Integrated Cryogenic Battery and Electronics Development for Lunar Surface Power Systems
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Lunar igneous rocks, properly interpreted, can give useful information about mineral assemblages and mineral chemistry as a function of depth in the lunar interior. Though intensely brecciated, terra rocks reveal, in their chemistry, evidence for a magmatic history. Partial melting of feldspathic lunar crustal material occurred in the interval 4.6 to 3.9 Gy. Melting of ilmenite-bearing cumulates at depths near 100 km produced parent magmas for Apollo 11 and 17 titaniferous mare basalts in the interval 3.8 to 3.6 Gy. Melting of ilmenite-free olivine pyroxenites (also cumulates?) at depths greater than 200 km produced low-titanium mare basalts in the interval 3.4 to 3.1 Gy. No younger igneous rocks have yet been recognized among the lunar samples and present-day melting seems to be limited to depths greater than 1000 km.
Session 13 of the Thirty-Fifth Lunar and Planetary Science Conference that took place on Tuesday, March 16, 2004. This session includes reports on asteroids, meteors, and comets. The attached document is a listing of all reports included in this session. The full text documents for each report is available in the Related Records section.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.
The 34th Lunar and Planetary Science Conference was held March 17-21, 2003. Topics included planetary exploration, crater research on Mars, Earth, Moon, and other planets or satellites, imaging techniques and image analysis, age determination, albedo studies, petrographic studies, isotope composition studies, instrument design, sampling methods, landform analysis, asteroids, impact analysis, impact melts, and related research.
Preparing payloads for the lunar surface requires rigorous testing that accurately captures the extreme environmental and operational conditions. This presentation provides an overview of the lunar relevant test capabilities at NASA JSC’s Astromaterials Research and Exploration Science (ARES) laboratories as well as the Energy System Test Area (ESTA) Lunar Development and Test Facility. These facilities allow teams to assess hardware performance in dusty vacuum environments, characterize interactions with high fidelity lunar regolith simulants, evaluate mechanical and thermal durability, and understand the effects of micrometeoroid and orbital debris impacts—critical factors for certifying payloads that will operate on the lunar surface or in orbit. While Lunar power challenges such as variable illumination, extreme temperatures, and dust driven degradation will be briefly summarized, the focus of this talk is on how JSC’s test infrastructure enables developers to validate designs, reduce mission risk, and ensure compatibility with CLPS and Artemis objectives. NASA JSC’s expertise and experience help industry, academic, and government teams prepare robust hardware ready for successful delivery and operation on the surface of the Moon.
Explore the source record for details and available documents.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. Presented is the system thermal vacuum test plan and configuration to validate the thermal control system performance in a flight-like environment. The test will measure the nighttime heat leaks for the bus and 18 seismometers to ensure lunar night survival and operability.
Some topics covered: Implications of internal fragmentation on the structure of comets; Atmospheric excitation of mars polar motion; Dunite viscosity dependence on oxygen fugacity; Cross profile and volume analysis of bahram valles on mars; Calculations of the fluxes of 10-250 kV lunar leakage gamma rays; Alluvian fans on mars; Investigating the sources of the apollo 14 high-Al mare basalts; Relationship of coronae, regional plains and rift zones on venus; and Chemical differentiation and internal structure of europa and callisto.
Behavior of Ullage Bubbles during Blowdown in Low-g Experiment (BUBBLE) is a cryogenic tank depressurization drop tower experiment currently being designed at NASA Glenn Research Center. There is a need for liquid level rise data while venting a cryogenic propellant tank below the liquid saturation pressure in a reduced gravity environment. When a cryogenic tank is vented to a vapor pressure below the liquid saturation pressure, bubbles become entrained in the liquid causing the bulk liquid-vapor interface to rise. In reduced gravity, bubble rise velocity is diminished leading to a larger liquid level rise compared to a 1g environment. The purpose of the experiment is to gain further understanding of tank depressurization fluid physics and obtain high-fidelity data for model validation in 1g and reduced gravity environments. On-orbit cryogenic propellant tanks operating at high fill levels must efficiently manage venting operations to avoid the risk of liquid entrainment in the vent line, which could lead to asymmetric control thruster loads, freezing and clogging, and loss of liquid propellant. Validated models could be used to design settling and venting profiles to reduce risk and increase efficiency for cryogenic storage and transfer operations.
The Lunar and Planetary X-Ray Diffraction Program consists of three concurrent efforts aimed at rapid development of a first-generation flight-instrument system, evaluation of potential advances in diffractometer components for a possible second-generation instrument, and full investigation of the capabilities and limitations of rock analysis by X-ray diffraction. More complete descriptions of each of these studies are given below; the papers which follow are grouped according to these subjects in Sections II through V.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.
The Lunar Environment Monitoring Station (LEMS) is an autonomous, survive-the-lunar-night seismic suite to be deployed on the Lunar surface by the Artemis III crew and designed to operate continuously for two years. It will see the extremes of the Lunar south pole thermal environment where surface temperatures range from -200°C to +20°C and where nighttime duration is at least 354 hours. Given power and mass constraints, the thermal system is limited to 2.5 Watts of heat during the lunar night. The electrical harnessing named the Signal and Power Passthrough (SAPP) was designed to minimize heat loss while meeting power and signal integrity requirements. To mitigate risk due to uncertainty associated with the harnessing materials, routing, and tie-downs, a flight-like thermal conductance test was performed to measure the heat loss. The test methodology, results, and model correlation are presented.