Search NASA⌕ Search

SEARCH · Search NASA

Results for “Building Permits”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Marine Energy Environmental Toolkit for Permitting and Licensing

The permitting and licensing process for marine energy in the U.S. could take up to 7 years for even small demonstrations or pilot studies despite existing resources like Tethys, MarineCadstre, and the FERC E-Library. The goal of the Marine Energy Environmental Toolkit Project was to increase regulators, developers, and marine energy innovators’ understanding of potential environmental effects of marine energy conversion devices deployments and provide information to make efficient and effective determinations during permitting and licensing; develop a one-stop shop for existing environmental, spatial, regulatory, and scientific data that allows users to access disparate sources of data through a series of tags and spatial queries. The Toolkit (marineenergy.app) builds upon prior U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO) investments by pulling from WPTO-funded and outside resources to facilitate the permitting and licensing process, inform technology developers of required permits, and disseminate the latest knowledge of the environmental effects of these devices to regulators, developers, and marine energy innovators and stakeholders.

16 TIDAL AND WAVE POWER↗

Assessing the New Home Market Opportunity: Case Study and Cost Modeling for Solar and Storage in 2030

Residential solar and storage markets are growing in the United States. With approximately 1 million new homes constructed every year, this represents a significant opportunity for solar and storage installations. Some homebuilders have begun to build new homes with solar and storage included as a standard offering. It is not clear how solar and storage is incorporated into the new construction process and at what cost. Further, it is unclear what barriers or opportunities exist to scale this model nationwide. To fill this gap in the literature, this research conducts a case study of Mandalay Homes' new solar and storage community in Arizona to gather lessons learned. From this foundation, we further generate a set of pathways to reduce install costs and expand solar and storage market penetration in this sector. To model existing and 2030 solar and storage costs, we use the National Renewable Energy Laboratory's (NREL's) bottom-up cost model. This modeling is further informed by 12 interviews conducted with new home builders, solar contractors, and other subject matter expert organizations. Our case study analysis generated three key considerations for other homebuilders including: 1. Educating local permitting, inspection, and in some cases utility officials on solar and storage products, designs, and code compliant building practices may be required. The need for education may decline as more local governments and utilities review and approve solar and storage projects. 2. Incorporating solar and storage systems into the homebuilding process can add complexity and related coordination challenges. This does not need to result in home construction delays, but can result in costly contractor "dry runs" to construction sites. 3. Deploying solar and storage at the time of new construction has significant economies of scale, which can improve the value proposition of the systems. The case study, extant literature, and interviews were used to model both existing and future solar and storage installation costs at time of new construction. Here, we find three key cost reduction opportunities relating to solar and battery storage hardware, customer acquisition, and overhead. If future contractors can maximize the cost reduction opportunities outlined here, residential new construction costs could decline by 8 - 25% by 2030, depending on the modeled scenario. Though we expect costs to decline through 2030, it is unclear which of these scenarios may ultimately appear. Interviewees further identified a variety of barriers across each cost category that could temper the savings shown here. At the same time, interviewees described several pathways to scale the new construction solar and storage market, beyond installation cost savings. Interviewees confirmed that changes in finance, rate design, resilience policies, deployment mandates, and DER aggregation could all support more market adoption than seen today. These findings suggest that there are significant opportunities to expand new construction markets and this research can serve as a baseline to assess progress in this segment through 2030.

14 SOLAR ENERGY↗

Composing effective prediction at five points

Color-kinematics duality in the adjoint has proven key to the relationship between gauge and gravity theory scattering amplitude predictions. In recent work, we demonstrated that at four-point tree-level, a small number of color-dual EFT building blocks could encode all higher-derivative single-trace massless corrections to gauge and gravity theories compatible with adjoint double-copy. One critical aspect was the trivialization of building higher-derivative color-weights — indeed, it is the mixing of kinematics with non-adjoint-type color-weights (like the permutation-invariant d 4 ) which permits description via adjoint double-copy. Here we find that such ideas clarify the predictions of local five-point higher-dimensional operators as well. We demonstrate how a single scalar building block can be combined with color structures to build higher-derivative color factors that generate, through double copy, the amplitudes associated with higher-derivative gauge-theory operators. These may then be suitably mapped, through another double-copy, to higher-derivative corrections in gravity.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory

Kier + Wright, as Qualified SWPPP Developer (QSD), puts forth this Storm Water Pollution Prevention Plan (SWPPP) for the Limited Area, Multi-Purpose (LAMP) High Bay Laboratory facility (Project) located at Sandia National Laboratories, 7011 East Avenue, CA. The property is owned by the U.S. Department of Energy, and managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The project proposes converting an asphalt parking lot into a new high bay machine shop building and a low bay office building. Per the California State Water Resources Control Board’s (California State Water Board) Construction General Permit (CGP), a SWPPP is required when 1 acre or more of land is disturbed. The project site area of 1.6 acres exceeds the minimum acreage threshold of 1 acre and therefore requires SWPPP implementation. QSD has determined the sediment risk for this project, based on soil type at the site and starting and ending dates of construction, to be low (Section 3.4.1 and Appendix B). Receiving water for this project is the Arroyo Seco. QSD has determined the Arroyo Seco to be a high-risk receiving water because it has the three beneficial uses of “spawn”, “cold”, and “migratory” (Sections 3.3 and 3.4.2 and Appendix B). QSD has determined the overall risk level for the site to be Risk Level 2, based on a combination of low sediment risk and high receiving water risk (Appendix B). As such, QSD has delineated a variety of Best Management Practices (BMPs) to be employed during project construction to reduce or eliminate pollutants in stormwater runoff or any other discharges from the Project site. In addition to site-specific BMPs, this SWPPP report provides instruction for on site monitoring. Electronic copies of required documentation such as inspection reports, REAPs, annual report documentation, etc. shall be submitted to NTESS Sandia Delegated Representative via Newforma.

54 ENVIRONMENTAL SCIENCES↗

Residential Building Energy Efficiency Field Studies: Low-Rise Multifamily

In recent years, the U.S. Department of Energy (DOE) has conducted a series of research studies to validate energy efficient building technologies in the field. Much of the work has focused on single-family construction, and some has also addressed commercial energy codes. The work detailed in this DOE-funded study (EE0007616) focuses on low-rise multifamily buildings (three stories or fewer above grade) in various regions of the United States, and reports on how state-level building codes are being implemented, both in terms of observed characteristics and also in terms of estimated energy impacts. Nearly 100 buildings across four states—Illinois, Minnesota, Oregon, and Washington—were sampled, which represent a range of climate types from mild temperature to very cold continental. Both common entry and outdoor entry buildings were included, and a parallel research project evaluated envelope air tightness and current still-evolving air tightness testing methods. Finally, a set of structured interviews of building designers and other relevant professionals was carried to out to gain more insight into this market. To the greatest extent possible, the methodology developed under the project for low-rise multifamily buildings mirrored the approach established by Pacific Northwest National Laboratory (PNNL) for single-family residential buildings (https://www.energy.gov/eere/buildings/downloads/residential-building-energy-code-field-study). This included the general approach to sampling, recruitment, and data collection, as well as data analysis and presentation. The range of permitting dates for the sites encompassed two energy code cycles in most regions. All states in the study had adopted a variation of the International Energy Conservation Code (IECC) for the structure of their state code. The low-rise multifamily occupancy presents a hybrid building type: most of the building’s conditioned floor area was covered by the residential chapter of the code while portions of the building (such as corridors and common spaces) fell under the commercial code chapter. The key items assessed in this work were: Building Shell—exterior wall insulation, ceiling insulation, foundation insulation, windows. Common Areas—HVAC and lighting. Living Units—lighting, ventilation. A few items were not assessed in detail, given their relative paucity in this occupancy type; these included duct leakage, pipe insulation, and hot water circulation controls. Building characteristics were collected via a combination of architectural, mechanical, electrical, and plumbing plan reviews and field inspections, and entered into a spreadsheet-based tool that was later queried to build a database. Data went through quality control both upon arrival and via a later semi-automated review and assurance process. Most of the data are presented graphically so that the reader can quickly assess compliance with the applicable energy codes (both by state and by code year). As a final step, EnergyPlus™ simulations were created for all buildings in the study to estimate both the as-found energy use intensity (EUI) and the energy and CO 2 that could be saved if features that were found to not meet code minimums were brought up to code. The savings estimates were tabulated for each of the four states in the study. The research team found that the single-family approach was largely applicable to low-rise multifamily buildings. This applies to both the data collection and the prototype EUI analysis. Most of the occupied space is living units and falls under residential energy codes, and many characteristics use similar envelope construction and relatively straightforward mechanical systems and lighting. One of the most challenging aspects of this work was to build an effective spreadsheet-based data collection instrument that could allow efficient collection of both building plan and field data. The research team is of the view that other methods could be equally effective if the work is done carefully with diligent quality control. The primary findings for the work center around the thermal envelope and mechanical systems and lighting at the sites: For thermal envelope components, the majority of buildings met or were better than the prescriptive code.This suggests that building designers and builders are aware of code requirements. In some cases, surveyed buildings were designed to qualify for energy efficiency certification programs. These buildings made up at least 20% of sampled buildings in each state. Almost all buildings met mechanical system efficiency requirements (for both living units and common areas). In some cases, sites employed systems that were considerably more efficient than required by the applicable energy code. Dwelling units had a majority of high-efficacy lighting, often in excess of the state’s residential code requirements. While high-efficacy fixtures were also typical in common areas (corridors and stairwells), lighting power densities (LPDs) in these areas were sometimes higher than levels dictated by the applicable part of the state commercial energy code. The simulation models run on a series of low-rise multifamily prototypes, informed by a composite of the field data collected, calculated annual EUIs of between 20 and 50 kBtu/ft2-yr, with the range representing the effects of both building characteristics and building location (climate zone). A detailed process (based on simulations of prototype buildings) was used to estimate the amount of avoided energy use that would occur if 100% adherence to energy codes were attained. The results indicated modest savings are attainable for items such as window thermal performance and common area lighting. The result is overall only a modest potential for additional energy savings, averaging about 10% of EUI.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Acquisition and Implementation of a Comprehensive Environmental Permits Linking Tool at Savannah River Site - 20234

Historically, Savannah River Nuclear Solutions LLC (SRNS) tracked environmental regulatory commitments and the requirements from hundreds of permits at the Savannah River Site (SRS) using several separate methods, making integrated compliance assurance cumbersome and labor-intensive. When SRNS experienced an increase in environmental issues in 2017, SRNS management and U.S. Department of Energy - Savannah River (DOE-SR) management decided a single, proactive approach was needed to capture environmental permit information (including regulations, Consent Orders, DOE Orders, and any other state or federally issued statement of requirements), track the tasks necessary to ensure compliance with these requirements, and thereby mitigate the risk of noncompliance. SRNS developed a list of mandatory objectives that the tool must meet to function as a Comprehensive Environmental Permits Linking Tool (CEPLT). A key requirement was the ability to map Site permits to their governed locations and display the associated requirements at the compliance point (e.g., outfall, stack, waste unit, etc.). Several options included modifying existing onsite resources, building a custom onsite solution, purchasing an off-the-shelf solution, and contracting an offsite developer to build a custom solution. SRNS concluded an off-the-shelf solution with configuration and customization options would provide the flexibility to fit the unique needs of Savannah River Site (SRS) while taking advantage of industry-tested software and providing a reduced deployment timeline. SRNS chose Gensuite{sup R} a, a cloud-based solution that offers numerous a la carte applications in the environmental, health, and safety arenas, as the best candidate. SRNS selected three (3) integrated applications (Compliance Calendar, Permit Manager, and Mapper) to function as the CEPLT. The Compliance Calendar module allows for creation and tracking of regulatory commitment tasks assigned to responsible environmental professionals. Permit Manager organizes permits and other requirement documents, linking the commitments in each to Compliance Calendar tasks and/or implementing procedures. Mapper provides GIS capability for mapping the data from the other two modules to their physical onsite locations. The CEPLT was configured to allow for other SRS Site Tenants to eventually utilize the applications. Additionally, DOE-SR uses the CEPLT to provide an overview of contractor environmental compliance activities and to organize DOE-specific documents and tasks. The CEPLT fulfilled the requirement of meeting current compliance needs as well as providing the ability to grow as new organizations are incorporated and functionality is expanded. SRNS now uses the CEPLT to more effectively manage permit requirements, improve knowledge transfer, and increase the Site's overall protection of the environment, the Site worker, and the public. Possible future uses of the system include integration of mobile applications for timely communication of potential non-compliant conditions and DOE complex-wide deployment allowing for enhanced DOE site and Head Quarters oversight. Implementation of CEPLT will result in cost savings, both in terms of dollars and man-hours. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transboundary determinants of avian zoonotic infectious diseases: challenges for strengthening research capacity and connecting surveillance networks

As the climate changes, global systems have become increasingly unstable and unpredictable. This is particularly true for many disease systems, including subtypes of highly pathogenic avian influenzas (HPAIs) that are circulating the world. Ecological patterns once thought stable are changing, bringing new populations and organisms into contact with one another. Wild birds continue to be hosts and reservoirs for numerous zoonotic pathogens, and strains of HPAI and other pathogens have been introduced into new regions via migrating birds and transboundary trade of wild birds. With these expanding environmental changes, it is even more crucial that regions or counties that previously did not have surveillance programs develop the appropriate skills to sample wild birds and add to the understanding of pathogens in migratory and breeding birds through research. For example, little is known about wild bird infectious diseases and migration along the Mediterranean and Black Sea Flyway (MBSF), which connects Europe, Asia, and Africa. Focusing on avian influenza and the microbiome in migratory wild birds along the MBSF, this project seeks to understand the determinants of transboundary disease propagation and coinfection in regions that are connected by this flyway. Through the creation of a threat reduction network for avian diseases (Avian Zoonotic Disease Network, AZDN) in three countries along the MBSF (Georgia, Ukraine, and Jordan), this project is strengthening capacities for disease diagnostics; microbiomes; ecoimmunology; field biosafety; proper wildlife capture and handling; experimental design; statistical analysis; and vector sampling and biology. Here, we cover what is required to build a wild bird infectious disease research and surveillance program, which includes learning skills in proper bird capture and handling; biosafety and biosecurity; permits; next generation sequencing; leading-edge bioinformatics and statistical analyses; and vector and environmental sampling. Creating connected networks for avian influenzas and other pathogen surveillance will increase coordination and strengthen biosurveillance globally in wild birds.

54 ENVIRONMENTAL SCIENCES↗

Waste Compliance and Tracking System (WCATS) Version 3 Requirements Document

This document describes the end-user requirements for the Waste Compliance and Tracking System (WCATS) project in accordance with the WCATS Software Quality Management Plan, EPC-WMP-WCATSPLAN-001. The WCATS application shall support the generation, characterization, processing, and shipment of LANL radioactive, hazardous, and industrial waste. Regulatory drivers include RCRA hazardous waste, DOT shipping, NNSA nuclear material control and accountability, DOE nuclear safety, TSDF permit, and transuranic waste certification requirements. The system will utilize a task-based architecture that supports the spectrum of treatment, storage, disposal, administrative, and characterization based unit operations necessary to manage waste from cradle to grave. The application design shall readily accommodate new facilities, processes, workflow, signature requirements, and so forth, via end-user established metadata. WCATS will provide support for representing waste storage and disposal facilities, buildings, rooms, and grid layouts (x, y, z) to support waste and radioactive material inventory management. Nuclear material at risk (MAR), DOE hazard rating (e.g., Category II facility) compliance per DOE-STD-1027, and permit inventory requirements will be configurable for any storage or disposal facility, or waste operation, and the system will automatically evaluate and enforce those requirements. In addition, the application will support the characterization and management of the entire range of hazardous and radioactive wastes (TRU, MTRU, LLW, MLLW, hazardous waste, etc.) that might be colocated or processed at a permitted facility. Some capabilities not found in traditional systems include user-defined tank systems for liquid waste, user-defined work paths (i.e., sequence of operations), and an equipment subsystem for tracking the calibration, maintenance, and inspection of tools used to process waste, such as torque wrenches, scales, pH probes, etc. The application incorporates a desktop and mobile user interface as shown in Figure 1. The mobile interface supports field operations, such as waste item characterization, intra-facility transfers, internal and external audits, and shipment preparation and receipt.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PySAGES: flexible, advanced sampling methods accelerated with GPUs

Abstract Molecular simulations are an important tool for research in physics, chemistry, and biology. The capabilities of simulations can be greatly expanded by providing access to advanced sampling methods and techniques that permit calculation of the relevant underlying free energy landscapes. In this sense, software that can be seamlessly adapted to a broad range of complex systems is essential. Building on past efforts to provide open-source community-supported software for advanced sampling, we introduce PySAGES, a Python implementation of the Software Suite for Advanced General Ensemble Simulations (SSAGES) that provides full GPU support for massively parallel applications of enhanced sampling methods such as adaptive biasing forces, harmonic bias, or forward flux sampling in the context of molecular dynamics simulations. By providing an intuitive interface that facilitates the management of a system’s configuration, the inclusion of new collective variables, and the implementation of sophisticated free energy-based sampling methods, the PySAGES library serves as a general platform for the development and implementation of emerging simulation techniques. The capabilities, core features, and computational performance of this tool are demonstrated with clear and concise examples pertaining to different classes of molecular systems. We anticipate that PySAGES will provide the scientific community with a robust and easily accessible platform to accelerate simulations, improve sampling, and enable facile estimation of free energies for a wide range of materials and processes.

Chemistry↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

54 ENVIRONMENTAL SCIENCES↗

Air quality and comfort constrained energy efficient operation of multi-zone buildings

Maintaining indoor air quality (IAQ) through effective ventilation is essential for the well-being and productivity of building occupants. Control strategies aimed at improving the efficiency of heating, ventilation and air conditioning (HVAC) systems must jointly determine ventilation and heating and cooling processes. Here, in this paper, we study the problem of minimizing the energy consumption of the HVAC system in a multi-zone building, while meeting thermal comfort and IAQ requirements. We first perform a steady state analysis of the zonal carbon dioxide (CO 2 ) concentration and the temperature dynamics. The resulting expressions are convex in the zonal mass flow rates and zonal temperatures. Guided by the steady state solutions for meeting the thermal comfort constraints, we develop two control policies for improving the energy efficiency of building HVAC systems while jointly satisfying indoor temperature and IAQ constraints. We compare the performance of our proposed approaches with those of multiple baseline approaches which implement separate regimes for controlling zonal temperature and IAQ for a typical work-day in a multi-zone campus building. We have evaluated the performance of our proposed approaches under varying levels of flexibility in zonal temperatures. We have shown that zonal temperature flexibility can result in energy savings up to 32% (for the same control strategies) as compared to the case where no such flexibility is permitted. Our proposed approaches were seen to offer potential savings of nearly 29% compared to the baseline.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Toward a glycyl radical enzyme containing synthetic bacterial microcompartment to produce pyruvate from formate and acetate

Formate has great potential to function as a feedstock for biorefineries because it can be sustainably produced by a variety of processes that don’t compete with agricultural production. However, naturally formatotrophic organisms are unsuitable for large-scale cultivation, difficult to engineer, or have inefficient native formate assimilation pathways. Thus, metabolic engineering needs to be developed for model industrial organisms to enable efficient formatotrophic growth. Here, we build a prototype synthetic formate utilizing bacterial microcompartment (sFUT) encapsulating the oxygen-sensitive glycyl radical enzyme pyruvate formate lyase and a phosphate acyltransferase to convert formate and acetyl-phosphate into the central biosynthetic intermediate pyruvate. This metabolic module offers a defined environment with a private cofactor coenzyme A that can cycle efficiently between the encapsulated enzymes. To facilitate initial design-build-test-refine cycles to construct an active metabolic core, we used a “wiffleball” architecture, defined as an icosahedral bacterial microcompartment (BMC) shell with unoccupied pentameric vertices to freely permit substrate and product exchange. The resulting sFUT prototype wiffleball is an active multi enzyme synthetic BMC functioning as platform technology.

59 BASIC BIOLOGICAL SCIENCES↗

Market Driven Residential Energy Codes: Comparing Performance in a Changing Technological Environment

The research project is undertaken to better understand the changing relationship between the two basic methods of building energy code compliance – prescriptive and performance – and how those methods relate to each other with respect to advancements in building energy computer simulation standards and capabilities. The International Energy Efficiency Code (IECC) is a model code adopted by many jurisdictions across the United States. Historically, the prescriptive compliance methodology has been preferred in most jurisdictions. The prescriptive methodology requires meeting or exceeding specific efficiency minimums for each envelope component. This tends to be a simple method to teach and verify. A more involved prescriptive alternative called the Total UA alternative is sometimes used. This method requires some multiplication, summing, and comparison to compute, so it is done with a fairly simple computer program. However, advances in computer and building energy simulation technology have resulted in increased use of more detailed performance compliance methods. The performance compliance method establishes the annual energy cost threshold via hourly simulation models. The compliance threshold is determined with a comparison building model simulation with geometry similar to the proposed home and with energy feature parameters and efficiencies as specified in the IECC. This project examines relationships between the two methods of building energy code compliance, including: • Overall annual energy use based on utility bill analysis by compliance method • Code official work processes with respect to compliance methods • Gaps and issues associated with building code compliance methods • Simulated energy use difference between compliance methods • Code compliance cost as a function of compliance method • Code compliance labeling effectiveness for high performance residences • Getting to net zero energy use and net zero greenhouse gas emissions through high performance code alternatives • Electronic code permitting and compliance alternatives

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

CarbonSAFE North Dakota – Early Successes

Conference presentation for American Institute of Chemical Engineers (AIChE) Annual Meeting, Boston, MA and virtual, November 5–11 and 15–19, 2021. As part of the U.S. Department of Energy’s (DOE’s) CarbonSAFE program, the Energy & Environmental Research Center (EERC) is conducting commercial-scale site characterization and permitting of up to two geologic horizons for the geologic storage of anthropogenic CO2 emissions. These storage horizons would collectively and permanently store nearly 4 million metric tons (MMt) of CO2 per year captured as part of Minnkota Power Cooperative’s (Minnkota’s) Project Tundra. Minnkota’s ambitious initiative to build the world’s largest postcombustion carbon capture and storage facility in central North Dakota demonstrates the existence of a business case for carbon capture, and storage (CCS).

20 FOSSIL-FUELED POWER PLANTS↗

Observation of a single protein by ultrafast X-ray diffraction

The idea of using ultrashort X-ray pulses to obtain images of single proteins frozen in time has fascinated and inspired many. It was one of the arguments for building X-ray free-electron lasers. According to theory, the extremely intense pulses provide sufficient signal to dispense with using crystals as an amplifier, and the ultrashort pulse duration permits capturing the diffraction data before the sample inevitably explodes. This was first demonstrated on biological samples a decade ago on the giant mimivirus. Since then, a large collaboration has been pushing the limit of the smallest sample that can be imaged. The ability to capture snapshots on the timescale of atomic vibrations, while keeping the sample at room temperature, may allow probing the entire conformational phase space of macromolecules. Here we show the first observation of an X-ray diffraction pattern from a single protein, that of Escherichia coli GroEL which at 14 nm in diameter is the smallest biological sample ever imaged by X-rays, and demonstrate that the concept of diffraction before destruction extends to single proteins. From the pattern, it is possible to determine the approximate orientation of the protein. Our experiment demonstrates the feasibility of ultrafast imaging of single proteins, opening the way to single-molecule time-resolved studies on the femtosecond timescale.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Final DOE-ASR Report for the Project “Using LASSO to bridge the gap between model and observations and to learn about atmospheric convection”

Atmospheric convection spans a wide range of spatial and temporal scales and involves complex interactions with the surrounding dynamic and thermodynamic environment, particularly over tropical continental regions. These processes remain a major source of uncertainty in weather and climate models, including persistent biases in the diurnal cycle of convective precipitation that directly affect estimates of climate sensitivity. Addressing these challenges requires the combined use of high-resolution observations and cloud-resolving modeling frameworks. In this context, the DOE Atmospheric Radiation Measurement (ARM) program’s Large-Eddy Simulation ARM Symbiotic Simulation and Observation (LASSO) activity provides a powerful platform that pairs comprehensive observations with numerical simulations to enable process-level understanding of atmospheric convection. Within this context, this Research and Development Partnership Pilot (RDPP) project was designed to initiate and expand DOE ARM/ASR research capacity at minority-serving institutions, while advancing scientific understanding of convective processes over the Amazon rainforest. Consistent with the RDPP mission, the project emphasized partnership development, training, and workforce capacity building alongside exploratory research activities. On the scientific side, the project produced two peer-reviewed journal articles, and one manuscript currently under review (see list in section 3.1). Together, these studies combine long-term ARM observations and cloud-resolving and convection-permitting modeling to investigate the environmental controls on the shallow-to-deep convective transition during the Amazon wet season. The results demonstrate the central role of early-day moisture preconditioning and large-scale dynamical forcing in regulating isolated deep convection, provide mechanistic insight into convective evolution, and establish physically informed modeling frameworks for future sensitivity experiments. These scientific outcomes are described in sections 2.1 to 2.3 and were disseminated in 8 conference presentations (see section 3.2) and 5 invited talks (see section 3.3), reflecting broad engagement with our community. Equally important, the project achieved its RDPP capacity-building objectives (see section 2.4). A sustained research partnership was established among the University of Maryland, Baltimore County (UMBC), Morgan State University (MSU), and Howard University (HU), and extended to include collaboration with Pacific Northwest National Laboratory (PNNL). The project organized multiple multi-day training events focused on ARM data, LASSO simulations, and quantitative analysis methods, directly engaging students, postdoctoral researchers, and faculty across institutions. These activities broadened participation in ASR research and led to independent adoption of LASSO workflows by students beyond the immediate project team. Finally, the project successfully positioned the participating institutions to pursue future DOE research. Preliminary scientific results, coupled with strengthened partnerships and technical capacity, enabled the submission of follow-on proposals to DOE ASR funding opportunities. In this way, the project fulfilled the RDPP goal of seeding durable research capacity and laying the foundation for larger-scale, sustained engagement with DOE ARM and ASR programs.

54 ENVIRONMENTAL SCIENCES↗