Search NASA⌕ Search

SEARCH · Search NASA

Results for “Early Artemis”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Backup Optical Navigation Attitude for Artemis-1 Backup Attitude Ground Tool

The Backup Optical Navigation Attitude (BONA) software was developed as a response to the Artemis1 Power Distribution Unit (PDU) hardware problems found early in 2021. The hardware problem, a capacitor installed incorrectly, removes the intended redundant path for which the PDU can relay its power and data to attached devices. Specific to the BONA context, the concern is that a failure of the single remaining path in this PDU would lead to an inability to communicate with one of the two-star trackers (STs) on Orion. By flight rule, being reduced to a single star tracker means an immediate turn around end-of-mission. The BONA software is not intended to extend the mission, but instead act as a single star tracker attitude confirmation tool. Insurance, if you will, for the Orion project that a ground tool is available to compare the single remaining ST results with optical navigation images retrieved during the mission. Engineers operating BONA in the Mission Control Center (MCC) Mission Evaluation Room (MER) will analyze the downlinked star field images and based on the stars identified and known time of image, derive vehicle attitude estimates, which can be compared with the ST results. Potentially, in extreme situations, and with expert recommendation, the derivations could lead to navigation state updates being commanded to Orion.

GNC↗

Unbounded Learning Environments as an Approach to Preserving Design Flexibility Demonstrated With Nasa Stem Enhancement in Earth Science (SEES) Students

The Artemis Lunar program is providing opportunity for young scientists and engineers to contribute towards leading edge design concepts regarding early on-surface work areas that are aligned with major national initiatives. Therefore, it is imperative in any discovery process that those young scientists and engineers be provided the bandwidth or operating in a ‘greenfield’ technology environment that encourages new ideas, and perhaps the discovery of ideas that would not be realized within typical structured engineering constraints. To facilitate this concept, the use of unbounded teaching methods was utilized to provide a low-constraint environment from which students can design and discover the requirements that are bounded by the natural environment of the lunar surface, and then build up design requirements un-hindered by budgetary and/or logistics realizations of the moment funding capabilities. Specifically, this design exercise provided the students to operate with unlimited budgets, and unlimited up-mass lifts to the lunar surface to develop a preliminary feasible process for establishing a working lunar research based upon the near-area permanently shadowed regions within the lunar surface. In concept, working near PSRs will be advantageous as they receive near eternal shielding from solar radiation and may potentially host numerous volatile substances such as water ice, methane, hydrogen sulfide and helium-3 that will be the target of scientific investigation and in-situ resource utilization ISRU. The advantage of an upstream working area is that the quality of return materials could potentially be exponential when including an upstream analysis prior to earth-return missions. Furthermore, it’s well known within the scientific and engineering community that working with the base materials in front of human eyes elucidates new features and observations that may not survive when stored and shipped to Earth. Finally, it is theorized that these methods and techniques developing on the lunar surface would be applicable to other planets or cometary surfaces.

Education↗

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion↗

A Ground Testing Program to Verify Lunar Dust-Tolerant Hardware for the Artemis Mission

In preparation for NASA’s Artemis Mission that will return humans to the surface of moon by 2024, an extensive test campaign will be undertaken to understand the effects of lunar dust contamination on equipment. Historically, early Apollo astronauts were affected by lunar dust that entered the cabin after their extravehicular activities, and subsequent missions had various cleaning protocols to reduce the impact of the contamination. The longest stays on the lunar surface were Apollo 15, 16, and 17 (just over three days), so equipment and suits were required to operate reliably for a relatively short duration. The ultimate goal of Artemis is a sustained human presence on the lunar surface, beginning with Artemis 3 which targets a six-and-a-half day surface deployment. This requires the design and testing of dust-tolerant infrastructure. Ground testing with aerosolized lunar dust simulants in a specialized chamber is an inexpensive way to verify the performance of equipment. Chambers equipped with various powder dispersers and analysis instrumentation can explore a variety of realistic scenarios relevant to lunar surface missions, from the interaction of dust with sensitive surfaces such as solar panels, textiles, radiators, and scientific equipment, to the effects of dust as it intrudes into habitable areas. These experiments require careful consideration of the expected mass concentrations, aerosolization methods, and transport properties of dust. Instruments that use light-scattering techniques to measure mass concentrations require calibration against lunar simulants for improved accuracy, and different simulants may have different calibration factors. Test facilities, laboratory setup and test methods for aerosolizing lunar simulant will be described along with relevant aerosol instruments and calibration efforts.

Benjamin J Sumlin↗

Trajectory Design and Early Mission Operations for the Lunar IceCube Mission

The Lunar IceCube (LIC) mission, a Next Space Technologies for Exploration Partnerships (NSTEP) program selection, was launched as a rideshare onboard Artemis-I on November 16th 2022, and deployed into a high energy lunar flyby trajectory. The final destination of the mission was a polar elliptical lunar orbit from which it could conduct spectroscopy observations of the lunar surface; however, a near rectilinear halo orbit (NRHO) was planned to be used as a staging orbit that divided the lunar transfer and low-thrust spiral phases of the mission. This paper presents the process used to design the LIC transfer trajectory from the high-energy deployment state to a 9:2 synodic resonance NRHO. Additional analyses performed, to assess the critical deployment to lunar flyby phase of the trajectory and to generate recovery trajectories following a loss of contact with the spacecraft, are described as well. Lessons learned from working on the LIC mission are presented to inform the design of similar future CubeSat missions.

Robert E Pritchett↗

A Collaborative Vision for Deep Space Human Exploration

Artemis will be the first cooperative campaign among nations for crewed planetary exploration. This paradigm shift reflects a collaborative vision for deep space human exploration that embraces the concept that, “If you want to go fast, go alone; If you want to go far, go together.” This paper elaborates on the way the National Aeronautics and Space Administration(NASA)is striving to make its Moon to Mars effort a collaborative endeavor for long-term human exploration of deep space and for the international space community. The agency is making great strides in unifying its workforce, mission directorates, technical authorities, and centers behind shared goals and processes. Enhanced communication and a reinvigoration of systems engineering ideals have been a hallmark of that effort, guided by the Moon to Mars Architecture, which defines what NASA aims to accomplish and how it will execute those goals. This interdisciplinary approach ensures the Artemis campaign supports NASA’s engineering, science, and technology development goals. As of September 2024, over 43 nations have signed the Artemis Accords, which establish a common set of principles for peaceful cooperation in civil space exploration. Building off these efforts, NASA has been engaging in separate and distinct discussions about partner contributions to Artemis. International partnerships for the Artemis campaign include long-standing partners as well as agencies with which NASA has only more recently begun collaborating. The Gateway Program is an early example of both –benefitting from partnerships with Canada, Japan, and Europe forged though decades of cooperation on the International Space Station, as well as a new partnership with the United Arab Emirates. The agency’s Moon to Mars Objectives and Architecture unify the NASA workforce with common goals and shared systems-engineering processes. The architecture offers pathways for broader participation from industry, academia, and international partners. The agency evolves this collaborative approach through its annual Architecture Concept Review cycle, seeking input from the NASA workforce, and through workshops, from industry, academia, and the international space community to refine NASA’s roadmap for exploration. Exploring together, NASA and its partners are setting humanity on the path to long-term presence at the Moon and our eventual journey to Mars

Objective↗

Optimizing Postural Control Assessment in Astronauts and Head-Down Bedrest Subjects

In space, astronauts undergo physiological adaptations, such as changes in sensorimotor processing, to acclimate to microgravity conditions. However, these adaptations pose challenges upon astronauts’ return to Earth, particularly in postural control. Astronauts struggle with balance and coordination during the early post-flight period. Understanding these adaptations and their implications is key for optimizing astronaut health and performance, especially in anticipation of upcoming Artemis lunar missions. Head-down bedrest (HDBR) is a ground-based spaceflight analog that allows for additional research to be conducted into this adaptation and recovery period to test potential countermeasures before spaceflight. This research aims to delve into the assessment of postural control in both HDBR subjects and astronauts, providing insights essential for mission preparedness and the development of effective countermeasures.

H E Gustafson↗

Building the RS-25 Engine for NASA’s Next Generation of Exploration.

NASA is aggressively pursuing a human lunar return to the Moon with the Artemis Program. The Space Launch System (SLS) is critical to the transportation architecture, providing both crew and cargo capability. To accelerate SLS development, NASA settled on space shuttle heritage propulsion technologies. Early missions will use repurposed RS-25 engines from the Shuttle Program adapted to SLS requirements. For future missions, however, NASA and engine contractor Aerojet Rocketdyne are restarting RS-25 production with a goal of using the latest manufacturing technologies to produce an RS-25 variant that will cost at least 30 percent less than the shuttle-era engines developed and flown for almost 30 years. The prospect of restarting the production line on these engines after many years and modifying the engine to reduce cost and better match the needs of the SLS vehicle presented unique challenges and opportunities for NASA and Aerojet Rocketdyne. NASA and AR are now deep into the process of adapting 16 RS-25 engines for the first four SLS Artemis flights and building the first RS-25 “Restart” engines for future Artemis missions. In addition to navigating programmatic, technical, and logistical challenges with the current RS-25 production work, NASA and AR have partnered to pursue new methods of building this engine through advanced manufacturing techniques to further reduce the cost and schedule required to build each RS-25 engine to contribute to the long-term affordability of the SLS vehicle. This presentation will discuss the goals for the restart program, the challenges, and results to date.

Jessica Jean Wood↗

Actively Controlled Louver for Human Spacecraft Radiator Ultraviolet (UV), Dust, and Freeze Protection

The paper examines the use of actively controlled louvers for human spacecraft radiators. State of the Art (SOA) radiators were design for Low Earth Orbit (LEO) operations where Ultraviolet (UV) radiation and dust have miniscule performance impacts. However, Artemis missions to the lunar orbit or surface will expose the radiators to high dose UV radiation and dust, which can degrade the radiator coating emissivity by up to 50% and consequently reduce performance early in missions. In addition, environmental nighttime temperatures at the lunar south pole are significantly colder and linger longer than LEO, and may require up to 4 kW of heater power to prevent coolant tubes from freezing, thawing, and rupturing. Analysis showed equipping the radiators with actively controlled louvers attenuated the UV radiation and dust effects, and limited degradation to less than 10% through End of Life (EOL) of missions. Furthermore, analysis demonstrated the ability to eliminate the heater power needed for freeze protection. Louver technology is a promising solution to maintain radiator performance and integrity for Artemis missions, but heritage louvers are passively controlled and only been used on small satellites. The technology requires maturing to active control, or motor actuated, to achieve faster thermal response times. Design considerations are discussed in this paper.

Louver↗

Ulysses radio observations of the heliospheric activity in early June 1991

The radio receiver of the URAP (Unified Radio and Plasma Wave) experiment on Ulysses has recorded a heliospheric activity particularly intense between late May and early June 1991. Many solar radio emissions of types III and II were observed together with interplanetary (IP) shocks. In the same time, the radio spectrograph ARTEMIS at Nancay (France) observed several intense type II bursts. We investigate the association and/or interaction of these radio emissions, which are remotely observed, with some IP shocks detected in situ, in the context of a Coronal Mass Ejection (CME) induced scenario.

Hoang, S.↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

Regolith Adaptive Modification Systems (Rams) - Final Report

Establishing human habitation on the Moon or Mars requires a palette of reaction chemistries for deconstructing extraterrestrial soils to extract structural metals, fuels, and propellants, as well as consolidating the soils into load-bearing forms. This report outlines progress related to the fundamental chemistry of in-situ resource utilization that is the focus of our Regolith Adaptive Modification System (RAMS) NIAC project. The RAMS concept is a breakthrough approach for preparing surfaces for early landing sites–and subsequent settlement operations–on the Lunar and Martian surface, among others. The RAMS concept is aligned with aspirations and capabilities of planned NASA Artemis mission. The approach is predicated on the sequential delivery of microcapsules onto lunar and Martian surfaces, which upon rupture, release payloads that react with regolith to yield geopolymerized subsurface slabs and surface high-strength steel skin and anchors . Through successively more exothermic reactions, we are seeking to build subsurface geopolymer slabs and use thermite reactions to constitute micro-alloyed advanced high-strength steel (AHSS) and Ti—Al—V pads on surfaces of planetary bodies, thereby circumventing the need for energy-intensive sintering technologies. As a precursor delivery system used to constitute landingpads, RAMS can be scaled for robotic, human-class, and more prominent (i.e., Starship) landers and will be configured within pressurized delivery systems that use radio beacons to outline coordinates for precision landings. Microcapsule delivery systems are designed to impel precursors (nanothermite mixtures and organosilanes), which activate in response to stress, heat, or impact to constitute deep geopolymerized slabs and AHSS skins. Dust mitigation is accomplished by reaction/solidification chemistry that yields a subsurface slab and advanced high-strength steel skin and anchors.

2021 NIAC Phase I↗

ECS Artemis II Upgrades

The National Aeronautics and Space Administration (NASA) actively works to further the expectations of space exploration and research. NASA has been able to develop innovative technology and methods that has allowed for continued discovery and innovation. NASA is in the midst of work for the Artemis mission, which is to return to the moon in an effort to prepare for future Mars exploration. After the successful launch of Artemis I last November, our sights have shifted to Artemis II, which is set to launch next year and bring humans into the lunar orbit for the first time in over fifty years. Artemis II will be the first crewed mission for the program and will represent another step forward in our mission to advance our knowledge of the universe around us. From there, the Artemis program will move onto building a permanent site on the moon that will allow us to eventually reach Mars. During my time at NASA, I was able to work with the NE-XF Branch, also known as the Environmental and Life Support Systems Branch. I specifically worked with the Environmental Control Systems (ECS) team. During my time here, construction on the system in the Vehicle Assembly Building (VAB) and at Launchpad 39B have been progressing at full force. ECS is used to provide processed and purged air at specific temperatures, pressures, and humidity’s to fulfill requirements necessary to support Orion and the SLS. While the Pad has been undergoing upgrades from the original Artemis I configuration, the VAB has a completely new ECS very similar to it. While both systems have been undergoing upgrades, we have been able to transition into testing the systems as we prepare for stacking in the VAB early next year. My role has allowed me to learn about how the systems work and function through walkdowns and visits out to both the Pad and the VAB. I’ve been able to see firsthand how the system operates and have learned how the system affects the vehicle. I’ve been able to shadow my mentor, my coworkers, and COMET operators to oversee the construction efforts of the system along with the testing of the software and the system itself. I even was able to aid in testing at the console myself at Pad 39B. Additionally, I am also revising and reviewing displays for Artemis IV that will be used to remotely control parts of the system. Eventually these displays will be used to support the future of Artemis.

Monique Toon↗

Training Artemis Astronauts to Explore the Moon

To prepare for human exploration of the Moon in the mid-2020s, NASA is developing a program to provide geoscience and planetary science classroom training and geologic eld training to astronauts and other mission personnel. The Artemis geoscience training plan builds on a long legacy: NASA has trained astronauts in geology, planetary science, and geological eld work for more than 50 years. From ~1965-1972, the geology focus for astronauts included orbital Earth observations during the early NASA missions, but the endgame was preparation for the Apollo missions to the Lunar surface [see Phinney (2015), NASA-SP-2015-626; Lofgren et al.(2011);Schmitt, et al. (2011); and El Baz (2011), all from GSA SP483]. From the mid 1970s through2017, the primary purpose for geoscience training was to prepare astronauts to observe theEarth and document a wide variety of Earth processes from orbital platforms (Skylab, SpaceShuttle and International Space Station). Astronaut observations of Earth from the InternationalSpace Station remain an important activity today, but the prospect of exploration of the lunar surface through the Artemis Program lends additional purpose to the geoscience content and eld experiences that we provide the astronauts. We recently completed the geology and eld training with Astronaut Class 22 and are now planning both focused eld exercises and simulations for future Artemis crews, as well as the accompanying classroom lessons on lunar and planetary sciences. The training we offer extends beyond the astronaut office – we partner across operational and engineering organizations at NASA and provide eld work exercises and opportunities to personnel in the Flight Operations Directorate (responsible for the overall training and certification), as well as the exploration Extravehicular Activity Oce (developing spacewalk suits and tools). These partnerships contribute to building a common language and sense of purpose, and also help to ensure that NASA’s geoscience training and science operations are fully integrated with the teams and systems responsible for getting the next generation of astronauts to the surface of the Moon.

Artemis↗

Application and Use of Lunar Node-Derived Beacons for Lunar Surface Navigation

To maximize the scientific return and safety of operations on the lunar surface, multiple civil organizations are investing in Position, Navigation, and Timing infrastructure. This approach mimics the deployment of Global Navigation Satellite Systems around the Earth and aims to enable a similar robust capability around the moon. With these satellites, it will be possible to maintain high- fidelity knowledge of positioning and timing both on the surface and in orbit. For initial deployments, this capability is focused on high need areas, such as the Lunar South Pole, the target of the currently in-planning Artemis surface missions to high accuracy. Similar to GNSS systems, this capability will be implemented over time to build up to a level of global access for real-time navigation. For early missions, this means a limited capability in terms of coverage. To provide increased performance, ground augmentation can be leveraged. This not only provides an additional reference signal but helps to supply timing to enable a high accuracy real-time position solutions. This paper discusses the path towards evolving the Lunar Node 1 platform to augment these early constellation deployments. Analysis of notional performance with and without surface aids is provided, as well as discussion and paths towards deployment and operation. Given the analysis results, the benefit of surface navigation aids to both provide additional surface-based signals to fill in coverage gaps helps to provide additional robustness and an early-on capability.

Evan J. Anzalone↗

From Apollo to Artemis: How Processing ANGSA Core Samples 73001/2 Can Help to Prepare for Future Sample Return Missions to the Moon and Beyond.

Introduction: Apollo Sample 73001/2 is a ~71cm long double drive tube consisting of an upper part (73002) and a lower part (73001) that contains regolith collected near Lara Crater at the Apollo 17 site, Station 3. The double drive tube is believed to have penetrated a lunar landslide deposit that was transported from the slope of the South Massif into the Taurus-Littrow Valley [1]. As part of the ANGSA (Apollo Next Generation Sample Analyses) initiative, preparing a preliminary examination (PE) catalog of 73001/2 is a crucial first step for the early identification of material types such as rock fragments and potential stratigraphy within the core. Many new curation and scientific tools such as X-ray computed tomography (XCT) [3], multi-spectral imaging [4], and gas extraction manifold with piercing tool [5-7], have been applied to the ANGSA core to benefit curation strategy, PE efforts, sample allocation to the planetary science community, and ultimately help to prepare for future sample return missions like Artemis. 73001/2 Preliminary Examination and Processing: Sample 73002 was successfully opened and extruded in Nov. 2019 and fully dissected at the end of 2021. Sample 73001 (Fig. 1) was successfully extruded in March 2022 after careful planning before opening the Core Sample Vacuum Container (CSVC) that was holding the drive tube of 73001. XCT, as part of PE, was used to scan the bottom and top part of the 73001 core tube within the CSVC prior to opening it to 1) facilitate non-destructive, rapid detection of any contamination potentials due to piercing of the CSVC during gas extraction [7]; and 2) to aid in the Artemis sample tool development and provide data on the knife edge seal of the CSVC. This knowledge will help us connect the mechanics of the implemented design (i.e., XCT data) to the performance of the seal (i.e., data on the gas samples will tell us how well the seal preserved the volatile record of lunar samples). Both type of information will feed forward into Artemis tool and storage strategies for future samples. Results and Lessons learned: The XCT data of the CSVC and core tube within showed that the bottom Teflon cap was not pierced during gas extraction (Fig. 1c) and thus, the sample integrity remained guaranteed during piercing and subsequent gas extraction. However, the XCT scan of the top of the core (Fig. 1b) revealed that the drive tube was overfilled with lunar soil and the tool that keeps the soil constrained within the drive tube was not fully deployed. These preliminary data allowed us to implement the necessary steps to prevent loss of sample integrity, including any potential stratigraphy shifts during extrusion. Processing Apollo core 73001/2, creating an informative PE catalog, and applying new and refined tools and technologies for sample analyses are invaluable activities that will assist in circumventing any potential pitfalls, aid in the characterization of samples, and help in the assessment of how well any lunar material has been collected and preserved in the past. This will aid in designing future sample collections and curation procedures and help to prepare for future human exploration and sampling missions such as Artemis. References: [1] Schmitt H. (2017) Icarus 298, 2-33. [3] Zeigler et al. (2021) LPSC 52nd, #2632; [4] Sun et al. (2021), LPSC 52nd, #1789; [5] Parai et al. (2021), LPSC 52nd #2665; [6] Schild et al. (2021) LPSC 52nd #1888; [7] McDonald (2022) ESL 2022.

ANGSA↗

Effects of the evolving early Moon and Earth magnetospheres

Recently it has been identified that our Moon had an extensive magnetosphere for several hundred million years soon after it was formed when the Moon was within 20 Earth Radii (R E ) from the Earth. Some aspects of the interaction between the early Earth-Moon magnetospheres are investigated by mapping the interconnected field lines between the Earth and the Moon and investigating how the early lunar magnetosphere affects the magnetospheric dynamics within the coupled magnetospheres over time. So long as the magnetosphere of the Moon remains strong as it moves away from the Earth in the antialigned dipole configuration, the extent of the Earth’s open field lines decreases. As a result, at times it significantly changes the structure of the field-aligned current system, pushing the polar cusp significantly northward, and forcing magnetotail reconnection sites into the deeper tail region. In addition, the combined magnetospheres of the Earth and the Moon greatly extend the number of closed field lines enabling a much larger plasmasphere to exist and connecting the lunar polar cap with closed field lines to the Earth. That configuration supports the transfer of plasma between the Earth and the Moon potentially creating a time capsule of the evolution of volatiles with depth. This paper only touches on the evolution of the early Earth and Moon magnetospheres, which has been a largely neglected space physics problem and has great potential for complex follow-on studies using more advanced tools and due to the expected new lunar data coming in the next decade through the Artemis Program.

Astronomy & Astrophysics↗

Artemis Vehicle Battery Requirements and Processes

- Purpose: - Give an overview of cells, batteries and design features for safety - Show what the hazards are for flying batteries in crewed space vehicles - Show how to control the hazards of batteries and verify that they are functioning as expected - Contact Information - Success of batteries being approved for flight is improved by talking with JSC Battery Safety Group early in the development of hardware

Renee Coe Weber↗