Economic utilization of general aviation airport runways

The urban general aviation airport economics is studied in detail. The demand for airport services is discussed, and the different types of users are identified. The direct cost characteristics of the airport are summarized; costs to the airport owner are largely fixed, and, except at certain large airports, weight is not a significant factor in airport costs. The efficient use of an existing airport facility is explored, with the focus on the social cost of runway congestion as traffic density at the airport build up and queues form. The tradeoff between aircraft operating costs and airport costs is analyzed in terms of runway length. The transition from theory to practice is treated, and the policy of charging prices only on aircraft storage and fuel is felt likely to continue. Implications of the study from the standpoint of public policy include pricing that spreads traffic peaks to improve runway utilization, and pricing that discriminates against aircraft requiring long runways and causes owners to adopt V/STOL equipment.

Piper, R. R.↗

Renewable-battery hybrid power plants in congested electricity markets: Implications for plant configuration

Examining coupled renewable-battery power plants (“hybrids”) in congested areas provides insights into a future of increased wind and solar penetration. Our study focuses on two types of congested regions, Variable Renewable Energy (VRE)-rich Areas and Load Centers, and explores likely plant configuration choices for developers and transmission network planners. Here, this paper examines how hybrid value, comprising energy and capacity value, varies by plant configuration and congested region type considering factors such as storage duration, battery degradation, and ability to charge from the grid. We select plant locations from across the seven main U.S. independent system operators (ISOs). Hybrid value for each configuration is computed based on profit-maximizing plant operation given perfect foresight, according to observed wholesale power market real time prices from 2018 to 2021. In VRE-rich Areas, the median increase in energy value from extending storage duration from one to 4h is 29.4% for solar and 26.8% for wind, assuming low battery degradation costs and storage sized to 100% of the plant's nameplate generation capacity. Increasing storage duration beyond 4h does not substantially increase its value from energy markets, even in VRE-rich Areas. We find that solar hybrids reach a 90% capacity credit with 4h of storage, while wind hybrids require 8h of storage, based on the capacity factor of each hybrid during the top 100 net load hours.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Civil Tiltrotor Feasibility Study for the New York and Washington Terminal Areas

NASA tasked LMI to assess the potential contributions of a yet-undeveloped Civil Tiltrotor aircraft (CTR) in improving capacity in the National Airspace System in all weather conditions. The CTRs studied have assumed operating parameters beyond current CTR capabilities. LMI analyzed CTRs three ways: in fast-time terminal area modeling simulations of New York and Washington to determine delay and throughput impacts; in the Integrated Noise Model, to determine local environmental impact; and with an economic model, to determine the price viability of a CTR. The fast-time models encompassed a 250 nmi range and included traffic interactions from local airports. Both the fast-time simulation and the noise model assessed impacts from traffic levels projected for 1999, 2007, and 2017. Results: CTRs can reduce terminal area delays due to concrete congestion in all time frames. The maximum effect, the ratio of CTRs to jets and turboprop aircraft at a subject airport should be optimized. The economic model considered US traffic only and forecasted CTR sales beginning in 2010.

Stouffer, Virginia↗

Curb Allocation and Pick-Up Drop-Off Aggregation for a Shared Autonomous Vehicle Fleet

Advances in information technologies and vehicle automation have birthed new transportation services, including shared autonomous vehicles (SAVs). Shared autonomous vehicles are on-demand self-driving taxis, with flexible routes and schedules, able to replace personal vehicles for many trips in the near future. The siting and density of pick-up and drop-off (PUDO) points for SAVs, much like bus stops, can be key in planning SAV fleet operations, since PUDOs impact SAV demand, route choices, passenger wait times, and network congestion. Unlike traditional human-driven taxis and ride-hailing vehicles like Lyft and Uber, SAVs are unlikely to engage in quasi-legal procedures, like double parking or fire hydrant pick-ups. In congested settings, like central business districts (CBD) or airport curbs, SAVs and others will not be allowed to pick up and drop off passengers wherever they like. This paper uses an agent-based simulation to model the impact of different PUDO locations and densities in the Austin, Texas CBD, where land values are highest and curb spaces are coveted. In this paper 18 scenarios were tested, varying PUDO density, fleet size and fare price. The results show that for a given fare price and fleet size, PUDO spacing (e.g., one block vs. three blocks) has significant impact on ridership, vehicle-miles travelled, vehicle occupancy, and revenue. A good fleet size to serve the region’s 80 core square miles is 4000 SAVs, charging a $1 fare per mile of travel distance, and with PUDOs spaced three blocks of distance apart from each other in the CBD.

Hunter, Christian B.↗

The Potential Impact of Offshore Wind Energy on a Future Power System in the U.S. Northeast

This study aims to understand and quantify the potential impact of offshore wind on a future electricity system in the U.S. Northeast. In this analysis, a detailed representation of the Northeast power system is adopted, using a generation portfolio for 2024 paired with offshore wind nameplate capacities of 0 gigawatts (GW), 2 GW, and 7 GW. The analysis identifies points of offshore wind interconnection in the ISO-New England and New York Independent System Operator control areas and uses hourly wind profiles from the Wind Integration National Dataset Toolkit. Hourly simulations of the 2024 power system operations show an ability to accommodate the prescribed offshore wind capacities by adapting the system's generation dispatch. Curtailment levels of offshore wind range between 4% and 5%. Offshore wind generation displaces primarily natural-gas combined-cycle generation; however, requires increased flexibility from combined cycles through more frequent start-ups. The number of hours with transmission congestion increases because of offshore wind injection, with varying impact on a subregional level. Offshore wind's capacity credit was found to be 14.5%-28.3% and is lower than estimated in other large-scale power system studies, in part because this study considered a different weather year and a power system representation with higher shares of solar PV and onshore wind. The reliability contribution of resources is a topic area identified for more research and collaboration. The 7-GW scenario shows a reduction in locational marginal price of 11%, with production cost savings of up to 18% compared to the 0-GW scenario.

17 WIND ENERGY↗

Multi-Stage Modeling With Recourse Decisions for Solving Stochastic Complementarity Problems With an Application in Energy

This paper presents a multi-stage model with recourse decisions for solving complementarity problems in a competitive electricity market under uncertainty, while also considering renewable energy technologies and battery storage utilization. The model is based on a Nash-Cournot formulation of imperfect competition among power producers. We analyze the value of variable renewable energy (VRE) and battery storage under different uncertainties, such as demand level and VRE availability. To illustrate the proposed model, we apply it to three- bus five-player model and analyze different cases varying costs, including a user-optimal perspective (with market power) and a system-optimal perspective (with central planning). We also consider the potential for congestion in the system by restricting the transmission capacity between a single interface that connects two buses. Our findings show that increasing the battery storage capacity results in a decrease in the need for perfect information about future uncertainties. Additionally, as the model allows for more uncertainty, it becomes more apparent that the stochastic mixed complementarity problem (MCP) has an advantage over a deterministic equivalent. We propose the use of the Value of the Stochastic Equilibrium Solution (VSES) as a quality metric to compare the stochastic MCP with its deterministic equivalent. Overall, expanding battery storage capacity can lower the maximum, mean, and variance values of delivered prices, but there are diminishing returns to this approach.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Near-Term Reliability and Resilience (NTRR) (Final Report)

The Near-Term Reliability and Resiliency (NTRR) was awarded in December 2020 as an inter-lab project to examine the reliability and resilience of the electricity grid and natural gas transportation availability. The project builds on studies conducted by The North American Electric Reliability Corporation (NERC), the U.S. Department of Energy (DOE), and other non-governmental research and operational focused on reliability and resilience analyses challenges. The research was conceived to address near-term scenarios (within 10 years), when many local and regional policy transitions could begin to impact grid reliability, resilience, and supporting infrastructure availability. To integrate the natural gas interdependency, the team began with the generating capacity and demand projections from the 2020 NERC Long-Term Reliability Assessment and the Bulk Electric System (BES) transmission topologies defined in the Western Electricity Coordinating Council (WECC) Anchor Data Set, Eastern Interconnection Reliability Assessment Group Multi-Regional Modeling Working Group (ERAG/MMWG) Data Set, the team calculated baseline regional power sector gas demands from present electricity delivery year through the end of delivery year 2030/31 by applying security constrained economic dispatch. This demand was compiled along with demand projections for regional residential, commercial, and industrial natural gas demands from the most recent Energy Information Administration (EIA) Annual Energy Outlook Reference Case into Deloitte’s MarketBuilder® North American Gas Model. Through the application of these demands, MarketBuilder® was projected the topology of natural gas flows in the natural gas pipeline network across the interconnected North American system along with regional natural gas prices that may be seen by market participants in future years Additionally, contingencies and sensitivities focused on the built models of the Eastern Interconnection (EI) and Western Interconnection (WI). They address challenges from the following with the outcomes being an identification of performance under the extreme conditions and an identification of potential grid weaknesses that should be addressed to mitigate the reduced performance and improve the resilience and reliability of the specific regions as well as the National Grid: • Weather events including extreme heat, extreme cold, high wind, no wind, wind and solar forecasting errors, and wildfires. • Gas availability, factoring in supply disruption (contractual and physical), seasonal availability constraints, and infrastructure limitations; and • Transmission availability and congestion.

03 NATURAL GAS↗

Models and Strategies for Optimal Demand Side Management in the Chemical Industries

Deregulation and the increase of renewable electricity generation from wind and solar photovoltaics have transformed the U.S. electricity market. Economic and environmental benefits notwithstanding, the presence of renewables has increased variability and uncertainty on the supply side of the grid. Managing demand, rather than generation – a strategy referred to as “demand response (DR)” – is an attractive approach for mitigating this imbalance. DR efforts aim to reduce electricity usage during peak demand times, lessening stress on the grid. Industrial users are particularly attractive entities for DR participation since they present large, localized loads that can provide significant relief on grid demand and –unlike other large loads, such as buildings – are minimally dependent on human needs and preferences. In this project, we accomplished three main objectives. (1) We developed data-driven low-order DR scheduling-relevant dynamic models of chemical processes. Concurrently, we studied the formulation and solution of the associated optimal DR production scheduling problems. (a) A prototype air separation unit (ASU) model was used to generate simulated operating data for initial modeling efforts, which enabled the later use of industrial data for data-driven modeling. (b) We utilized Hammerstein-Wiener (HW) and Finite Step Response (FSR) models to represent nonlinear plant dynamics. (c) The HW models were linearized using exact linearization so they could potentially be embedded in power system models, which are formulated as mixed integer linear programs (MILPs). (d) We solved DR optimization problems under uncertainty and found that even naïve predictions of electricity price and product demand led to significant cost savings benefits. (2) Our DR scheduling optimization problem formulations are amenable to real-time solution. (a) We utilized Lagrangian Relaxation (LR) to efficiently solve the optimization problem by decoupling subproblems linked by complicating constraints. (b) We have achieved computation times for the 3-day DR scheduling problem of an ASU as low as 1.88 minutes. (3) Our representations of the DR behavior of chemical process as grid-level batteries were embedded in power system models. (a) For a small-scale grid, we found that incorporating the dynamics of the chemical plant in the optimal power flow calculations resulted in better resource management leading to up to 15% and 46% cost reduction for the grid and chemical plant operations, respectively, during periods of power line congestion. We have published several works dedicated to modeling and solving DR optimization problems from the user side. These were published in top peer-reviewed journals and are summarized in this report. The most recent work (and papers in preparation) considers DR scheduling from the grid side. Future efforts will consider networked plants (e.g., air separation units operating on a common pipeline) for DR participation, which is expected to amplify the capabilities of industrial DR participants to perform load-shifting. Our consideration of uncertainty in DR has inspired future directions in this area as well: we plan to develop multistage methods to fully account for the effects of uncertainty in DR scheduling.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Revenue-Maximizing Shared Parking and Electric Vehicle Charging Management in Multi-Unit Dwellings

In urban areas, searching for parking and electric vehicle (EV) charging can result in cruising, congestion, and environmental externalities. Recognizing the business opportunity of offering private parking and charging infrastructure access within multi-unit dwellings (MUDs) during daytime, we model a shared parking and EV charging management system. We maximize the revenue of MUD charging hubs in mixed land use, catering to public demand. Our approach accounts for the objectives of the two stakeholders involved: a demand model is fitted on the choices of EV charging users, and the supply model optimizes the allocation of parking and charging requests in an MUD parking lot. A binary integer linear programming model for the allocation of parking and charging spaces with a rolling horizon is integrated with matching rules that handle both parking and charging requests. In our numerical experiments in a neighborhood of Chicago, Illinois, we estimate the performance of the MUD parking and charging system with metrics that include revenue, number of matchings, and utilization rates. At any given time, MUDs with lower prices attract more charging requests, particularly those of longer duration, resulting in higher revenue and greater charging utilization. Dynamic pricing facilitates a more equitable distribution of requests; as MUD parking lots reach capacity and their fees increase, other MUDs become more competitive, attracting additional requests. Comparing our method against first-come-first-served and optimal-solution benchmarks, we demonstrate our model’s effectiveness in dynamically managing mixed parking and charging demand in MUD charging hubs.

electric vehicle, multi-unit dwelling, charging in↗

Transportation Hub Infrastructure Expansion: Decision Support Under Uncertainty

The Athena project (www.athena-mobility.org) has worked to investigate the relationship between the Dallas-Fort Worth Airport (DFW) and the greater Dallas area in order to better understand and therefore better inform future decision-making regarding the critical infrastructure that influence mobility between the airport and the city. Through this work, infrastructure related to curbside pickup and drop-off, parking, public transit, and the road network congestion were identified as critical to the operation of the DFW transportation hub. The infrastructure analysis and expansion aspect of the Athena project is focused on the restructuring of the CTA curb as a hierarchical curb and the building or repurposing of parking infrastructure as the interplay between these two areas. Many sources of uncertainty exist that may impact future airport and transportation hub operations, such as passenger volume growth, population demographic changes over time, electric vehicle (EV) adoption rates, and autonomous vehicle (AV) adoption rates. Due to these sources of uncertainty, we have selected for our research a modeling framework that can capture various types of uncertainty and hedge against those uncertainties in the optimization process. We analyze road network and curb congestion, the rise of transportation networking companies, trends in parking usage, existing policies around this infrastructure, airport revenue streams, and other contributing factors to enable infrastructure decision making with less uncertainty. To accomplish this wholistic analysis, we have developed a novel multi-stage, multi-period stochastic optimization model which considers the airport's decisions from 2025-2045 under different possible future macro trajectories and day-to-day variations in operational conditions captured as "annual representation of operations" scenarios with respective probabilities. This model has also been designed to leverage the outputs of various efforts under the Athena project to create a combined decision framework for infrastructure decisions. These various efforts include the route optimization model, the ASPIRES simulation, the mode choice model, and the SUMO traffic simulation. Our computational experiments of this system at scale have resulted in a working version of our infrastructure model which enables the explicit representation and consideration of various sources of uncertainty in the decision process to enable robust, flexible decision-making. This model has been effectively run on NREL's HPC system, Eagle, with large numbers of stochastic scenarios and shows promise as a scalable tool for robust consideration of uncertainties in airport planning. We have tested our model using 30,240 operational circumstances in total, resulting in a problem with more 200 million variables. This model was solved in several different configurations, and a workflow to simulate the performance of the infrastructure model results was developed and deployed. In general, our results indicate that a combination of remote parking, remote curb infrastructure, and dynamic pricing can generate revenue, reduce emissions, accommodate emerging technologies such as AVs and EVs, and manage airport passenger growth over time. We note the success of the proposed strategy depends on the data collection and forecasting abilities of DFW. We have also seen that the AV adoption by TNCs might necessitate larger amounts of remote curb. The results of this work inform strategies for airport infrastructure decision making, as well as demonstrate the value of an adaptable model, but also indicate that there are avenues remaining where further research would be of value.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Are coupled renewable-battery power plants more valuable than independently sited installations?

Coupled renewable-battery powerplants differ from the traditional concept of independent siting of electricity resources within transmission networks. Prior research on the value proposition and cost savings from coupling did not consider the geographic constraint of co-location. This paper fills the gap by assessing how pricing volatility differences between nodes within electricity markets impact the system value of coupled renewable-battery projects as compared to independent VRE and battery installations. We use wholesale power market prices from 2012–2019 across the seven main U.S. independent system operators (ISOs) with a linear optimization program to compare the electricity market value of coupled projects to the value of the same underlying sub-components, deployed separately. We find that additional value from adding a 4-hour battery sized to 50% of renewable-plant nameplate capacity is $\$$10/MWh across ISOs on average. The highest boost occurs in California ($\$$15/MWh), where the value of adding storage to solar rises over time in tandem with increased solar penetration in the region. If renewables and batteries are deployed independently, we estimate that $\$$12.5/MWh of additional value could be achieved because of more flexibility on battery siting and operation. The $\$$12.5/MWh coupling penalty is reduced to $\$$1.6/MWh when considering alternative approaches to integrating battery storage. This result implies that renewable-battery power plants will play an increasing role in electricity systems if they can be built for $\$$2–$\$$13/MWh less than independent projects of comparable size. However, the wide regional variation in coupling penalties, along with the importance of conditions captured in our sensitivity cases, suggests the tradeoff between coupling penalties and savings will vary by situation. Therefore, roles exist for independent and coupled projects from a system optimization perspective.

14 SOLAR ENERGY↗

Multiple Hub Network Choice in the Liberalized European Market

A key question that so far has received relatively little attention in the germane literature is that of the changes at various airports as a result of the EU liberalization policies. That is, presently, most major European airports still benefit from the so-called home-carrier phenomenon where the country's publicly or semi-publicly owned carrier uses the country's main airport as its gateway hub and, consequently, the home-carrier is also the principal user of this airport (in terms of proportion of total aircraft movements, number of passengers transported, connections, slots ownership, etc.). The country's main airport has substantially benefited from these monopoly conditions of airline captivity, strongly determined by the bilateral system of international air transport regulation. Therefore, European major airports were used to operate in essentially different markets, compared to the increasingly competitive markets of their home based carriers. This partly explains relative stability of transport volumes and financial results of European major airports compared to the relatively volatile financial results of most European national airlines. However, the liberalization of European aviation is likely to change this situation. Market access is open now to all community carriers, i.e. carriers with majority ownership and effective control in the hands of EU citizens. Ticket prices are free, governments can only intervene in case of dumping or excessive pricing. A community airline can choose its seat in any of the 15 member states. Licensing procedures are harmonized between member states. In the last few months community carriers have had unrestricted route access within the EU. Most probably this development will be extended to countries inside and outside Europe. Last year the European Commission got the mandate to start negotiations with 10 other European countries. In the meantime the EC has also started negotiations with the USA on so-called soft rights. In the meantime, open skies agreements have been concluded between the USA and most of the EU member states to facilitate strategic alliances between airlines of the states involved. As a result of this on-going liberalization the model of the single 'national' carrier using the national home base as its single hub for the designated third, fourth and sixth freedom operations will stepwise disappear. Within the EU the concept of the national carrier has already been replaced by that of the community carrier. State ownership in more and more European carriers is reduced. On the longer run mergers or even bankruptcy will further undermine the "single national carrier - single national hub" model in Europe. In the meantime, strategic alliances between national carriers in Europe will already reduce the airlines' loyalty to a single airport. Profit maximization and accountability to share holders will supersede the loyalty of these newly emerging alliances, probably looking for the opportunities of a multiple hub network to adequately cover the whole European market. As a consequence, some European airports might see a substantial decline in arriving, departing and transfer traffic, thus in revenues and financial solvency, as well as in their connection to other inter-continental and intra-European destinations. At the same time, other airports might realize a significant increase in traffic as they will be sought after by the profit maximizing airlines as their major gateway hubs. Which will be the losing airports and which will be the winning ones? Can airports anticipate the actions of airlines in deregulated markets and utilize policies which will improve their relative position? If so, what should be these anticipatory policies? These questions become the more urgent, since an increasing number of major European airports will be privatized in the near future. Although increasing airport congestion in Europe will also be reflected in a growing demand pressure for airport slots, this is not a guarantee for a stable transport volume growth of individual airports. The more volatile the market is, the more vulnerable privatized airports become. Therefore, the main issue of this study is the analysis of the opportunities of major European airports to become a central hub as a result of the network choices made by the new European airlines in a completely liberalized market. In a previous study (Berechman and de Wit, 1996), we already explored the potential of Amsterdam Airport Schiphol of becoming the major West-European hub, once European aviation markets are deregulated. A major hindrance of that study was the use of a single hub-and-spoke network. For example that model could not analyze the viability of different combinations of European hubs within a multiple hub network of alternative airline alliances. In this study, we have formulated the model of a multi-hub network where two West-European airports are used for inter-continental and intra-European travel to enable a more realistic analysis of hub choice. Like the previous one also this multi-hub model is primarily used to assess the potential ability of Amsterdam Airport Schiphol for becoming a major West-European hub. Thus, in particular, the policy tests focus on this airport in a double hub network.