Search NASA⌕ Search

SEARCH · Search NASA

Results for “Earned Value Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

45 records · Page 3

Going South: Analysis of an Historic Project Engineering Failure

NASA's successful conduct of the Apollo Program greatly enhanced the prestige of the United States and remains broadly accepted as America's gift to all Mankind. NASA's accomplishments continue to amaze the world. With the Vision for Space Exploration (VSE) Americans once again tasked NASA to carry out a project that is expected to provide inspiration and economic stimulus to the United States and to the world. In preparation NASA has thoroughly examined space program precedents. There is, however, another precedent which has not been examined in this context but whose scope and environment in many ways parallel the VSE. This project was initiated by a team that had, ten years before, successfully completed an effort that, at a cost of $173 billion (in 2008 dollars), had pushed the envelope of technology, brought economic growth, established their country as the world leader in engineering, and been broadly accepted as that country's gift to all Mankind. The new project was again inspired by popular desire to enhance national prestige and make yet another major contribution to Humanity. This effort was predicted to require eight years and $156 billion (2008 dollars). However, after nine years and expenditures of 96% beyond the baseline, the project collapsed amid bankruptcy, political scandal, and criminal prosecution. This paper applies current project management metrics, such as earned value analysis, to review the strategic decisions in this historic failure and describe its ultimate collapse. Key mistakes are identified, and lessons are drawn which may prove useful in guiding the VSE.

Scott, John H.↗

Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

Hoffman, Edward J.↗

Thoughts on Earned Value Assessments

This slide presentation reviews the concepts of Earned Value reporting and Earned Value Metrics (EVM) and the implementation for the Constellation Program. EVM is used to manage both the contract and civil service workforce, and used as a measure of contractor costs and performance. The Program EVM is not as useful for Level of Effort tasking, for either contractor, or civil service employees. Some issues and concerns in reference to EVM and the process for the use of EVM for Mission assurance are reviewed,

Pido, Kelle↗

Project resources planning and control

This report contains instructional guidelines for the resources planning and control of research and development (R&D) projects managed by NASA's Langley Research Center (LaRC). Although written to serve primarily as a practical guide and reference for those LaRC personnel who perform resources planning, analysis, control, and reporting functions, it should also be meaningful to other NASA personnel who are directly or indirectly involved in or affected by these functions, especially project technical managers whose responsibilities include resources management. Certain sections should help Contractor personnel to better understand what resources information must usually be submitted on LaRC projects and what use is made of such information. The Project Manager of a large R&D project typicaly receives support from an Analyst in the area of resources management. The Analyst provides assistance in four functional areas: Planning, Analysis/Control, Administration, and Reporting. Each of these functions are discussed in detail. Examples of techniques used effectively on LaRC projects have been included where applicable. A considerable amount of information has been included on the use of Performance Measurement (Earned Value) Systems for contract cost control and reporting as little information is currently available on this subject in NASA publications.

Sibbers, C. W.↗

Using remote sensing to quantify the additional climate benefits of California forest carbon offset projects

Abstract Nature‐based climate solutions are a vital component of many climate mitigation strategies, including California's, which aims to achieve carbon neutrality by 2045. Most carbon offsets in California's cap‐and‐trade program come from improved forest management (IFM) projects. Since 2012, various landowners have set up IFM projects following the California Air Resources Board's IFM protocol. As many of these projects approach their 10th year, we now have the opportunity to assess their effectiveness, identify best practices, and suggest improvements toward future protocol revisions. In this study, we used remote sensing‐based datasets to evaluate the carbon trends and harvest histories of 37 IFM projects in California. Despite some current limitations and biases, these datasets can be used to quantify carbon accumulation and harvest rates in offset project lands relative to nearby similar “control” lands before and after the projects began. Five lines of evidence suggest that the carbon accumulated in offset projects to date has generally not been additional to what might have otherwise occurred: (1) most forests in northwestern California have been accumulating carbon since at least the mid‐1980s and continue to accumulate carbon, whether enrolled in offset projects or not; (2) harvest rates were high in large timber company project lands before IFM initiation, suggesting they are earning carbon credits for forests in recovery; (3) projects are often located on lands with higher densities of low‐timber‐value species; (4) carbon accumulation rates have not yet increased on lands that enroll as offset projects, relative to their pre‐enrollment levels; and (5) harvest rates have not decreased on most project lands since offset project initiation. These patterns suggest that the current protocol should be improved to robustly measure and reward additionality. In general, our framework of geospatial analyses offers an important and independent means to evaluate the effectiveness of the carbon offsets program, especially as these data products continue improving and as offsets receive attention as a climate mitigation strategy.

59 BASIC BIOLOGICAL SCIENCES↗

Valuing the Future Electric Grid: A Bid-Based Approach

Energy storage resources (ESRs) and other zero marginal cost (ZMC) resources have unique characteristics that are not fully captured in today’s electricity planning and operations modeling tools. Because the modeling assumptions used in these tools are simplified approximations of how operations and investment decisions occur in the real-world, accurately representing cost and operational characteristics are key for determining how these resources impact price formation. Questions such as—Where should we build new transmission? Will a small modular reactor earn enough revenue to participate in the future electric grid? Is retrofitting a coal plant with carbon capture technology economically feasible?—all require accurate electricity prices, which aren’t available from today’s electricity planning and operations modeling tools. As an example, production cost models (PCMs) are heavily utilized tools that determine the cost and reliability of the electric system. However, as PCMs were developed to help thermal generators manage their fuel inventories, production cost modeling is largely based on fuel prices. Because ESRs do not incur fuel costs, they are often modeled as ZMC resources. In reality, ESRs incur opportunity costs as well as technology-specific (degradation) costs that are non-trivial to calculate but are important for price formation. In this research, we identify options to incorporate more realistic opportunity and degradation costs in ESR bidding algorithms. Expanding available bidding assumptions allows energy system modelers to develop more accurate economic valuations for ESRs, leading to more accurate price formation from leading energy system modeling tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A National Infrastructure for Artificial Intelligence on the Grid (NI4AI) (Final Scientific/Technical Report)

Electric utilities have traditionally taken a very pragmatic yet myopic approach with grid sensors and the resulting collected data. Sensors are purchased and deployed to solve a specific, known problem that has risen to sufficient awareness as to justify the effort of deploying sensors and the needed capital investment. This sensor data flows into proprietary software packages with limited functionality intended only to address the initial problem. This approach aligns with the financial incentives of the utility to deploy capital into fixed hardware assets for which the corporations earn a rate of return. This mentality stands in stark contrast to the big data revolution that started nearly 25 years ago with the rise of Google. In this worldview, data is a fundamental business asset; successful organizations collect, store, explore, merge, and exploit as much data as possible to not only solve problems well understood today but also to tackle new problems that will inevitably rise tomorrow. The ARPA-E Open Innovation 2018 project entitled A National Infrastructure for Artificial Intelligence on the Grid or NI4AI for short was designed to demonstrate this alternative paradigm for using data. To do this, the project was composed of three key thrust areas. The first major component deployed a variety of high-frequency grid sensors and captured terabytes of both wide-scale and localized grid measurements, generating high-value datasets for grid research and algorithm development. The second aspect made available PingThings’ PredictiveGridTM, a horizontally scalable, cloud-based data management and AI platform built for time series data to explore and exploit the collected data. Finally, the project fostered a diverse and open research community composed of experts from numerous fields through focused educational content, code sharing, and data science competitions. Shifting away from “single use” sensors and closed data silos within electric utilities is a major benefit to the public at large. This legacy approach to data is incredibly (1) capital intensive (new sensors must be deployed for each new problem and problems tend to arise continuously) and (2) painfully slow (new problems must be identified first and then new sensors must be deployed to collect data to begin to address the issue). The transition to a carbon neutral grid requires a massive transformation of the existing grid infrastructure and will continue to challenge the legacy grid in unforeseen ways. The only way to make the energy transition cost effective is for utilities to abandon this dated data paradigm and adopt more contemporary approaches. NI4AI has shown that it is technically possible and economically feasible to ingest, explore, and exploit grid data collected from even very high frequency sensing, such as continuous point on wave sensors collecting measurements 10,000 times a second. In fact, the PredictiveGrid platform used is commercially available and deployed at several utilities in the United States. Project accomplishments were numerous and included (1) making available a state of the art time series platform to the community, (2) collecting over 520 streams of time series data from grid sensors totaling over 1 trillion grid measurements, and (3) developing and nurturing a community within the industry focused on the use of data to create value for utilities and, ultimately, end consumers.

97 MATHEMATICS AND COMPUTING↗

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation

Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Title: Students Solving Problems for ISS and Beyond: Inspiring the Next-Generation Session Description: NASA High school students United with NASA to Create Hardware (HUNCH) mission is to empower and inspire students through a Project-Based Learning program where 7-12 grade students learn 21st century skills and can launch their careers through participation in the design and fabrication of real-world valued products for NASA. With six different tracks consisting of Design & Prototype, Culinary Challenge, Softgoods, Precision Machining, Software, and Video Challenge, students are given the opportunity to create solutions for the International Space Station (ISS), the Moon, and beyond. Many projects are requested by the Crew to help ease living conditions, giving students the opportunity to make an impact on the lives of Astronauts. Other projects come directly from NASA and its partners. Join our session to learn how NASA is working with teachers across the country to mentor the next generation of scientists and engineers to solve some of NASA’s greatest challenges. Learning Outcomes: 1. Describe the NASA HUNCH Program, including the program objectives, goals, and strategic partnerships for middle school and high school outreach and advocacy efforts. 2. Identify the innovative strategies NASA is using to work with middle and high school students to solve real-world problems 3. Use the knowledge gained to inspire the next generation of scientists and engineers Session Track: Advocacy & Outreach Specialized Focus Area: Women in Government and Military Learning Level: Foundational Session Format: Listen & Learn Speaker Qualifications: 1. Deboshri Sadhukhan • Current Job Title: Deputy Project Manager • Topic Experience (years of experience related to proposed topic): 1-5 years • Biography: Deboshri Sadhukhan is an engineer for NASA Glenn Research Center (GRC). She has worked on numerous projects — from International Space Station (ISS) fluid technologies, to Orion European Service Module propulsion, to planetary science missions and other game-changing technologies. Her roles have ranged from Project Manager to System Safety Lead. She currently serves as a GRC Regional Mentor for the High school students United with NASA to Create Hardware (HUNCH) program. She also serves as Deputy Project Manager for an ISS payload and Safety & Mission Assurance Lead for a Radioisotope Power Systems project. In these roles, she oversees each phase of a project from beginning to end and provides leadership to increase the reliability, maintainability and system safety of hardware and personnel throughout the system life cycle. She holds a Bachelor of Science in Electrical Engineering from The University of Akron. 2. Nancy Hall • Current Job Title: Project Manager • Topic Experience: 20+ years • Biography: Nancy Rabel Hall earned a B.S. degree in Space Sciences from Florida Institute of Technology and a M.S. degree in Mechanical Engineering from the University of Toledo. She has been at NASA Glenn for over 30 years. She has led several International Space Station experiments that studied how the behavior of fluids and fluid systems behave differently in microgravity as compared to here on Earth. She is also the High school students United with NASA to Create Hardware (HUNCH) project manager, a program that allows students to design and fabricate hardware and softgoods for NASA as well as participate in a culinary and video challenge. She enjoys talking to the public and students about the work being done at NASA as well as showing students how math and science can be fun. She is an amateur radio operator, enjoys playing golf, and reading science fiction and fantasy books.

HUNCH↗