the features of the software a test case is presented showing the influence of the optimization algorithm parameters on its efficiency to find an optimal investments planning. (authors)

97 MATHEMATICS AND COMPUTING↗