Search NASA⌕ Search

SEARCH · Search NASA

Results for “Check Standard”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Shield to Pin Coupling of Lightning-Like Transients on Payload Umbilical Cables on a Launch Pad

In this paper we describe in-situ testing of a long payload umbilical, on a launch site, injected with “lightning- like” transients and describe resulting pin-to-pin voltages. Injections and voltage measurements near the ground support equipment room, as well as at a location near the payload junction box, are made. The umbilical cables tested include an outer over-braid and the inner conductor coupling is examined for open circuit, short-circuit and various loads representative of spacecraft input impedances. This testing is important because the Kennedy Space Center (KSC) where the lightning occurrence is the highest in the United States, is the primary launch site for Launch Services Program spacecraft customers. Lightning planning is essential but developing a lightning plan is often overlooked or not adequately analyzed leaving the spacecraft vulnerable to time delays or even damage when lightning occurs. At other popular launch sites like Vandenberg Air Force Base (VAFB) where lightning occurs less often, although at the same or greater intensity when it does occur, lightning planning is often completely ignored by the spacecraft. The two major questions to be addressed in the lightning plan are what retesting should be done to establish a “goodness” level and what is the trigger criteria for this testing? The spacecraft will typically use a standard spacecraft check-out procedure to address the necessary retesting, but determining the trigger criteria is often an issue. For instance, a spacecraft needs to understand what their immunity is to a certain lightning magnitude and location. Determining the amount of current that can be coupled onto a spacecraft umbilical can be calculated by using worst case assumptions or measured with current probes and current measurement devices. Spacecraft can also determine what pin-to-pin voltages they are sensitive to, however pin-to-pin voltage measurements are not typically taken during the strike due to the invasive nature of this measurement. In this paper, we present detailed data on the shield to pin voltage transfer functions to provide insight to the spacecraft developers for lightning retest criteria planning. The results from this unique testing opportunity provide essential details on specific coupling mechanisms affecting spacecraft hardware that interfaces with the ground support equipment. This missing link between cable shield currents and payload susceptibility voltages has been methodically tested and representative data presented.

Trout, Dawn↗

Analysis and Evaluation of NASA's MK40B Six-Component TASK Balance

The paper discusses the physical characteristics NASA's MK40B TASK balance. It is NASA's newest TASK balance that was optimized for the testing of wind tunnel models in the NASA Ames 11-ft Transonic Wind Tunnel. The calibration data of the MK40B balance was obtained in Calspan's Automatic Balance Calibration System. A machine load schedule design was used for the calibration that was developed at the NASA Ames Balance Calibration Laboratory. The calibration data was analyzed using both the Non-Iterative Method and the Iterative Method. Then, the chosen regression models of the calibration data were assessed and compared using the percent contribution, the variance inflation factor, and the calibration load residuals. Interactions of single-component loads were also quantified. In addition, the bi-directional characteristics of the six gage outputs of the balance were assessed by applying a semi-empirical test that was developed at the Ames Balance Calibration Laboratory. It was concluded that four of the six gages of the balance have bi-directional characteristics. Finally, the accuracy of the load prediction equations of the balance was tested by applying the equations to independent check load data that was obtained at the NASA Ames Balance Calibration Laboratory. The standard deviation of the check load residuals met expectations. The check load data also confirmed that the interactions of the forward and aft normal forces on the axial force gage output are very small. - This paper is to be presented in the invited special session titled: "65 Years of TASK Wind Tunnel Balances - Past, Present, and Future".

wind tunnel balance↗

Infrared standard stars

The results of an observational program aimed at setting up a network of faint near-infrared standards of sufficient accuracy are reported. The network covers both northern and southern hemispheres and includes standards red enough to provide at least a limited check on color transformations. The standards are set up at J (1.2 micron), H (1.6 micron), K (2.2 microns), and L (3.5 microns), and their H2O and CO molecular absorption indices are determined. The problem of color transformations between observatories is discussed briefly. All magnitudes presented are transformed to the natural system defined by the CIT observations.

Elias, J. H.↗

Prediction Interval Development for Wind-Tunnel Balance Check-Loading

Results from the Facility Analysis Verification and Operational Reliability project revealed a critical gap in capability in ground-based aeronautics research applications. Without a standardized process for check-loading the wind-tunnel balance or the model system, the quality of the aerodynamic force data collected varied significantly between facilities. A prediction interval is required in order to confirm a check-loading. The prediction interval provides an expected upper and lower bound on balance load prediction at a given confidence level. A method has been developed which accounts for sources of variability due to calibration and check-load application. The prediction interval method of calculation and a case study demonstrating its use is provided. Validation of the methods is demonstrated for the case study based on the probability of capture of confirmation points.

Landman, Drew↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Low Level Calibration of Liquid Scintillation Counting

Liquid Scintillation Counting (LSC) is an analytical laboratory method that quantifies the concentrations of alpha and beta emitting isotopes. The LSC method can be utilized for the detection of tritium, both environmentally and at nuclear facilities. Most LSC samples are aqueous-based and prepared as a radioactive sample dissolved or suspended in a high efficiency scintillation cocktail that converts radioactive energy into light pulses. When placed in counting vials, the liquid scintillation cocktail allows for optical coupling in which energy is released from the samples radioactive decay, and transferred to the scintillator. That energy is then absorbed to produce excited electrons that fall back to their ground-state and emit a pulse of light that is detected by the liquid scintillation analyzers photomultiplier tubes. Quench is a signal attenuation due to physical, chemical, or color interferences. To compensate for quench, quench standards of a known concentration are implemented at increasing increments of quench per vial to create a quench curve. Quench standards can be purchased pre-made or customized from the manufacturer, however, there are several issues that arise from purchasing the pre-made quench standards. The main issues with ordering pre-made quench standards is that they use higher count values, between 30,000 and 250,000 disintegrations per minute (dpm) of tritium per vial and only come in glass vials. Using higher counting standards in glass vials makes it hard to see lower concentrations in plastic vials. Additionally, when using higher energy standards the accuracy of the calibration readings tend to be lower. On the other hand, making a set of quench standards in-house allows for the customization of the dpm concentration to roughly 1,500-3,000 and preparation in plastic vials. This allows for lower activity readings that results in closer precision of the samples' true concentration. Technical Objectives: Create a quench curve and calibrate the LSA for tritium. Verify the calibration of the quench curve prior to cross sample runs. Check calibration against Quality Control (QC) reference value. Conclusion: a tritium quench curve calibration was performed using a scintillation cocktail with ultima gold (AB and AB/F), acetone (only with AB), and water (only with AB/F). By performing the tritium quench curve calibration, the counting efficiency was correlated to various levels of quench. Calibration checks with quality control standards were also performed to verify that the calibration was correct. The observed results provided acceptable values that matched the quality control standard reference values with an acceptable uncertainty. The next step will be fine tuning and cross comparison checks with legacy instrumentation.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Guide to Developing Energy Services Interfaces

This document provides guidance to develop communications interfaces that are highly interoperable and adhere to a set of energy services interface (ESI) principles. It can be applied in the context of information and communications technology interface standards and implementation profiles that enable the integration of a facility with responsive distributed energy resources (DER) into an electric power system consistent with the fundamental ESI principles. In this context, a DER facility may consist of a single DER with a communicating controller or may be as complex as a microgrid campus with several buildings and many DERs. This document is not a technical interface standard, but the requirements described can be used to check that existing, augmented, or new interface standards meet the interoperability requirements of the ESI concept. In this way, this guide for the ESI specification can support future advancements in developing interoperability standards and implementation profiles. The intended audience for this document is DER integration practitioners and ecosystem groups that are in the business of developing and implementing communications interfaces for DER integration. It is intended that these groups apply the information and processes in this document to develop communications standards and implementation profiles that are consistent with fundamental ESI principles.

2030.5↗

Solar panel acceptance testing using a pulsed solar simulator

Utilizing specific parameters as area of an individual cell, number in series and parallel, and established coefficient of current and voltage temperature dependence, a solar array irradiated with one solar constant at AMO and at ambient temperature can be characterized by a current-voltage curve for different intensities, temperatures, and even different configurations. Calibration techniques include: uniformity in area, depth and time, absolute and transfer irradiance standards, dynamic and functional check out procedures. Typical data are given for individual cell (2x2 cm) to complete flat solar array (5x5 feet) with 2660 cells and on cylindrical test items with up to 10,000 cells. The time and energy saving of such testing techniques are emphasized.

Hershey, T. L.↗

Mini All-purpose Satellite Control Center (MASCC)

A new generation of Mini All-purpose Satellite Control Centers (MASCC) has been developed by CNES (F). They turn out to be easily adaptable to different kinds of satellites, both Low Earth Orbital or Geostationary. The features of MASCC allow both standard satellite control activities, and checking of passengers experiments hosted on a space platform. In the different environments in which it may be used, MASCC provides standard broadcasting of telemetry parameters on animated synoptics (curves, bar graphs, alphanumeric displays, ...), which turns out to be a very useful and ergonomic medium for operational teams or satellite specialists. Special care has been taken during the MASCC development about two points: - automation of all routine tasks, allowing automated operation, and limiting human commitment to system supervision and decision making, - software adaptability. To reach these two main objectives, the MASCC design provides:(1) a simple, robust and flexible hardware architecture, based on powerful distributed workstations; and (2) a table-driven software architecture, easily adapted to various operational needs. Satellite characteristics are described in a central Data Base. Hence, the processing of telemetry and commands is largely independent from the satellite itself. In order to validate these capabilities, the MASCC has been customized to several types of satellites and orbital platforms: (1) SPOT4, the French new generation of remote sensing satellites; (2) TELECOM2, the French geostationary TV and telecommunication satellite; and (3) MIR, the Russian orbital platform. MASCC development has been completed by the third quarter of 1993. This paper will provide first a description of the MASCC basic functions, of its hardware and software design. It will then detail the increased automation capability, along with the easy adaptation of the MASCC to new satellites with minimal software modifications.

Zaouche, Gerard↗

Three Approaches for Complete Measurement of the Transverse Beam Optics Along the Fermilab Muon Campus Extraction Line

Traditionally, the process of measuring the optical parameters of a beamline has employed the use of one of two standard methods, namely the three-screen method or a quadrupole magnet scan. Both require either an area of zero dispersion to perform the measurements or knowledge of the dispersion function and momentum spread beforehand in order to provide accurate results. There is however a third method that can be used to measure the standard optical parameters, the beam parameters, the dispersion function, and the momentum spread simultaneously. This method, aptly named the six-screen method, is an extension of the more standard three-screen method. Utilizing the simulation environment of G4beamline, we simulated the 8 GeV proton beam in the M4 beamline and measured the optical and beam parameters using the two standard approaches. Those results were then used as a reference to check the viability of employing the less standard six-screen method in the M4 line. If shown to be a viable option, the six-screen method could be used to retrieve the dispersion function and momentum spread of the beam without needing to change the energy of the beam.

43 PARTICLE ACCELERATORS↗

Energy Services Interface: Requirements Document

This energy services interface (ESI) requirements document represents a process step in the path for creating an ESI specification, which will describe the technical characteristics of an ESI. This document outlines the concepts that need to be covered in the ESI specification, such as principal functions of the ESI, grid services communicated through the ESI, and the ESI lifecycle. It provides context for the Department of Energy’s (DOE’s) Grid Modernization Laboratory Consortium (GMLC) to engage industry participants in the development of the ESI specification. To do this, it describes the desired contents of the ESI specification and provides examples of the type of material that needs to be included in it. The purpose of the ESI specification is to define the requirements that are to be addressed in information and communications technology (ICT) interface standards for enabling the integration of a facility containing responsive distributed energy resources (DER facility) to an electric system consistent with the fundamental ESI principles. In this context, a DER facility may consist of a single DER with a communicating controller or may be as complex as a microgrid campus with several buildings and many DERs. The ESI specification is not a technical interface standard, but the requirements in the specification can be used to check that existing, augmented, or new interface standards meet the interoperability requirements of the ESI concept, which is explained further in this document. In this way, the ESI specification can be used to guide standards advancement work in multiple standards development organizations. To explain the scope of the ESI specification, this ESI requirements document provides examples of situations (or illustrative applications) for using an ESI to coordinate DER flexibility for grid operations. These examples originate from foundational work for describing common grid-DER service agreements that are anticipated to be supported using this interface.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PHOTCAL: The IRAF photometric calibration package

The IRAF photmetric calibration package PHOTCAL is discussed. PHOTCAL is a set of tasks designed to derive the transformation from the instrumental photometric system to the standard photometric system, and apply the transformation to the observations. The PHOTCAL package contains tasks for: (1) creating and/or editing standard star catalogs and observations catalogs, (2) creating, checking and editing the configuration file which specifies the format of the standard star and observations catalogs and the form of the transformation equations, (3) solving the transformation equations interactively or non-iteractively using non-linear least squares fitting routines, and (4) applying the transformation to the observations. PHOTCAL standard star and observations catalogs are simple text files, whose columns are delimited by whitespace, and whose first column contains the star names. This format makes it relatively easy to interface the output of non-IRAF photometry programs as well as the output of the IRAF APPHOT and DAOPHOT photometry packages to PHOTCAL. PHOTCAL maintains a standard star catalog directory for the convenience of the user, but users can easily create their own standard star catalogs and/or define their own standard star catalog directory. Separate observations files produced by APPHOT, DAOPHOT or a user program containing data for stellar fields taken through different filters, can be combined into observations catalogs using one of the PHOTCAL preprocessor tasks. The input configuration file required by PHOTCAL is a text file, consisting of a series of instructions written by the user in a mini-language understood by the PHOTCAL parser. These instructions: (1) assign names to the input data columns in the standard star and observations catalogs, (2) assign names and initial values to the parameters to be fit, (3) define and describe how to solve the transformation equations. The mini-language approach permits great flexibility in the format of the input catalogs and the form of the transformation equations.

Davis, L. E.↗

Building Performance Database API (BPD API) v2.1

The Building Performance Database (BPD) is the largest publicly-available source of measured energy performance data for buildings in the United States. It contains information about the building's energy use, location, and physical and operational characteristics. The BPD can be used by building owners, operators, architects and engineers to compare a building's energy efficiency against customized peer groups, identify energy efficiency opportunities, and set energy efficiency targets. It can also be used by energy efficiency program implementers and policymakers to analyze energy efficiency features and trends in the building stock. The BPD compiles data from various data sources, converts it into a standard format, cleanses and quality checks the data, and provides users with access to the data in a way that maintains anonymity for data providers. This software is the database and the Application Programming Interface (API). Users can utilize the BPD's data to develop their own applications using the API. Version 2.1 included a major update for multiple years of data and refactoring of code for faster queries.

Mathew, Paul↗

PNNL ARENA Cable Motor Test Bed Update

A major focus of the Light Water Reactor Sustainability (LWRS) Cable Nondestructive Examination (NDE) 2021 research is to acquire new equipment and integrate it with existing NDE instruments for a cable motor test bed which has been dubbed the Accelerated and Real Time Experimental Nodal Analysis or “ARENA”. All the primary components have been received and are being staged in the 2410 Stevens building on PNNL’s Richland campus. Building modifications to support a plug-in 480VAC receptacle have been completed and details of the system operating procedure (SOP) are in review. The approved SOP is required before the system is energized but is expected before July 2021. The ARENA system will support planned cable tests for 2021 and beyond that cannot conveniently be performed with on-site installations of cable test equipment including: (1) NDE Tests including Frequency Domain Reflectometry (FDR), Time Domain Reflectometry (TDR), Tan Delta (TD) Impedance measurements, Low Frequency Dielectric Spectroscopy (DS) measurements, standard multi-meter resistance checks, withstand tests and other bulk and distributed tests from the instrument panel with and without motors connected. (2) Online energized live wire tests using partial discharge instruments and LIVE-WIRE spread-spectrum TDR instruments. (3) Cable tests with partially submerged cable segments (including ability to submerge live cable segments). (4) Cable tests with partially or completely thermally aged segments (including ability to expose energized cable segments to thermal aging and use online monitoring instruments to monitor cable performance. (5) Ability to introduce low resistance simulations of connector or splice faults to off-line and on-line instrument setups.

42 ENGINEERING↗

Measurement of CPAS Main Parachute Rate of Descent

The Crew Exploration Vehicle Parachute Assembly System (CPAS) is being designed to land the Orion Crew Module (CM) at a safe rate of descent at splashdown. Flight test performance must be measured to a high degree of accuracy to ensure this requirement is met with the most efficient design possible. Although the design includes three CPAS Main parachutes, the requirement is that the system must not exceed 33 ft/s under two Main parachutes, should one of the Main parachutes fail. Therefore, several tests were conducted with clusters of two Mains. All of the steady-state rate of descent data are normalized to standard sea level conditions and checked against the limit. As the Orion design gains weight, the system is approaching this limit to within measurement precision. Parachute "breathing," cluster interactions, and atmospheric anomalies can cause the rate of descent to vary widely and lead to challenges in characterizing parachute terminal performance. An early test had contradictory rate of descent results from optical trajectory and Differential Global Positioning Systems (DGPS). A thorough analysis of the data sources and error propagation was conducted to determine the uncertainty in the trajectory. It was discovered that the Time Space Position Information (TSPI) from the optical tracking provided accurate position data. However, the velocity from TPSI must be computed via numerical differentiation, which is prone to large error. DGPS obtains position through pseudo-range calculations from multiple satellites and velocity through Doppler shift of the carrier frequency. Because the velocity from DGPS is a direct measurement, it is more accurate than TSPI velocity. To remedy the situation, a commercial off-the-shelf product that combines GPS and an Inertial Measurement Unit (IMU) was purchased to significantly improve rate of descent measurements. This had the added benefit of solving GPS dropouts during aircraft extraction. Statistical probability distributions for CPAS Main parachute rate of descent and drag coefficient were computed and plotted. Using test data, a terminal rate of descent at splashdown can be estimated as a function of canopy loading.

Ray, Eric S.↗

Implementing Model-Check for Employee and Management Satisfaction

This presentation will discuss methods to which ModelCheck can be implemented to not only improve model quality, but also satisfy both employees and management through different sets of quality checks. This approach allows a standard set of modeling practices to be upheld throughout a company, with minimal interaction required by the end user. The presenter will demonstrate how to create multiple ModelCheck standards, preventing users from evading the system, and how it can improve the quality of drawings and models.

Jones, Corey↗

SCaN Network Ground Station Receiver Performance for Future Service Support

Objectives: Examine the impact of providing the newly standardized CCSDS Low Density Parity Check (LDPC) codes to the SCaN return data service on the SCaN SN and DSN ground stations receivers: SN Current Receiver: Integrated Receiver (IR). DSN Current Receiver: Downlink Telemetry and Tracking (DTT) Receiver. Early Commercial-Off-The-Shelf (COTS) prototype of the SN User Service Subsystem Component Replacement (USS CR) Narrow Band Receiver. Motivate discussion of general issues of ground station hardware design to enable simple and cheap modifications for support of future services.

Deep Space Network (DSN)↗

A Multi-Encoding Approach for LTL Symbolic Satisfiability Checking

Formal behavioral specifications written early in the system-design process and communicated across all design phases have been shown to increase the efficiency, consistency, and quality of the system under development. To prevent introducing design or verification errors, it is crucial to test specifications for satisfiability. Our focus here is on specifications expressed in linear temporal logic (LTL). We introduce a novel encoding of symbolic transition-based Buchi automata and a novel, "sloppy," transition encoding, both of which result in improved scalability. We also define novel BDD variable orders based on tree decomposition of formula parse trees. We describe and extensively test a new multi-encoding approach utilizing these novel encoding techniques to create 30 encoding variations. We show that our novel encodings translate to significant, sometimes exponential, improvement over the current standard encoding for symbolic LTL satisfiability checking.

Rozier, Kristin Y.↗