Search NASA⌕ Search

SEARCH · Search NASA

Results for “CONTRACTOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Needs of Non-Energy Focused Contractors

To better understand the informational needs of non-energy focused contractors, including what information they need to motivate them to become energy-focused, the BARA team studied the type of information provided by the national programs, trade associations, and manufacturers that were researched for the related technical report: Effective Communication of Energy Efficiency. While that report focused on the delivery method, format, and strategy of the information, this study examines the content being put forward.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Final Report: Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation

This report documents the Contractor Readiness Assessment (CRA) for TREAT Fuel Movement and Control Rod Drives Isolation. The review followed the approved Plan of Action (POA) and Implementation Plan (IP) using the identified core requirements. The activity was limited scope focusing on the control rod drives functional isolation and fuel element movement. The purpose of this review is to ensure the facility's readiness to move fuel elements thus supporting inspection and functionally isolate the control rod drives to maintain the required shutdown margin.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Community Toolkit for Designing and Implementing a Contractor Accelerator Program

This toolkit is designed to provide communities with an overview of the methodology and approach to designing, developing, and implementing contractor development programs. These programs support small businesses from historically under-represented communities so that they can better compete and become leaders in the clean energy marketplace. The toolkit was developed by Elevate and NREL for the Communities LEAP program.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Optimizing Residential HVAC Systems: Evaluating How the Usage of Smart Diagnostic Tools for Quality Installation and Commissioning Impacts System Performance and HVAC Contractor Businesses

The adoption of digital quality installation and fault detection tools has the potential to transform the $14 billon residential heating, ventilating, and air conditioning (HVAC) service and installation industry. Increased market penetration can be accelerated by providing an increased understanding of the energy and economic value proposition of the usage of these tools. In tandem with energy and HVAC system performance impact research and analysis, the Southface Team investigated the economic business implications for HVAC service and installation contractors adopting the use of measureQuick (mQ), a smart diagnostic app that aids in quality installation and fault detection and works agnostically with Bluetooth-enabled HVAC technician tools.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Maintenance of Maywood Laboratory Operations Support During Contractor Transition and Replacement of the Project Databases - 16329

In December 2013, Cabrera Services (Cabrera) executed transition of the FUSRAP Maywood Superfund Site remediation project operations, including an on-site accredited environmental lab, from a large business that had established technology infrastructure in place for over a decade which required updating to support the expected remediation scope and client needs. As of November 2015, Cabrera has shipped over 116,000 yd{sup 3} of contaminated soil to disposal facilities. During the transition, the USACE FUSRAP Maywood Laboratory (UFML) continued to support project operations, providing the expected timely and reliable results and maintaining their New Jersey Department of Environmental Protection certification for all parameters of concern, while having to cope with new challenges and additional tasks having the potential to disrupt the laboratory's ability to support project operations. This case study examines the challenges with maintaining a certified radiochemistry laboratory and an aggressive remediation schedule during a period of prime contractor transition which included a complete IT infrastructure overhaul, and conversion of the existing Microsoft Access laboratory database and project Electronic Data Management System (EDMS) to a customized commercial solution. Challenges: I. Procurement of a new database subcontractor and working closely with them to achieve the following: a. Migration of all environmental (including radiological, chemical, and quality control), health and safety, and spatial data as well as reports, queries, and analytical instrument software processes from a MS Access data management system to a SQL server system; and b. Verification that the functionality and data integrity of the databases remained intact. II. The onsite laboratory was changed over to a new onsite network and the following tasks were completed with little or no interruption to site operations by January 10, 2014: i. Installation of new instrument personal computers (PCs) and making them fully operational; ii. Configuration of the lab domain and server to host the LIMS (replaced all servers/domain/workstations with Windows 7 and Server 2012 machines). iii. Networking of the laboratory building into the rest of the project site via fiber optic cabling across the site. iv. Upgrade of the wide area network (WAN) data connection to high-speed Fiber Optic service; v. Upgrade of the telephones into voice over internet protocol (VOIP) phones. vi. Splitting of the database into front ends and a centralized back-end hosted on the new server to allow simultaneous access for fixes and improvements. III. Phone service interruption; phone systems were operational by January 10, 2014. Additional Tasks: I. Revision of the USACE FUSRAP Maywood Laboratory (UFML) Quality Systems Manual Rev. 1 Submitted 01/16/14; II. Writing of the Uniform Federal Policy Quality Assurance Project Plan Rev. 1 (UFP-QAPP) submitted 1/21/14. This document replaced the prior project data quality plan, the Chemical Data Quality Management Plan. III. Support of USACE communications to the New Jersey Department of Environmental Protection (NJDEP) on lab management and personnel transition to Cabrera. This work was important since it ensured a smooth transition and shows how critical project records infrastructure such as databases, can be upgraded with minimal interruption of project support. Such work may provide benefit to other similar projects, especially long term projects where database infrastructure upgrades may be beneficial in terms of improved efficiencies in data recording and transfer, and improved security in data storage. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contingency contractor optimization. Phase 2, architecture document

This report provides documentation of the overarching architecture for the Strategic Contractor Planning Tool and framework. The report describes the system organization, high-level system structure, and interfaces. Various architectural views provide descriptions of the planning tool architecture, information flow, and functionality. The information flow serves to tie together the architecture, analytic framework and existing capabilities. This report highlights the potential integration points for the planning tool within the existing OSD and DoD strategic planning activities. Many existing tools, policies, and information can be leveraged as inputs to this planning tool, including strategic planning information, personnel, and cost resources. These resources are listed and discussed. A high-level description of the planning tool functionality and usage are also described.

Miner, Nadine E.↗

2011 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

This report documents the status of revegetation projects and natural resources mitigation efforts conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites at Hanford. This report contains the vegetation monitoring data that was collected in the spring and summer of 2011 from the River Corridor Closure Contractor’s revegetation and mitigation areas on the Hanford Site.

54 ENVIRONMENTAL SCIENCES↗

Final Report for the Restart of the Waste Characterization, Reduction and Repackaging Facility (WCRRF) Contractor Readiness Assessment (CRA)

The Los Alamos National Laboratory (LANL or Laboratory) Contractor Readiness Assessment (CRA) required for restart of the Technical Area (TA) 50 Waste Characterization, Reduction, and Repackaging Facility (WCRRF) for remediated nitrate salt (RNS) waste operations was performed in compliance with the requirements of Department of Energy (DOE) Order (O) 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities, and LANL procedure FSD-115-001, Verification of Readiness to Start Up or Restart LANL Nuclear Facilities, Activities, and Operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Contingency Contractor Optimization Phase 3 Sustainment Cost by JCA Implementation Guide

This document provides implementation guidance for implementing personnel group FTE costs by JCA Tier 1 or 2 categories in the Contingency Contractor Optimization Tool – Engineering Prototype (CCOT-P). CCOT-P currently only allows FTE costs by personnel group to differ by mission. Changes will need to be made to the user interface inputs pages and the database

97 MATHEMATICS AND COMPUTING↗

Final Report for the Contractor Readiness Assessment of the Transient Reactor Test Facility Resumption of Transient Testing Activity at the Idaho National Laboratory

The purpose of this review was to verify readiness for the TREAT restart of transient testing activity at the INL and inform the startup authorization authority decision-making for startup authorization by providing a deliberate and managed determination of the state of readiness preparation and determination of whether operations can be performed safely. Verification of readiness included assuring that equipment operability, procedure viability, and personnel knowledge, skills, and performance are adequate for operations. Because the TREAT (including restart of transient testing activity) is a hazard category-2 nuclear facility and because reactor operation and transient testing activities were suspended for programmatic and funding reasons in excess of a year, DOE O 425.1D required that both a contractor and DOE RA be satisfactorily completed prior to startup of the TREAT and restart of transient testing activity. To this end, DOE directed that a CRA and federal RA be conducted. The CRA IP defined the depth of the CRA through the objectives and CRADs, delineated in Appendix A of the IP; established roles and responsibilities for CRA team activities; and established processes, practices, and protocols for preparation, conduct, documentation, and reporting of the CRA. The approaches and methodologies identified in the IP were used to verify that the BEA management team has established SSCs, developed personnel capabilities and competencies, and implemented safety features, programs, and procedures in a manner that provides reasonable assurance for adequate protection of workers, the public, and the environment in preparation for and execution of the TREAT restart of transient testing activity. This CRA was intended to confirm that (1) the facility is in a state of readiness to safely conduct operations in accordance with the safety basis; and (2) the management control programs are in place to ensure safe operations can be sustained. This equated to mature implementation of the integrated safety management (ISM) in conjunction with implementation of the individual facility authorization basis. This CRA was structured to verify the readiness to conduct restart of transient testing activity safely, and that facility programs were in place to support the restart of transient testing activity.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Architects, Engineers, and Contractors - Key to Moving Towards a Zero Carbon Future: Preprint

Many building owners have set energy or carbon goals often citing targets of carbon neutrality in the next 10 to 30 years. Ultimately, these goals need to be translated into actions related to new and existing construction. Designers and contractors are key to designing solutions that meet the energy and carbon goals. As a voluntary program, the Design and Construction Allies (Allies program) was formed to identify barriers for the adoption of zero energy and zero carbon buildings (ZEZC). The goal was to understand why "all" buildings are not designed with ZEZC in mind. Currently the Allies program consists of 25 leading architecture, engineering, and construction firms that are seeking to take actionable steps to deliver buildings with the ZEZC goal. In the first year, the Allies have found numerous barriers and have implemented working groups to address key challenges that can be solved readily Allies. The paper will document program formulation and engagement strategies as well as the identified barriers and related recommendations for the design and construction community to shift towards ZEZC as a normal design and construction outcome. Two major topics rose to the top that the working groups were created to address: (1) providing guidance and knowledge to clients such that they will be active in creating ZEZC, and (2) bringing together knowledge around embodied carbon such that action can be taken to reduce this carbon emission area. Each working group has refined the barriers and created solutions that have been tested by Ally members. This rapid identification of barriers and subsequent creation of deployable solutions shows rapid change can happen.

design allies↗

DEMONSTRATION OF THE NEXT-GENERATION CAUSTIC-SIDE SOLVENT EXTRACTION SOLVENT WITH 2-CM CENTRIFUGAL CONTRACTORS USING TANK 49H WASTE AND WASTE SIMULANT

Researchers successfully demonstrated the chemistry and process equipment of the Caustic-Side Solvent Extraction (CSSX) flowsheet using MaxCalix for the decontamination of high level waste (HLW). The demonstration was completed using a 12-stage, 2-cm centrifugal contactor apparatus at the Savannah River National Laboratory (SRNL). This represents the first CSSX process demonstration of the MaxCalix solvent system with Savannah River Site (SRS) HLW. Two tests lasting 24 and 27 hours processed non-radioactive simulated Tank 49H waste and actual Tank 49H HLW, respectively. Conclusions from this work include the following. The CSSX process is capable of reducing {sup 137}Cs in high level radioactive waste by a factor of more than 40,000 using five extraction, two scrub, and five strip stages. Tests demonstrated extraction and strip section stage efficiencies of greater than 93% for the Tank 49H waste test and greater than 88% for the simulant waste test. During a test with HLW, researchers processed 39 liters of Tank 49H solution and the waste raffinate had an average decontamination factor (DF) of 6.78E+04, with a maximum of 1.08E+05. A simulant waste solution ({approx}34.5 liters) with an initial Cs concentration of 83.1 mg/L was processed and had an average DF greater than 5.9E+03, with a maximum DF of greater than 6.6E+03. The difference may be attributable to differences in contactor stage efficiencies. Test results showed the solvent can be stripped of cesium and recycled for {approx}25 solvent turnovers without the occurrence of any measurable solvent degradation or negative effects from minor components. Based on the performance of the 12-stage 2-cm apparatus with the Tank 49H HLW, the projected DF for MCU with seven extraction, two scrub, and seven strip stages operating at a nominal efficiency of 90% is {approx}388,000. At 95% stage efficiency, the DF in MCU would be {approx}3.2 million. Carryover of organic solvent in aqueous streams (and aqueous in organic streams) was less than 0.1% when processing Tank 49H HLW. The entrained solvent concentration measured in the decontaminated salt solution (DSS) was as much as {approx}140 mg/L, although that value may be overstated by as much as 50% due to modifier solubility in the DSS. The entrained solvent concentration was measured in the strip effluent (SE) and the results are pending. A steady-state concentration factor (CF) of 15.9 was achieved with Tank 49H HLW. Cesium distribution ratios [D(Cs)] were measured with non-radioactive Tank 49H waste simulant and actual Tank 49H waste. Below is a comparison of D(Cs) values of ESS and 2-cm tests. Batch Extraction-Strip-Scrub (ESS) tests yielded D(Cs) values for extraction of {approx}81-88 for tests with Tank 49H waste and waste simulant. The results from the 2-cm contactor tests were in agreement with values of 58-92 for the Tank 49H HLW test and 54-83 for the simulant waste test. These values are consistent with the reference D(Cs) for extraction of {approx}60. In tests with Tank 49H waste and waste simulant, batch ESS tests measured D(Cs) values for the two scrub stages as {approx}3.5-5.0 for the first scrub stage and {approx}1.0-3.0 for the second scrub stage. In the Tank 49H test, the D(Cs) values for the 2-cm test were far from the ESS values. A D(Cs) value of 161 was measured for the first scrub stage and 10.8 for the second scrub stage. The data suggest that the scrub stage is not operating as effectively as intended. For the simulant test, a D(Cs) value of 1.9 was measured for the first scrub stage; the sample from the second scrub stage was compromised. Measurements of the pH of all stage samples for the Tank 49H test showed that the pH for extraction and scrub stages was 14 and the pH for the strip stages was {approx}7. It is expected that the pH of the second scrub stage would be {approx}12-13. Batch ESS tests measured D(Cs) values for the strip stages to be {approx}0.002-0.010. A high value in Strip No.3 of a test with simulant solution has been attributed to issues associated with the limits of detection for the analytical method. In the 2-cm contactor tests, the first four strip stages of the Tank 49H waste test and all five strip stages in the simulant waste test had higher values than the ESS tests. Only the fifth strip stage D(Cs) value of the Tank 49H waste test matched that of the ESS tests. It is speculated that the less-than-optimal performance of the strip section is caused by inefficiencies in the scrub section. Because strip is sensitive to pH, the elevated pH value in the second scrub stage may be the cause of strip performance. In spite of the D(Cs) values obtained in the scrub and strip sections, testing showed that the solvent system is robust. Average DFs for the process far exceeded targets even though the scrub and strip stages did not function optimally. Correction of the issue in the scrub and strip stages is expected to yield even higher waste DFs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DEMONSTRATION OF THE NEXT-GENERATION CAUSTIC-SIDE SOLVENT EXTRACTION SOLVENT WITH 2-CM CENTRIGUGAL CONTRACTORS USING TANK 49H WASTE AND WASTE SIMULANT

Researchers successfully demonstrated the chemistry and process equipment of the Caustic-Side Solvent Extraction (CSSX) flowsheet using MaxCalix for the decontamination of high level waste (HLW). The demonstration was completed using a 12-stage, 2-cm centrifugal contactor apparatus at the Savannah River National Laboratory (SRNL). This represents the first CSSX process demonstration of the MaxCalix solvent system with Savannah River Site (SRS) HLW. Two tests lasting 24 and 27 hours processed non-radioactive simulated Tank 49H waste and actual Tank 49H HLW, respectively. A solvent extraction system for removal of cesium from alkaline solutions was developed utilizing a novel solvent invented at the Oak Ridge National Laboratory (ORNL). This solvent consists of a calix[4]arene-crown-6 extractant dissolved in an inert hydrocarbon matrix. A modifier is added to the solvent to enhance the extraction power of the calixarene and to prevent the formation of a third phase. An additional additive is used to improve stripping performance and to mitigate the effects of any surfactants present in the feed stream. The process that deploys this solvent system is known as Caustic Side Solvent Extraction (CSSX). The solvent system has been deployed at the Savannah River Site (SRS) in the Modular CSSX Unit (MCU) since 2008.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Panel Session 120: Roundtable: Waste Management - Energy Facilities Contractor Operating Group (EFCOG WM)

This Roundtable focused on the WM EFCOG working group as they met to discuss a variety of issues of importance to US DOE waste management operations. The purpose of the WM EFCOG is to seek out and promote the best management and operating practices, cost effective technologies and disposal options for all waste streams generated at US DOE facilities whether destined for US DOE or commercial facilities. Each site representative provided a radioactive waste management lessons learned briefing. Panelists with presentations: Savannah River Site (SRS) Solid Waste Program Update (Kerri Crawford); Idaho Clean-up Project Status (Frederick Hughes); West Valley Demonstration Project Update - EFCOG Waste Management Working Group (John Rendall); Key Project Challenges and Successes (Kalli Shupe); EFCOG WMWG Challenging Waste Subgroup Update (Tammy Monday); CH TRU Difficult Waste Stream Processing Challenges (Daniel Pancake); Argonne Building 350 Clean-up Success Using Effective Work Control (Daniel Dilday); Problematic Waste Streams on the Oak Ridge Reservation (John Wrapp)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety-Class Uninterruptable Power Supply General Contractor for the TA-55 TRP II Project: REQUEST FOR QUALIFICATION No. ADPM-002 - PREQUALIFICATION CRITERIA

LANS is seeking to establish qualified suppliers for the procurement and construction of a Safety-Class Uninterruptable Power Supply (UPS) facility in accordance with ASME NQA-1 2008 and 2009 addenda. This scope includes Work required to construct a new UPS facility at Technical Area (TA)-55 including procurement, construction, installation, and post installation testing of all structures, systems, and equipment (e.g., foundations, concrete, structural steel, building components, HVAC, fire protection, site utilities) excluding the UPS system itself. Design of the facility and associated infrastructure are provided by LANL. Final design of the UPS system will be provided by the UPS Integrator under separate contract. Procurement of all safety-related components (specified by LANL) must be in accordance with NQA-1 and must be purchased from qualified suppliers that have an NQA-1 program or through Commercial Grade Dedication (CGD) in accordance with NQA-1a-2009, Subpart 2.14. The SUBCONTRACTOR shall plan, schedule, coordinate, test, inspect and assure effective performance of all aspects of the Work as described herein.

42 ENGINEERING↗