Search NASA⌕ Search

SEARCH · Search NASA

Results for “Constructions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Automated Progress Monitoring in Modular Construction Factories Using Computer Vision and Building Information Modeling

Modular construction methods have recently gained interest due to the advantages offered in terms of safety, quality, and productivity for projects. In this method, a significant portion of the construction is performed off-site in factories where modular components are built in different workstations, assembled on the production line, and shipped to the site for installation. Due to the labor-intensive nature of tasks, cycle times in modular construction factories are highly variable, which commonly leads to major bottlenecks and delays in construction projects. To remedy this effect, recent methods rely on sensors such as RFID to monitor the production process, which is reportedly expensive, and intrusive to the work process. Recently, computer vision-based methods have been proposed to track the production process in modular construction factories. However, these methods overlook monitoring the assembly process on the production line. Therefore, this paper presents a method to monitor the assembly process by integrating computer vision-based methods with Building Information Modeling (BIM). The proposed method detects the modular units using object segmentation; superimposes the installation area with the corresponding 2D region using BIM, and identifies the installation of the components using image processing techniques. The proposed method has been validated using surveillance videos captured from a modular construction factory in the US. Successful implementation of the proposed method can lead to timely identification of delays during the assembly process and reduce delays in modular integrated construction projects.

building information modeling↗

A Path to Zero Energy Ready Home Construction

This paper will be presented at the 5th Residential Building Design & Construction Conference in State College, Pennsylvania. While the number of zero energy homes constructed in the U.S. has grown dramatically, increasing nearly 400% since 2015, zero energy homes still accounted for less than 1% of all U.S. homes constructed as of December 2018. Concerns about high costs or implementation challenges have kept many builders from attempting zero energy home construction. However, builders participating in the U.S. Department of Energy’s Zero Energy Ready Home Program are showing that zero energy ready home construction can be achieved simply and cost effectively with off-the-shelf equipment and materials and common construction techniques. Construction methods used by builders in the DOE program are compared with those used in just-to-code new homes and existing homes for several key components, including wall assemblies and HVAC systems. Examples of cost-effective assemblies used in the Mid Atlantic states are provided.

U.S. Department of Energy Building Technologies Pr↗

Enhancing Worker Safety During Off-Site Construction of Energy-Efficient, Low-Carbon Exterior Envelope

The construction industry is not doing enough to embrace off-site modular construction. It is a missed opportunity for optimized energy efficiency because prefabricated exterior wall envelopes are lower in cost and faster and easier to install. Factory off-site construction offers improved safety for construction workers because work is done in a controlled environment, but lack of intent, understanding, and data is also a missed opportunity for enhancing worker safety. This research looks specifically at the prefabricated wall exterior envelope in the context of safety. The research question is "off-site factories build with ease of energy efficiency and lowered carbon emissions, but is the process safer?" This research was funded by NREL Student Training in Applied Research (STAR) program, University Partnerships Program, and Wells Fargo Bank. Key finding is that modular and prefabricated construction are perceived to be safer, but the accident rates are much higher than in the general construction and manufacturing industries. Proposed solutions to decrease accidents in off-site prefabricated construction includes safety training for workers, provide movable kiosks with PPE at workstations, ensure tools are well-maintained and place safety posters in visible locations. Future work includes improving worker safety to increase worker productivity, perform pilot demonstration, work with factory designers for new modular layout for worker safety, i.e., easy access to PPE kiosks, and work closely with OSHA so that they take notice of this safety niche.

drywall↗

A New State of the Art: Zero Energy Modular Multifamily Construction

In 2020, the U.S. Department of Energy's Building Technologies Office (BTO) launched the Advanced Building Construction (ABC) Initiative. This initiative aimed to integrate energy efficiency into high-production construction practices. One focus area of the initiative is off-site construction, an approach that may achieve scalable, efficient, and high-performing construction buildings through process standardization. This report presents the findings and recommendations from our ABC Initiative project: A New State of the Art: Zero-Energy Modular Multifamily Construction System. The objectives of the BTO-funded project are to: 1) Achieve energy performance 50% better than the 2018 International Energy Conservation Code (IECC). 2) Achieve this level of energy performance at no additional cost VEIC worked with Louisiana State University (LSU), National Renewal Energy Lab (NREL), [the project team], and industry partners at the Mod Coach, KBS, and Solar Home Factory to identify and analyze multifamily business designs and modular construction practices. These designs and processes hold the promise of achieving the goals set out by the DOE.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The coset construction for non-equilibrium systems

We propose a systematic coset construction of non-equilibrium effective field theories (EFTs) governing the long-distance and late-time dynamics of relativistic, finite-temperature condensed matter systems. Our non-equilibrium coset construction makes significant advances beyond more standard coset constructions in that it takes advantage of recently-developed techniques, which allow the formulation of non-equilibrium effective actions that account for quantum and thermal fluctuations as well as dissipation. Because these systems exist at finite temperature, the EFTs live on the closed-time-path of the Schwinger-Keldysh contour. Since the coset construction and the non-equilibrium effective actions may be unfamiliar to many readers, we include brief introductions to these topics in an effort to make this paper self-contained. To demonstrate the legitimacy of this coset construction, we successfully reproduce the known EFTs for fluids and superfluids at finite temperature. Then, to demonstrate its utility, we construct novel EFTs for solids, supersolids, and four phases of liquid crystals, all at finite temperature. We thereby combine the non-equilibrium effective action and the coset construction to create a powerful tool that can be used to study many-body systems out of thermal equilibrium.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

LLNS Request for Permanent Variance from 10 CFR 851 for Construction

Lawrence Livermore National Security, LLC (LLNS) requests variance from 10 CFR 851 (the Rule) for construction work at Lawrence Livermore National Laboratory (LLNL). The request is based upon successful application of similar variances granted to LLNS in continued support of the National Nuclear Security Administration (NNSA) initiative to streamline the delivery of line-item construction projects under $50 million. This request is aligned with the approved NA 50 safety approach. Experience gained in the construction of the new LLNL Emergency Operations Center (EOC) under the variance granted in June 2020 and construction preparations to date on the Digital Infrastructure Capabilities Expansion (DICE) under the variance granted April 2022 is very encouraging. There are strong indicators that a benefit has been realized by both the subcontractors executing the work and the Laboratory. The variance has permitted local/regional construction businesses contracted to Management & Operation Contractor operated facilities and lower tier subcontractors to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the Department of Energy (DOE) Complex. While compliance to standards that are as safe and healthful as those in 10 CFR 851: confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum has been avoided. Safety and health performance on the construction project including the number of inspection and surveillance issues is comparable to other subcontractors and projects at LLNL executed under 10 CFR 851. This variance application was prepared according to the requirements in 10 CFR 851, Subpart D – Variances, § 851.31 Variance Process. This request is limited to subcontractor executed construction at LLNL.

42 ENGINEERING↗

Benefits Of Automated Construction And Energy Efficiency Measures In Modular Homes

This article builds on and adds to a Buildings XV publication that introduced the Transformative Efficiency and Automation in Modular Homes (TEAMH) project. The TEAMH project sought to develop a scalable solution for producing modular homes with 20-50% energy savings and similar cost relative to site-fabricated single-family home construction. A key aspect of the project was assessing the potential for labor cost reductions through automation-assisted construction using light gauge steel (LGS). To quantify the advantages of this approach, side-by-side comparisons were made between traditional wood-framed construction and automation-assisted LGS construction. This demonstration involved constructing one wood-framed wall and several LGS test walls, accompanied by a time-and-motion study. The results indicated that automation assistance could decrease construction time and associated labor costs by as much as 46%. High-performance envelope technologies for exterior insulation and air sealing were evaluated to compare modular homes with site-built homes that meet the International Energy Conservation Code (IECC). A key technology considered was vacuum insulation panels (VIPs) with fiberglass cores. Guarded hot box testing of multiple full-scale wall assemblies containing different combinations of exterior continuous insulation systems containing phenolic foam and VIPs. Testing on various full-scale wall assemblies revealed that, with LGS construction, cavity insulation had minimal impact on exterior wall performance. Omitting cavity insulation can reduce labor and material costs while streamlining manufacturing, as its installation is labor-intensive and not easily automated due to the need for precise placement around wiring and other internal components. Guarded hot box tests of multiple LGS test walls with foam and VIP-based exterior insulation systems achieved R-values of up to 31 hr-ft2-°F/Btu. Finally, building energy modeling of multiple modular home designs indicated that the upgraded envelope assemblies can yield heating energy savings of up to 50% and cooling energy savings of up to 30% compared to IECC 2018 standards.

Shrestha, Som [ORNL] (ORCID:0000000183993797)↗

Understanding the Challenges of Financing Modular Construction: A Case Study for Prospective Multifamily Units

Compared to traditional site build, modular construction can significantly shorten construction schedules and speed income generation. Modular construction may also reduce construction costs. Yet access to commercial financing remains one of the most significant barriers to modular construction. Materials must be purchased, and production lines reconfigured for each project months ahead of fabrication. Materials alone can be 60% or more of the total cost of production. As a result, manufacturers require large upfront deposits—often 30% or more of the off-site contract. In addition, the capital-intensive nature of modular construction requires frequent progress payments for manufacturers to maintain cash flow. For those lenders willing to fund modular projects, many require the developer to share more of the risk. This may include the developer paying for line reservation fees and material deposits 3–6 months prior to production. Because these are unsecured loans, interest rates may be higher and loan amounts lower. As suppliers, modular manufacturers discourage retainage. Together, these and other factors may contribute to higher equity requirements for the developer—particularly at the beginning of the project.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Perspectives on Potential Advanced Construction Technologies for Nuclear Energy

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, the National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

DNA parts and gene constructs for plant biodesign

Plant biodesign requires the knowledge of DNA parts (e.g., genes, promoters, terminators), along with their combinations (as gene constructs) linked to engineered traits. DNA parts with validated or predicted functions in plants have been deposited in various online databases. However, these existing databases focus on basic biological functions of individual DNA parts, leaving a gap between basic knowledge and bioengineering applications. To fill this knowledge gap, we have created a user-friendly, open-ended database as a knowledge graph linking DNA parts to gene constructs to traits. This database contains experimentally validated DNA parts and gene constructs documented in peer-reviewed publications. The DNA parts include 1) molecular components with biological functions, such as genes involved in various biological processes (e.g., metabolic and signal transduction pathways) and 2) molecular components with technical functions, such as gene expression, genome engineering and sequence splicing. The gene constructs deposited in this database include both single-gene and multi-gene constructs. This database allows users to submit DNA parts and gene construct compositions linked to engineered traits described in peer-reviewed publications, providing a public digital repository for sharing the biodesign information among the researchers in the fields of plant biotechnology and plant synthetic biology.

plant biodesign synthetic biology gene constructs ↗

Integrating Energy Efficiency Strategies with Industrialized Construction for Our Clean Energy Future: Preprint

NREL’s Industrialized Construction Innovation Team has developed an ambitious plan to accelerate the integration of energy efficiency (EE) strategies with Industrialized Construction (IC). The United States (U.S.) construction industry is beginning to use IC methods to build multifamily apartment buildings to address affordability and labor shortages. Apart from reducing cost of construction and delivery times, the IC method of permanent modular construction has the potential to facilitate the integration of a wide range of EE strategies and advanced controls into such buildings. While there may be unintended EE benefits to IC such as a tighter envelope due to higher construction quality, the process has not been leveraged specifically to enhance EE. NREL aims to claim this missed opportunity and integrate IC benefits with EE as well as advanced controls, distributed energy resources, and grid-friendly design strategies. The paper proposes an ‘IC Assessment Framework’ to achieve affordable zero-energy modular multifamily buildings. Through the selection criteria of Design for Manufacturing and Assembly, the framework aims to distill a broad range of proven EE strategies for site-built into a set of strategies that qualify as easy to integrate for off-site. The output is a Factory Information Model (FIM) that represents a process-based digital twin to enable advanced time-and-motion study, plugs into open source building energy modeling platform (EnergyPlus), and serves as a vital tool facilitating wider adoption of EE integration. Conclusively, the paper delineates next steps for upcoming pilots with NREL’s IC partners towards developing a transformational pathway for our Clean Energy Future.

30 DIRECT ENERGY CONVERSION↗

ADVANCED CONSTRUCTION TECHNOLOGY INITIATIVE (ACTI)

Advanced reactor technologies have attracted considerable financial support, catalyzing innovation in the nuclear energy landscape. These next generation reactors are designed with enhanced passive safety systems and the potential for cost reductions. As these advanced reactors approach technological maturity, their commercial success also requires focused examination and essential support. Economic assessments in the nuclear energy sector often emphasize construction costs and the risk of scheduling delays as primary contributors to deployment expenditures. Traditionally, vital elements of nuclear energy deployment including civil/structural engineering, design sophistication and automation have been either undervalued or postponed in the development cycles. Additionally, the nuclear industry’s collective experience in nuclear project execution has diminished over the past several decades due to the infrequency of new plant constructions. Hence, The National Reactor Innovation Center’s (NRIC) Advanced Construction Technology Initiative (ACTI) program aims to reduce cost overruns and schedule slippages that have plagued the construction of nuclear power plant projects. With this initiative, NRIC is facilitating the development of advanced nuclear plant construction technologies and approaches through partnerships that would provide game-changing benefits to the construction of advanced nuclear power plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Direct interpolative construction of the discrete Fourier transform as a matrix product operator

The quantum Fourier transform (QFT), which can be viewed as a reindexing of the discrete Fourier transform (DFT), has been shown to be compressible as a low-rank matrix product operator (MPO) or quantized tensor train (QTT) operator. However, the original proof of this fact does not furnish a construction of the MPO with a guaranteed error bound. Meanwhile, the existing practical construction of this MPO, based on the compression of a quantum circuit, is not as efficient as possible. We present a simple closed-form construction of the QFT MPO using the interpolative decomposition, with guaranteed near-optimal compression error for a given rank. This construction can speed up the application of the QFT and the DFT, respectively, in quantum circuit simulations and QTT applications. We also connect our interpolative construction to the approximate quantum Fourier transform (AQFT) by demonstrating that the AQFT can be viewed as an MPO constructed using a different interpolation scheme.

97 MATHEMATICS AND COMPUTING↗

Vision and Development of a Design, Implementation, and Verification Automation (DIVA) Software Platform for DNA Construction

Abstract DNA construction, while a prerequisite to many biological endeavors, is often a time-consuming distraction from an individual’s primary research objectives. We envisioned that with the right software infrastructure and cultural mindset, a single person could execute in parallel the batched DNA construction tasks of an entire research institute, at scales realizing efficiency gains through process and laboratory automation. In pursuit of this vision, we developed the Design, Implementation, and Verification Automation (DIVA) software platform. DIVA’s web interface enables researchers to design DNA constructs (using visual biological computer-aided design tools and biological parts repositories), submit designs for construction to dedicated staff, and track DNA construction as it progresses. DIVA supports the dedicated staff through the DNA construction process and records both successful and unsuccessful attempts toward improving the overall process. The platform is publicly available at public-diva.jbei.org and its open-source code through github.com/JBEI/DIVA.

Plahar, Hector [DOE Agile BioFoundry , , ,; DOE Jo↗

Universal construction of black hole microstates

We refine and extend a recent construction of sets of black hole microstates with semiclassical interiors that span a Hilbert space of dimension e S , where S is the black hole entropy. We elaborate on the definition and properties of microstates in statistical and black hole mechanics. The gravitational description of microstates employs matter shells in the interior of the black hole, and we argue that in the limit where the shells are very heavy, the construction acquires universal validity. To this end, we show it for very wide classes of black holes; we first extend the construction to rotating and charged black holes, including extremal and near-extremal solutions, with or without supersymmetry, and we sketch how the construction of microstates can be embedded in string theory. We then describe how the approach can include general quantum corrections, near or far from extremality. For supersymmetric black holes, the microstates we construct differ from other recent constructions in that the interior excitations are not confined within the near-extremal throat. Published by the American Physical Society 2024

Astronomy & Astrophysics↗

Draft ASME Boiler and Pressure Vessel Code Cases and Technical Bases for Use of Alloy 617 for Constructions of Nuclear Component Under Section III, Division 5

The American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code currently only allows five materials for use in construction of nuclear components for high temperature service. These are: 2.25Cr-1Mo and V-modified 9Cr-1Mo steels, Types 304 and 316 stainless steels and the high nickel Alloy 800H. Since 2005, the US high temperature gas-cooled reactor program has been characterizing elevated temperature mechanical properties of Alloy 617 as the leading candidate construction material for the intermediate heat exchanger. After analysis of these experimental results, along with historical data and additional results available through the Generation IV International Forum, Very High Temperature Reactor, Materials Program Management Board Materials Handbook, a draft ASME Code Case to allow nuclear construction with Alloy 617 for temperatures up to 1750°F (954°C) has been developed. This report contains the Code Case for Low Temperature Service Construction of Section III, Division 5, Subsection HB, Subpart A, Class A and Subsection HC, Subpart A, Class B components, which has been approved in Section II, Materials, and Section III, Rules for Construction of Nuclear Facility Components. Supporting technical justification for the low temperature Code Case is also included. This Code Case allows use of Alloy 617 up to 800°F (425°C). This report also contains an updated draft of a Section III, Division 5, Subsection HB, Subpart B, Class A Code Case for Alloy 617 to qualify it for use in construction of nuclear components up to 1750°F (954°C) for service life up to 100,000 hours. The draft contained in Appendix 4, subject to editorial revision and approval by the ASME Special Task Group on Alloy 617 Code Qualification, will be submitted for approval by letter ballot by the appropriate ASME Committees. The technical justification supporting the Code Case is presented in Appendix 5 of this report. This background document is part of the information package that will be submitted with the Code Case for ballot.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of National New Construction Weighting Factors for the Commercial Building Prototype Analyses (2008-2022)

The U.S. Department of Energy (DOE) tasked Pacific Northwest National Laboratory (PNNL) with updating commercial building construction weights for the purpose of estimating national and state-by-state energy savings impacts of changes made to various commercial energy codes and standards. A similar activity was last completed by PNNL in 2020 using disaggregate construction volume data acquired from the Dodge Data & Analytics database (formerly McGraw Hill) for the years 2003-2018 (Lei et al, 2020). As time passes, changes in economic and social demand reshape construction volume trends. For the current update, PNNL reviewed the same data source with the latest construction data for the years 2008-2022. For commercial building analyses, PNNL typically uses a suite of 16 prototype buildings simulated in the 19 ASHRAE climate zones with 16 of them present in the United States. The 2008-2022 commercial building weighting factors were derived using the same approach employed to develop the 2003-2018 set (Lei et al, 2020). Applying the construction volume data from the database to the prototypes and climate zones resulted in the following new construction area-based weighting factors. Table ES.1 shows the weighting factors including all building categories found in the database, and Table ES.2 shows the weighting factors normalized to include only buildings represented by the 16 prototypes. Section 3.0 also includes national- and state-level weighting factors by area and building count.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗