Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fermilab”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Current Progress on the High-Field Cable Testing Facility at Fermilab

Fermi National Accelerator Laboratory (Fermilab) is constructing a new High Field Vertical Magnet Test Facility (HFVMTF) with capabilities comparable to the European facilities EDIPO and FRESCA2. The facility, located at Fermilab, will feature a background magnetic field of 15 T, generated by a magnet provided by Lawrence Berkeley National Laboratory (LBNL). The HFVMTF will support two U.S. national programs under the DOE Office of Science: the U.S. Fusion Energy Science (FES) program and the Magnet Development Program (MDP). It will enable the testing of HTS samples in high magnetic fields across a wide range of temperatures and facilitate the development of hybrid magnets combining LTS and HTS superconductors. This paper presents an overview of the current progress in constructing the facility, including updates on the test cryostat, power supplies, and systems for quench protection and monitoring.

Velev, G. [Fermilab]↗

Data preservation at the Fermilab Tevatron

The Fermilab Tevatron collider's data-taking run ended in September 2011, yielding a dataset with rich scientific potential. The CDF and D0 experiments each have approximately 9 PB of collider and simulated data stored on tape. A large computing infrastructure consisting of tape storage, disk cache, and distributed grid computing for physics analysis with the Tevatron data is present at Fermilab. The Fermilab Run II data preservation project intends to keep this analysis capability sustained through the year 2020 and beyond. To achieve this goal, we have implemented a system that utilizes virtualization, automated validation, and migration to new standards in both software and data storage technology and leverages resources available from currently-running experiments at Fermilab. Lastly, these efforts have also provided useful lessons in ensuring long-term data access for numerous experiments, and enable high-quality scientific output for years to come.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Improvement Plans of Fermilab’s Proton Accelerator Complex

The flagship of Fermilab's long term research program is the Deep Underground Neutrino Experiment (DUNE), located Sanford Underground Research Facility (SURF) in Lead, South Dakota, which will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab's Main Injector. The physics goals of the DUNE require a proton beam with a power of some 2.4 MW at 120 GeV, which is roughly four times the current maximum power. Here I discuss current performance of the Fermilab proton accelerator complex, our plans for construction of the SRF proton linac as key part of the Proton Improvement Plan-II (PIP-II), outline the main challenges toward multi-MW beam power operation of the Fermilab accelerator complex and the staged plan to achieve the required performance over the next 15 years.

43 PARTICLE ACCELERATORS↗

Cryogenics and purification systems of the ICARUS T600 detector installation at Fermilab

This paper describes the cryogenic and purification systems of the ICARUS T600 detector in its present implementation at the Fermi National Laboratory, Illinois, U.S.A. The ICARUS T600 detector is made of four large Time Projection Chambers, installed in two separate containers of about 275 m 3 each. The detector uses liquid argon both as target and as active medium. For the correct operation of the detector, the liquid argon must be kept in very stable thermal conditions and the contamination of electronegative impurities must be consistently kept at the level of small fractions of parts per billion. The detector was previously operated in Italy, at the INFN Gran Sasso Underground Laboratory (LNGS), in a three-year run on the CERN to LNGS Long Baseline Neutrino Beam. For its operation on the Booster and NuMI neutrino beams at Fermilab, for the search of sterile neutrinos and measurements of neutrino-argon cross sections, the detector was moved from Gran Sasso to CERN for the upgrades required for operation at shallow depth with high intensity neutrino beams. The liquid argon containers, the thermal insulation and all the cryogenic equipment have been completely re-designed and rebuilt, following the schemes of the previous installation in Gran Sasso. The detector and all the equipment have been transported to Fermilab, where they have been installed, tested and recently put into operation. The work described in this paper has been conducted as a joint responsibility of CERN and Fermilab with the supervision provided by the ICARUS Collaboration. Design, installation, testing, commissioning and operation are the result of a common effort of CERN, Fermilab and INFN groups.

Cryogenic detectors↗

Fermilab Cryogenic Test Facilities

Fermi National Accelerator Laboratory (Fermilab) has multiple cryogenic test facilities, undertaking testing of superconducting magnets, Superconducting Radio Frequency (SRF) cavities, SRF cryomodules and other helium cryogenic components. The test areas within Fermilab include: Meson Cryogenic Test facility (Meson), Industrial Building 1 (IB-1), Heavy Assembly Building/Illinois Accelerator Research Center (HAB/IARC), New Muon Lab, (NML) and the Cryomodule Test Facility (CMTF). Meson and HAB/IARC utilize repurposed Tevatron era reciprocating engine based cryogenic refrigerator systems, whereas CMTF and IB-1 utilize gas bearing turbine based coldboxes. Each of these test areas support the various Fermilab projects and collaborations including the Linear Coherent Light Source II (LCLS-II), Proton Improvement Plan II (PIP-II), High Luminosity Large Hadron Collider (HL-LHC), and Mu2e. This paper outlines the diverse and extensive cryogenic test capabilities within Fermilab.

43 PARTICLE ACCELERATORS↗

Fermilab's Horizontal Test Stand Upgrade Overview and Commissioning

Cryo-assemblies with the Nb 3 Sn MQXFA low-beta quadrupoles for the High Luminosity LHC (HL-LHC) upgrade will be tested at Fermilab's magnet test facility. A total of 10 cryo-assemblies will be delivered to CERN within the US HL-LHC Accelerator Upgrade Project (AUP). The horizontal test stand at Fermilab already has been used for testing the existing LHC inner-triplet quadrupoles, but the stand and corresponding electrical and cryogenic sub-systems were not operational for more than a decade. In order to restore the test stand functions and meet the design and test requirements for the HL-LHC magnets, the existing horizontal test facility at Fermilab underwent a significant refurbishment of the cryogenic and mechanical components. Most of the upgrades were completed and verified during so called zero-magnet test by late 2020, and then final commissioning of the upgraded horizontal test stand was completed during the first cryo-assembly test in 2023. These tests verified the major cryo-mechanical installations, as well as the basic test stand operations, including controlled cooldown and operation at 1.9 K, magnet protection and process controls. Here, in this paper, overview of the Fermilab's horizontal test facility upgrade and commissioning of these upgrades are presented.

43 PARTICLE ACCELERATORS↗

Overview of LCLS-II Project Status at Fermilab

The superconducting RF Continuous-Wave (CW) Linac for the LCLS-II consists of thirty-five 1.3 GHz and two 3.9 GHz cryomodules that Fermilab and Jefferson Lab are jointly producing in collaboration with SLAC. Fermilab’s scope of work is to build, test, and deliver half the 1.3 GHz and all the 3.9 GHz cryomodules and to design and procure components for the cryogenic distribution system. Fermilab has primary responsibility for delivering a working design. The cryomodule design basis was the European XFEL but several elements evolved to meet CW operation requirements and specifics of the SLAC tunnel. There have been several challenges faced during the design, assembly, testing and transportation of the cryomodules which have required design updates. Success in overcoming these challenges is attributable to the strength of the LCLS-II SRF Collaboration (Fermilab, Jefferson Lab and SLAC with extensive help from DESY and CEA/Saclay). The cryogenic distribution system has progressed relatively well and there are valuable Lessons Learned. An overview of the status, accomplishments, problems encountered, solutions developed, and a summary of Lessons Learned will be presented.

43 PARTICLE ACCELERATORS↗

The Science Training Program for Young Italian Physicists and Engineers at Fermilab

The summer training program for Italian undergraduate and graduate students at the Department of Energy (DOE) laboratory of Fermilab (Batavia, Illinois, USA) started in 1984 as a 2 month training program for Italian undergraduate students in physics of the Istituto Nazionale di Fisica Nucleare (INFN) collaborating in the Collider Detector experiment (CDF) at the Fermilab Tevatron proton - antiproton collider. While in 1984 the program involved only 4 physics students from the University of Pisa, in the following years it rapidly grew in scope and size under the management of the Cultural Association of Italians at Fermilab (CAIF). With an average number of 30 trainees/year reached in the last few years, the total number of Italian students hosted at Fermilab since 1984 has exceeded 500 units. Since 2015 the program has been included in the portfolio of the summer courses of the University of Pisa, which acknowledges 6 ECTS to the interns.

Barzi, Emanuela↗

Fermilab Accelerator Complex: Status and Improvement Plans

Fermilab carries out an extensive program of accelerator-based high-energy particle physics research, which relies on 8 GeV and 120 GeV proton accelerators. Routine operations with 700 kW, 120 GeV proton beam power on a neutrino target was achieved in 2017. There are plans to further increase the beam power to the 900 kW range. The next major upgrade of the Fermilab accelerator complex, the PIP-II project, is under development. Its goal is to deliver 1.2 MW of beam power on target at the start of the DUNE experiment in the middle of the next decade. PIP-II will replace the existing 40-year old 400 MeV normal-conducting Linac with a modern 800 MeV superconducting RF based linear accelerator. There are several concepts for future upgrades that will increase the beam power to >2.4 MW, after replacement of the existing 8 GeV Booster synchrotron. The Muon Campus provides 3.1 GeV polarized muons to the g-2 experiment and will provide 8 kW of 8 GeV protons to the Mu2e production target. The Fermilab Test Beam Facility provides a primary 120 GeV proton beam of moderate intensity, (1-300 kHz) and secondary particle beams of energies down to about 1 GeV, consisting of hadrons, muons and/or electrons/photons for detectors tests. In this article we discuss the current performance of the Fermilab accelerator complex, the upgrade plans for the next two decades, and the accelerator R&D program to address cost and performance risks for these upgrades.

43 PARTICLE ACCELERATORS↗

Electron Cloud Studies at Fermilab

The presence of unwanted electrons in an accelerator vacuum chamber, known as E-cloud (E-cloud) can potentially cause operational problems in the Fermilab Main Injector (MI) and Recycler Ring (RR). E-cloud has caused instability in the RR in the past, and although it is not currently a problem, there is measurable E-cloud in the MI accelerator. There are planned beam intensity increases due to upgrades of the Fermilab accelerator complex, so E-cloud could become a problem. Some work has been done by others previously to understand how low SEY (Secondary Electron Yield coefficient) coatings might mitigate production of E-cloud, and to model the mechanism whereby E-cloud causes beam instability. Using previous studies as a base, this research took several approaches toward understanding the risk of E-cloud at Fermilab. The evolution of the SEY of the SS316L (stainless steel), TiN coated SS316L, and amorphous carbon coated SS316L were measured in-situ using a SEY meas urement station in the MI tunnel. The SEY of these materials change over time either due to bombardment of the E-cloud, or disruption of vacuum conditions. The SEY evolution was tracked over a several year period to find out how long it takes for the SEY of each material to reach its lowest level, and how much the SEY rises during deconditioning periods of poor vacuum. The SEY measurement results can be used to determine whether the SS316L will be a problem at upgrade intensities, and if so, whether or not TiN and A-Carbon coatings can mitigate E-cloud related problems sufficiently. Direct measurements of the E-cloud were done as well, and compared to simulation. The E-cloud bombardment rate was measured at different beam intensities and bunch lengths. It was possible to get detailed information on how the E-cloud varies over the acceleration cycle, where sensitivity to bunch length is reflected in the evolution of the E-cloud. The Retarding Field Analyzer (RFA) measuring th e E-cloud bombardment rate was near the instrument that is u! sed to measure the SEY of the beam pipe material. This proximity provided an accurate SEY value for simulations, so that the simulated E-cloud bombardment rate could be better compared to measurement. Bunch length measurements and computations generated accurate bunch length information also needed as input for simulations. After this careful control of the input parameters, the POSINST simulations of E-cloud were a good match to direct measurements. This gave confidence that predictions could be made concerning the E-cloud densities at upgrade intensities. These densities were compared against corresponding proton densities to predict the SEY required to avoid instabilities. That prediction and the information provided by the SEY measurements provide helpful information regarding the risks of E-cloud effects at future beam intensities at Fermilab.

43 PARTICLE ACCELERATORS↗

LArSoft and Future Framework Directions at Fermilab [Slides]

The diversity of the scientific goals across HEP experiments necessitates unique bodies of software tailored for achieving particular physics results. The challenge, however, is to identify the software that must be unique, and the code that is unnecessarily duplicated, which results in wasted effort and inhibits code maintainability. Fermilab has a history of supporting and developing software projects that are shared among HEP experiments. Fermilab's scientific computing division currently expends effort in maintaining and developing the LArSoft toolkit, used by liquid argon TPC experiments, as well as the event-processing framework technologies used by LArSoft, CMS, DUNE, and the majority of Fermilab-hosted experiments. As computing needs for DUNE and the HL-LHC become clearer, the computing models are being rethought. This talk will focus on Fermilab's plans for addressing the evolving software landscape as it relates to LArSoft and the event-processing frameworks, and how commonality among experiment software can be achieved while still supporting customizations necessary for a given experiment's physics goals.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

A Cost-Effective Upgrade Path for the Fermilab Accelerator Complex

The Fermilab Proton Improvement Plan II, or PIP-II, would enable the world's most intense high-energy neutrino beam and would help scientists search for rare particle physics processes. The PIP-II goal is to deliver 1.2 MW of proton beam power from the Fermilab Main Injector, over the energy range 60 - 120 GeV, at the start of operation of the LBNF/DUNE program. PIP-II provides a variety of upgrade paths to higher beam power from the Main Injector, as demanded by the neutrino science program and as recommended by the 2014 P5 report. Delivering more than 2 MW to the LBNF target in the future will require a replacement of the existing Booster. This report outlines a cost-effective Booster replacement option and an upgrade path for the Fermilab Accelerator Complex to attain 2.4-MW beam power on the LBNF target, as well as to retain the capability to provide 8-GeV proton beams to the existing Fermilab Muon Campus via the existing Recycler ring. Its cost-effectiveness is achieved by: (1) using a small-diameter metallic vacuum chamber in the Booster replacement and (2) reusing the existing Recycler ring. Reusing the Recycler ring may be of particular advantage since it is presently employed to deliver 8-GeV beams to the Muon Campus experiments. The present concept also retains such a capability.

43 PARTICLE ACCELERATORS↗

Accelerator challenges in the Fermilab Neutrino Program

In Fermilab's 2022-2023 proton complex run, Fermilab recovered from an unexpected failure in the neutrino focusing horn to achieve a record beam power of 960 kW. For Snowmass and P5, Fermilab recently proposed a new upgrade plan known as Accelerator Complex Evolution (ACE) to occur after PIP-II upgrade in tandem with DUNE/LBNF operation. The first phase of ACE, is the ACE Main Injector Ramp and Targetry upgrade, would raise the LBNF beam power from 1.2 MW to 2 MW by shortening the Main Injector cycle time to around 0.65s. The second phase of ACE, the ACE Booster Replacement, would replace the Booster with a new machine and achieve 2.4 MW for DUNE/LBNF. The core accelerator challenges, present and future, for operating intense neutrino beams at Fermilab will be highlighted.

43 PARTICLE ACCELERATORS↗

The Italian Summer Students Program at Fermilab and other US Laboratories: 40 years of education in particle physics and technology

Since 1983 the Italian groups collaborating with Fermilab (US) have been running a 2-month summer training program for Master students. While in the first year the program involved only 4 physics students, in the following years it was extended to engineering students. Many students have extended their collaboration with Fermilab with their Master Thesis and PhD. The program has involved almost 600 Italian students from more than 20 Italian universities. Each intern is supervised by a Fermilab Mentor responsible for the training program. Training programs spanned from Tevatron, CMS, Muon (g-2), Mu2e and SBN and DUNE design and data analysis, development of particle detectors, design of electronic and accelerator components, development of infrastructures and software for tera-data handling, quantum computing and research on superconductive elements and accelerating cavities. In 2015 the University of Pisa included the program within its own educational programs. Summer Students are enrolled at the University of Pisa for the duration of the internship and at the end of the internship they write summary reports on their achievements. After positive evaluation by a University of Pisa Examining Board, interns are acknowledged 6 ECTS credits for their Diploma Supplement. In the years 2020 and 2021 the program was canceled due to the sanitary emergency but in 2022 it was restarted and allowed a cohort of 21 students in 2022, and a cohort of 27 students in 2023 to be trained for nine weeks at Fermilab. We are now organizing the 2024 program.

Barzi, Emanuela↗

Baby Bison at Fermilab

Fermilab’s first director, Robert Wilson, established the bison herd in 1969 as a symbol of the history of the Midwestern prairie and the laboratory’s pioneering research at the frontiers of particle physics. The herd remains a major attraction for families and wildlife enthusiasts. A herd of pure bison is a natural fit for a prairie ecosystem, like the kind that exists on the Fermilab site. Fermilab hosts 1,100 acres of reconstructed tall-grass prairie. A baby bison was born at Fermilab on April 20, 2017. Here is that story.

99 GENERAL AND MISCELLANEOUS↗

Design of the cryogenic systems for the Near and Far LAr-TPC detectors of the Short-Baseline Neutrino program (SBN) at Fermilab

The Short-Baseline Neutrino (SBN) physics program at Fermilab and Neutrino Platform (NP) at CERN are part of the international Neutrino Program leading to the development of Long-Baseline Neutrino Facility/Deep Underground Neutrino Experiment (LBNF/DUNE) science project. The SBN program consisting of three Liquid Argon Time Projection Chamber (LAr-TPC) detectors positioned along the Booster Neutrino Beam (BNB) at Fermilab includes an existing detector known as MicroBooNE (170-ton LAr-TPC) plus two new experiments known as SBN’s Near Detector (SBND, ~260 tons) and SBN’s Far Detector (SBN-FD, ~760 tons). All three detectors have distinctly different design of their cryostats thus defining specific requirements for the cryogenic systems. Fermilab has already built two new facilities to house SBND and SBN-FD detectors. The cryogenic systems for these detectors are in various stages of design and construction with CERN and Fermilab being responsible for delivery of specific sub-systems. This contribution presents specific design requirements and typical implementation solutions for each sub-system of the SBND and SBN-FD cryogenic systems.

43 PARTICLE ACCELERATORS↗

LArSoft and Future Framework Directions at Fermilab

The diversity of the scientific goals across HEP experiments necessitates unique bodies of software tailored for achieving particular physics results. The challenge, however, is to identify the software that must be unique, and the code that is unnecessarily duplicated, which results in wasted eort and inhibits code maintainability. Fermilab has a history of supporting and developing software projects that are shared among HEP experiments. Fermilab’s scientific computing division currently expends eort in maintaining and developing the LArSoft toolkit, used by liquid argon TPC experiments, as well as the event-processing framework technologies used by LArSoft, CMS, DUNE, and the majority of Fermilab-hosted experiments. As computing needs for DUNE and the HL-LHC become clearer, the computing models are being rethought. Presented here are Fermilab’s plans for addressing the evolving software landscape as it relates to LArSoft and the data-processing frameworks, specifically as it relates to the DUNE experiment.

Knoepfel, Kyle↗

200 MV Record Voltage Of vCM And LCLS-II-HE Cryomodules Production Start At Fermilab

The Linac Coherent Light Source (LCLS) is an X-ray science facility at SLAC National Accelerator Laboratory. The LCLS-II project (an upgrade to LCLS) is in the commissioning phase; the LCLS-II-HE (High Energy) project is another upgrade to the facility, enabling higher energy operation. An electron beam is accelerated using superconducting radio frequency (SRF) cavities built into cryomodules. It is planned to build 24 1.3 GHz standard cryomodules and one 1.3 GHz single-cavity Buncher Capture Cavity (BCC) cryomodule for the LCLS-II-HE project. Fourteen of these standard cryomodules and the BCC are planned to be assembled and tested at Fermilab. Procurements for standard cryomodule components are nearing completion. The first LCLS-II-HE cryomodule, referred to as the verification cryomodule (vCM) was assembled and tested at Fermilab. Fermilab has completed the assembly of the second cryomodule. This paper presents LCLS-II-HE cryomodule production status at Fermilab, emphasizing the changes done based on the successes, challenges, mitigations, and lessons learned from LCLS-II; validation of the changes with the excellent vCM results.

43 PARTICLE ACCELERATORS↗