Search NASA⌕ Search

SEARCH · Search NASA

Results for “Depot”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Modeled Electricity Demand Profiles for Electric Transit Bus Depots in the United States

Hourly one-week electricity demand profiles for electric transit bus depots in the United States, as described in Liu et al. (2025). Please cite as: Liu, Bo, Tim Jonas, Kara Podkaminer, and Brennan Borlaug. 2025. Hourly Load Profile Dataset for Electric Transit Bus Depots in the United States. Golden, CO: National Renewable Energy Laboratory. NREL/TP-5400-92140. https://www.nlr.gov/docs/fy25osti/92140.pdf

24 POWER TRANSMISSION AND DISTRIBUTION↗

Heuristic solutions to the single depot electric vehicle scheduling problem with next day operability constraints

This study focuses on the single depot electric vehicle scheduling problem (SDEVSP) within the broader context of the vehicle scheduling problem (VSP). By developing an effective scheduling model using mixed-integer linear programming, we generate bus blocks that accommodate electric vehicles (EVs), ensuring successful completion of each block while considering recharging requirements between blocks and during off-hours. Next day operability constraints are also incorporated, allowing for seamless repetition of blocks on subsequent days. The SDEVSP is known to be computationally complex, deriving optimal solutions unattainable for large-scale problems within reasonable timeframes. To address this, we propose a two-step solution approach: first solving the single depot VSP, and then addressing the block chaining problem (BCP) using the blocks generated in the first step. The BCP focuses on optimizing block combinations to facilitate recharging between consecutive blocks, considering operational constraints. Further, a case study conducted reveals that nearly 100% electrification for Chicago, IL and Austin, TX transit buses is viable yet requires 1.6 EVs at 150-mile range per diesel vehicle.

33 ADVANCED PROPULSION SYSTEMS↗

Piecewise Linear Optimization for Public EV Charging Depots in Different Utility Environments

With the proliferation of electric vehicles (EVs), EV supply equipment technology is being pushed to increasingly higher power levels, such as extreme fast charging (XFC) at 300kW or more. As more public XFC depots are connected to electric distribution systems, utility operators will mitigate their impact with pricing schemes and programs such as demand response, demand charges, and time-varying prices. In this paper we describe an XFC management system that combines an on-site battery energy storage system and an optimization application that minimizes the cost to operate the depot in light of the utility pricing programs. We have designed the optimizer specially to use fast and simple linear programming so that it can be deployed to low-cost computing platforms. We also describe how several utility pricing schemes are integrated into a single piecewise model, reducing the engineering effort to implement the optimizer in different utility environments.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Orbiting propellant depot safety. Volume 1: Management summary report

Orbital missions are considered which require the use of orbiting vehicles, e.g., a cislunar shuttle, that is either chemically or nuclear propelled, functioning as orbit-to-orbit shuttles combined with space tugs for servicing earth-orbiting payloads. Such vehicles may be stationed in a low earth orbit from which they would initiate and terminate flights. The flight frequency of these vehicles indicates that large quantities of propellants will have to be delivered to them in orbit. Orbiting propellant depots, in both geocentric and selenocentric orbits, are being considered as candidate methods of making the required propellants readily available. An assessment of the potential safety hazards associated with the operation of such a depot is summarized.

Source record↗

Orbiting propellent depot safety. Volume 2: Technical discussion

The results of a study assessing the gross requirements and concomitant safety hazards associated with the operation of several configurations of orbiting propellant depots (OPD) are presented. The major structural and operational aspects of the integral, semimodular, and modular concepts are described. The concepts are evaluated to determine their safety hazards, and emphasis is placed on propellant transfer to and from the OPD. The study indicates that a modular mode of depot resupply is desirable regardless of the OPD configuration. This resupply mode requires no flow transfer to resupply either the semimodular or modular OPD. Of the three concepts, the semimodular appears to provide the best operational advantage and lowest safety risk.

Source record↗

NASA Shuttle Logistics Depot (NSLD) - The application of ATE

The concept of the NASA Shuttle Logistics Depot (NSLD) developed for the Space Shuttle Orbiter Program is described. The function of the NSLD at Cape Canaveral is to perform the acceptance and diagnostic testing of the Shuttle's space-rated line-replaceable units and shop-replaceable units (SRUs). The NSLD includes a comprehensive electronic automatic test station, program development stations, and assorted manufacturing support equipment (including thermal and vibration test equipment, special test equipment, and a card SRU test system). The depot activities also include the establishment of the functions for manufacturing of mechanical parts, soldering, welding, painting, clean room operation, procurement, and subcontract management.

Simpkins, Lorenz G.↗

A Probabilistic Tool that Aids Logistics Engineers in the Establishment of High Confidence Repair Need-Dates at the NASA Shuttle Logistics Depot

The NASA Shuttle Logistics Depot (NSLD) is tasked with the responsibility for repair and manufacture of Line Replaceable Unit (LRU) hardware and components to support the Space Shuttle Orbiter. Due to shrinking budgets, cost effective repair of LRU's becomes a primary objective. To achieve this objective, is imperative that resources be assigned to those LRU's which have the greatest expectation of being needed as a spare. Forecasting the times at which spares are needed requires consideration of many significant factors including: failure rate, flight rate, spares availability, and desired level of support, among others. This paper summarizes the results of the research and development work that has been accomplished in producing an automated tool that assists in the assignment of effective repair start-times for LRU's at the NSLD. This system, called the Repair Start-time Assessment System (RSAS), uses probabilistic modeling technology to calculate a need date for a repair that considers the current repair pipeline status, as well as, serviceable spares and projections of future demands. The output from the system is a date for beginning the repair that has significantly greater confidence (in the sense that a desired probability of support is ensured) than times produced using other techniques. Since an important output of RSAS is the longest repair turn-around time that will ensure a desired probability of support, RSAS has the potential for being applied to operations at any repair depot where spares are on-hand and repair start-times are of interest. In addition, RSAS incorporates tenants of Just-in-Time (JIT) techniques in that the latest repair start-time (i.e., the latest time at which repair resources must be committed) may be calculated for every failed unit This could reduce the spares inventory for certain items, without significantly increasing the risk of unsatisfied demand.

Bullington, J. V.↗

A-Train Data Depot: Integrating and Visualizing Atmospheric Measurements Along the A-Train Tracks

The succession of US and international satellites that follow each other, seconds to minutes apart, across the local afternoon equator crossing is called the ATrain. The A-Train consists of the following satellites, in order of equator crossing: OCO, EOS Aqua, CloudSat, CALIPSO, PARASOL, and EOS Aura. Flying in such formation increases the number of observations, validates observations, and enables coordination between science observations, resulting in a more complete virtual science platform (Kelly, 2000) The goal of this project is to create the first ever A-Train virtual data portal/center, the A-Train Data Depot, to process, archive, access, visualize, analyze and correlate distributed atmosphere measurements from various A-Train instruments along A-Train tracks. The A-Train Data Depot (ATDD) will enable the free movement of remotely located A-Train data so that they are combined to create a consolidated vertical view of the Earth s Atmosphere along the A-Train tracks. Once the infrastructure of the ATDD is in place, it will be easily evolved to serve data from all A-Train data measurements: one stop shopping. The innovative approach of analyzing and visualizing atmospheric profiles along the platforms track (i.e., time) will be accommodated by reusing the GSFC Atmospheric Composition Data and Information Services Center (ACDISC) visualization and analysis tool, GIOVANNI, existing data reduction tools, on-line archwing for fast data access, and Cooperative Institute for Research in the Atmosphere (CRA) data co-registration tools. Initial measurements utilized include CALIPSO lidar backscatter, CloudSat radar reflectivity, clear air relative humidity, water vapor and temperature from AIRS, and cloud properties and aerosols from both MODIS. This will be followed by associated measurements from MLS, OMI, HIRDLS, and TES. Given the independent nature of instrument/platform development, the ATDD project has been met with many interesting challenges that, once resolved, will provide a much greater understanding of the relative flight dynamics and data co-registration of the suite of A-Train instruments, thus greatly increasing the accuracy of A-Train data analysis. Some of these challenges will be discussed. The project s resulting visualizations and analysis illustrate the importance of managing data so that measurements from various missions can be combined to enhance the understanding of the atmosphere. A-Train data management coordination, as performed here, is extremely significant in facilitating the A-Train science of clouds, precipitation, aerosol and chemistry.

Kempler, Steven↗

Function Point Analysis Depot

The Function Point Analysis (FPA) Depot is a web application originally designed by one of the NE-C3 branch's engineers, Jamie Szafran, and created specifically for the Software Development team of the Launch Control Systems (LCS) project. The application consists of evaluating the work of each developer to be able to get a real estimate of the hours that is going to be assigned to a specific task of development. The Architect Team had made design change requests for the depot to change the schema of the application's information; that information, changed in the database, needed to be changed in the graphical user interface (GUI) (written in Ruby on Rails (RoR and the web service/server side in Java to match the database changes. These changes were made by two interns from NE-C, Ricardo Muniz from NE-C3, who made all the schema changes for the GUI in RoR and Edwin Martinez, from NE-C2, who made all the changes in the Java side.

Muniz, R.↗

Nth-plant scenario for forest resources and short rotation woody crops: Biorefineries and depots in the contiguous US

Estimating the US potential of woody material is of vital importance to ensure cost-effective supply logistics and develop a sustainable bioenergy and bioproducts industry. We analyzed a mature conversion technology for woody resources for the contiguous US that takes advantage of economies of scale: the nth-plant. Here, we developed a database to quantify the total accessible woody biomass within a distributed network of preprocessing depots and biorefineries considering both quality specifications for conversion and a target cost to compete with fossil fuels. We considered two categories of woody biomass: 1) forest residues from trees, tops and limbs produced from conventional thinning and timber harvesting operations as well as non-timber tree removal; and 2) short rotation woody crops such as poplar, willow, pine, and eucalyptus. A mixed integer linear programming model was developed to analyze scenarios with woody feedstock blends at variable biomass ash contents and cost targets at the biorefinery. When considering a target cost of 85.51 dollars/dry ton (2016$) at the biorefinery, the maximum accessible biomass from forest residues in 2040 remained constant at 106 million dry tons regardless of ash targets. Including short rotation woody crops as part of the blend increased the total accessible biomass to 153 and 195 million dry tons at ash targets of 1% and 1.75%, respectively. We concluded from our analysis that woody resources could address about 55% of EPA’s (Environmental Protection Agency) target of 16 billion gallons of cellulosic biofuel.

09 BIOMASS FUELS↗

Nth-plant scenario for blended pellets of Miscanthus, Switchgrass, and Corn Stover using multi-modal transportation: Biorefineries and depots in the contiguous U.S.

The sustainability of the biofuel industry depends on the development of a mature conversion technology on a national level that can take advantage of the economies of scale: the nth-plant. Here, this study addresses the logistic challenge of mobilizing national cellulosic feedstock supplies for a sustainable bioenergy industry. A Mixed Integer Linear Programming (MILP) model was developed and updated to deliver on-spec biomass that considers both a desired quantity and quality at the biorefinery. Our supply chain analysis includes multi-modal transport (truck and rail), varying depot and biorefinery sizes, and feedstock blends of corn stover (harvested by either a two- or three-pass method), switchgrass, and miscanthus. The following US states: Illinois, Kansas, Missouri, North Carolina, Oklahoma, Georgia, and Texas were identified as key locations for producing accessible miscanthus. Based on our most optimistic scenario, using trucks as the only transportation mode in 2040 with a cost target of $\$$79/dt, corn stover, switchgrass, and miscanthus could help meet 48% of the EPA target, 173 million dry tons that translate into 7.8 billion GGE. The addition of rail transportation for biomass delivery to biorefineries could help meet 79% of the EPA target, 283 million dry tons that translate into 12.7 billion GGE.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

National Summary Statistics for Depot-Based Medium- and Heavy-Duty Vehicle Operations

This file provides nationally aggregated summary statistics to characterize the daily operations of medium- and heavy-duty vehicles. It provides typical daily driving distances, domicile dwell durations, and one version of potential normalized electric vehicle depot charging load curves. The methodology to create these data was designed with national representativeness in mind, and the data are suitable for national analysis.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Depot Charging Schedule Optimization for Medium- and Heavy-Duty Battery-Electric Trucks

Charge management, which lowers charging costs for fleets and prevents straining the electrical grid, is critical to the successful deployment of medium- and heavy-duty battery-electric trucks (MHD BETs). This study introduces an energy demand and cost management framework that optimizes depot charging for MHD BETs by combining an energy consumption machine learning model and a linear program optimization model. The framework considers key factors impacting real-world MHD BET operations, including vehicle and charger configurations, duty cycles, use cases, geographic and climate conditions, operation schedules, and utilities’ time-of-use (TOU) rates and demand charges. The framework was applied to a hypothetical fleet of 100 MHD BETs in California under three different utilities for 365 days, with results compared to unmanaged charging. The optimized charging solution avoided more than 90% of on-peak charging, reduced fleet charging peak load by 64–75%, and lowered fleet energy variable costs by 54–64%. This study concluded that the proposed charge management framework significantly reduces energy costs and peak loads for MHD BET fleets while making recommendations for fleet electrification infrastructure planning and the design of utility TOU rates and demand charges.

Song, Shuhan↗

Orbital propellant depot system.

Review of some of the problems involved in the design of a long-term propellant storage depot in earth orbit to act as a resupply station for cargo/personnel shuttles between earth orbit and lunar orbit, between low earth orbit and synchronous orbit, and possibly for use with interplanetary probes. The problems discussed pertain essentially to the long-term storage and propellant transfer capabilities.

Wilson, D. J.↗

Orbiting propellant depot safety. Volume 3: Appendices

Appendices to support the findings of the Orbiting Propellant Depot Safety study are presented. The subjects discussed are ullage control subsystems, evaluation of methods, propellant transfer, and baseline subsystem selection.

Source record↗

Food depot: Apollo-Soyuz test project

The Food Depot operations required to produce the ASTP Food System, the food system and some analysis and recommendations related to future operations are described.

Bourland, C. T.↗

The case for a centralized repair depot for Space Shuttle

The first priority of the NSTS program is to make the Space Shuttle system fully operational and cost effective in providing routine access to space. In support of this priority an integrated logistics support system was planned, structured and is being implemented to support a launch-on-time goal of 95 percent. In achieving a 95 percent spares 'fill rate' in an environment of small fleet size, highly unique and high cost assets, significant spares cost can be incurred. A major portion of these costs are for the additional spares required when repair or acquisition times are lengthy. This paper provides a fundamental analysis of the costs and other factors involved in the spare and repair process and provides an optimized cost and process solution for the Space Shuttle program - a centralized repair depot located at KSC.

Enlow, R. D.↗

Space propulsion technology and cryogenic fluid depot

Information on space propulsion and technology and the cryogenic fluid depot is given in viewgraph form. Information is given on orbit transfer, electric propulsion, spacecraft propulsion, and program objectives.

Diehl, Larry A.↗