Fuel cell on-site integrated energy system parametric analysis of a residential complex

The use of phosphoric acid fuel cell powerplant to provide all the electricity required by an 81-unit garden apartment complex is studied. Byproduct heat is recovered and provides some of the heat required by the complex. The onsite integrated energy system contains energy conversion equipment including combinations of compression and absorption chillers, heat pumps, electric resistance heaters, and thermal storage. The annual fuel requirement for several onsite integrated energy systems as well as the fuel cell breakeven cost for one specific system were calculated. It is found that electrical efficiency cannot be traded off against thermal efficiency without paying a penalty in system efficiency.

Simons, S. N.↗

Study of fuel cell on-site, integrated energy systems in residential/commercial applications

Three building applications were selected for a detailed study: a low rise apartment building; a retail store, and a hospital. Building design data were then specified for each application, based on the design and construction of typical, actual buildings. Finally, a computerized building loads analysis program was used to estimate hourly end use load profiles for each building. Conventional and fuel cell based energy systems were designed and simulated for each building in each location. Based on the results of a computer simulation of each energy system, levelized annual costs and annual energy consumptions were calculated for all systems.

Wakefield, R. A.↗

Develop and test fuel cell powered on-site integrated total energy system. Phase 3: Full-scale power plant development

An integrated 5 kW power system based upon methanol fuel and a phosphoric acid fuel cell operating at about 473 K is described. Description includes test results of advanced fuel cell catalysts, a semiautomatic acid replenishment system and a completed 5 kW methanol/system reformer. The results of a preliminary system test on a reformer/stack/inverter combination are reported. An initial design for a 25 kW stack is presented. Experimental plans are outlined for data acquisition necessary for design of a 50 kW methanol/steam reformer. Activities related to complete mathematical modelling of the integrated power system, including wasteheat utilization, are described.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

A schematic and physical layout is given for the 5kW integrated system and the development status of individual components is described. The results of using a one dimensional mathematical model of the 5kW reformer are presented. Plans for a single-tube reformer test unit for the acquisition of temperature profile data are described. Tentative specifications for a 50kW dc-to-ac inverter are listed. Performance data are given on two 3-cell stacks incorporating semiautomatic acid replenishment systems and improved electrocatalysts. A qualification test on methanol/steam reforming catalyst T2107RS is reported, including a portion in which the catalyst was deliberately poisoned with 800 ppm ethanol in the feed.

Source record↗

Develop and test fuel cell powered on-site integrated total energy system

Satisfactory performance is reported for the first 12-cell sub-stack of the 5 kW rebuild using improved ABA reactant distribution plates. Construction and test results are described for the first full-sized single-cell test (0.33 m x 0.56 m). Test duration was 450 hours. Plans are outlined for construction and testing of two methanol reformer units based on commercially-available shell-and-tube heat exchangers. A 5 kW-equivalent precursor and a 50 kW-equivalent prototype will be built. Supporting design and single-tube experimental data are presented. Stack support efforts are summarized on corrosion currents of graphite materials and acid-management of single-cell test facilities. Comparative properties are summarized for the two methanol/steam reforming catalysts evauated under Task V (now completed); T2107RS and C70-2RS.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Satisfactory performance is reported for the first three 12-cell sub-stacks of the 5 kW stack rebuild. Early general conclusions are presented from an economic study. Results are reported on a successful 700-hour test of a 3-cell stack in the full-sized configuration (0.33m x 0.56m). Construction of a 5 kW equivalent methanol/steam reformer based on a commercial shell-and-tube heat exchanger was completed. Several test runs are summarized. Preliminary conclusions are presented on the technical and economic aspects of fuel cell/HVAC interaction. Physical data are presented on several dense graphite materials which are candidates for gas-distribution plates. Performance of a new cathode catalyst is reported.

Source record↗

Develop and test fuel cell powered on-site integrated total energy systems

On-going testing of an 11 cell, 10.7 in. x 14 in. stack (about 1 kW) reached 2600 hours on steady load. Nonmetallic cooling plates and an automated electrolyte replenishment system continued to perform well. A 10 cell, 10.7 in. x 14 in. stack was constructed with a modified electrolyte matrix configuration for the purpose of reducing cell IR loss. The desired effect was achieved, but the general cell performance level was irregular. Evaluation is continuing. Preparations for a long term 25 cell, 13 in. x 23 in. test stack (about 4 kW) approached completion. Start up in early May 1984 is expected.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

Two 25-cell, 13 inch x 23 inch (4kW) stacks were started up to evaluate the reliability of component and stack technology developed through the end of 1983. Both stacks started up well and are running satisfactorily on hydrogen-air after 1900 hours and 800 hours, respectively. A synthetic-reformat mixing station is nearing completion, and both stacks will be operated on reformate fuel. A stack-protection control system was placed in operation for Stack No. 2, and a similar set-up is in preparation for Stack No. 1. This system serves to change operating conditions or shut the stack down to avoid deleterious effects from nonstack-related upsets. The capability will greatly improve changes of obtaining meaningful long-term test data.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

Two 25 cell stacks of the 13 inch x 23 inch cell size (about 4kW) remain on test after 4000 hours and 2900 hours, respectively, using simulated reformate fuel. These tests are focusing on the durability of fuel cell stack components developed through the end of 1983. Also, these stacks are serving as forerunners of a 25kW stack that will contain 175 cells of the same size and will employ the same technology base. The stack technology development program has focused on a new, low cost bipolar plate edge seal technique and evaluation of advanced cathode catalysts, an electrolyte replenishment system, and nonmetallic cooling plates in small stacks.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems: Phase 3, full-scale power plant development

A 25 cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 6000 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests were carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. In light of the favorable results obtained, a 25kW stack that will contain 175 cells of the same size is being constructed using the same technology base. The components for the 25kW stack have been completed. A methanol steam reformer with a design output equivalent to 50kW has been constructed to serve as a hydrogen generator for the 25kW stack. This reformer and the balance of the fuel processing sub system are currently being tested and debugged. The stack technology development program focused on cost reduction in bipolar plates, nonmetallic cooling plates, and current collecting plates; more stable cathode catalyst support materials; more corrosion resistant metal hardware; and shutdown/start up tolerance.

Kaufman, A.↗

Develop and test fuel cell powered on site integrated total energy systems. Phase 3: Full-scale power plant development

The third in a series of 4kW stacks, consisting of 24 cells of the 13 inch x 23 inch cell size, has been on test for about 1600 hours. This stack is similar to the first two stacks, which ran 7000 and 8400 hours, respectively. The present stack incorporates technology improvements relating to the electrolyte-matrix, the current-collector assembly, and a reduction in the number of cooling plates. Performance is currently averaging about 0.64 per cell at 161 mA sq cm.

Kaufman, A.↗

Develop and test fuel cell powered on-site integrated total energy systems. Phase 3: Full-scale power plant development

The testing of two 25-cell stacks of the 13 inch x 23 inch cell size (about 4kW) was carried out for 7000 and 8400 hours, respectively. A 25kW stack containing 175 cells of the same size and based on the same technology was constructed and is on test. A third 4kW stack, which will contain 24 cells, will comprise several new technology features; these will be assesed for performance and durability in long-term testing.

Kaufman, A.↗

Develop and test fuel cell powered on site integrated total energy sysems: Phase 3: Full-scale power plant development

A 25-cell stack of the 13 inch x 23 inch cell size (about 4kW) remains on test after 8300 hours, using simulated reformate fuel. A similar stack was previously shut down after 7000 hours on load. These tests have been carried out for the purpose of assessing the durability of fuel cell stack components developed through the end of 1983. A 25kW stack containing 175 cells of the same size and utilizing a technology base representative of the 25-cell stacks has been constructed and is undergoing initial testing. A third 4kW stack is being prepared, and this stack will incorporate several new technology features.

Kaufman, A.↗

Adaptable Monitoring Package Development and Deployment: Lessons Learned for Integrated Instrumentation at Marine Energy Sites

Integrated instrumentation packages are an attractive option for environmental and ecological monitoring at marine energy sites, as they can support a range of sensors in a form factor compact enough for the operational constraints posed by energetic waves and currents. Here we present details of the architecture and performance for one such system—the Adaptable Monitoring Package—which supports active acoustic, passive acoustic, and optical sensing to quantify the physical environment and animal presence at marine energy sites. we describe cabled and autonomous deployments and contrast the relatively limited system capabilities in an autonomous operating mode with more expansive capabilities, including real-time data processing, afforded by shore power or in situ power harvesting from waves. Across these deployments, we describe sensor performance, outcomes for biological target classification algorithms using data from multibeam sonars and optical cameras, and the effectiveness of measures to limit biofouling and corrosion. On the basis of these experiences, we discuss the demonstrated requirements for integrated instrumentation, possible operational concepts for monitoring the environmental and ecological effects of marine energy converters using such systems, and the engineering trade-offs inherent in their development. Overall, we find that integrated instrumentation can provide powerful capabilities for observing rare events, managing the volume of data collected, and mitigating potential bias to marine animal behavior. These capabilities may be as relevant to the broader oceanographic community as they are to the emerging marine energy sector.

16 TIDAL AND WAVE POWER↗

Appropriate assessment of plans in England

'Appropriate assessment' of plans and projects is required under the European Habitats Directive. It assesses whether a plan or project, 'in combination', could affect the 'integrity' of sites of international nature conservation importance in Europe. It is very precautionary: plans or projects that could affect site integrity may not be adopted unless a series of stringent requirements-testing of alternatives, proof of overriding need, and provision of compensation-are met. Appropriate assessment of plans began to be carried out in England in early 2006. Since then, various guidance documents have been published, but there is still considerable debate about just what methodology should be used, how to test impacts on site 'integrity', what avoidance and mitigation measures are adequate, who should be responsible for these measures etc., and even about what the process should be called. The first legal challenges based on appropriate assessment of plans are emerging. Appropriate assessments are showing that many English plans could affect European sites, either directly through land take, or indirectly by, for instance, reducing water levels or increasing recreational disturbance. The question now is how to respond to the clash between people's aspirations for new homes and economic growth, and wildlife conservation. This article discusses the legal requirements and emerging guidance on appropriate assessment of plans in England, how it relates to strategic environmental assessment, the current status of these assessments, and emerging issues.

07 ISOTOPE AND RADIATION SOURCES↗

Evaluating Probability of Containment Effectiveness at a GCS Sites using integrated assessment modeling approach with Bayesian decision Networks

Improved scientific and engineering understanding of the behavior of geologic CO2 storage together with established regulatory framework and incentive structures raise the prospects for accelerated, large-scale deployment of this greenhouse gas emissions reduction approach. Incentive structures call for the establishment of appropriate verification and accounting approaches to support claims of the integrity of a geologic storage complex and to justify taking credit for long-term storage. In this study, we present a framework for assessing the probability of containment effectiveness over the lifetime of a geologic carbon storage site (e.g., after 70 years of injection and post-injection site performance) using forward stochastic model realizations based on site characterization data and using a monitoring-informed Bayesian network based on hypothetical detectability from surface seismic surveys over the site injection and post-injection phases. The National Risk Assessment Partnership’s open-source Integrated Assessment Model (NRAP-Open-IAM) was utilized to develop an ensemble of 10,000 a priori stochastic forecasts of CO2 containment. Those simulations were used to train the Bayesian network model to estimate the prior probabilities of the CO2 leakage mass into overlying, monitorable aquifers considering the uncertainties in the reservoir properties, permeability of potentially leaky wells and the overlying aquifers. The conditional probabilities in the Bayesian network were either learned from the NRAP-Open-IAM simulations or derived from the predefined detection thresholds for the monitoring method. Observations obtained from monitoring, over time during the site operation phases were then used to generate updated posterior probabilities of containment (and any loss from containment) in the Bayesian network by propagating the prior probabilities through the conditional probabilities. We demonstrate how to construct and use the Bayesian network for verifying the long-term storage complex effectiveness informed by monitoring based on the NRAP-Open-IAM simulations previously developed for the FutureGen 2.0 site. This approach may have relevance for stake holders to demonstrate secure geologic storage, provide a defensible, probabilistic approach to claim credit for geologic storage, and to estimate the likelihood that any fraction of the claimed credit may need to be refunded to the creditor based on available monitoring information.

Bayesian network, Risk assessment, Monitoring, car↗